655
|
Thu Jul 10 14:59:01 2008 |
rob | Update | Locking | RF common mode at zero offset | [I]rob, john, yoichi[/I]
[SIZE=3][FONT=Comic Sans MS]Last night we |
 |
654
|
Thu Jul 10 13:47:12 2008 |
Yoichi | HowTo | Computers | svn access via https | Now you can access to the svn repository on
nodus by https.
To perform a checkout, you can use the following |
|
653
|
Wed Jul 9 17:58:19 2008 |
John | Summary | General | Illuminator alarms | This morning some time was wasted on alignment
due to the illuminators.
|
|
652
|
Wed Jul 9 15:04:22 2008 |
steve | Metaphysics | Photos | SURFs helping hands | Surf students are helping out with baffle
cleaning. |
|
651
|
Wed Jul 9 12:42:14 2008 |
John | Update | Locking | Hand off to RF CARM | Rob, Yoichi, John
Last night we were able to reduce the CARM |
|
650
|
Tue Jul 8 21:58:22 2008 |
alberto | Update | General | Secondaty beam aligned to the IFO beam again | Yesterday the alignment of the secondary beam
to the IFO was completely lost and today
I had to realign all the optics before I |
|
649
|
Tue Jul 8 21:46:38 2008 |
Yoichi | Configuration | PSL | GC650M moved to the PMC transmission | I moved a GC650M, which was monitoring the
light coming out of the PSL, to the transmission
port of the PMC to see the transmitted mode |
|
648
|
Tue Jul 8 12:25:54 2008 |
John | Summary | PSL | ISS gain set to 2dB | |
|
647
|
Tue Jul 8 10:26:30 2008 |
Masha | Update | Auxiliary locking | setup updates | Yesterday I changed one of the beam splitters
in the Mach Zehnder to one with a more stable
mount as to reduce the system's coupling |
|
646
|
Tue Jul 8 10:20:10 2008 |
steve | Update | PEM | HEPA turned on | It is specially important to run the PSL-HEPA
filters when inside counts is peaking at
30,000 counts
|
|
645
|
Tue Jul 8 08:16:56 2008 |
steve | Update | PSL | PMC problem | The PMC is unhappy. PMC auto locker is not
working.
DC output slider adjust has to be moved from |
|
644
|
Tue Jul 8 00:14:28 2008 |
John | Summary | Computers | Alarm handler | Rob thought it would be nice to have some
alarms on the cpu loads and FE syncs.
I added all these channels to the alarm handler |
|
643
|
Mon Jul 7 19:15:38 2008 |
Alberto | Update | General | Optics alignement on the ABS length experiment | Today I started setting up the PLL instruments
to lock the frequency of the NPRO beam to
the IFO beam. with no need of a new alignment |
|
642
|
Mon Jul 7 16:30:08 2008 |
steve | Update | PSL | PSL-PEM 16 days trend | This morning the laser head temp was up to
20.3C because the laser chiller was overflowing.
I removed 700 cc water.
|
|
641
|
Mon Jul 7 14:02:05 2008 |
Yoichi | Update | Computers | SVN conversion progress | So far /cvs/cds/caltech/medm, /cvs/cds/caltech/chans
and /cvs/cds/caltech/scripts have been converted
to svn working copies.
|
|
640
|
Mon Jul 7 13:58:37 2008 |
Eric, josephb | DAQ | PEM | Using unused PEM channels to test camera code | Joe and I have taken control of the EPICS
channels C1:PEM-Stacis_EEEX_geo and C1:PEM-Stacis_EEEY_geo
since we heard that they are no longer in |
|
639
|
Mon Jul 7 13:49:27 2008 |
Yoichi | HowTo | PSL | MZ offset, gain tips | John, Yoichi
This morning John found that MZ servo is |
|
638
|
Mon Jul 7 13:06:38 2008 |
Koji | Update | General | Beats of the two lasers in the absolute length measurement observed | One may need an RF filter after the mixer.
I expect the SR560 does work for this purpose.
If it does not, a passive LPF can be used.
|
|
637
|
Mon Jul 7 11:22:02 2008 |
Alberto | Update | General | Beats of the two lasers in the absolute length measurement observed | I didn't post a screenshot from the RF SA
because I had troubles with the interface
with the computer (unfortunately the network |
|
636
|
Sun Jul 6 16:17:40 2008 |
tobin | HowTo | Computers | SVN | I was able to check out the 40m SVN here in
Livingston using this command:
|
|
635
|
Thu Jul 3 22:54:45 2008 |
Koji | Update | General | Beats of the two lasers in the absolute length measurement observed | Great! Conguraturation! I wish if I could
see it! It's nice if you can put the photo
or anything of the RF spectrum analyzer.
|
|
634
|
Thu Jul 3 18:48:09 2008 |
Alberto | Update | General | Beats of the two lasers in the absolute length measurement observed | I adjusted the alignment of the flipper mirror
as suggested by Koji making the two beam
spots match. I also aligned all the IFO mirrors |
|
633
|
Thu Jul 3 16:57:23 2008 |
John | Summary | General | FSS_RMTEMP | The FSS room temp alarm has been beeping a
lot recently. I altered the FSS_RMTEMP alarm
levels using the
|
 |
632
|
Thu Jul 3 16:18:51 2008 |
rob | Summary | Locking | specgrams | I used ligoDV to make some spectrograms of
DARM_ERR (1), QPDX (2), and QPDY (3). These
show the massive instability from 30-40Hz |
  |
631
|
Thu Jul 3 13:54:26 2008 |
rob | Configuration | Computers | mDV on rosalba |
Does mDV work on rosalba? It can't find
[B][FONT=Courier New]NDS_GetChannels[/FONT][/B]. |
|
630
|
Thu Jul 3 13:12:32 2008 |
Rob, Yoichi, John | Update | Locking | More oscillations | Bounce/ roll filters were added to the short
degrees of freedom to reduce the effect of
the 24Hz line seen on Tuesday night.
|
  |
629
|
Thu Jul 3 12:36:05 2008 |
Jonh | Summary | SUS | ETMY watchdog | ETMY watchdog was tripped. I turned it off
and re-enabled the outputs. |
|
628
|
Thu Jul 3 11:53:30 2008 |
Koji | Update | General | Status of the alignment of the NPRO beam for the Absolute Length Measurement | The method itself looked fine.
Use of the one arm configuration will make |
|
627
|
Wed Jul 2 19:15:52 2008 |
Alberto | Update | General | Status of the alignment of the NPRO beam for the Absolute Length Measurement | Today I've tried to bring the frequency of
the NPRO laser close enough to that of the
IFO beam so that the beat between the two |
 |
626
|
Wed Jul 2 18:30:01 2008 |
John | Update | IOO | QPD alignment | I aligned the beams on the following QPDs
IP POS
|
 |
625
|
Wed Jul 2 17:19:03 2008 |
John | Summary | Computers | op440m - shutdown and restarted | After 160days op440m was getting a little
slow. |
|
624
|
Wed Jul 2 15:14:42 2008 |
steve | Update | General | added beam traps | I placed baked razor beam trap after INJ_SM1
and flipper in the injection path on the
AP table
|
|
623
|
Wed Jul 2 13:56:10 2008 |
Rob, Yoichi, John | Update | Locking | 24.5 Hz resonance | Work continues on trying to reduce the CARM
offset using dc signals from PO_DC. Got up
to arm powers of
|
|
622
|
Wed Jul 2 10:35:02 2008 |
Eric | Summary | Cameras | General Summary | I finished up the 2D Gaussian fitting code,
and, along with Joe, integrated into the
Snap software so that it automatically does |
   |
621
|
Wed Jul 2 06:46:05 2008 |
Alberto | Configuration | General | NPRO on to warm up | This morning I turned on the NPRO on the AP
table so that it can warm up for a few hours
before I start using it today.
|
|
620
|
Wed Jul 2 00:59:13 2008 |
Masha | Update | Auxiliary locking | balanced detection, noise plots, progress | Progress report submitted today(!). It is
on the 40m wiki page. Below is a figure of
some estimated noise sources.
|
 |
619
|
Tue Jul 1 21:54:05 2008 |
Koji | Update | General | Re: Abs. Length Meas. setup | I tried to look for the beating in the signal
from the PD but I couldn't find. I had the
temperature of the laser initially set to |
|
618
|
Tue Jul 1 21:45:48 2008 |
John | Update | PSL | Mach Zehnder script and screen | I've edited C1: PSL_MACH_ZEHNDER.adl and /cvs/cds/caltech/scripts/PSL/MZ/lockMZ
to reflect the changes described in entry
#616. |
|
617
|
Tue Jul 1 21:27:27 2008 |
rob | HowTo | Computer Scripts / Programs | slider twiddling after reboot |
Sometimes after we reboot the front-end machines,
some of the hardware gets stuck in an unknown |
|
616
|
Tue Jul 1 16:48:42 2008 |
rob, john | Configuration | PSL | MZ servo switch problem resolved forever | [quote]C1:PSL-MZ_BLANK switch (to turn on/off
the servo) is not working again. The switch
is always off regardless of the epics state.
|
|
615
|
Tue Jul 1 14:24:58 2008 |
rob | HowTo | Computer Scripts / Programs | conlog time machine |
I've written a perl script (now in the $SCRIPTS/general
directory) which implements a "conlog restore" |
|
614
|
Tue Jul 1 13:34:29 2008 |
rob | Update | Computers | RFM network back | [quote]
For some reason, the computers requiring
startup.cmd (like c1lsc) halt after running |
|
613
|
Tue Jul 1 12:51:34 2008 |
John | Summary | General | IFO alignment | Rana, Rob, Yoichi, John
The recent computer problems and MZ work |
|
612
|
Tue Jul 1 12:08:38 2008 |
John, Joe | Configuration | PSL | PMC input PD | Joe and I switched cables so that the PMCR
screen actually shows reflection not transmission.
|
|
611
|
Tue Jul 1 11:57:24 2008 |
Yoichi | Configuration | PSL | MZ servo switch problem again | C1:PSL-MZ_BLANK switch (to turn on/off the
servo) is not working again. The switch is
always off regardless of the epics state.
|
|
610
|
Tue Jul 1 11:53:38 2008 |
Yoichi | Update | Computers | RFM network back | I took a tour of the FE machines and power
cycled all of them.
After executing the software restart procedures |
|
609
|
Tue Jul 1 10:15:22 2008 |
steve | Update | PSL | eventfull two days | The laser recovered from a short temp rise.
The MZ was aligned and realigned. The suspentions
were kicked up accidentally.
|
|
608
|
Tue Jul 1 09:26:33 2008 |
steve | Update | Computers | RFM network is down | |
|
607
|
Mon Jun 30 18:36:01 2008 |
Yoichi | Update | PSL | MZ alignment again | John, Yoichi
We re-adjusted the MZ alignment. The reason |
|
606
|
Mon Jun 30 16:00:02 2008 |
josephb, sam | Configuration | Computers | | Sam and I setup Cat6 cable from Megatron to
the 1Y6 Switch (131.215.113.252) and also
connected the 1Y6 Hub to the control room |
|