  638   Mon Jul 7 13:06:38 2008 KojiUpdateGeneralBeats of the two lasers in the absolute length measurement observed One may need an RF filter after the mixer.
I expect the SR560 does work for this purpose.
If it does not, a passive LPF can be used.
  
  637   Mon Jul 7 11:22:02 2008 AlbertoUpdateGeneralBeats of the two lasers in the absolute length measurement observed I didn't post a screenshot from the RF SA
because I had troubles with the interface
with the computer (unfortunately the network
  
  636   Sun Jul 6 16:17:40 2008 tobinHowToComputersSVNI was able to check out the 40m SVN here in
Livingston using this command:
  
  635   Thu Jul 3 22:54:45 2008 KojiUpdateGeneralBeats of the two lasers in the absolute length measurement observed Great! Conguraturation! I wish if I could
see it! It's nice if you can put the photo
or anything of the RF spectrum analyzer.
  
  634   Thu Jul 3 18:48:09 2008 AlbertoUpdateGeneralBeats of the two lasers in the absolute length measurement observed I adjusted the alignment of the flipper mirror
as suggested by Koji making the two beam
spots match. I also aligned all the IFO mirrors
  
  633   Thu Jul 3 16:57:23 2008 JohnSummaryGeneralFSS_RMTEMPThe FSS room temp alarm has been beeping a
lot recently. I altered the FSS_RMTEMP alarm
levels using the
 FSStime.pngFSSalarm.png 
  632   Thu Jul 3 16:18:51 2008 robSummaryLockingspecgramsI used ligoDV to make some spectrograms of
DARM_ERR (1), QPDX (2), and QPDY (3).  These
show the massive instability from 30-40Hz
 darm_specg.pngqpdx_specg.pngqpdy_specg.png 
  631   Thu Jul 3 13:54:26 2008 robConfigurationComputersmDV on rosalba
Does mDV work on rosalba?  It can't find
[B][FONT=Courier New]NDS_GetChannels[/FONT][/B].
  
  630   Thu Jul 3 13:12:32 2008 Rob, Yoichi, JohnUpdateLockingMore oscillationsBounce/ roll filters were added to the short
degrees of freedom to reduce the effect of
the 24Hz line seen on Tuesday night.
 LOL.pngNoisyX080702.pngPOXforCARM080702.png 
  629   Thu Jul 3 12:36:05 2008 JonhSummarySUSETMY watchdogETMY watchdog was tripped. I turned it off
and re-enabled the outputs.
  
  628   Thu Jul 3 11:53:30 2008 KojiUpdateGeneralStatus of the alignment of the NPRO beam for the Absolute Length MeasurementThe method itself looked fine.

Use of the one arm configuration will make
  
  627   Wed Jul 2 19:15:52 2008 AlbertoUpdateGeneralStatus of the alignment of the NPRO beam for the Absolute Length MeasurementToday I've tried to bring the frequency of
the NPRO laser close enough to that of the
IFO beam so that the beat between the two
 DSC_0156.JPGDSC_0158.JPG 
  626   Wed Jul 2 18:30:01 2008 JohnUpdateIOOQPD alignmentI aligned the beams on the following QPDs

IP POS
 IOO080702.pngMC080702.png 
  625   Wed Jul 2 17:19:03 2008 JohnSummaryComputersop440m - shutdown and restartedAfter 160days op440m was getting a little
slow.
  
  624   Wed Jul 2 15:14:42 2008 steveUpdateGeneraladded beam trapsI placed baked razor beam trap after INJ_SM1
and flipper in the injection path on the
AP table
  
  623   Wed Jul 2 13:56:10 2008 Rob, Yoichi, JohnUpdateLocking24.5 Hz resonanceWork continues on trying to reduce the CARM
offset using dc signals from PO_DC. Got up
to arm powers of
 locking080702.png 
  622   Wed Jul 2 10:35:02 2008 EricSummaryCamerasGeneral SummaryI finished up the 2D Gaussian fitting code,
and, along with Joe, integrated into the
Snap software so that it automatically does
 attemptedSinglePeakFitWithoutOffset.tiffattemptedSinglePeakFitWithoutOffsetZoomed.tiffattemptedPeakSubtraction.tiffOMCSweepSinglePeak.tiff 
  621   Wed Jul 2 06:46:05 2008 AlbertoConfigurationGeneralNPRO on to warm upThis morning I turned on the NPRO on the AP
table so that it can warm up for a few hours
before I start using it today.
  
  620   Wed Jul 2 00:59:13 2008 MashaUpdateAuxiliary lockingbalanced detection, noise plots, progressProgress report submitted today(!). It is
on the 40m wiki page. Below is a figure of
some estimated noise sources.
 noise_sources.pdfbalancing_detectors.png 
  619   Tue Jul 1 21:54:05 2008 KojiUpdateGeneralRe: Abs. Length Meas. setupI tried to look for the beating in the signal
from the PD but I couldn't find. I had the
temperature of the laser initially set to
  
  618   Tue Jul 1 21:45:48 2008 JohnUpdatePSLMach Zehnder script and screenI've edited C1: PSL_MACH_ZEHNDER.adl and /cvs/cds/caltech/scripts/PSL/MZ/lockMZ
to reflect the changes described in entry
#616.
  
  617   Tue Jul 1 21:27:27 2008 robHowToComputer Scripts / Programsslider twiddling after reboot
Sometimes after we reboot the front-end machines,
some of the hardware gets stuck in an unknown
  
  616   Tue Jul 1 16:48:42 2008 rob, johnConfigurationPSLMZ servo switch problem resolved forever[quote]C1:PSL-MZ_BLANK switch (to turn on/off
the servo) is not working again. The switch
is always off regardless of the epics state.
  
  615   Tue Jul 1 14:24:58 2008 robHowToComputer Scripts / Programsconlog time machine
I've written a perl script (now in the $SCRIPTS/general
directory) which implements a "conlog restore"
  
  614   Tue Jul 1 13:34:29 2008 robUpdateComputersRFM network back[quote]
For some reason, the computers requiring
startup.cmd (like c1lsc) halt after running
  
  613   Tue Jul 1 12:51:34 2008 JohnSummaryGeneralIFO alignmentRana, Rob, Yoichi, John

The recent computer problems and MZ work
 align080701.png 
  612   Tue Jul 1 12:08:38 2008 John, JoeConfigurationPSLPMC input PDJoe and I switched cables so that the PMCR
screen actually shows reflection not transmission.
  
  611   Tue Jul 1 11:57:24 2008 YoichiConfigurationPSLMZ servo switch problem againC1:PSL-MZ_BLANK switch (to turn on/off the
servo) is not working again. The switch is
always off regardless of the epics state.
  
  610   Tue Jul 1 11:53:38 2008 YoichiUpdateComputersRFM network backI took a tour of the FE machines and power
cycled all of them.
After executing the software restart procedures
  
  609   Tue Jul 1 10:15:22 2008 steveUpdatePSLeventfull two daysThe laser recovered from a short temp rise.
The MZ was aligned and realigned. The suspentions
were kicked up accidentally. 
 2d.jpg 
  608   Tue Jul 1 09:26:33 2008 steveUpdateComputersRFM network is down    
  607   Mon Jun 30 18:36:01 2008 YoichiUpdatePSLMZ alignment againJohn, Yoichi

We re-adjusted the MZ alignment. The reason
  
  606   Mon Jun 30 16:00:02 2008 josephb, samConfigurationComputers Sam and I setup Cat6 cable from Megatron to
the 1Y6 Switch (131.215.113.252) and also
connected the 1Y6 Hub to the control room
  
  605   Mon Jun 30 15:56:22 2008 JenneUpdateElectronicsFixing the LO demod signal To make the alarm handler happy, at Rana and
John's suggestion I replaced R14 of the MC's
Demod board, changing it from 4.99 Ohms to
  
  604   Mon Jun 30 15:08:52 2008 JohnSummaryPSLMZ alignmentI adjusted the alignmnet of the Mach-Zehnder's
two North mirrors (downstream of the EOMs).
 mzalign.png 
  603   Mon Jun 30 14:07:26 2008 RobConfigurationPSLDon't put the bin in front of the air conditioning unit[quote]We spotted that the laser power was
dropping.
[/quote]
 DSC_0140.png 
  602   Mon Jun 30 13:48:47 2008 John, RobConfigurationPSLDon't put the bin in front of the air conditioning unitWe spotted that the laser power was dropping.

[SIZE=5][COLOR=blue][FONT=Verdana]The air
 binremoval.png 
  601   Mon Jun 30 09:46:15 2008 JohnUpdateIOOMC WFSMC WFS are on. They seem to do some good during
the day.
  
  600   Mon Jun 30 08:59:23 2008 steveUpdateIOOIOO-MC_DEMOD_LO is lowThe alarm handler is beeping relentlessly:
asking for help in high partical count and
low demod signal
 demlo.jpg_____ 
  599   Mon Jun 30 05:33:38 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Optical setup (II)o The position of the iris was adjusted so
as not to disturub the beam for OMCR CCD.
  
  598   Mon Jun 30 01:49:06 2008 JohnUpdateIOOMC workI'm in the process of aligning the mode cleaner/
input beam.
  
  597   Sun Jun 29 20:29:48 2008 ranaUpdatePSLCorrelation of PSL SLOW control v. Room temperature   slowtemp.png 
  596   Sun Jun 29 20:09:40 2008 JohnSummaryIOOmcup and mcdown indicatorsI edited the mcup and mcdown scripts so that
C1IFO_STATE shows when these scripts are
running.
 mcscreen.pngifostate.png 
  595   Sun Jun 29 19:53:26 2008 JohnSummaryPSLISS[quote]I reduced the gain of the ISS (C1:
PSL-ISS_VGAGAIN) from 5dB to 2dB. Any higher
and it constantly saturates.[/quote]
  
  594   Sun Jun 29 19:19:47 2008 ranaSummaryIOOTrends of the PSL/IOO Quads over 1000 daysOnly IOO POS has been working for the past
2 years. I guess we should recommission the
IOO ANG and REFL QPDs
 a.png 
  593   Sun Jun 29 18:58:43 2008 ranaSummaryComputers1e20 is too big for AWG and/or IOVMEWhile testing out my matlab/awgstream based
McWFS diagnostic script I accidentally put
a
  
  592   Sun Jun 29 14:53:02 2008 robUpdateComputersRebooting[quote]All of the computers are now showing
green lights.
  
  591   Sun Jun 29 11:31:52 2008 JohnSummaryPSLISSI reduced the gain of the ISS (C1: PSL-ISS_VGAGAIN)
from 5dB to 2dB. Any higher and it constantly
saturates.
  
  590   Sun Jun 29 02:33:28 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Optical setup (I)I have constructed the beam injection optics
for the abs length measurement.
 optical_configuration.pngoptical_layout_ap_table2.pngoptical_layout_ap_table2.pdf 
  589   Sat Jun 28 23:23:50 2008 JohnUpdateComputersRebootingAll of the computers are now showing green
lights.
  