Fri Dec 19 16:38:09 2008, steve, Update, LSC, all optlevs centered
|
Sun Dec 21 13:00:06 2008, steve, Update, all down cond., vac and laser back on
|
Fri Jan 9 09:14:17 2009, steve, Update, PEM, ifo is recovered after eq
|
Fri Jan 9 16:52:18 2009, steve, Update, VAC, tp3 forline pump replaced
| +
Wed Jan 14 09:22:43 2009, steve, HowTo, VAC, N2 supply pressure lowered for vac valves
|
Wed Jan 14 10:59:06 2009, steve, Bureaucracy, VAC, rga waiting to be "connected"
| +
Wed Jan 14 15:53:32 2009, steve, DAQ, PSL, MC temperature sensor
|
Thu Jan 15 09:19:32 2009, steve, Update, IOO, MC locking
|
Thu Jan 22 08:34:10 2009, steve, Bureaucracy, SAFETY, safety training
| +
Fri Jan 23 10:00:21 2009, steve, Update, PSL, PMC transmission is down
|
Thu Feb 5 09:12:29 2009, steve, Bureaucracy, SAFETY, safety updates & fire alarm test
|
Fri Feb 6 14:49:31 2009, steve, Summary, SAFETY, laser inventory
|
Fri Feb 6 16:23:54 2009, steve, Update, MOPA, MOPAs of 7 years
|
Tue Feb 10 10:48:48 2009, steve, Bureaucracy, SAFETY, safety glasses scanned 
|
Wed Feb 11 11:39:17 2009, steve, Configuration, General, vac envelope ground
|
Fri Feb 13 08:38:03 2009, steve, Update, IOO, MC2 damping restored
|
Fri Feb 13 16:30:49 2009, steve, Configuration, General, status quo is disturbed
|
Wed Feb 18 15:31:38 2009, steve, Bureaucracy, SAFETY, emergency back-up lights checked
|
Thu Feb 19 11:51:56 2009, steve, Update, MOPA, HTEMP variation is too much
|
Mon Feb 23 11:07:01 2009, steve, Bureaucracy, SAFETY, Kiwamu receives safety training
|
Tue Mar 3 08:44:31 2009, steve, Update, PEM, air cond. maintenance today
|
Wed Mar 11 16:41:22 2009, steve, Update, MOPA, spare NPRO power
|
Fri Mar 20 11:01:02 2009, steve, Update, PEM, particle counts are high
|
Fri Mar 20 15:54:29 2009, steve, Omnistructure, General, 480V crane power switch on MEZ
|
Tue Mar 24 09:04:02 2009, steve, Update, SUS, 4.8 mag earthquake
|
Wed Mar 25 09:55:45 2009, steve, Update, IOO, glitching sensors of MC
|
Sun Mar 29 13:44:27 2009, steve, Update, SUS, ETMY sus damping restored
|
Mon Mar 30 15:51:27 2009, steve, Update, Electronics, HP4291A left the lab to be repaired
|
Tue Mar 31 09:42:32 2009, steve, Update, PEM, ETMY sus damping restored again
|
Wed Apr 1 10:22:13 2009, steve, Update, VAC, RGA logging is working
|
Fri Apr 3 10:01:50 2009, steve, Update, VAC, rgascan with temp plot 
| +
Wed Apr 8 09:36:20 2009, steve, Configuration, VAC, valve condition changed to BG to calibrate the RGA
|
Thu Apr 9 11:27:19 2009, steve, Update, VAC, vac gauge reading problem 
| +
Mon Apr 13 08:59:57 2009, steve, Update, PSL, mixers on order
| +
Wed Apr 15 11:25:21 2009, steve, Configuration, VAC, RGA cal completed
| +
Tue Apr 21 18:18:27 2009, steve, Update, VAC, maglev failed
|
Wed Apr 22 11:16:26 2009, steve, Configuration, VAC, Cryo pump is ON and the Maglev is dead
|
Thu Apr 23 16:38:33 2009, steve, Update, VAC, vac valve relay box is shorting
| +
Fri Apr 24 16:02:31 2009, steve, HowTo, VAC, cryo pump interlock rule
|
Mon Apr 27 18:31:44 2009, steve, Configuration, VAC, VC1 closed
|
Tue Apr 28 09:27:32 2009, steve, Configuration, VAC, cryopump deserves some credit 
| +
Wed Apr 29 10:20:14 2009, steve, HowTo, VAC, cryo pump interlock rule is waved
| +
Mon May 4 10:38:52 2009, steve, Update, MOPA, laser power is dropped
| +
Tue May 5 10:42:18 2009, steve, Update, MOPA, laser power is back
| +
Thu May 7 10:28:20 2009, steve, Update, VAC, retrofitted maglev's needs
|
Sun May 10 13:41:17 2009, steve, Update, VAC, ETMY damping restored, VC1 opened
| +
Mon May 11 11:49:20 2009, steve, Update, PSL, MOPA cooling water lines are backwards
| +
Thu May 14 15:28:28 2009, steve, Summary, SUS, April 24 earthquake effect on MC2
| +
Tue May 19 09:34:29 2009, steve, Configuration, VAC, IFO is not pumped & CRYO is being regenerated 
|
Tue May 19 15:57:07 2009, steve, Update, IOO, MC2 damping restored after EQ
|
|