  1700   Wed Jun 24 17:08:16 2009 steveBureaucracySAFETYsurf student safetyThe 40m lab specific safety training is
done. The participants were
Stephanie Erickson, Clara Bennett,
  
  1699   Wed Jun 24 14:43:19 2009 robUpdateComputerstdsresp on linux => pzresp 
tdsresp is broken on our linux control
room machines.  I made a little perl
  
  1698   Wed Jun 24 12:09:24 2009 ClaraUpdatePEMWeek 1(ish)I spent the week reading up on filter algorithm
theory, particularly Wiener filtering. I
have also learned how to get data from specific
  
  1697   Wed Jun 24 12:04:22 2009 ZachUpdateCamerasSURF entryThis week, I've been reading some literature
concerning PLL and familiarizing myself with
LINUX, MATLAB, and high-pass filter circuits. 
  
  1696   Wed Jun 24 12:04:00 2009 ClaraUpdatePEMaccelerometer clarificationWhen I said "MC1/MC2 accelerometers,"
I meant the entire three-axis accelerometer
set at each point.
  
  1695   Wed Jun 24 11:20:40 2009 StephanieUpdateGeneralMultiply Resonant EOM UpdateI have created the attached EOM circuit
with resonances at 11 MHz, 29.5 MHz, and
55 MHz (the magnitude and phase of the voltage
 EOM_CktDiagram.JPGEOM_VoltagePlot.JPG 
  1694   Wed Jun 24 10:53:34 2009 Chris ZimmermanUpdateGeneralWeek 1/2 UpdateI've spent most of the last week doing
background reading; fourier transforms, shm,
e&m, and other physics that I didn't
  
  1693   Wed Jun 24 09:21:19 2009 steveConfigurationVACIFO RGA scan with Maglev & Cryo


   
        
            
 nmagd1ifo.jpgnmagCryopres.jpg 
  1692   Tue Jun 23 23:14:36 2009 ClaraConfigurationPEMAccelerometers relocatedBoth accelerometers have been moved in
an attempt to optimize their positions. The
MC1 accelerometer was moved from one green
  
  1691   Tue Jun 23 15:19:42 2009 steveConfigurationVACV1 is open


   
        
            
 V1_opennmag.jpg 
  1690   Tue Jun 23 10:06:03 2009 steveUpdateVACnew maglev RGA scan at day6The Maglev is running for 10 days with
V1 closed.  The pressure at the RGA-region
is  at 2e-9 torr on CC4 cold cathode
 newmagscand6.jpgnmagpresd10.jpg 
  1689   Sun Jun 21 00:08:26 2009 ranaConfigurationComputerselog rebooted 
nodus:log>dmesg
  
  1688   Fri Jun 19 14:30:47 2009 AlbertoConfigurationComputerselog rebooted


   
        
            
  
  1687   Fri Jun 19 13:39:29 2009 AidanUpdateGeneralUpper limit measurement of the scatter from the eLIGO beam dumps. 
 D0900095_ELIGO_35_WATT_AIR_COOLED_BEAM_DUMP_3INCH_P.POL-3.PDFbeam_dump_expt.pngscatter_measurement1.pdfBRDF1.pdfIMG_0308.JPG 
  1686   Fri Jun 19 13:38:42 2009 AlbertoConfigurationComputerselog rebootedToday I found the elog down, so I rebooted
it following the instructions in the wiki.
  
  1685   Thu Jun 18 23:20:40 2009 robSummaryLSCI-Q ratio with RF detected DARMThis is a ratio of PD1_I to PD1_Q (so a
ratio of the two quadratures of AS166), measured
in an anti-spring state.  It's not flat
 IQratio.jpg 
  1684   Thu Jun 18 23:08:46 2009 robUpdateLockingspectrumHere's a noise spectrum of the RSE interferometer,
in anti-spring mode, with RF readout. 
I'd say the calibration is "loose."
 DARMnoise_929352240.pngDARMnoise_929352240.pdf 
  1683   Wed Jun 17 01:09:47 2009 robUpdateComputers/cvs/cds 91% fullIn /cvs/cds/caltech
 
  
  1682   Wed Jun 17 01:07:50 2009 robConfigurationComputersmatapps on /cvs/cdsI checked out a copy of matapps into /cvs/cds/caltech/apps/lscsoft
so that I could find the matlab function
strassign.m, which is necessary for some
  
  1681   Tue Jun 16 20:03:41 2009 AlbertoUpdateElectronicsRequirements on Wenzel MultiplierFor
the 40m Upgrade, we plan to 
 SummaryOfResult.pdf 
  1680   Tue Jun 16 17:38:35 2009 robUpdateLockingDeWhites ONWith the common mode servo bandwidth above
30kHz and the BOOST on (1), I was able to
switch on the test mass dewhitening. 
  
  1679   Tue Jun 16 16:10:01 2009 peteUpdateLockinginput matrix experimentsLast night Rob ran senseDRM and loadDRMImatrixData
and came up with the following for the input
matrix:
  
  1678   Tue Jun 16 14:02:16 2009 robUpdateLockinglockedThe IFO is locked, at the operating point
(zero CARM offset).  The problem with
reducing the residual CARM offset in the
  
  1677   Tue Jun 16 09:02:30 2009 steveConfigurationVACnew maglev RGA scanThe maglev fore line pressure is 3e-6 torr
at CC2 after 4 days of pumping. Varian turbo
V-70 is pumping on it through V4 and VM2
 nmagd4scan.jpgnmagd4.jpg 
  1676   Tue Jun 16 03:43:04 2009 robUpdateLockingsame troublesLock is still being lost, right at the
end of the process when trying to reduce
the CARM offset to zero.
  
  1675   Tue Jun 16 02:09:31 2009 robUpdateLockingDD handoff finally workingI had trouble getting the SRC handoff from
SD to DD to work.  I tried different
gains, flipping the PD7 & 8 demod phases
  
  1674   Mon Jun 15 16:31:36 2009 steveConfigurationVACRGA is scanning new Maglev


   
        
            
  
  1673   Mon Jun 15 15:17:33 2009 josephb, SteveConfigurationVACVacuum control and monitor screensWe updated the vacuum control and monitor
screens  (C0VAC_MONITOR.adl and C0VAC_CONTROL.adl). 
We also updated the /cvs/cds/caltech/target/c1vac1/Vac.db
  
  1672   Fri Jun 12 15:34:49 2009 steveConfigurationVACmaglev is running


   
        
            
  
  1671   Fri Jun 12 09:56:38 2009 steveConfigurationVACnew maglev installedJoe and Steve
 
The retrofitted Osaka 390 was installed
 m390pd.jpg 
  1670   Fri Jun 12 02:01:03 2009 robUpdateComputer Scripts / ProgramsDRM matrix diagonalizationI started two scripts, senseDRM
and loadDRMImatrixData.m, which Peter
will bang on until they're correct. 
  
  1669   Thu Jun 11 22:14:10 2009 AlbertoUpdateLSCDD Handoff for the Short DOFs completedThis afternoon I tuned the handoff script
for the SRC, after that Rob eralier during
the day had already adjusted that for PRC.
  
  1668   Thu Jun 11 14:54:18 2009 josephb, albertoUpdateComputersWireless networkAfter poking around for a few minutes several
facts became clear:
1) At least one GPIB interface has
  
  1667   Thu Jun 11 03:15:15 2009 AlbertoUpdateLSCDD Handoff attemptsPete, Alberto,
tonight we worked on the tuning of
the double demod phases for the handoff of
  
  1666   Wed Jun 10 09:28:14 2009 steveUpdatePSLPMCThe PMC alarm was on this morning. It was
relocked at lower HV
The FSS_RMTEMP jumped 0.5 C so The
 pmctemphv.jpg 
  1665   Wed Jun 10 09:06:12 2009 steveUpdatePEMparticle counts and turbulanceI moved the mobile HEPA filter from ITMX's
north door to ITMX-ISCT and covered it up
with a merostate tent to accommodate the
 parturbulnc.jpg 
  1664   Wed Jun 10 01:52:34 2009 AlbertoUpdateElectronicsMC length and Marconis' frequenciesPete, Rob, Alberto,
yesterday we thought that some of
the problems we were having in locking the
  
  1663   Tue Jun 9 23:25:24 2009 robUpdateLocking?


   
        
            
  
  1662   Tue Jun 9 11:29:07 2009 JenneUpdateoplevsMeasured ETMY oplev beam size...put everything backI measured the ETMY oplev beam size at
a couple different distances away from the
HeNe by taking out the steering mirror and
  
  1661   Mon Jun 8 18:22:27 2009 AlbertoDAQLSCAdded PD11 I amd Q slow channelsI just added two slow channels to C0EDCUEPICS
to monitor the input of PD11. The names are:
[C1:LSC-PD11_I_INMON]
  
  1660   Sun Jun 7 04:57:39 2009 YoichiUpdateLocking?


   
        
            
  
  1659   Sat Jun 6 01:44:53 2009 rob UpdateLocking?Lock acquisition is proceeding smoothly
for the most part, but there is a very consistent
failure point near the end of the cm_step
  
  1658   Fri Jun 5 17:22:55 2009 peteUpdateLockingdaytime lockingAfter fixing the tp problem, I tried locking
again.  Grabbing and DD handoff, no
problem.  Died earlier than last night,
  
  1657   Fri Jun 5 16:45:28 2009 rob, peteHowToComputerstdsavg failure in cm_step script


   
        
            
  
  1656   Fri Jun 5 13:51:49 2009 robUpdateLockingtdsavg failure in cm_step script


   
        
            
  
  1655   Fri Jun 5 02:59:03 2009 pete, albertoUpdateLockingtdsavg failure in cm_step scriptthe command
tdsavg 5 C1:LSC-PD4_DC_IN1
was causing grievous woe in the cm_step
  
  1654   Fri Jun 5 01:10:13 2009 rob, peteUpdateLockingunderminedWe were stymied early in the evening by
a surreptitiously placed, verbo-visually
obfuscated command in the drstep script. 
  
  1653   Thu Jun 4 23:39:23 2009 peteUpdatePEM5 days, 20 days of accelerometersLooks like yesterday was particularly noisy. 
It's unclear to me why diurnal variation
much more visible in MC1_Y, and why the floor
 acc_5day.pngacc_20days.png 
  1652   Thu Jun 4 16:54:19 2009 peteUpdateLockingdaytime DD handoffI played with the DD handoff during the
day.  The DRM dark port was flickering
like a candle flame in Dracula's castle. 
  
  1651   Thu Jun 4 15:53:15 2009 steveUpdatePSLNPRO cooling flowrate adjustedThe Neslab chiller is working well. It's
temp display shows 20.0 C rock solid. Flow
meter rotating at 13.5Hz at the out put of
 needlevalve.jpg 