  5329   Wed Aug 31 14:50:18 2011 kiwamuUpdatePhotospictures of OSEMsThe pictures that we took are now on the
Picasa web site. Check it out.
  
  3987   Fri Nov 26 16:37:29 2010 kiwamuUpdatePhotospictures on PIcasa I uploaded some pictures taken in
the last and this week. They are on the Picasa
web albums.
 DSC_2657_ss.jpg 
  2118   Mon Oct 19 14:48:15 2009 rana, robSummaryElectronicspiezo jena measuring boxAttached is the schematic of the Piezo Jena
driver measuring box made in a Pomona box:
 PA160153.JPGPA160151.JPG 
  13541   Fri Jan 12 18:08:55 2018 gautamUpdateGeneralpip installed on nodusAfter much googling, I figured out how
to install pip on SL7:

  
  3937   Wed Nov 17 02:53:41 2010 yutaUpdateIOOplaced new PRM to BS table(Kiwamu, Yuta)

Background:
  
  4372   Thu Mar 3 00:12:52 2011 kiwamuUpdateGreen LockingplanTomorrow's tasks
 
- Auto noise budget 
  
  7371   Mon Sep 10 19:04:32 2012 ranaUpdateGeneralplan On Friday, Koji and I adjusted the
beam pointing into the DRMI using the PZT
yaw and found that the beam inside the DRMI
  
  4421   Tue Mar 22 00:01:25 2011 kiwamuSummaryGreen Lockingplan for daytime tasksSome
tasks for the daytime tomorrow.
  * Beam profile measurements
  
  4159   Fri Jan 14 20:37:00 2011 kiwamuHowToGreen Lockingplan for this month I summarized how we proceed our green
locking in this month on the wiki.
Since step1 and 2 shown on the wiki
 green_plan.png 
  4419   Mon Mar 21 16:49:11 2011 kiwamuSummaryGreen Lockingplan for this week- Plan for this
week
  
  13825   Tue May 8 10:24:10 2018 KiraSummaryPEMplan for this weekHere are a few things I will be working
on:


Design PCB boards for the
  
  4426   Wed Mar 23 00:51:47 2011 kiwamuUpdateGreen Lockingplan for tomorrow  -
Plan for tomorrow
    * Video cable
  
  13501   Wed Jan 3 18:00:46 2018 gautamUpdatePonderSqueezeplan of actionNotes
of stuff we discussed @ today's meeting,
and afterwards, towards measuring ponderomotive
  
  8746   Tue Jun 25 19:18:07 2013 gautamConfigurationendtable upgradeplan of action for PZT installation  This entry is
meant to be a sort of inventory check and
  
  8800   Wed Jul 3 21:19:04 2013 gautamConfigurationendtable upgradeplan of action for PZT installation This is an update on the situation
as far as PZT installation is concerned.
I measured the required cable (PZT driver
 DAC_bank.pngASC_schematic.pdf 
  4387   Tue Mar 8 15:33:09 2011 kiwamuSummaryGreen Lockingplan on Mar.8th
  
  5122   Fri Aug 5 08:08:42 2011 kiwamuSummaryGeneralplan todayToday's main
mission is : adjustment of the arm length
  
  3982   Tue Nov 23 23:13:40 2010 kiwamuSummaryCDSplan: we will install C1LSC [Joe, Suresh, Kiwamu]
 We
  
  2568   Wed Feb 3 11:13:15 2010 steveConfigurationGeneralplaned power outage for Sat. Feb 20The electrical shop has to connect the
new power transformer at CES. This means
we will have no AC power for ~8 hrs on Saturday,
  
  4382   Mon Mar 7 18:20:01 2011 kiwamuSummaryGreen Lockingplans
This
week's goal is to investigate the source
of the differential noise and to lower it.
  
  6353   Mon Mar 5 06:11:08 2012 kiwamuSummaryLSCplansPlans:

     DRMI (PRMI) + one arm
  
  1624   Mon May 25 21:31:47 2009 carynUpdatePEMplugged in Guralp channelsGuralp Vert1b and Guralp EW1b are plugged
back in to PEM ADCU #10 and #12 respectively.
Guralp NS1b remains plugged in. So, 
  
  1648   Wed Jun 3 12:31:13 2009 carynUpdatePEMplugged in guralp channels    
  5063   Fri Jul 29 18:43:02 2011 Manuel, IshwitaUpdatePEMplugging seismometers to ADC[Manuel, Ishwita, Jenne, Jamie]
We changed the C1PEM model and the
names of the C1:PEM channels.
  
  4345   Wed Feb 23 16:34:42 2011 valeraConfiguration pmc lens stagedI put the PMC last mode matching lens (one
between the steering mirrors) on a translation
stage to facilitate the PMC mode matching.
 PMCrefl.JPGP1070438.JPGP1070439.JPG 
  9961   Fri May 16 09:46:05 2014 SteveUpdatePSLpointing monitoring

    

       
            
  
  11820   Sat Nov 28 11:46:40 2015 yutaroUpdateLSCpossible error source of loss map measurementI found that TRY level degraded and the
beam shape seen with CCD camera at AS port
was splitted when the beam spot on ETMY was
  
  8078   Wed Feb 13 19:09:32 2013 yutaSummaryGeneralpossible explanations to oval REFL beam[Jenne, Manasa, Jamie, Yuta]

The shape of the REFL beam reflected
 REFL_1044844506.bmp 
  8079   Wed Feb 13 19:30:45 2013 KojiSummaryGeneralpossible explanations to oval REFL beam>> "What has changed since:"
Recently
the REFL path has been rearranged
  
  8080   Wed Feb 13 19:41:07 2013 yutaSummaryGeneralpossible explanations to oval REFL beamWe checked that REFL beam is already oval
in the vacuum. We also centered in-air optics,
including lens, in the REFL path, but REFL
  
  6159   Tue Jan 3 15:49:27 2012 JamieUpdateComputerspossible front-end timing issue

    

       
            
  
  6168   Wed Jan 4 09:06:50 2012 steveUpdateComputerspossible front-end timing issue


   
        
            
 rtntstat.png 
  6574   Thu Apr 26 18:15:59 2012 JamieUpdateCDSpossible issue with mx_stream on front endsI'm noticing what appears to be occasional
failures of mx_stream on the front end machines. 
It doesn't happen that frequently, but I've
  
  12096   Thu Apr 28 08:49:47 2016 SteveUpdatePEMpossible noise sources schedule
Building:        
Campus (see attached Map)        

       
 Campus_B&W_Map-2.pdf 
  109   Thu Nov 15 18:37:06 2007 tobinUpdateComputerspossible replacement for linux1's diskIt looks like the existing disk in linux1
is a Seagate ST380013A (this can be found
either via the smartctl utility or by looking
  
  13149   Fri Jul 28 20:22:41 2017 JamieUpdateCDSpossible stable daqd configuration with separate DC and FWThis week Jonathan Hanks and I have been
trying to diagnose why the daqd has been
unstable in the configuration used by the
  
  11757   Thu Nov 12 10:22:33 2015 SteveUpdatePEMpossible vibration for 4days Building:        
San Pasqual walkway East to West

                 
  
  13310   Mon Sep 11 23:31:50 2017 johannesUpdateCameraspost-vent camera capture comparisonThe latest pre-unintended vent captures
of the test mass face cameras were taken
on June
 13x 
  13334   Tue Sep 26 22:11:08 2017 johannesUpdateCameraspost-vent camera capture comparisonI configured the remaining GigE-Camera
to work on the 40m network. We currently
have 3 operational Basler cameras:
 lens_distance.pdfImage__2017-09-26__18-54-29.jpgIMG_20170926_190157222_HDR.jpgIMG_20170926_185649325.jpg 
  15550   Sun Aug 30 11:29:33 2020 ranaUpdateGeneralpower blink?My power at home winked out for a second
this morning, but it looks like either nothing
happened in the 40m lab or else it rode it
  
  4448   Mon Mar 28 16:24:35 2011 kiwamuUpdateGreen Lockingpower budget on PSL table   I measured some laser powers
associated with the beat-note detection system
 RFPD.png 
  6355   Mon Mar 5 14:10:35 2012 kiwamuUpdateLSCpower budget on the AP tableI
checked the laser powers on the AP table
and confirmed that their powers are low enough
 power_budget.png 
  12593   Thu Nov 3 08:07:52 2016 SteveUpdateGeneralpower glitchBuilding:        
Campus Wide         

       
 powerGlitch.png 
  12696   Mon Jan 9 09:18:47 2017 SteveUpdatePEMpower glitchThere was a power glitch last night around
1:15am

The vacuum was not effected.
 MondayMorning.png 
  12700   Tue Jan 10 21:47:00 2017 ranaUpdateCDSpower glitchDoes "done" mean they are OK
or they are somehow damaged? Do
you mean the workstations or the front end
  
  12594   Thu Nov 3 11:33:24 2016 gautamUpdateGeneralpower glitch - recoveryI did the following:


Hard reboots for fb, megatron,
and all the frontends, in that order
Checked
  
  12702   Wed Jan 11 16:35:03 2017 gautamUpdateCDSpower glitch - recovery progress[lydia, ericq, gautam]

We set about following the instructions
linked in the previous elog. A few notes/remarks:
 powerGlitchRecoveryJan2017.png 
  12701   Tue Jan 10 22:55:43 2017 gautamUpdateCDSpower glitch - recovery stepsHere
is a link to an elog with the steps I had
to follow the last time there was a similar
  
  12699   Tue Jan 10 16:20:11 2017 SteveUpdateCDSpower glitch......Raid is rebuildingJamie started the fm40m Raid rebuilding.
It has been beeping since the power outage.

Summary pages have no reading since
 rebuilding_in_progress.png 
  5270   Fri Aug 19 15:31:53 2011 steveUpdateGeneralpower interruption rescheduled to 10-1-2011       
       