40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 305 of 357  Not logged in ELOG logo
Entry  Wed Jul 10 14:57:01 2019, Koji, Summary, CDS, Channel recipe for iscaux upgrade D990694-B.pdfD990543A1.PDF
   +  Reply  Thu Jul 11 12:42:35 2019, gautam, Summary, CDS, P2 interface board IMG_7728.JPG
   +  Reply  Thu Jul 11 13:08:36 2019, Chub, Summary, CDS, P2 interface board 
   +  Reply  Thu Jul 11 13:09:22 2019, gautam , Summary, CDS, P2 interface board 
   +  Reply  Thu Jul 11 18:15:22 2019, gautam, Summary, Electronics, PSL/IOO rack checkout 
   +  Reply  Thu Jul 18 00:51:52 2019, Koji, Summary, CDS, iscaux electronics modifications LSC_whitening2.jpgLSC_whitening.jpg
   +  Reply  Thu Jul 18 22:34:40 2019, Koji, Summary, CDS, iscaux electronics modifications 
   +  Reply  Sat Jul 20 11:57:39 2019, gautam, Summary, CDS, P2 interface board IMG_7773.JPG
Entry  Tue Jul 30 20:11:12 2019, rana, Summary, IMC, IMC ASC: thoughts and hopes 
   +  Reply  Mon Aug 5 17:23:26 2019, gautam, Summary, Computers, WiFi Settings on asia 
Entry  Fri Sep 13 13:03:35 2019, Koji, Summary, CDS, DIN 96pin to DSUB37 adapter (single) ready for use P_20190912_192109.jpg
   +  Reply  Mon Sep 16 09:11:37 2019, gautam, Summary, CDS, DIN 96pin to DSUB37 adapter (single) ready for use 
   +  Reply  Mon Sep 16 20:22:19 2019, gautam, Summary, CDS, Update on the Acromag status acromagChecklist.pdf
Entry  Tue Sep 17 23:43:34 2019, Koji, Summary, CDS, Acromag logic checker digital_checker.pdfIMG_8914.JPG
Entry  Fri Dec 6 17:49:46 2019, rana, Summary, PEM, Jump test of seismometers: EX needs recentering Seismometers.pdfsrc.tgz
   +  Reply  Sun Dec 8 20:15:41 2019, rana, Summary, PEM, Jump test of seismometers: EX needs recentering seis_all_191208.pdf
   +  Reply  Mon Dec 9 13:08:24 2019, Yehonathan, Summary, PEM, Jump test of seismometers: EX needs recentering seis_191208.pdf
Entry  Wed Dec 11 15:01:57 2019, Jon, Summary, PSL, PMC cavity ringdown measurement IMG_0101.jpg
Entry  Mon Jan 13 23:30:53 2020, Yehonathan, Summary, PSL, Changes made since Gautam left 
   +  Reply  Tue Jan 14 20:17:09 2020, gautam, Summary, General, IFO recovery DCerrors.png
   +  Reply  Wed Jan 15 10:04:19 2020, gautam, Summary, General, POX / POY locking restored singleArms.png
Entry  Mon Feb 10 09:40:54 2020, Larry Wallace, Summary, General, SolidWorks Computer Upgrade and Printer repair 
Entry  Wed Feb 26 21:43:48 2020, Jon, Summary, BHD, Projected IFO noise budget, post-BHD upgrade 40m_phase_quad.pdf40m_aligo_comp.pdf40m_ampl_quad.pdfnoise_budget.tar
   +  Reply  Wed Feb 26 22:09:52 2020, gautam, Summary, BHD, Projected IFO noise budget, post-BHD upgrade 
   +  Reply  Mon Mar 2 23:49:03 2020, Jon, Summary, BHD, Projected IFO noise budget, post-BHD upgrade 40m_phase_quad.pdf40m_ampl_quad.pdf40m_aligo_comp.pdf
   +  Reply  Tue Mar 3 18:11:05 2020, Jon, Summary, BHD, Projected IFO noise budget, post-BHD upgrade 40m_phase_quad.pdf40m_ampl_quad.pdf40m_aligo_comp.pdf
   +  Reply  Thu Mar 5 19:45:23 2020, Jon, Summary, PSL, C1PSL in-situ test results c1psl_feedthrough_wiring_-_By_Connector_(3).pdf
   +  Reply  Wed Mar 11 18:12:53 2020, gautam, Summary, PSL, WFS Demod board modifications D980233-B_Mar2020Mods.pdf
Entry  Tue Apr 7 15:30:40 2020, Jon, Summary, NoiseBudget, 40m noise budget migrated to pygwinc 
Entry  Mon Apr 13 16:51:49 2020, rana, Summary, DAQ, NODUS: rsyncd daemon / service set up 
Entry  Fri Apr 24 00:26:59 2020, rana, Summary, PEM, L.A. EQ from Tuesday night April22-EQ.pdf
Entry  Tue May 12 17:51:25 2020, rana, Summary, Computer Scripts / Programs, updated LESS syntax highlight on nodus 
   +  Reply  Thu May 14 00:47:55 2020, gautam, Summary, Computer Scripts / Programs, pcdev1 added to authorized keys on nodus 
   +  Reply  Thu Jun 4 00:21:28 2020, Koji, Summary, COC, ITM spares and New PR3 mirrors transported to Downs for phasemap measurement 
Entry  Mon Jul 6 15:10:40 2020, Jon, Summary, BHD, 40m --> A+ BHD design analysis 
Entry  Wed Jul 15 17:46:05 2020, anchal, Summary, ALS, Noise budget for ALS  ALS_nb.pdf
Entry  Mon Jul 20 19:21:16 2020, anchal, Summary, ALS, Few proposals for Voyager ALS VoyagerALSSchemes.pdf
Entry  Thu Jul 23 15:58:24 2020, Jon, Summary, VAC, Vacuum controls refurbishment plan 
   +  Reply  Mon Jul 27 15:48:36 2020, Jon, Summary, VAC, Vacuum parts ordered 
Entry  Wed Sep 9 20:52:45 2020, rana, Summary, IOO, wandering line in IMC 
Entry  Sat Sep 19 23:59:22 2020, anchal, Summary, ALS, ALS noise budget update ALS_nb_ExtraPoles.pdfALS_controls.yamlALS_nb_Kiwamus_Values.pdfALS_controls_Kiwamus_Values.yamlALS_simulink_model.svg
   +  Reply  Sun Sep 20 23:12:13 2020, rana, Summary, ALS, ALS noise budget update 
   +  Reply  Tue Sep 22 00:14:43 2020, anchal, Summary, ALS, ALS noise budget update ALS_NoiseBudgetUpdate.pdfALS_controls.yaml
   +  Reply  Tue Sep 22 12:14:42 2020, rana, Summary, ALS, ALS noise budget update 
   +  Reply  Wed Sep 23 11:13:49 2020, anchal, Summary, ALS, ALS noise budget update ALS_NoiseBudgetUpdate.pdfALS_controls.yaml
   +  Reply  Wed Oct 7 16:56:23 2020, anchal, Summary, ALS, ALS noise budget update - Updated AUX PDH Loop values Extract_X_AUX_PDH_Model.zipALS_NoiseBudgetUpdate.pdf
   +  Reply  Thu Oct 8 11:59:52 2020, rana, Summary, ALS, ALS noise budget update - Updated AUX PDH Loop values 
   +  Reply  Fri Oct 9 18:32:14 2020, anchal, Summary, ALS, ALS noise budget update - Updated AUX PDH Loop values 
   +  Reply  Wed Oct 14 17:03:55 2020, anchal, Summary, ALS, ALS noise budget update - Added whitening filter for ADC ALS_NoiseBudgetUpdate.pdf
Entry  Thu Oct 15 13:48:58 2020, anchal, Summary, General, Lab Entry Notification 
ELOG V3.1.3-