  2997   Thu May 27 02:22:24 2010 kiwamuUpdateGreen Lockingmore details Here are some more plots
and pictures about the end PDH locking with
 stimes.pngspectrum.pngETMX_small.png 
  2999   Thu May 27 09:43:50 2010 ranaUpdateGreen Lockingmore details

    

       
            
  
  308   Mon Feb 11 14:24:19 2008 steveUpdatePEMmore earthquakesITMX and ITMY sus damping restored after Baja
earthquake 5.1 mag at 10:29 this morning.
 eqfeb11.jpg 
  11655   Thu Oct 1 19:49:52 2015 jamieUpdateDAQmore failed attempts at getting new fb workingSummary

I've not really
been able to make additional progress with
the new 'fb1' DAQ.  It's
  
  11656   Thu Oct 1 20:24:02 2015 jamieUpdateDAQmore failed attempts at getting new fb workingI just realized that when running fb1,
if a single mx_stream dies they all die.
  
  11664   Sun Oct 4 14:28:03 2015 jamieUpdateDAQmore failed attempts at getting new fb workingI tried to look at fb1 again today, but
still haven't made any progress.

The one thing I did notice, though,
  
  5279   Mon Aug 22 21:32:10 2011 kiwamuUpdateGeneralmore in-vac work : AS clipping fixed and OSEM/oplev adjustment[Keiko / Jenne / Jamie / Kiwamu]
 We
did the following things today :
  
  5284   Tue Aug 23 06:49:24 2011 AnamariaUpdateGeneralmore in-vac work : AS clipping fixed and OSEM/oplev adjustmentWhere was the AS clipping?! Ah, the suspense...


  
  4389   Wed Mar 9 04:46:13 2011 kiwamuUpdateGreen Lockingmore intensity noise measurement 
Here is a diagram for our intensity
noise coupling measurement.
 intensity_setup.pngIntensityNoise.png 
  1082   Fri Oct 24 11:09:08 2008 steveUpdateSAFETYmore lexan plates under camerasThe MC2, MC3&1 and BSC-SUS cameras were repositioned
somewhat in the 
process of placing lexan disks under neat
  
  1728   Thu Jul 9 19:05:32 2009 ClaraUpdatePEMmore mic position changes; mics not picking up high frequenciesBonnie has been strung up on bungees in
the PSL so that her position/orientation
can be adjusted however we like. She is now
 6x 
  1729   Thu Jul 9 19:24:50 2009 ranaUpdatePEMmore mic position changes; mics not picking up high frequenciesMight be the insidious 850 Hz AA filters in
the black AA box which precedes the ADC.
  
  2040   Fri Oct 2 02:55:07 2009 robUpdateLockingmore progressMore progress with locking tonight, with
initial acquisition and power ramps working. 
The final handoff to RF CARM still needs
  
  2047   Sat Oct 3 14:53:24 2009 robUpdateLockingmore progressLate last night after the ETMY settled
down from the quake I made some more progress
in locking, with the handoff to RF CARM succeeding
  
  12095   Thu Apr 28 00:41:08 2016 gautamUpdateendtable upgrademore progress - Transmon PD installedThe IR Transmon system is almost completely
laid out, only the QPD remains to be installed.
Some notes:
  
  2673   Mon Mar 15 09:43:47 2010 steveUpdatePEMmore sandblasting todayDo not open IFO vacuum envelope today!
They are sandblasting again at CES
  
  6959   Wed Jul 11 11:18:21 2012 steveUpdatePEMmore seismic noise next week 
   The fabricators
of the big flume in the CES lab have begun
 testing the sediment feed system which is
  
  6961   Wed Jul 11 13:45:01 2012 JenneUpdatePEMmore seismic noise next week

    

       
            
  
  12794   Fri Feb 3 11:03:06 2017 jamieUpdateCDSmore testing fb1; DAQ DOWN DURING TESTMore testing of fb1 today.  DAQ DOWN
UNTIL FURTHER NOTICE.

Testing Wednesday did not resolve
  
  10714   Fri Nov 14 08:25:29 2014 SteveUpdateSUSmorning issuesPRM, SRM and the ENDs are kicking up. 
Computers are down.  PMC slider is stuck
at low voltage.
 morning.png 
  9726   Fri Mar 14 09:44:34 2014 SteveUpdateLSCmorning lock   2hrsMorningLock.png 
  13504   Fri Jan 5 17:50:47 2018 ranaConfigurationComputersmotif on nodusI had to do 'sudo yum install motif'
on nodus so that we could get libXm.so.4
so that we could run MEDM. Works now.
  
  12582   Thu Oct 27 09:38:32 2016 SteveUpdatePEMmouseWe may have a mouse in the lab. 
Do not leave any food scrap in trash ! Traps will be set.
 mouse.jpg 
  12605   Tue Nov 8 08:51:59 2016 SteveUpdatePEMmouse hole sealedThis is where the mammal came though. It
is reach able from room 108 CES

 CES108rs.jpg 
  3646   Tue Oct 5 09:26:04 2010 steveConfigurationPEMmoved accelerometersAccelerometers xyz were moved from IOO-south/west 
corner to under PSL table. They were turned
off for ~20 minutes.
  
  698   Fri Jul 18 19:30:20 2008 MashaUpdateAuxiliary lockingmoving from 40mI will be working in the basement of Bridge
probably starting next week; I moved the
NPRO laser and some of the optics from my
  
  2182   Thu Nov 5 16:30:56 2009 peteUpdateComputersmoving megatron Joe and I moved megatron and its
associated IO chassis from 1Y3 to 1Y9, in
preparations for RCG tests at ETMY.
  
  12521   Wed Sep 28 04:27:33 2016 ericqUpdateGeneralmucking aboutPMC was terribly misaligned. The PMCR camera
seems to have drifted somewhat off target
too, but I didn't touch it.
 alscheck.pdfweird_olpit.pdf 
  12522   Thu Sep 29 09:49:53 2016 ranaUpdateGeneralmucking aboutWith the WFS and OL, we never have figured
out a good way to separate pit and yaw. Need
to figure out a reference for up/down and
  
  12527   Sat Oct 1 10:03:28 2016 ericqUpdateGeneralmucking aboutSome things I did last night:

I measured the X PDH OLG, and turned
the gain down by ~6dB to bring the UGF back
  
  12529   Tue Oct 4 02:59:48 2016 ericqUpdateGeneralmucking about[ericq, gautam]

We poked around trying to figure
out the X PDH situation. In brief, the glitchiness
 2016-10-04_ALSXspectra.pdf 
  2294   Wed Nov 18 16:58:36 2009 kiwamuUpdateElectronicsmulti-resonant EOM --- EOM characterization ---In designing the whole circuit it is better
to know the characteristic of the EOM.
I made impedance measurement with
 EOM_impedance.png 
  2295   Wed Nov 18 22:38:17 2009 KojiUpdateElectronicsmulti-resonant EOM --- EOM characterization ---How can I get those values from the figure?

  
  2292   Wed Nov 18 14:55:59 2009 kiwamuUpdateElectronicsmulti-resonant EOM --- circuit design ----The circuit design of multi-resonant EOM
have proceeded.
By using numerical
 whole_circuit.pngdesigned.pngmont.png 
  2263   Fri Nov 13 05:03:09 2009 kiwamuUpdateElectronicsmulti-resonant EOM --- input impedance of LC tank ----I measured the input impedance of the
LC tank circuit with the transformer. The
 input_impedance.pnginput_impedance2.png 
  2262   Fri Nov 13 03:38:47 2009 kiwamuUpdateElectronicsmulti-resonant EOM --- impedance of LC tank circuit ----I have measured the impedance of the LC
tank circuit which I referred on my
last entry.
 LCtank_impedance.pngLCtank_model.png 
  346   Thu Feb 28 19:37:41 2008 robConfigurationComputersmultiple cameras running and seisBLRMS[quote]1) Mafalda is now connected via an
orange Cat5E ethernet cord to the gigabit
ethernet switch in rack in the office space.
  
  6152   Tue Dec 27 22:17:56 2011 kiwamuUpdateLSCmultiple-LOCKIN new screensSome
new screens have been made for the new multiple-LOCKIN
system running on the LSC realtime controller.
 Untitled.png 
  6150   Mon Dec 26 14:01:45 2011 kiwamuUpdateLSCmultiple-LOCKIN newly addedThe multiple
LOCKIN module has been newly added on the
 multiple-lockin.png 
  7457   Mon Oct 1 16:05:01 2012 jamieUpdateCDSmx stream restart required on all front endsFor some reason the frame builder and mx
stream processes on ALL front ends were down. 
I restarted the frame builder and all the
  
  11103   Thu Mar 5 19:13:17 2015 ranaUpdateCDSmxStream all restart at ~7:10 pm    
  6609   Sun May 6 00:11:00 2012 DenUpdateCDSmx_streamc1sus and c1iscex computers could not connect
to framebuilder, I restarted it, did not
help. Then I restarted mx_stream daemon on
  
  9825   Thu Apr 17 17:15:54 2014 jamieUpdateCDSmx_stream not starting on c1iooWhile
trying to get dolphin working on c1ioo,
the c1ioo
 c1ioo_no_mx_stream.png 
  9830   Fri Apr 18 14:00:48 2014 rolfUpdateCDSmx_stream not starting on c1ioo 
 To fix open-mx connection to
c1ioo, had to restart the mx mapper on fb
  
  9831   Fri Apr 18 19:05:17 2014 jamieUpdateCDSmx_stream not starting on c1ioo


   
        
            
  
  9826   Thu Apr 17 17:22:32 2014 JenneUpdateCDSmx_stream not starting on c1ioo, locking okayJamie tells me that the 2 big consequences
of this are (a) we are not archiving any
data that is collected on the ioo machine,
  
  6778   Thu Jun 7 03:37:26 2012 yutaUpdateCDSmx_stream restarted on c1lsc, c1ioo c1lsc and c1ioo computers had FB net statuses
all red. So, I restarted mx_stream on each
computer. 
  
  6761   Wed Jun 6 00:37:11 2012 JenneUpdateComputersmx_stream restarted on iscey, susJust as Yuta and I were sitting down to
look at our beatnote (really the output of
the freq discriminator) on Dataviewer, all
  
  7612   Wed Oct 24 19:55:06 2012 jamieUpdate my assesment of the folding mirror (passive tip-tilt) situationWe removed all the folding mirrors ({P,S}R{2,3})
from the IFO and took them into the bake
lab clean room.  The idea was that at
  
  7617   Thu Oct 25 02:10:22 2012 KojiUpdate my assesment of the folding mirror (passive tip-tilt) situationThe thinner wire has a history that it
did not improve the hysteresis (ask Jenne).
Nevertheless, it's worth to try.
  