  13231   Mon Aug 21 09:08:54 2017 SteveUpdateSUStiny glitches

They are synchronised tiny glitches. They are not mechanical.
 

  7924   Tue Jan 22 09:18:50 2013 SteveUpdateTip - Tilttip tilt bases ordered

The corrected drawing base for tip tilt with coils are going to the shop. The will be back by the end of the week.

  7627   Thu Oct 25 22:52:07 2012 janoschUpdateGeneraltip-tilt phase maps

Now that I read Koji's last elog about phase maps, I am not sure if these are still required, but here they are (the tilt-removed phase maps of the Laser Optik mirrors), first 1, 2, 3:

sn1Laseroptik_untilted.pngsn2Laseroptik_untilted.pngsn3Laseroptik_untilted.png

Then 4,5,6:

sn4Laseroptik_untilted.pngsn5Laseroptik_untilted.pngsn6Laseroptik_untilted.png

So they all have an elevated center. I am not sure why the phase maps of mirrors 5 and 6 are slightly smaller in dimension. Anyhow, all mirrors have quite strong aberrations. Also, there is no big difference between the mirrors. Check for yourself, but be careful with the colors since the scales are all different.

  7628   Thu Oct 25 23:00:44 2012 ManasaUpdateGeneraltip-tilt phase maps

Are these maps drawn from the data we extracted using Image SXM??

  7629   Thu Oct 25 23:14:42 2012 janoschUpdateGeneraltip-tilt phase maps

Quote:

Are these maps drawn from the data we extracted using Image SXM??

 Indeed. So the only manipulation that I did was to remove the tilt (since this should usually be seen as an artifact of the measurement, or better, we can assume that tilt is compensated by alignment). I did not remove the curvature.

  7638   Mon Oct 29 11:27:42 2012 ManasaUpdateGeneraltip-tilt phase maps

 [Jan, Manasa]

Below are phasemaps for the tip-tilts with both tilt and RoC removed. We have not used Koji's code; but tweaked the earlier code to remove curvature.

The RoC values matched approximately to that quoted by Gari Lynn ~700m.

RoC of tip-tilts
Mirror
RoC (m)
SN1 748.7176
SN2 692.7408
SN3 707.0336
SN4 625.5152
SN5 672.5340
SN6 663.7791

 

Phasemaps

The color scale for height are not the same for all mirrors.

 

SN1, SN2 and SN3

sn1_UC_UT.pngsn2_UC_UT.pngsn3_UC_UT.png

SN4, SN5 and SN6

sn4_UC_UT.pngsn5_UC_UT.pngsn6_UC_UT.png

  7639   Mon Oct 29 14:57:41 2012 janoschUpdateGeneraltip-tilt phase maps

Quote:

 [Jan, Manasa]

Below are phasemaps for the tip-tilts with both tilt and RoC removed. We have not used Koji's code; but tweaked the earlier code to remove curvature. 

 The posted residual phase maps show circular contours since the data came with relatively low resolution in height. This is ok for what we want to do with these phase maps (i.e. simulating higher-order mode content in the PRC using Finesse). Better resolution is only required if you want to understand in detail optical scattering out of the cavity. Anyhow, the circular artifacts can be removed by first interpolating the phase maps to a higher lateral resolution, and then performing tilt and curvature subtraction. So we will soon have better looking phase maps posted. Then we should think about what type of Finesse simulation we could run. Certainly one simulation is to look at the beam shape in the PRC, but more interesting could be how sensitive the shape is to mirror alignments. The current simulation shows a mode that resembles the TEM01, but I have not yet tried to find optimal alignment of the mirrors (in simulation) to search for the TEM00 mode.

  4357   Fri Feb 25 13:28:14 2011 kiwamuSummaryGeneralto do list
 Because it maybe useful to share this kind of information among us, I just put a to-do-list which has been continuously noted in my laptop.
 I guess those items can be applied for the coming two months (i.e. March and April). Anything else ?

-- Alignment

     - C1ASS

           * finalize the model and make user friendly scripts and medm screens
           * adjustment of phase rotations
           * cavity auto alignment for green

     - MC WFS 

          * put sensing matrices
          * whitening ?

    - OPLEVs

        * binary output for OPLEV whitening
        * calibration of OPLEVs  [rad/count]
        * characterization of OPLEV servos
        * bigger trans impedance gains to have reasonable readouts


-- Optimization of Suspended Optics

  - diagonalizations

         * input matrices
         * f2p with higher precision

  - damping control

        * fix ETMY damping
         * Bounce Roll notches
         * Q adjustment for damping

  - upgrading of electronics

        * bigger trans impedance gain for OSEMs
        * widen the voltage range of AA filter boards
   

   - weekly check

       * a routine script for measuring free swinging spectra


-- Input Optics

   - PMC

         * mode matching
         * epics LO HI values

   - FSS and ISS

        * recover FSS
        * make ISS working

   - EOM

       * AM minimization
       * triple resonant box

   - doubling and RFPD for green

        * mode matching to doubling crystal
        * connect RFPD_DC_MON to ADC
        * string +/-150 V and +/-15power cables from 1X1 rack to RFPDs
        * visibility check and loss investigations for the beat RFPD
        * rearrange RF amplifiers (ZLN series) for the RFPD
        * realgin Jenne's DCPD

 

-- Length Sensing and Control

   - digital system and electronics

       * characterization of RFPDs ==> SUresh/UG
       * installation of RF generation box and distribution box ==> Suresh/U
       * new LSC model and start making useful scripts (csh ? perl ? python ?)
       * binary outputs for PD whitening
       * make item lists for ordering (?)
       * draw cool diagrams for RF cable distribution and map of LSC rack.


-- Green Locking

    - X end station

           * eliminate undesired multiple spots on RFPD
           *  connect REFLPD_DCMON to ADC
           *  remote local boost
           * demodulation phase adjustment
           *  look for a high voltage amp. (bipoler)
           * installation of a mechanical shutter
           *  ETMX_TRANS CCD camera
           * analog low pass filter for temperature control

    - Y arm green locking ==> Suresh/Bryan

        * item lists
        * preparation of base mounts
        * mode matching estimation
        * mode measurement of input beam from Lightwave
        * temeperature scanning for beat location finding with IR beam
        * Installation
       * modification of PDH box

    - digital control systems

           * user friendly medm screens
           * apply proper filters for AC-DC whitened signal blending
           * add MC2 feedback path

      - noise budget

          * in-loop and out-of-loop evaluation
          * shot noise  
          * RFPD noise modeling
          * how intensity noise couples through MFD
          * electrical noise
          * frequency noise contribution from end laser and PSL
          * calibration of arm PDH signal

   - cavity scan and handing off

         * optimization of open loop transfer function for ALS
         * auto scripts   

-- misc.

   - CCD camera
        * color filters to separate IR and green (?)
   - lab laptops
        * a laptop for each end station (?)
    - dichroic TT (?)
        * large wegded and AR coated for 532nm (?)
    - epics for RS232C      
        * RS232C for doubling oven temperature

 

  4359   Fri Feb 25 14:50:16 2011 KojiSummaryGeneralto do list

- Put priority on the list

- Put names on the items

- Where is the CDS TO DO ==> Joe

-

- Remote disconnection of the greeen PDH 

- What is the situation of the PD DC for the LSC PDs?

- SUS Satelite box Resister replacement ==> Jamie

- IMC mode matching ==> Jamie/Larisa 

- Mechanical shutters everywhere

- SRM OPLEV Connection

- MC OAF

- Better LSC whitening boards

- DAFI 

Quote:
 Anything else ?

  4364   Mon Feb 28 11:22:40 2011 josephbSummaryGeneralto do list
Quote:

- Where is the CDS TO DO ==> Joe

CDS To Do:

1) Get ETMY working - figure out why signals are not getting past the AI board (D000186) to the coils.

2) Get TDS and command line AWG stuff working

3) Get c1ass and new c1lsc (with Koji) fully integrated with the rest of the system.

4) Get CDS software instructions up to date and well organized.

5) Redo cabling  and generally make it a permanent installation instead of hack job:

   a) Measure cable lengths, check connectors, wire with good routes and ensure strain relief.  Ensure proper labeling

   b) Get correct length fiber for c1sus RFM and timing.

   c) Fix up final BO adapter box and DAC boxes.

   d) Make boxes for the AA filter adapters which are currently just hanging.

   e) Get two "faceplates" for the cards in the back of the ETMY IO chassis so they can screwed down properly.

   f) Remove and properly store old, unused cables, boards, and anything else.

6) Create new documentation detailing the current 40m setup, both DCC documents and interactive wiki.

7)  Setup an Ubuntu work station using Keith's wiki instructions

 

Simulated Plant To Do:

1)Create simulated plant to interface with current end mass controls (say scx).

2) Create proper filters for pendulum and noise generation, test suspension.

3) Propagate to all other suspensions.

4) Working on simulated IFO plant to connect to LSC.  Create filters for near locked (assume initial green control perhaps) state.

5) Test LSC controls on simulated IFO.

6) Fix c code so there's seamless switching between simulated and real controls.

CDS Status:

MC damp dataviewer diaggui AWG c1lsc c1ioo c1sus c1iscex c1iscey RFM The Dolphins Sim.Plant Frame builder TDS Cabling
                             
  4322   Fri Feb 18 00:35:21 2011 kiwamuSummaryGeneralto do list for Feb. 18th

DAYTIME

  -  more precise F2P measurement and modify lockin simlink model (Kiwamu)

  -  run  C1ASS to check it (Valera)

  -  take care of CDS (Joe)

  -  MC mode matching (Jenne/Koji)

   -  RF stuff  (Suresh)

  -  mode matching for doubling crystal at PSL table (low priority)

  -  OPLEV (low priority)

NIGHITTIME

 -  update the noise spectra of green locking

 -  make noise budgets

  4310   Thu Feb 17 00:43:13 2011 kiwamuSummaryGeneralto do list for tomorrow

Let's share our tasks !

 

==== daytime ===

 . mode matching for MC  (Jenne/Koji)

 . mode matching for doubling crystal on PSL table (Suresh/Koji)

 . f2p adjustment (Kiwamu)

 . fix daq and CDS issues (Joe)

 . increase oplev gain (low priority)

 . make ITMY camera nicer (Steve)

 . c1ass simlink model (Valera/Joe)

 . Bounce Roll notches (Suresh)

 

==== nighttime (after 7pm) ====

 . align everything   (at first green beam, then X arm cavity and finally IR beam)

 . update the noise spectrum of the green locking

 . estimate the noise from angle to length coupling

  11902   Sat Dec 26 10:34:43 2015 SteveUpdateGeneraltoday

PMC locked manually and PRM sus damping restored.

  5207   Fri Aug 12 15:16:56 2011 jamieUpdateSUStoday's SUS overview

Here's an update of the suspensions, after yesterdays in-vacuum work and OSEM tweaking:

  • PRM and ETMY are completely messed up.  The spectra are so bad that I'm not going to bother posting anything.   ETMY has extreme sensor voltages that indicate that it's maybe stuck to one of the OSEMS.  PRM voltages look nominal, so I have no idea what's going on there.
  • ITMY is much improved, but it could still use some work
  • SRM is a little worse than what it was yesterday, but we've done a lot of work on the ITMY table, such as moving ITMY suspension and rebalancing the table.
  • BS looks for some reason slightly better than it did yesterday
TM   M cond(B)
SRM SRM.png

      pit     yaw     pos     side    butt
UL    0.828   1.041   1.142  -0.135   1.057 
UR    1.061  -0.959   1.081  -0.063  -1.058 
LR   -0.939  -0.956   0.858  -0.036   0.849 
LL   -1.172   1.044   0.919  -0.108  -1.035 
SD    0.196  -0.024   1.861   1.000   0.043

4.20951
ITMY  ITMY.png       pit     yaw     pos     side    butt
UL    1.141   0.177   1.193  -0.058   0.922 
UR    0.052  -1.823   0.766  -0.031  -0.974 
LR   -1.948  -0.082   0.807  -0.013   1.147 
LL   -0.859   1.918   1.234  -0.040  -0.957 
SD   -1.916   2.178   3.558   1.000   0.635 
7.70705
BS  BS.png       pit     yaw     pos     side    butt
UL    1.589   0.694   0.182   0.302   1.042 
UR    0.157  -1.306   1.842  -0.176  -0.963 
LR   -1.843  -0.322   1.818  -0.213   0.957 
LL   -0.411   1.678   0.158   0.265  -1.038 
SD    0.754   0.298  -3.142   1.000   0.053
6.12779

 

  5453   Mon Sep 19 01:38:00 2011 kiwamuUpdateLSCtoday's locking activity

[Anamaria / Kiwamu]

 The incident beam pointing was improved by using PZT1 and PZT2. 

With some triggers the lock of PRMI became smoother.

For the DRMI lock, the MICH and SRCL signals on AS55 are not quite decoupled, so we should find cleaner signals for them.

 

(what we did)

 + locked the Y arm

 + aligned incident beam by using PZT1(#5450) and PZT2. The spot positions on ITMY and ETMY are now well-centered.

 + tried activating C1ASS but failed. It needs some gain changes due to the new PZT1 response.

 + locked the X arm

 + aligned the TRX PD (Thorlab signal PD) and set the trigger.

 + C1ASS also doesn't work for the X arm

 + realigned the PRM and BS oplevs. the PRM oplev was clipped at a steering mirror on the optical bench

 + locked PRMI and aligned the PRM mirror such that the optical gain was maximized

 + optimized the demod phase of AS55 and REFL11

 + checked the UGF of the MICH and PRCL lock. The UGF of MICH is about 100Hz with gain of -20, and the UGF of PRCL was 85 Hz with gain of 0.1

 + adjusted the output matrix such that the MICH control doesn't couple into the PRCL control.

 + set the triggers for the MICH and PRCL control to make the lock acquisition smoother.

 + tried locking DRMI and it was sort of locked. However the SRCL signal showed up a lot in AS55_Q, where the MICH signal is extracted.

  4299   Tue Feb 15 11:53:02 2011 kiwamuSummaryGeneraltoday's missions

I think this week is going to be an "alignment week".

The goal is to get a good alignment on X arm for both the green and the IR beam in order to reduce a2l couplings.

 

Today's missions are :

 - fixing the oplev channel names (see here)

 - fixing the oplev gain issue (see here)

 - engage the oplev servos

 - f2p adjustment

 - make a realtime lockin model for the f2p measurement and the dithering technique

 - alignment of the MC incident beam  (because we installed a new PMC this morning)

 - manual alignment of the IR beam by steering PZT1 and PZT2 (this procedure will be replaced by an automatic way soon)

 - bounce roll filters (see here)

 

  3021   Mon May 31 17:47:34 2010 kiwamuUpdateIOOtoday's plan : MC alignment

[Alberto, Kiwamu]

0. have a coffee and then dress up the clean coat.

1. level the MC table

2. lock and align MC 

3. run A2L script to see how much off-centering of the spots

4. steer the periscope mirror <--- We are here

5. move the pick off mirror which is used for monitoring of MCT CCD

6. check the leveling and move some weights if it's necessary

7. shut down

  4546   Wed Apr 20 20:42:55 2011 kiwamuUpdateVIDEOtoday's video session

[Steve / Suresh / Kiwamu]

90 % of unused video cables have been removed.

Still a couple of video cables are floating around the video MUX. They will be removed in the next week's session.

DSC_2931_ss.jpg

DSC_2938_ss.jpg

 

  5245   Tue Aug 16 04:28:09 2011 kiwamuUpdateGeneraltoday's work to do

The main goal of today is to extract the pick-off beams

Today's menu :

  + If necessary steer ETMs and ITMs to make the X and Y green beam flashing.

  + Open the IOO and OMC chamber and lock MC.

       => cover the place of the access connector by a large piece of aluminum foil. It will give a robust lock of MC.

  + Check the beam pointing down to Y arm by looking at the ETMY face camera.

        => If it's necessary align PZT1 and PZT2 from EPICS to make the IR beam flashing in the X arm.

  + Align BS and let the beam hit the center of ETMX to make the X arm flashing.

        => These alignment procedure will automatically gives us the MICH fringes on the AS CCD camera.

  + Rotate the SRM tower to get the SRMI fringes on the AS CCD camera.

        => This is because the required amount of the YAW correction on SRM is currently beyond the range of the DC bias.

  + Align PRM to get the PRMI fringes on AS CCD camera. Also make sure the beam comes back to the REFL CCD camera.

  + Lock the PRC to make POP/POX/POY bright enough.

     => Probably the REFL11 RFPD needs more power. To increase the power, just rotate the HWP, which is sitting before the RFPDs on the AS table.

     => If the signal on AS55 is too small, we can use REFL11_Q or REFL55 for the MICH lock.

  + OR inject and align the ABSL laser to make those pick-off beams bright enough.

     => This case we don't have to make the DRMI exactly on the resonance, what we need is just the DRMI flashing.

  + Align necessary optics for those pick-off beams.

     => In our definition (aLIGO definition) POP is the beam propagating from BS to PRM. Don't be confused by another one, which propagates from PRM to BS.

  + Steer two mirrors on the ETMY table for aligning IPANG. Also, steer some mirrors on the BS table for IPPOS.

    => IPANG has already reached the ETMY table, so ideally we don't have to steer a mirror on the BS table.

    => IPPOS/ANG are very visible with a sensor card.

  + Align some oplevs.

     => This work is relatively independent from the other tasks. Steve can take care of it.

  + Adjust the OSEM to their mid-range.

     => This work can be done anytime, but everytime we have to recover the alignment of the interferometer.

  5248   Tue Aug 16 11:49:17 2011 jamie, jenneUpdateGeneraltoday's work to do

>If necessary steer ETMs and ITMs to make the X and Y green beam flashing.

Green is now flashing in both X and Y arms

>Open the IOO and OMC chamber and lock MC.

Open, and cover in place. MC is flashing and locking.

 

  5250   Tue Aug 16 17:09:55 2011 JenneUpdateGeneraltoday's work to do

Quote:

  + Rotate the SRM tower to get the SRMI fringes on the AS CCD camera.

        => This is because the required amount of the YAW correction on SRM is currently beyond the range of the DC bias.

 Kiwamu aligned things for me, and I rotated the SRM tower so that the reflected beam was pretty much totally overlapping the incident beam.  The SRC was aligned to make sure things were good.  Now the DC bias for SRM Yaw is ~1.4, so we're totally good. 

To rotate SRM, Jamie had the idea of using 2 screws so I could push the tower on one side, and back off the screw an equal amount on the other side and push the tower to be touching both screws again, to ensure that I was rotating about the center of the tower and wasn't introducing any Pos action. 

While I was at it, I also moved the OSEM connector tower back to its normal place on the table, so it's not in the way of oplev beams.  It had been moved previously to accommodate ITMY near the door.

  3496   Tue Aug 31 14:47:53 2010 steveConfigurationPEMtoilet upgrade

Our toilets were replaced by a green Gerber 1.6 gpf ( 6 lpf ) last week.

  14191   Wed Aug 29 14:51:05 2018 SteveUpdateGeneraltomorrow morning

Electrician is coming to fix one of the fluorenent light fixture holder in the east arm tomorrow morning at 8am. He will be out by 9am.

The job did not get done. There was no scaffolding or ladder to reach troubled areas.

  5553   Tue Sep 27 04:13:22 2011 kiwamuUpdateLSCtonight's locking activity

The lock of PRMI wasn't so robust although it could stay locked for more than 10 minutes.

There have been 2-3Hz spikes in everywhere. It needs to be investigated.

 

(to do)

 + Diagnosis on the suspensions.

 + Check the beam centering on the RFPDs.

 + Check the f2a filters on PRM and BS.

 + Health check of the suspensions by locking some cavities and measuring the noise spectra for comparison.

 + Trying to use another signal port other than AS55.

 

(Spikes)

 The attached picture below is an example of the REFLDC and POXDC signals in time series.

This was when PRCL and MICH were locked by REFL33_I and AS55_Q respectively.

PRMI.png

Note that when PRMI is unlocked, REFLDC goes to ~ 5000 counts and POXDC goes within ADC noise of ~ 1 counts.

According to the POP camera it looked like something was oscillating in the YAW direction which coincided with the spikes.

I tried finding any suspicious angular motions in the ITMs, BS and PRM olevs, but none of them showed the 2-3 Hz feature.

  4601   Mon May 2 21:14:55 2011 kiwamuUpdateElectronicstoo loose Heliax connectors on 1Y2 rack

I found that all the Heliax cables landing on the bottom of 1Y2 were too loose.

Due to this loose connection the RF power at 55 MHz varies from -34 dBm to 3 dBm, depending on the angle of the Heliax's head.

DSC_2982_ss.jpg

 

The looseness basically comes from the fact the black plate is too thick for the Heliax cable to go all the way. It permits the Heliax's heads to rotate freely.

What we should do is to make countersinks on the black plate like this:

DSC_2984_ss.jpg

 

  4602   Mon May 2 23:29:57 2011 SureshUpdateElectronicstoo loose Heliax connectors on 1Y2 rack

The countersink gives rise to another problem when we mount the N-type-to-SMA bulkhead adaptor.  As we are making a circular hole in the plastic strip (instead of a hole with two flat sections)  the adaptor is free to turn when we tighten it with a wrench.  We currently hold the smooth circular part on the other side with a gripping pliers and while tightening.  If that part disappears into the countersink (as seen in the pics) we will not be able to tighten the adaptor sufficiently and consequently we will also not be able to get the heliax connector to be tight.

A better solution would be to use the 1/4-inch plastic L-angle beam which Steve has used on the AS table.  In addition to solving this loose connector problem, the beam is also more rigid than the plastic strip.

 

  12388   Tue Aug 9 16:19:27 2016 SteveUpdateSUStorque driver for wire clamp

New Wiha 28504 torque wrench for SOS wire clamping. It's range 7.5  - 20 in-lb in 0.5 steps [ 0.9 - 2.2 Nm ] Audible and perceptible click when the pre-set torque has been attained at ±6% accuracy.  

The new ETMX sus wire torqued to ~ 11.5 in-lb [1.3 Nm ]

Quote:

Gautam and Steve,

The clamp's left side was jammed onto the left guide pin. It was installed slit facing left. Gautam had to use force to remove it. The clamp should move freely seating on the guide rods till torque aplied. Do not move on with the hanging of optic with a jammed clamp. Fix it.

Never use force as you are hanging - aligning optic. The clamp is in the shop for resurfacing and slit opening.

 

 

  11239   Thu Apr 23 15:40:41 2015 SteveUpdateGeneraltorque for 1/4-20

 

Few 1/4 -20 socket cap head screw with washers were tested for optimum torque.

QJR 117E Snap On  torque wrench was used. I found that 40 lb in was enough.

Looked up recommended values on the web later:

Our Thorlab SS 1/4-20 screw kits are SS 18-8 as DRY 70 inch / lbs max, lubricated  60 inch / lbs max

These numbers will varie with washers, material it's going into and so on!

BLACK-OXIDE Alloy Steel Socket Head Cap Screws can go much higher value

Thread Size 1/4"-20
Length 1/4"
Thread Length Full
Additional Specifications Black-Oxide Alloy Steel
RoHS Compliant

The standard among high-strength fasteners, these screws are stronger than Grade 8 steel screws. They have a minimum tensile strength of 170,000 psi. and a minimum Rockwell hardness of C37. Length is measured from under the head.

Inch screws have a Class 3A thread fit. They meet ASTM A574.

Black Oxide—Screws have been heat-treated for hardness, which results in a dark surface color.

 
The information in this 3-D model is provided for reference only. Details
 
 

We still do not know that what torque values we get best performance : minimum jiggel and drift etc.

After looking at these numbers I raise my recommendation to 50 inch / lbs on a std aplication.

Rana is next to calibrate his feelings and declare the right number.

Than Koji....and so on

Once we a number, than I buy more torque wrenches to fit it.

  11244   Fri Apr 24 18:13:36 2015 ranaUpdateGeneraltorque for 1/4-20

For 1/4-20 bolts made of 18-8 Stainless Steel, the recommended torque varies from 65-100 inch-pounds, depending upon the application, the lubrication, how loose the bolt is, if there's a washer, etc.

For our case, where we are going into a tapped, ferromagnetic stainless table, its less clear, but it will certainly by in the 60-80 range. This is close to the 5-6 foot-lbs that I recommended on Wednesday.

I've ordered 3 torque wrenches with 1/4" drive so that we can have one at each end and one in the toolbox near MC2. We'll indicate the recommended torque on there so that we can tighten everything appropriately.

  11181   Sat Mar 28 03:21:49 2015 denUpdateLSCtowards angular ff

Tonight I measured seismic noise coupling to beam spot on PR2. There is coherence of 0.9 from X to PIT and Y to YAW around the stack resonances. TF was fited using vectfit and put into static matrix of oaf in the elements T240X -> PRM PIT, T240Y -> PRM YAW. I think we should actuate on the error point of the PRM OL but I decided not to go for a model change tonight. Data from seismometers and POP QPD was obtained during the UTC time 04:06:00 - 04:50:00 when PRMI was locked on sideband

Interferometer was locking rather robustly and every lock lasted on the everage of 3 minutes. During these lock periods I incresed bandwidth of optical lever servos of BS and test masses from 4Hz up to 10Hz and then closed transmission QPD loops. It seems from the camera that lock losses correspond to strong motion of the beam on pop camera. Scripts that change OPLEV bandwidth are in /users/den "increase_ol_bandwidth.sh" "decrease_ol_bandwidth.sh". Script "engage_qpd_servos" turns off ETM oplevs and turns on ETM -> trans QPD servos. These scripts can be copied to locking directrly if are useful.

Please, note that transition from 3f to 1f should still be tuned. Only PRCL was stably controlled using 1f so far

  388   Fri Mar 21 09:02:03 2008 steveUpdateVACtp 2 failed
Small turbo #2 is the forepump of the maglev.
It failed last night, shut down the maglev and interlock closed V1
Ifo pressure is 20 mTorr now. The Yarm was still locked at 8am this morning.
The PSL beam to MC was blocked just before the output periscope.
The psl mechanial shutter did not work from epic screen.
  389   Fri Mar 21 11:54:38 2008 robUpdateVACtp 2 failed

Quote:
Small turbo #2 is the forepump of the maglev.
It failed last night, shut down the maglev and interlock closed V1
Ifo pressure is 20 mTorr now. The Yarm was still locked at 8am this morning.
The PSL beam to MC was blocked just before the output periscope.
The psl mechanial shutter did not work from epic screen.


The PSL mechanical shutter actually did trip last night, greatly confusing me and Rana. Not realizing that the software vacuum interlock had tripped, we manually re-opened the shutter. I'll modify the relevant MEDM screens to indicate when the EPICS interlock trips.
  385   Thu Mar 20 15:28:20 2008 steveUpdateVACtp2 's drypump replaced
The fore pump of tp2 was replaced at fore line pressure 998m Torr
  1220   Fri Jan 9 16:52:18 2009 steveUpdateVACtp3 forline pump replaced
Alberto took 40m vacuum 101 class as we replaced the drypump at the annulus pump line.

He is still not authorized to use the monster 2 3/8" open end wrench that is 36" long.

The fore line pressure dropped to 20 mTorr from 1 Torr as the pumps were swapped.
Bob needs to be given credit for replacing the tip seal on this Varian SH-100 drypump
The ss-hose felt dry at the tp3 exhaust end but it was some what "teflon coated-placticky-
-almost oily" at intake end of the dry pump.
We'll have to replace this metal hose next time.

This is a reminder that the 40m vacuum operation is fully manual.
It requires two people to switch a vacuum valve and one of them has to be experienced.
  2970   Fri May 21 16:37:35 2010 steveConfigurationVACtp3's drypump replaced

Bob replaced the tipseal in an other drypump and I swapped it in. TP3 turbo is running again, it's foreline pressure is 40 mTorr. The RGA is still off

  2073   Fri Oct 9 01:31:56 2009 ranaConfigurationDAQtpchn mystery

Does anyone know if this master file is the real thing that's in use now? Are we really using a file called tpchn_C1_new.par? If anyone sees Alex, please get to the bottom of this.

allegra:daq>pwd
/cvs/cds/caltech/chans/daq
allegra:daq>more master
/cvs/cds/caltech/chans/daq/C1ADCU_PEM.ini
#/cvs/cds/caltech/chans/daq/C1ADCU_SUS.ini
/cvs/cds/caltech/chans/daq/C1LSC.ini
/cvs/cds/caltech/chans/daq/C1ASC.ini
/cvs/cds/caltech/chans/daq/C1SOS.ini
/cvs/cds/caltech/chans/daq/C1SUS_EX.ini
/cvs/cds/caltech/chans/daq/C1SUS_EY.ini
/cvs/cds/caltech/chans/daq/C1SUS1.ini
/cvs/cds/caltech/chans/daq/C1SUS2.ini
#/cvs/cds/caltech/chans/daq/C1SUS4.ini
/cvs/cds/caltech/chans/daq/C1IOOF.ini
/cvs/cds/caltech/chans/daq/C1IOO.ini
/cvs/cds/caltech/chans/daq/C0GDS.ini
/cvs/cds/caltech/chans/daq/C0EDCU.ini
/cvs/cds/caltech/chans/daq/C1OMC.ini
/cvs/cds/caltech/chans/daq/C1ASS.ini
/cvs/cds/gds/param/tpchn_C1_new.par
/cvs/cds/gds/param/tpchn_C2.par
/cvs/cds/gds/param/tpchn_C3.par

  2075   Fri Oct 9 14:23:53 2009 Alex IvanovConfigurationDAQtpchn mystery

"Yes. This master file is used."

Quote:

Does anyone know if this master file is the real thing that's in use now? Are we really using a file called tpchn_C1_new.par? If anyone sees Alex, please get to the bottom of this.

allegra:daq>pwd
/cvs/cds/caltech/chans/daq
allegra:daq>more master
/cvs/cds/caltech/chans/daq/C1ADCU_PEM.ini
#/cvs/cds/caltech/chans/daq/C1ADCU_SUS.ini
/cvs/cds/caltech/chans/daq/C1LSC.ini
/cvs/cds/caltech/chans/daq/C1ASC.ini
/cvs/cds/caltech/chans/daq/C1SOS.ini
/cvs/cds/caltech/chans/daq/C1SUS_EX.ini
/cvs/cds/caltech/chans/daq/C1SUS_EY.ini
/cvs/cds/caltech/chans/daq/C1SUS1.ini
/cvs/cds/caltech/chans/daq/C1SUS2.ini
#/cvs/cds/caltech/chans/daq/C1SUS4.ini
/cvs/cds/caltech/chans/daq/C1IOOF.ini
/cvs/cds/caltech/chans/daq/C1IOO.ini
/cvs/cds/caltech/chans/daq/C0GDS.ini
/cvs/cds/caltech/chans/daq/C0EDCU.ini
/cvs/cds/caltech/chans/daq/C1OMC.ini
/cvs/cds/caltech/chans/daq/C1ASS.ini
/cvs/cds/gds/param/tpchn_C1_new.par
/cvs/cds/gds/param/tpchn_C2.par
/cvs/cds/gds/param/tpchn_C3.par

 

  94   Mon Nov 12 14:09:19 2007 robDAQGeneraltpman dead on fb40m
The testpoint manager was dead on fb40m. I know I re-started it sometime after the power outage, so something must have killed it. If you get an error from DTT like
"diagnostic kernel does not support: testpoints", then log into fb40m as root, check for the tpman with a ps -ef | grep tpman. If it's not there, then run /usr/controls/tpman & and close the terminal window.
  1417   Sun Mar 22 23:16:41 2009 ranaDAQComputer Scripts / Programstpman restart
Could get testpoints but couldn't start excitations. Restarted tpman on daqawg. Works now.

Still no log file. Mad
  10869   Wed Jan 7 14:16:27 2015 JenneUpdateLSCtrans QPDs realigned

Now that both end transmission QPDs have the line filters, I aligned them.

I locked and aligned the IR using the ASS, then went to each end table and put the beam in the center of the QPD.

  2494   Sun Jan 10 13:32:09 2010 HaixingUpdateSUStransfer function measurement of the quadrant maglev circuit

I have assembled the circuit and the control box for the quadrant magnetic levitation yesterday. The final setup is shown

in the figure below:

Quad_maglev_ctrl_box_in.JPGQuad_maglev_ctrl_box_front.JPG

 

Due to my carelessness, I I connected the wrong ends of the power supply. I damaged 4 op-amp and one voltage 

regulator during this assembly. This stupid mistake spent me several hours to fix, and I got a bitter lesson;-(

 

Afterwards, I replaced those op-amps and reconnected the power supply . Kiwamu helped me and we measured

the transfer function of this circuit.  The transfer function agrees with  the specification in the schematics which

has a integrator below 1 Hz and a differentiator from 5 to 20 Hz. The bode plot for the measured transfer function

is the following:

quad_mag_tf_amp.png

 quad_mag_tf_phs.png

Today I tested the photodetector parts and found that there is a mysterious oscillation. Whenever I connect the

photodector input A of the circuit (as indicated in the figure below),

PD.PNG

the output of the op-amp has a 500k Hz oscillation shown up in the oscilloscope.This happens even A is disconnected from

the photodetector and connected to an open end wire. I don't know how to eliminate it, and its amplitude is so large (peak to

peak is around 2.5 V) which completely dominates the photodetector output. Does anybody has some ideas? Thanks.

 

Quad_mag_lev_osc.JPG

  2495   Sun Jan 10 15:47:26 2010 KojiUpdateSUStransfer function measurement of the quadrant maglev circuit

1. Why do all of the BNCs have no GND connection? Each should have the individual cables to the ground. Each signal line and the corresponding ground line should be twisted together.

2. This looks the (usual) oscillation of the V-I conversion stage but I can't tell anything as I don't have the circuit diagram of the whole circuit.

3. In a certain case, putting some capacitance at the feedback may help. Read P.11 of the data sheet of LT1125. Try to put some capacitors from 20pF to some larger one whether it changes the situation or not. I suppose the bandwidth of your sensor can be ~1kHz. So putting a capacitance less than 10nF still has no effect to the servo.

  2497   Sun Jan 10 16:50:34 2010 HaixingUpdateSUStransfer function measurement of the quadrant maglev circuit

Quote:

1. Why do all of the BNCs have no GND connection? Each should have the individual cables to the ground. Each signal line and the corresponding ground line should be twisted together.

2. This looks the (usual) oscillation of the V-I conversion stage but I can't tell anything as I don't have the circuit diagram of the whole circuit.

3. In a certain case, putting some capacitance at the feedback may help. Read P.11 of the data sheet of LT1125. Try to put some capacitors from 20pF to some larger one whether it changes the situation or not. I suppose the bandwidth of your sensor can be ~1kHz. So putting a capacitance less than 10nF still has no effect to the servo.

 1. They are all connected to the box which has a single connection to the board ground. If I connect each of them to the ground, there would be many small loops

of ground. Of course, I should have replaced all the connectors such that the they are disconnected to the box as point out by Robert.

2. The oscillation disappears after I add 5 nF capacitor in parallel to the existing resistor. Thank you very much for pointing this out.

  2498   Sun Jan 10 17:15:25 2010 KojiUpdateSUStransfer function measurement of the quadrant maglev circuit

1. Yes. That is the bad. You should eventually replace the BNCs to the isolated ones.

2. OK. I like to emphasize again that everyone works on electronics should read data sheets more carefully and seriously because they have many important practical instructions to exploit full performance of the components. 

Quote:

Quote:

1. Why do all of the BNCs have no GND connection? Each should have the individual cables to the ground. Each signal line and the corresponding ground line should be twisted together.

2. This looks the (usual) oscillation of the V-I conversion stage but I can't tell anything as I don't have the circuit diagram of the whole circuit.

3. In a certain case, putting some capacitance at the feedback may help. Read P.11 of the data sheet of LT1125. Try to put some capacitors from 20pF to some larger one whether it changes the situation or not. I suppose the bandwidth of your sensor can be ~1kHz. So putting a capacitance less than 10nF still has no effect to the servo.

 1. They are all connected to the box which has a single connection to the board ground. If I connect each of them to the ground, there would be many small loops

of ground. Of course, I should have replaced all the connectors such that the they are disconnected to the box as point out by Robert.

2. The oscillation disappears after I add 5 nF capacitor in parallel to the existing resistor. Thank you very much for pointing this out.

 

  4324   Fri Feb 18 15:05:49 2011 kiwamuUpdateGreen Lockingtransfer function of angle to beat note (length)

[Koji and Kiwamu]

 We took transfer functions (TF) from the angle excitations at ETMX and ITMX to the green beat note signal (i.e. angle to length TF).

It turned out that the coupling from ETMX_PIT is quite large.

I wonder how f2p of the ETMX changes this coupling. We'll see.

 

a2l_TF.png

 

The plot above shows a set of the transfer functions from the angle excitation to the green beat note.

Note that the y-axis has not been calibrated, it is just a unit of counts/counts.

You can see that the TF from ETMX_PIT to the beat (red cruve) is larger than the others by about a factor of 10 over most of the frequency range.

This means that any PIT motions on ETMX can be coupled into the green beat signal somewhat over the wide frequency range.

It looks having a resonance at 1.5 Hz, but we don't exactly know why.

At that time the coil gains on only ITMX were tuned by applying f2p filters, but ETMX wasn't because of a technical reason coming from epics.

 

- - - - measurement conditions

  * PSL laser was locked to X arm by feeding back the IR PDH signal to MC2.

  * the green laser was locked to Xarm as usual.

  * took the green beat note signal (approximately 0 dBm) into Rana's MFD with the cable length of about  6 m.

  * the output from the MFD was connected to XARM_COARSE channel without a whitening filter.

  * excitation signal was injected into either ASC_PIT or ASC_YAW. The excitation was Gaussian noise with frequency band of 10 Hz and amplitude of 300 counts.

  * only ITMY had the f2p filters, which balance the coil gains all over the frequency.

 

  6655   Tue May 22 00:23:45 2012 DenUpdateCDStransmission error monitor

I've started to create channels and an medm screen to monitor the errors that occur during the transmission through the RFM model. The screen will show the amount of lost data per second for each channel.

Not all channels are ready yet. For created channels, number of errors is 0, this is good.

 Screenshot.png

  13330   Mon Sep 25 17:56:33 2017 johannesUpdateComputer Scripts / Programstransmitted power during lossmap

I had to do a reboot + burt restore of c1psl today. It was unresponsive and I couldn't get the PMC to lock. I also had to slightly realign the PMC, and the IMC was too misaligned for the autolocker to catch lock. Adjusting it manually, it was predominantly MC1 PIT that was off. The YARM locked on a 10 mode and had to be aligned manually as well.

I left a script running on Donnatella that tilts ETMX and thus moves the beam on ITMX. I'm monitoring the transmitted power to evaluate sane thresholds for the demodulation offsets in a lossmap measurement. The script will return the IFO to normal after it is done and will take <2 hours to complete (no real clue, but there's no way it takes longer than that for ~50 datapoints).

  6556   Sat Apr 21 21:10:34 2012 JamieUpdateCDStrend frame issue partially resolved

Quote:

Unfortunately it looks like there may be a problem with trend data, though.  If I try to retrieve 1 minute of "full data" with dataviewer for channel C1:SUS-ITMX_SUSPOS_IN1_DQ around GPS 1019089138 everything works fine:

Connecting to NDS Server fb (TCP port 8088)
Connecting.... done
T0=12-04-01-00-17-45; Length=60 (s)
60 seconds of data displayed

but if I specify any trend data (second, minute, etc.) I get the following:

Connecting to NDS Server fb (TCP port 8088)
Connecting.... done
Server error 18: trend data is not available
datasrv: DataWriteTrend failed in daq_send().
T0=12-04-01-00-17-45; Length=60 (s)
No data output.

Alex warned me that this might have happened when I was trying to test the new daqd without first turning off frame writing.

Alex told me that the "trend data is not available" message comes from the "trender" functionality not being enabled in daqd.  After re-enabling it (see #6555) minute trend data was available again.  However, there still seems to be an issue with second trends.  When I try to retrieve second trend data from dataviewer for which minute trend data *is* available I get the following error message:

Connecting to NDS Server fb (TCP port 8088)
Connecting.... done
No data found

read(); errno=9
read(); errno=9
T0=12-04-04-02-14-29; Length=3600 (s)
No data output.

Awaiting more help from Alex...

  7955   Tue Jan 29 15:16:18 2013 ManasaFrogsGeneraltrial run

 

 I would like to suggest a trial run on these....Ergomates and the cleanboot!

ErgoMatesFeatures.jpg

booties.jpg

REPLY by JCD:  Are these going to trap dirt and be impossible to clean though?  The nice thing about Crocs and the giant flip flops is that they are solid and if they get dirty you can do a quick wipedown, and they're good as new.

  7967   Wed Jan 30 16:24:25 2013 ManasaFrogsGeneraltrial run

Quote:

 

REPLY by JCD:  Are these going to trap dirt and be impossible to clean though?  The nice thing about Crocs and the giant flip flops is that they are solid and if they get dirty you can do a quick wipedown, and they're good as new.

 The Cleanboot is washable and reusable!