Tue Jun 5 09:32:12 2012, steve, Update, SUS, PRM oscillation
| +
Tue Jun 5 09:44:14 2012, steve, Update, PSL, ref cavity ion pump must be pumped
| +
Tue Jun 5 14:17:14 2012, steve, Update, PEM, air cond maintenance
| +
Wed Jun 6 09:27:09 2012, steve, Update, SUS, PRM damping restored
|
Wed Jun 6 14:17:56 2012, steve, Update, Computers, iMac ordered
| +
Wed Jun 6 14:36:58 2012, steve, Update, SUS, ETMY oplev work finished
| +
Thu Jun 7 08:12:20 2012, steve, Update, SUS, PRM is still oscillating
| +
Thu Jun 7 09:52:05 2012, steve, Update, PEM, air cond maintenance
| +
Fri Jun 8 15:24:08 2012, steve, Update, VAC, RGA scan at day 276 and pressure plots  
| +
Mon Jun 11 09:37:16 2012, steve, Update, IOO, PMC locked
| +
Tue Jun 12 16:33:32 2012, steve, Update, SUS, PRM oplevs servo ON for confirmation
| +
Tue Jun 12 17:04:55 2012, steve, Update, SUS, PRM oplevs servo is still bad
|
Wed Jun 13 11:19:05 2012, steve, Update, SUS, IDC receptacles clamped
|
Thu Jun 21 09:01:18 2012, steve, Update, STACIS, the resurrection of STACIS -surf
| +
Thu Jun 21 09:10:08 2012, steve, Update, PEM, flow bench must be running all times
|
Thu Jun 21 15:00:55 2012, steve, Update, SAFETY, SURFs 2012 safety training
| +
Sat Jun 23 18:44:15 2012, steve, Update, General, power surge has no effect on the lab
| +
Mon Jun 25 08:21:40 2012, steve, Update, General, AC power disturbance on Sat
| +
Fri Jun 29 11:02:00 2012, steve, Update, VAC, the vent is at 500 torr 
| +
Fri Jun 29 13:11:31 2012, steve, Update, VAC, 40m IFO at atm 
| +
Sat Jun 30 18:31:38 2012, steve, Update, IOO, input telescope beam clipping on Faraday
| +
Tue Jul 3 17:23:50 2012, steve, Update, VAC, pumpdown completed  
|
Fri Jul 6 08:38:04 2012, steve, Update, Computers, time out
| +
Fri Jul 6 09:27:40 2012, steve, Update, VAC, 4 days at atm
| +
Fri Jul 6 09:52:35 2012, steve, Update, VAC, pump down hick up 
| +
Wed Jul 11 11:18:21 2012, steve, Update, PEM, more seismic noise next week
|
Thu Jul 12 16:27:04 2012, steve, Update, VAC, drypump changed
| +
Fri Jul 27 14:28:36 2012, steve, Update, VAC, cold cathode gauges
| +
Mon Jul 30 09:00:18 2012, steve, Update, PSL, PMC is still not fixed 
| +
Mon Jul 30 15:49:16 2012, steve, Update, VAC, cc1 switched
| +
Tue Jul 31 08:01:22 2012, steve, Update, VAC, cc1 switched
| +
Wed Aug 1 16:38:46 2012, steve, Update, SUS, spare SRMU 03 optic moved  
| +
Mon Aug 6 07:59:33 2012, steve, Update, SUS, PRM oplevs servo is still bad
|
Mon Aug 6 09:46:31 2012, steve, Update, IOO, poweroutage turns laser off
| +
Mon Aug 6 10:53:32 2012, steve, Update, VAC, status: vauum normal
|
Mon Aug 6 16:48:43 2012, steve, Update, SUS, SRM oplev is clipping
| +
Tue Aug 7 16:11:23 2012, steve, Update, SUS, optical table box wall proposal 
| +
Sun Aug 12 01:21:26 2012, steve, Update, SAFETY, exit door left unlocked
| +
Mon Aug 13 15:31:09 2012, steve, Update, General, larger optical tables at the ends 
| +
Wed Aug 15 16:01:47 2012, steve, Update, General, larger optical tables at the ends ?
| +
Wed Aug 22 11:41:20 2012, steve, Update, General, grout plate for optical table at the ends 
| +
Mon Oct 1 17:03:01 2012, steve, Update, SUS, ETMY oplev relayed
| +
Fri Oct 12 16:59:26 2012, steve, Update, SUS, TT PITCH damping
| +
Mon Oct 15 08:08:33 2012, steve, Update, SUS, PRM damping restored
| +
Thu Nov 1 08:48:42 2012, steve, Update, Alignment, progress, then setback - trend of BS table shift  
| +
Fri Dec 14 09:05:04 2012, steve, Update, PEM, TT after eq 6.1
| +
Wed Mar 6 11:33:09 2013, steve, Update, SAFETY, safety audit 2013
| +
Wed Mar 13 16:04:24 2013, steve, Update, SAFETY, laser safety glasses checked
| +
Tue Mar 19 10:30:00 2013, steve, Update, SAFETY, crane inspection 2013 
| +
Fri May 31 10:25:17 2013, steve, Update, safety, first aid kits refilled
|
|