40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 305 of 344  Not logged in ELOG logo
Entry  Thu Dec 13 12:05:36 2007, alberto, Omnistructure, Electronics, The new Butterworth seems to work quite well TF_New_Butterworth_12-Nov-2007_TF.pngBultervverth2.png
It works better probably because of the small inductors I'm using this time.
The peak is at 30 MHz because I didn't have the precise elements to get 33. 
Entry  Wed Dec 19 11:31:01 2007, steve, Omnistructure, PEM, aircond filter maintenance acfilters6m.jpg
Jeff is working on all air condiontion units of the 40m lab
This we do every six months.
Entry  Sat Jan 26 02:08:53 2008, John, Omnistructure, LSC, Fibres 
There is now a fibre running from the SP table to the ISCT at the Y-end. In the coming days I will try to mode match the beam from this fibre into the arm
through ETMY. To achieve this I will be altering the optical layout of this table.
Entry  Tue Feb 12 13:53:27 2008, rob, Omnistructure, VAC, Return of the RGA RGA-080212.png

The new RGA head was installed a few days ago.  I just ran the [B]RGAlogger[/B] script to see if it works, which it does.  I also edited the crontab file
on op340m to run the RGAlogger script every night at 1:25 AM.  It should run tonight.
Entry  Fri Mar 7 19:04:39 2008, steve, Omnistructure, PSL, laser pointer 
Green laser pointer was found in my desk.
I blamed Rana for not returning it to me after a conference talk.
It is surprisingly bright still.
Entry  Sat Apr 26 11:21:15 2008, ajw, Omnistructure, Computers, backup of /cvs/cds restarted 
The backup of /cvs/cds (which runs as a cron job on fb40m; see /cvs/cds/caltech/scripts/backup/000README.txt) 
has been down since fb40m was rebooted on March 3.
I was unable to start it because of conflicting ssh keys in /home/controls/.ssh .
    Reply  Mon May 5 11:04:30 2008, rob, Omnistructure, Computers, Network setup 

Mafalda was not connected to the network, and so our DMF-based seisBLRMS has not been running for ~1 week.  I traced this to a broken ethernet cable connecting
mafalda to the network switch in the rack next to the B&W printer.  This cable has a broken connector at the switch side, which means it can't stay connected
Entry  Fri May 16 17:27:55 2008, Andrey, Omnistructure, General, Toilets are broken, do not use them !!! 

[COLOR=red][SIZE=4] Both toilets in 40-meter were constantly flushing, the leaking water was on the floor inside of the restrooms, so 
Entry  Fri Aug 1 11:51:15 2008, justing, Omnistructure, Computers, added /cvs/cds/site directory 
I added a /cvs/cds/site directory.  This is the same as is dicsussed [URL=http://ilog.ligo-la.caltech.edu/ilog/pub/ilog.cgi?group=detector&date_to_view=04/19/2008&anchor_to_scroll_to=2008:04:19:15:54:09-lisab]here[/URL].
 Right now it just has the text file 'cit' in it, but eventually the other scripts should be added.  I'll probably use it in the next version of mDV.
Entry  Tue Aug 26 09:58:59 2008, steve, Omnistructure, COC, ETMX is #03 etmx-d40posg_012.jpgetmx03.jpg
This is the picture of ETMX from the upper south west viewport
Entry  Tue Aug 26 18:19:16 2008, rana, Omnistructure, Electronics, Resistor Noise at the 40m SEI-RN_RNM.pdf
As Stefan points out in his recent ISS ilog entries at LLO, Daniel [COLOR=darkgreen]Sigg recently wrote a
recommendation memo on resistor and capacitor[/COLOR] choices: [URL=http://www.ligo.caltech.edu/docs/T/T070016-A/T070016-A.pdf]T070016[/URL].
Entry  Fri Oct 10 00:34:52 2008, rob, Omnistructure, Computers, FEs are down 

The front-end machines are all down.  Another cosmic-ray in the RFM, I suppose.  Whoever comes in first in the morning should do the all-boot described
in the wiki.
    Reply  Fri Oct 10 10:20:42 2008, Alberto, Omnistructure, Computers, FEs are down 
[quote]
The front-end machines are all down.  Another cosmic-ray in the RFM, I suppose.  Whoever comes in first in the morning should do the all-boot described
in the wiki.[/quote]
Entry  Fri Oct 10 13:57:33 2008, Alberto, Omnistructure, Computers, Problems in locking the X arm 
This morning for some reason that I didn't clearly understand I could not lock the Xarm. The Y arm was not a problem and the Restore and Align script worked
fine.
Entry  Wed Oct 22 20:50:30 2008, Alberto, Omnistructure, Computers, GPS 
Today I measured the GPS clock frequency at the output of CLOCK_MON in a board on the same crate where the c1iool0 computer is located. The monitor was
connected with a BNC cable to the 10MHz reference input of the frequency counter on top of that rack, where it was used to check the 166MHz coming from
one of the Marconi.
Entry  Thu Oct 23 18:45:18 2008, Alberto, Omnistructure, Computer Scripts / Programs, Python code for GPIB devices developed for the Absl length experiment HP8590.pysweepfrequency.py
I wrote two Python scripts for my measurement that can be also used/imitated by others: sweepfrequency. py and HP8590.py. The first is is the one that we
run by a Python interpreter (just typing "python <name script> <parameters>"from the terminal). It manages the parameters that we have to pass it for the
measurement and calls the second one, HP8590.py which actually does most of the job.
Entry  Fri Nov 14 17:41:50 2008, Jenne, Omnistructure, Electronics, Sweet New Soldering Iron newSolderingIron.JPG
The fancy new Weller Soldering Iron is now hooked up on the electronics bench.  

Accessories for it are in the blue twirly cabinet (spare tips of different types, CD, and USB cable to connect it to a computer, should we ever decide
Entry  Sat Dec 20 23:37:43 2008, rob, Omnistructure, General, Saturday Night Fever after presumed power failure 

Just came by to pick something up...
Entry  Sun Jan 4 13:17:23 2009, Alan, Omnistructure, Computer Scripts / Programs, New 40mWebStatus 
I have set up some code in /cvs/cds/caltech/scripts/webStatus along with a cronjob on controls@nodus to generate a webStatus every half hour, at [URL=https://nodus.ligo.caltech.edu:30889/40mWebStatus.html]40mWebStatus[/URL]

you are welcome to add/delete lines corresponding to interesting EPICS channels, in the template /cvs/cds/caltech/scripts/webStatus/webStatus_template.html
    Reply  Mon Jan 5 11:21:05 2009, Alan, Omnistructure, Computer Scripts / Programs, New 40mWebStatus 
[quote]
I guess we need some kind of "official" crontab file for controls@nodus so that we know how/where to add things. So, I put one in /cvs/cds/caltech/crontab/controls@nodus.crontab[/quote]
Entry  Thu Jan 8 20:26:17 2009, rob, Omnistructure, General, Earthquake in San Bernardino 
Magnitude 4.5
Date-Time
Entry  Mon Mar 9 10:59:05 2009, Alan, Omnistructure, Computers, ssh agent on fb40m restarted for backup 
After the boot-fest, the nightly backup to Powell-Booth failed, and an automatic email got sent to me. I restarted the ssh agent, following the instructions
in /cvs/cds/caltech/scripts/backup/000README.txt .
Entry  Thu Mar 12 00:29:39 2009, Jenne, Omnistructure, DMF, DMF being whiny again 
[QUOTE]The seisBLRMS has been running on megatron via an open terminal ssh'd into there from allegra with matlab running.[/QUOTE]

[Yoichi, Jenne]
Entry  Fri Mar 20 15:54:29 2009, steve, Omnistructure, General, 480V crane power switch on MEZ 
CES Mezzanine is beeing rebuilt to accommodate our new neighbor: the 20ft high water slide...& .jacuzzi
All our ac power transformers are up there. Yesterday we labelled the power switch of 480VAC on the mezz
that we need to keep to run the 3 cranes in the lab.
Entry  Fri Apr 3 14:52:38 2009, Jenne, Omnistructure, PEM, Guralp is finally back! 
After many, many "it'll be there in 2 weeks" from the Guralp people, our seismometer is finally back!
I have it plugged into the Guralp breakout box's Channel 1xyz (so I have unplugged the other Guralp).  Both of the Guralp's are currently
sitting under the MC1/MC3 chamber.
Entry  Fri Apr 24 16:24:25 2009, rob, Omnistructure, VAC, Paschen paschens.pngpaschenplot.m
In response to Steve's elog entry, and for 40m posterity, I provide the Paschen Curve.
Entry  Fri May 8 10:05:40 2009, Alan, Omnistructure, Computers, Restarted backup since fb40m was rebooted 
Restarted backup since fb40m was rebooted.
Entry  Sun May 17 20:50:38 2009, rob, Omnistructure, Environment, mag 5.0 earthquake in inglewood 
2009 May 18  03:39:36 UTC


    Details

   Maps
 
  Scientific & Technical
    Reply  Wed May 20 10:43:17 2009, steve, Omnistructure, Environment, accelerometers sensitivity eq5m4.jpg


    
        
            Quote:
        
        
            
            2009 May 18  03:39:36 UTC
            
            
                
    Reply  Wed May 20 16:03:52 2009, steve, Omnistructure, Environment, using OSEMs to look at seismic activity eqOSEM5m4.jpg
Rana suggested using OSEM sensing voltages as guide lines to look seismic activity.
As you see todays drilling and tumping activity was nothing compared to the EQ of mag 5 and 4
Optic level servos are turned back on.
Entry  Wed Jul 8 11:13:36 2009, Alberto, Omnistructure, Computers, wireless router disconnected 
Once again, this morning I found the wireless router disconnected from the LAN cable. No martian WiFi was available.
I wonder who is been doing that and for what reason.
Entry  Fri Jul 10 19:56:23 2009, rana, koji, Omnistructure, Environment, Changed office temp therm.JPG
I have increased the temperature setpoint in the office area by ~0.75 deg F. Figure attached. Also a few days ago I increased the setpoint of the AC
in the control room. Looks like the Laser is able to handle the changes in office area temperature so far, but lets see how it fares over the weekend.
    Reply  Sun Jul 12 20:05:06 2009, rana, Omnistructure, Environment, Changed office temp Picture_3.png
This is a 7-day minute trend. There's [B]no obvious effect[/B] in any of the channels looking back 2 days. 

Seems like the laser chiller fix has made the [U][COLOR=darkred]laser much more immune to the office area temperature[/COLOR][/U].
Entry  Sun Jul 12 23:14:56 2009, Jenne, Omnistructure, General, Web screenshots aren't being updated 
Before heading back to the 40m to check on the computer situation, I thought I'd check the web screenshots page that Kakeru worked on, and it looks like
none of the screens have been updated since June 1st.  I don't know what the story is on that one, or how to fix it, but it'd be handy if it were
fixed.
    Reply  Mon Jul 13 15:48:05 2009, rana, Omnistructure, Environment, Removal of the cold air deflection device for the MOPA chiller 
Around 2 PM today, I removed the blue flap which has been deflecting the cold air from the AC down into the laser chiller.
Let's watch the laser trends for a few days to see if there's any effect.
    Reply  Mon Jul 13 23:03:14 2009, rob, alberto, Omnistructure, Environment, Removal of the cold air deflection device for the MOPA chiller 
[quote]Around 2 PM today, I removed the blue flap which has been deflecting the cold air from the AC down into the laser chiller.
Let's watch the laser trends for a few days to see if there's any effect.[/quote]
    Reply  Tue Jul 14 00:32:46 2009, rob, alberto, Omnistructure, Environment, Removal of the cold air deflection device for the MOPA chiller 
[quote][quote]Around 2 PM today, I removed the blue flap which has been deflecting the cold air from the AC down into the laser chiller.
Let's watch the laser trends for a few days to see if there's any effect.[/quote]
    Reply  Tue Jul 14 17:48:20 2009, Jenne, Omnistructure, Environment, Removal of the cold air deflection device for the MOPA chiller ACeffectonLASER2.png
[quote][quote][quote]Around 2 PM today, I removed the blue flap which has been deflecting the cold air from the AC down into the laser chiller.
Let's watch the laser trends for a few days to see if there's any effect.[/quote]
    Reply  Sun Jul 19 22:38:24 2009, rob, Omnistructure, General, Web screenshots aren't being updated 


    
        
            Quote:
        
        
            
            Before heading back to the 40m to check on the computer situation, I thought I'd check the web screenshots page that
Entry  Wed Jul 22 18:04:14 2009, rob, Omnistructure, Computers, weird noise coming from Gigabit switch 
in the rack next to the printer.  It sounds like a fan is hitting something.
Entry  Fri Aug 7 13:42:12 2009, ajw, Omnistructure, Computers, backup of frames restored 
Ever since July 22, the backup script that runs on fb40m has failed to ssh to ldas-cit.ligo.caltech.edu
to back up our trend frames and /cvs/cds.
Entry  Fri Aug 7 16:14:57 2009, rob, Omnistructure, VAC, UPS failed 
Steve, Rana, Ben, Jenne, Alberto, Rob
 
UPS in the vacuum rack failed this afternoon, cutting off power to the vacuum control system.  After plugging all the stuff that had been
Entry  Fri Aug 7 18:06:24 2009, rob, Omnistructure, VAC, opening V1 when PTP1 is broken 
We've had a devil of a time getting V1 to open, due to the Interlock code. 
 
The short story is that if C1:Vac-PTP1_pressure > 1.0, the interlock code won't let you push the button to open V1 (but it won't close
Entry  Wed Aug 19 02:17:52 2009, rana, Omnistructure, Environment, Control Room Workstation desks lowered to human height 
There were no injuries...Now we need to get some new chairs.
Entry  Mon Aug 24 10:43:27 2009, Alberto, Omnistructure, Computers, RFM Network Failure 
This morning I found that all the front end computers down. A failure of the RFM network drove all the computers down.
I was about to restart them all, but it wasn't necessary. After I power cycled and restarted C1SOSVME all the other computers and RFM network came
back to their green status on the MEDM screen. After that I just had to reset and then restart C1SUSVME1/2.
Entry  Tue Sep 8 19:36:52 2009, Jenne, Omnistructure, DMF, DMF restarted 
I (think I) restarted DMF.  It's on Mafalda, running in matlab (not the complied version which Rana was having trouble with back in the day). 
To start Matlab, I did "nohup matlab", ran mdv_config, then started seisBLRMS.m running.  Since I used nohup, I then closed the terminal
window, and am crossing my fingers in hopes that it continues to work.  I would have used Screen, but that doesn't seem to work on Mafalda.
    Reply  Tue Sep 8 20:25:03 2009, Jenne, Omnistructure, DMF, DMF restarted 


    
        
            Quote:
        
        
            
            I (think I) restarted DMF.  It's on Mafalda, running in matlab (not the complied version which Rana was having
Entry  Fri Sep 18 14:25:00 2009, rob, Omnistructure, PSL, water under the laser chiller 
rob, koji, steve
We noticed some water (about a cup) on the floor under the NESLAB chiller today.  We put the chiller up on blocks and took off the side panel
for a cursory inspection, but found no obvious leaks.  We'll keep an eye on it.
    Reply  Fri Sep 18 16:05:08 2009, Jenne, Omnistructure, PSL, water under the laser chiller 


    
        
            Quote:
        
        
            
            rob, koji, steve
Entry  Mon Sep 28 23:44:18 2009, Koji, Omnistructure, SAFETY, Crappy power outlet 
Jenne, Koji
Tonight we found that the wireless for Martian network was down. 
We inspected the router and found the power was down. The power of the weather station was also down.
ELOG V3.1.3-