    Reply  Thu Oct 12 01:03:49 2017, johannes, HowTo, Cameras, ETMX GigE side view IMG_20171011_164549698.jpgImage__2017-10-11__16-52-01.pngGigE_lens_position_helper.py.zip
I calculated a better lens solution for the ETMX side view with the simple python script that's attached. The camera is still not as close to the
viewport as we would like, and now the front lens is almost all the up to the end of the tube. With a little more playing around there maybe a better way,
especially if we expand the repertoire of focal lengths. Using Steve's wonderful camera fixture I put the beam spot in focus. I turned the camera sideways
    Reply  Thu Oct 12 07:56:33 2017, Steve, HowTo, Cameras, ETMX GigE side view at 50 deg of IR scattering Image__2017-10-11__15-29-52_15k400g.pngImage__2017-10-12__15-50-18wipedRefocud2.pngcamCan16cm.jpg
 Telescope front lens to wall distance 25 cm,  GigE camera lenght 6 cm and cat6 cable 2cm

 Atm3,   Existing short camera  can has 16cm  lenght to lexan guard on viewport. Available 2" od periscope tube
lenght is 8cm. The one in use 16 cm long.
    Reply  Wed Oct 18 11:37:58 2017, johannes, HowTo, Cameras, ETMX GigE side view at 50 deg 



uote:



 Telescope front
lens to wall distance 25 cm,  GigE camera lenght 6 cm and cat6 cable 2cm
    Reply  Wed Oct 18 15:26:58 2017, johannes, HowTo, Cameras, Revision: CCD calibration calib_20170930_152.pdfcalib_20170930_153.pdf
The units were still off in my previous post. Here's the corrected, sanity-checked version:




Camera IP
Calibration Factor


192.168.113.152
85.8
+/- 4.3 pW*μs


192.168.113.153
78.3 +/- 3.9 pW*μs




I estimated
Entry  Thu Dec 7 11:14:37 2017, johannes, HowTo, Computer Scripts / Programs, Lots of red on the FE status screen 22.png
Since we're getting ready to put the replacement slow DAQ for c1auxex in I wanted to bring the IFO back to operating condition after the PMC hasn't
been locked for days. Something seems wrong with the CDS system though, many of the frontent models have red background and don't seem to be responsive.
I followed the instructions laid out in https://wiki-40m.ligo.caltech.edu/Computer_Restart_Procedures.
    Reply  Thu Dec 7 15:02:37 2017, Koji, HowTo, Computer Scripts / Programs, Lots of red on the FE status screen DSC_0552.JPG
Once a realtime machine was rebooted, it did not come back. I suspect that the diskless hosts have a difficulty to boot up.
    Reply  Thu Dec 7 15:46:31 2017, johannes, HowTo, Computer Scripts / Programs, Lots of red on the FE status screen 04.png
[Koji, Johannes]

The issue was partially fixed and the interferometer is in workable condition now.

What -probably- fixed it was restarting the dhcp server on chiara
Entry  Mon Jan 15 17:36:03 2018, gautam, HowTo, Optical Levers, Oplev calibration OLcalib_20180115.tar.bz2Oplevs.pdf
Summary:

I checked the calibration
of the Oplevs for both ITMs, both ETMs and the BS. The table below summarizes the old and new cts->urad conversion factors, as well as the factor describing
the scaling applied. Attachment #1
    Reply  Wed May 2 10:03:58 2018, Steve, HowTo, SEI, preparation of load cell measurement at ETMX 6x
Gautam and Steve,

We have calibrated the load  cells. The support beams height monitoring is almost ready.

The danger of this measurment that  the beams height changes can put shear
    Reply  Thu May 3 09:56:42 2018, Steve, HowTo, SEI, preparation of load cell measurement at ETMX 
[ Dennis Coyne'  precision answer ]



Differential Height between Isolators
    Reply  Mon May 14 08:55:40 2018, Dennis Coyne, HowTo, SEI, preparation of load cell measurement at ETMX 
follow up email from Dennis 5-13-2018.
The last line agrees with the numbers in elog13821.


Hi Steve & Gautam,
Entry  Tue Jul 10 16:59:12 2018, Izabella Pastrana, HowTo, Computer Scripts / Programs, Taking Remote TF Measurements with the Agilent 4395A 
I copied the netgpibdata folder onto rossa (under the directory ~/Agilent/), which contains all the necessary scripts and templates
you'll need to remotely set up, run, and download the results of measurements taken on the AG4395A network analyzer. The computer will communicate
with the network analyzer through the GPIB device (plugged into the back of the Agilent, and whose communication protocol is found in the AG4395A.py
Entry  Tue Jun 11 00:00:15 2019, Milind, HowTo, PSL, Steps to lock the PMC pmc_locked_settings.pdf
Today, Rana had me key the PSL crate.


Locating the rack: the crate is 1X1. This
link provides details of the locations and functions of the racks.
Keying the crate: the key is located at the bottom of the
Entry  Tue Jul 16 15:17:57 2019, Koji, HowTo, CDS, Final bit bug of the BIO CDS module  
Yutaro talked about the BIO bug in KAGRA elog. http://klog.icrr.u-tokyo.ac.jp/osl/?r=9536

I think I made the similar change for the 40m model somewhere (don't remember), but be aware of the presense of this bug.
Entry  Thu Sep 5 18:42:19 2019, aaron, HowTo, CDS, WFS discussion, restarting CDS 
[aaron, rana]

While going to take some transfer functions of the MC WFS loop, LSC was down. When we tried to restart the FE using 'rtcds restart --all',
c1lsc crashed and froze. We manually reset c1lsc, then laboriously determined the correct order of machines to reboot. Here's what works best:
    Reply  Thu Sep 5 20:30:43 2019, rana, HowTo, CDS, WFS discussion, restarting CDS 
via Polish chat, GV tells us to RTFE
    Reply  Fri Sep 6 09:40:56 2019, aaron, HowTo, CDS, WFS discussion, restarting CDS 
As suggested, I ran the script cds/rebootC1LSC.sh

I got a timeout error when the script tried closing the PSL shutter ('C1:AUX-PSL_ShutterRqst' not found), but Rana and I closed the shutter
before leaving last night. c1sus is down, so the script found no route to host c1sus; I'm thinking I need to reset c1sus for the script to run completely.
    Reply  Fri Sep 6 11:56:44 2019, aaron, HowTo, CDS, WFS discussion, restarting CDS B26CECF8-FC0D-4348-80DC-574B1E3A4514.jpeg
Rebooting

I reset c1lsc, c1sus, and c1ioo.

I noticed that the script gives the command 'ssh c1XXX', but we have been getting no route to host using this command. Instead, the machines
are currently only reachable as c1XXX.martian. I'm not sure why this is, so I just appended .martian in rebootC1LSC.sh
    Reply  Fri Sep 6 15:12:49 2019, Koji, HowTo, CDS, WFS discussion, restarting CDS 
Assuming you are at pianosa, /etc/resolv.conf is like

# Generated by NetworkManager
nameserver 192.168.113.104
    Reply  Fri Sep 6 21:22:06 2019, Koji, HowTo, CDS, How to save c1ioo 
Q1 Can we run the machine with the reduced # of cores?

Q2 We might be able to order them quickly. What's the spec and configuration of the DIMMs (like DDR2-667MHz ECC 4GBx4, and even more specs
(like Samsung 2GB DDR2 RAM PC2-6400 240-Pin DIMM M378T5663EH3) so that we are to identify the exact spec).
    Reply  Fri Sep 6 22:03:30 2019, aaron, HowTo, CDS, How to save c1ioo 
Saw these slightly delayed.

Q1: Not sure--is it a safe operation for me to remove the DIMM on CPU0, replace CPU0 (with no DIMM), and boot up to try this?

Q2: Specifically, it's this DIMM. The CPU core is compatible with
    Reply  Mon Sep 9 11:36:48 2019, aaron, HowTo, CDS, How to save c1ioo reboot.png
One pair of DIMM cards from the Sunstone box had the same Sun part number as those in c1ioo, so I swapped them in and reinstalled c1ioo's CPU0. c1ioo now boots up
an seems ready to go, I'm able to log on from nodus. I also reinstalled optimus' CPU0, and optimus boots up with no problems.
Entry  Mon Sep 16 12:00:16 2019, aaron, HowTo, General, Moved some immovable optics 
When I put away the lenses we had used for measuring the RF transfer functions of the QPD heads, I saw that I'd removed them from the cabinet containing
green endtable optics, but hadn't noticed the sign forbidding their removal. I'll talk with Koji/Gautam about what happened and what should be
done.
    Reply  Tue Sep 17 14:43:59 2019, gautam, HowTo, CDS, Final bit bug of the BIO CDS module  Screen_Shot_2019-09-17_at_2.44.41_PM.png
Came across this while looking up the BIO situation at 1Y2. For reference, the fix Koji mentions can be seen in the attached screenshot (one example,
the other BIO cards also have a similar fix). The 16th bit of the BIO is grounded, and some bit-shifting magic is used to implement the desired output.




Quote:


    Reply  Thu Sep 19 15:59:29 2019, aaron, HowTo, CDS, How to save c1ioo 
New DIMM cards have arrived. I stored them in the digital cabinet along y arm.
Entry  Thu Jul 9 16:02:33 2020, Jon, HowTo, CDS, Procedure for setting up BHD front-ends 
Here is the procedure for setting up the three new BHD front-ends (c1bhd, c1sus2, c1ioo - replacement). This plan is based on technical advice from Rolf
Bork and Keith Thorne.

The overall topology for each machine is shown here.
Entry  Tue Jan 12 08:21:47 2021, anchal, HowTo, CDS, Acromag wiring investigation SingleEndedNonFloatingWiring.pdfSingleEndedFloatingWiring.pdfDifferentialSignalWiring.pdf
I used an Acromag XT1221 in CTN to play around with different wiring and see what works.  Following are my findings:


Referenced Single Ended Source (Attachment 1):


If the source signal is referenced single ended,
i.e. the signal is only on the positive output and the negative side is tied to GND
    Reply  Tue Jan 12 11:42:38 2021, gautam, HowTo, CDS, Acromag wiring investigation 
Thanks for the systematic effort.


Can you please post some time domain plots (ndscope perferably or StripTool) to clearly show the different failure modes?
The
majority of our AI channels are "Referenced Single Ended Source" in your terminology. At least on the c1psl Acromag crate, there are no channels
    Reply  Wed Jan 13 16:09:29 2021, Anchal, HowTo, CDS, Acromag wiring investigation SimpleTestsStriptoolImages.pdf
I'm working on a better wiring diagram that takes into account multiple power supplies, how their GND is passed forward to the circuits or sensors
using those power supplies and what possible wiring configurations on Acromag would give low noise. I think I have two configurations in mind which I will
test and update here with data and better diagrams.
    Reply  Tue Jan 26 12:59:51 2021, Anchal, HowTo, CDS, Acromag wiring investigation TestingDifferentialSignalWithFloatingRTNwrtIN-.pdf
Taking inspiration from SR785 on how it reads differential signal, I figured that acromag too always need a way to return current through RTN ports always.
That must be the reason why everything goes haywire when RTN is not connected to IN-. Now for single ended signals, we can always short RTN to IN- and
keep same GND but then we need to be careful in avoiding ground loops. I'm gonna post a wiring diagram in next post to show how if two signal sources
    Reply  Tue Jan 26 15:37:25 2021, Anchal, HowTo, CDS, Acromag wiring investigation GeneralLabWiring.pdfGeneralLabWiring2.pdfGeneralLabWiring3.pdf
Here I present few wiring diagrams when using Acromag to avoid noisy behavior and ground loops.


Case 1: Only single-ended sources


Attachment 1 gives a functioning wiring diagram
when all sources are single ended.
One should always short the RTN to IN- pin if the particular GND carried by that signal has not been shorted
    Reply  Fri Jan 29 17:57:17 2021, Anchal, HowTo, CDS, Acromag wiring investigation GeneralLabWiringDiffWith2Wires.pdfGeneralLabWiringDiffWith3Wires.pdfDiffReadResistorbtwnINandRTN.pdf
I found a
white paper  from Acromag which discusses how to read differential signal using Acromag units. The document categorically says that differential
signals are always supposed to be transmitted in three wires. I provides the two options of either using the RTN to connect to the signal ground (as done
Entry  Wed Mar 3 12:00:58 2021, Paco, Anchal, HowTo, IMC, MC_F ASD 20210303_MC_F_Spectrum.pdf20210303_MC_F_Spectrum.tar.gz
[Paco, Anchal]

- Saved BURT backup in /users/anchal/BURTsnaps/
- Copied existing code for mode cleaner noise budget from /users/rana/mat/mc. Will work on this from home to convert it inot new pynb way.
Entry  Mon Apr 26 18:52:52 2021, Anchal, Paco, HowTo, Computer Scripts / Programs, awg free slot 
Today we had some trouble launching an excitation on C1:IOO-MC_LSC_EXC from awggui. The error read:

awgSetChannel:
failed getIndexAWG C1:SUS-MC2_LSC_EXC ret=-3
Entry  Sun Oct 31 14:21:31 2021, rana, HowTo, Treasure, IFOCad 
IFOcad model/video of the AEI 10m interferometer:

https://10m.aei.mpg.de/design-and-sensitivity/
Entry  Tue Nov 16 11:37:26 2021, Hang, HowTo, SUS, Fitting suspension model--large systematic errors L2L_L3P_fit.pdfL2L_L3P_residual.pdf
One goal of our sysID study is to improve the aLIGO L2A feedforward. Our algorithm currently improves only the statistical uncertainty and assumes the
systematic errors are negligible. However, I am currently baffled by how to fit a (nearly) realistic suspension model...

My test study uses the damped aLIGO QUAD suspension model. From the Matlab model I extract the L2 drive in [N] to L3 pitch in [rad] transfer
Entry  Mon Nov 29 15:24:53 2021, Hang, HowTo, General, Fisher matrix vs length of each FFT segment setup.pdfFisher_vs_Tperseg.pdffisher_vs_mcmc_offset_removed.pngfisher_vs_mcmc.png
We have been discussing how does the parameter estimation depends on the length per FFT segment. In other words, after we collected a series of
data, would it be better for us to divide it into many segments so that we have many averages, or should we use long FFT segments so that we have more
frequency bins?
Entry  Fri Jul 8 14:03:33 2022, JC, HowTo, VAC, Vacuum Preparation for Power Shutdown  Screen_Shot_2022-07-12_at_7.02.14_AM.png
[Koji, JC]

Koji and I have prepared the vacuum system for the power outage on Saturday.


Closed V1 to isolate the main volume.
Closed of VASE, VASV, VABSSCI,VABS, VABSSCO, VAEV, and VAEE.
Closed V6, then
Entry  Mon Jul 11 15:26:12 2022, JC, HowTo, VAC, Startup after Power Outage 
[Koji, Jc]

Koji and I began starting that Vacuum system up.


Reverse order step 2 of shutting down electronics. Anthing after, turn
    Reply  Mon Jul 11 17:41:52 2022, Koji, HowTo, VAC, Startup after Power Outage Screen_Shot_2022-07-11_at_18.13.00.png
- Once the FRG gauge readings are back (see next elog by Tega), I could open V1 to pump down the main vacuum manifold.
- TP2/TP3 were brought back to stand-by mode (slower spinning)
- V7 was closed to separate the annuli side and TP1
Entry  Thu Aug 25 15:24:06 2022, Paco, HowTo, Electronics, RFSoC 2x2 board -- fandango adc0_1137MHz.pngadc1_1137MHz.pngrfdc_PLLsettings.pngclockingwiz_settings.pngblockIPdiag.png
[Paco, Chris Stoughton, Leo -- remote]

This morning Chris came over to the 40m lab to help us get the RFSoC board going. After checking out our setup, we decided to do a very basic
series of checks to see if we can at least get the ADCs to run coherently (independent of the DACs). For this I borrowed the Marconi 2023B from inside
Entry  Mon Oct 17 17:42:35 2022, JC, HowTo, OPLEV Tables, IMC Reflected beam sketch Screenshot_2022-10-18_093033.png
I sketched up a quick drawing with estimated length for the IMC reflected beam. This includes the distances and focal length. Distances are from optic
to optic. 
    Reply  Thu Nov 17 11:24:39 2022, JC, HowTo, LSC, Locking MICH 
[Yuta, JC]

Here is the Yuta's Alignment Scheme from elog 17056  with these slight
adjustments: 
    Reply  Tue Nov 29 11:38:37 2022, JC, HowTo, LSC, Lock Single Arm After MICH lock Screen_Shot_2022-11-29_at_11.01.56_AM.png
I tried locking single arm this morning, but I was unable to because the triggers were set to lock strictly to MICH. Anchal explained this to me and
helped me out. I figured this information would be useful and should be logged somewhere. In red, this is accessed through the IFO --> Configure. Choosing
X Arm and Y Arm will change the triggers on the C1LSC page for the single arm locking (In the Black Box.) 
Entry  Thu Dec 6 15:21:59 2007, alberto, Frogs, Electronics, RF Transfer Function of Stiff Aluminum Wires TF_3cm_stiff_wires.amplitude.pngDSC_0225compressed.JPGTF_3cm_stranded_wires.amplitude.png
Transfer function of 3cm long Aluminum wires and of 3cm stranded wires
Entry  Wed Dec 12 22:24:48 2007, tobin, Frogs, PEM, weather station 
I poked at the weather station briefly this evening.

* There's almost nothing in the elog about it.
Entry  Sun Feb 24 10:51:58 2008, tf, Frogs, Environment, 40m in phdcomics? 
[url=http://www.phdcomics.com/comics/archive.php?comicid=977][img]http://www.phdcomics.com/comics/archive/phd021308s.gif[/img][/url]
Entry  Fri Jun 27 09:20:15 2008, steve, Frogs, PEM, dust particle count is up & alarm handler is on dust3y.jpg
This 3 years plot show the trend of seasons.
When outside air quality goes bad ( 0.5 micron > 1 million ) the lab follows.
I will demonstrate this effect with a 4th of July fire works calibration.
Entry  Mon Jul 14 10:57:00 2008, Koji, Frogs, Environment, Someone at 40M sent LHO water of life 
Someone at the 40m sent Mike@LHO a pound of peets coffee with the name of Koji Arai.
It was a good surprise! Thanks, we will enjoy it!
I will return to Pasadena next week. See you then.
Entry  Mon Aug 25 11:43:55 2008, Yoichi, Frogs, IOO, MC REFL PD cable had been disconnected through out the weekend 
Most of my morning was wasted by the MC REFL PD cable, which was disconnected on the generic LSC PD interface board.
I know who did this. *ME*. When I pulled out the MC board, which is sitting next to the PD interface, on Friday, I must have
disconnected the PD cable accidentally. The connector of the PD cable (D-Sub) does not have screws to tighten and easily comes off. 