40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 323 of 327  Not logged in ELOG logo
    Reply  Thu Apr 8 10:24:33 2010, Alberto, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent 
    Reply  Fri Apr 9 06:45:28 2010, Alberto, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent 
Entry  Sun Apr 11 13:51:04 2010, Alberto, Omnistructure, Computers, Where are the laptops? 
Entry  Mon Apr 12 16:20:05 2010, Alberto, Configuration, 40m Upgrading, REFL55 improved 2010-04-12_REFL55_TF_model_to_meas_comparison.png
    Reply  Mon Apr 12 17:09:30 2010, Alberto, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent 2010-04-09_REFL11NoiseMeasurements.png
    Reply  Thu Apr 22 21:42:24 2010, Alberto, Update, PSL, Innolight 2W Vertical Beam Profile 
    Reply  Wed Apr 28 14:15:58 2010, Alberto, Update, IOO, MC alignment 
Entry  Mon May 3 19:21:43 2010, Alberto, DAQ, Environment, Boot fest 
Entry  Wed May 5 16:32:39 2010, Alberto, Update, 40m Upgrading, New REFL55 PD, 11MHz rejection 2010-05-05_REFL55_CalibratedOpticalResponse0-60MHz.png
Entry  Thu May 6 16:18:37 2010, Alberto, Update, 40m Upgrading, New improved design for the 11MHz photodiode pox11.pdf
    Reply  Thu May 6 19:57:26 2010, Alberto, Update, 40m Upgrading, New improved design for the 11MHz photodiode pox11.pdf
    Reply  Fri May 7 18:18:02 2010, Alberto, Update, 40m Upgrading, New improved design for the 11MHz photodiode 
Entry  Mon May 10 16:59:35 2010, Alberto, Update, 40m Upgrading, Unexpected oscilaltionin the POY11 PD 2010-05-10_POY11_CalibratedOpticalResponse0-500MHz.pngPOX11.png
Entry  Mon May 10 19:29:33 2010, Alberto, HowTo, Electronics, New Focus 1811 PD calibrated against New Focus 1611 PD 
Entry  Wed May 12 17:10:16 2010, Alberto, Update, 40m Upgrading, RF frequency generation box - step 0 DSC_1499_small.JPG
Entry  Wed May 12 23:31:17 2010, Alberto, Update, 40m Upgrading, 216 MHz resonance in the POY11 PD killed POX11.png2010-05-12_POY11_CalibratedOpticalResponse0-500MHz.png
Entry  Fri May 21 11:56:34 2010, Alberto, Update, 40m Upgrading, 40mUpgrade Field Power and RF Power Spectrum at the ports. 38m/38.55m arm length issue. 7x
Entry  Fri May 21 16:27:45 2010, Alberto, Omnistructure, Environment, The control room is molding... 
Entry  Wed May 26 17:10:09 2010, Alberto, Update, 40m Upgrading, RF Generation box Visio-frequencyGenerationBox_wiringSchematic.png
Entry  Wed May 26 22:22:03 2010, Alberto, Configuration, 40m Upgrading, Arm cavity length reflRFpowerVsArmLength_3658m.pngreflRFpowerVsArmLength_3750m.png
Entry  Thu May 27 12:52:02 2010, Alberto, Update, 40m Upgrading, Arm lengths 
Entry  Fri May 28 07:13:05 2010, Alberto, Frogs, Green Locking, SR785 found abandoned next to the workbenches 
Entry  Fri May 28 21:32:32 2010, Alberto, Update, 40m Upgrading, MC alignment 
Entry  Sun May 30 15:33:21 2010, Alberto, Configuration, IOO, mode cleaner and air conditioning 
Entry  Sun May 30 15:36:22 2010, Alberto, Configuration, PSL, IMC periscope shutter 
Entry  Tue Jun 1 16:29:51 2010, Alberto, Update, IOO, MC transmitted beam aligned to the Faraday; next things to do 
    Reply  Mon Jun 7 07:39:38 2010, Alberto, Omnistructure, Electronics, Capacitor Bridge Test 
    Reply  Thu Jun 10 07:53:14 2010, Alberto, Update, PEM, LaTeXlabs 
    Reply  Thu Jun 10 11:10:21 2010, Alberto, Update, General, LaTeXlabs 
Entry  Sat Jun 12 19:41:04 2010, Alberto, Update, Locking, 40m Upgrade Optickle Model optickleIFOworkingpoint.pdf
Entry  Sat Jun 12 19:43:19 2010, Alberto, Update, WIKI-40M Update, IFO modeling Wiki Page updated 
    Reply  Wed Jun 16 18:44:07 2010, Alberto, Configuration, Computers, 40MARS 
Entry  Thu Jun 17 17:09:44 2010, Alberto, Update, LSC, Short Cavity Length Adjustments 
    Reply  Fri Jun 18 15:07:26 2010, Alberto, Update, LSC, Short Cavity Length Adjustments 
    Reply  Fri Jun 18 22:12:29 2010, Alberto, Update, IOO, Mode Profile after Mode Matching Telescope (Round 2) 
Entry  Wed Jul 7 17:18:57 2010, Alberto, Configuration, Electronics, Stochmon and LSC AM Stabilizer Decomissioned 
Entry  Thu Jul 15 12:21:08 2010, Alberto, Configuration, LSC, PRC and SRC length adjustements 8x
    Reply  Thu Jul 15 16:16:51 2010, Alberto, Configuration, LSC, PRC and SRC length adjustements 
Entry  Fri Jul 16 16:12:31 2010, Alberto, Configuration, Computers, c1susvme1/2 rebooted 
    Reply  Thu Jul 22 07:19:56 2010, Alberto, Update, Treasure, Monsters, LNVR, and Phase noise 
    Reply  Thu Jul 22 15:59:29 2010, Alberto, Update, PSL, PSL front end machine 
    Reply  Thu Jul 22 18:18:54 2010, Alberto, Update, PSL, Problem Solved 
Entry  Sat Jul 24 14:03:19 2010, Alberto, Update, Electronics, FSS Oscilaltor Phase Noise Measurement FSScrystalPhaseNoiseHigherGain.pdf
Entry  Sun Jul 25 18:47:23 2010, Alberto, Update, SVN, Optickle 40mUpgrade model updated to include short cavity length corrections 
Entry  Thu Jul 29 22:08:32 2010, Alberto, Update, SUS, More optics installed on the BS table 
Entry  Tue Aug 17 09:06:08 2010, Alberto, Update, elog, elog was down 
Entry  Fri Aug 20 16:41:43 2010, Alberto, Update, Electronics, Frequency Generation Box Assembly Completed 7x
Entry  Tue Aug 31 17:58:38 2010, Alberto, Update, Electronics, FSS Frequency Generation Box - Phase Noise 2010-08-31_FSSPhaseNoise04modified.png
Entry  Wed Sep 1 07:52:27 2010, Alberto, Configuration, Electronics, PMC board unplugged, turned on Sorensen switches on 1Y1 rack 
    Reply  Wed Sep 1 08:40:28 2010, Alberto, Configuration, Electronics, PMC board unplugged, turned on Sorensen switches on 1Y1 rack 
ELOG V3.1.3-