40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 304 of 341  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  12071   Tue Apr 12 09:14:57 2016 SteveUpdateSUSRuby wire - v - groove cut picturesThe
ruby wire standoff V groove cuts are
looking good.
 Sapphire_prism_wire_standoff.JPG 
  12088   Mon Apr 25 11:07:06 2016 SteveUpdateSUSspare SOS towerEarth quake stops need viton tips.

Wirestandoffs are still aluminum.
 ETMXreplacment.jpg 
  12092   Wed Apr 27 09:45:56 2016 ranaUpdateSUSspare SOS towerBah, we need ruby slippers for all future
suspensions. Prism with curved backside and
smooth grooves.
  
  12125   Mon May 23 10:55:49 2016 steveSummarySUSITMX oplev laser replaced 

     
May 23, 2016            
 ITMXoplev.png 
  12126   Mon May 23 15:51:32 2016 steveSummarySUSoplev laser summary updated 




 oplSum.png 
  12128   Tue May 24 10:21:36 2016 ericqSummarySUSITMX Oplev loopsI did a quick measurement of the ITMX oplev
loops, both pitch and yaw have about the
same upper UGF as previous measurements with
  
  12133   Wed May 25 08:32:55 2016 SteveUpdateSUSlocal EQ 3.5mLocal EQ 3.5 mag  at 2:28 UTC May
24, 2016 Rancho Cucamonga, Ca.....no damage

 
 3.5Cucam.pnglocal3.5cucam.png 
  12144   Wed Jun 1 15:01:56 2016 SteveUpdateSUS wire standoffs updateThere are some issues with 5 mm sapphire
prism Atm5. It will cause  interference
between one of the prisms and the Side OSEM.
 06011603.PDF06011602.PDFsapphire_stand_off_v2.pdfside_OSEM_ETMY.jpg5p2wsf.png 
  12146   Thu Jun 2 16:35:44 2016 KojiUpdateSUS wire standoffs updateGap of the prism from the mirror

Sag: s = R(1-Cos[ArcSin[d/2/R]])

- Mirror curvature sag for 2mm
 sapphire_stand_off_v3.pdfarrangement-v3.pdf 
  12149   Fri Jun 3 14:24:13 2016 SteveUpdateSUSlocal EQ 3.1 mLocal EQ 3.1 mag at Jun 2, 2016 11:06:16
PM UTC, Muscoy CA........no damage

Our STS should seen this shake.
 eq3.1mMuscoyCa.png 
  12165   Fri Jun 10 09:52:51 2016 SteveUpdateSUS EQ 5.2 mag Borego SpringEQ  5.2 mag at Jun 10, 8:04 am UTC,
Borego Spring, CA  ~150 mi away.........no
obvoius damage, damping restored, MC is locking,
 5.2mBoregoSpring.pngeqBSs.png 
  12168   Fri Jun 10 16:19:03 2016 ericqUpdateSUSETMX watchETMX has been jumping around again lately.
Just now, I zeroed the ETMX alignment offsets
in the SUS model, and centered the ETMX
  
  12171   Mon Jun 13 10:01:58 2016 SteveUpdateSUSETMX jumps 




 noDamping24hrs.pngETMXjumps.png 
  12177   Tue Jun 14 15:55:17 2016 ericqUpdateSUSETMX watchWithin two hours, it was already all over
the place. 

 ETMX_wander.png 
  12178   Tue Jun 14 16:53:16 2016 ranaUpdateSUSETMX watchWhat about ETMY? and are these really microradians
or just some made up cal?
  
  12187   Thu Jun 16 11:10:17 2016 SteveUpdateSUSspare ETMX optics preparation to be hanged



D
Location
 SOSsus_Page_1.pngSOSsus_Page_2.pngETMXspareTowerFace.jpgETMXspareTowerBack.jpgmagnets-dumbbells.jpg 
  12199   Mon Jun 20 09:36:10 2016 SteveUpdateSUS EQ 3.1 m Big Bear Lake, CANo suspention lost damping.

 
 eq3.1BigBearLakeCA.png 
  12218   Tue Jun 28 09:14:27 2016 SteveUpdateSUS ETMX optics preparation to be rehangedGiven the effect on the contrast defect,
the consensus at the meeting Wednesday 6-22 
was that we should continue to use the existing
 nylonFCss.jpg 
  12226   Wed Jun 29 08:20:04 2016 SteveUpdateSUS First Contact shelf life
We'll follow LIGO policy:
Our
policy is to use first contact within 1 year
of purchase for use in the interferometers.
  
  12227   Wed Jun 29 14:32:22 2016 SteveUpdateSUS how to remove epoxy from optics 

Hi Steve -
  
  12229   Wed Jun 29 16:02:29 2016 SteveUpdateSUS ETMX beam baffleIn the attached photo from 2012, one can
see the installed black glass baffle. According
to the drawings (LIGO-DNNNXXX) this one has
 IMG_1608.JPG 
  12230   Wed Jun 29 16:05:47 2016 ericqUpdateSUSETMX suspension readinessI've gone through the SOS suspension
document (E970037)
and some old elogs to get an idea of all
  
  12231   Thu Jun 30 10:03:16 2016 SteveUpdateSUS how to remove epoxy from opticsProposed Acetone soak dish for SOS epoxy
softening.

It has good acces through 5"
 SOSsoakDish.jpgSOSsoakDish_tv.jpg 
  12232   Thu Jun 30 14:31:02 2016 ChemistryUpdateSUSNO   mad-scientist.jpg 
  12241   Tue Jul 5 09:25:31 2016 SteveUpdateSUS how to remove epoxy from opticsGlass soaking dish with teflon guides.




 SOSsoakingDish.jpgSOSsoakingD.jpg 
  12264   Thu Jul 7 09:13:54 2016 SteveUpdateSUSSOS gluing fixtureAtm 1,
It's right arm is perfect.

Atm 3-4, The left one has bended
 SOSgluingFixRarmWend.jpgSOSgluingFixRarm.jpgSOSgluingFixLarm45.jpgSOSgluingFixLarm.jpgSOSgluingFixture.jpg 
  12315   Wed Jul 20 13:58:55 2016 SteveUpdateSUSSUS damping out of vac chamberCheater
cable to be used in clean room pitch
gluing alingment.
 ETMXrack.jpgfromETMX-satBox.jpgsusDampingSatboxCab.jpgsusDampingSatboxCabl.jpg 
  12316   Wed Jul 20 14:03:01 2016 ericqUpdateSUSEffect of thicker ruby standoffsThe new ETMX ruby guide rods are slightly
thicker than the old aluminum ones; specifically
1.27mm vs 1.0mm.
  
  12334   Mon Jul 25 17:01:54 2016 SteveUpdateSUSETMX suspension - progressITMY side  : Magnet od 1.9 mm so wire
to magnet gap ~ 0.2-0.3 mm

 
 ITMYside2011.JPG 
  12341   Wed Jul 27 11:40:48 2016 steveSummarySUSoplev laser summary updated 




  
  12342   Wed Jul 27 15:03:02 2016 sisyphusMetaphysicsSUSBroken wireWhile tightening the bolts on the ETMX
wire clamp, the wire broke. All four
face magnets broke off. 
 Unknown.jpeg 
  12343   Wed Jul 27 16:56:47 2016 ranaMetaphysicsSUSBroken wireFor the rest of this vent, at least, we
need to start using the EQ stops
more frequently. Whenever the
  
  12346   Thu Jul 28 08:42:36 2016 SteveUpdateSUS wire clampThe clamp is in the machine for milling
off the grooves. It's condition is normal.
The edges needs some 800 sand paper so it
 e12342.jpg 
  12353   Fri Jul 29 03:59:55 2016 ericqUpdateSUSIn air OSEM diagonalization checkThe question arose whether we can get good
enough data to diagonize our OSEM sensing
matrices in air. 
 BS_OSEM_diag.pdf 
  12355   Fri Jul 29 15:17:23 2016 SteveUpdateSUSwire and clamping testUnbaked steel music wire from  "Ca
Fine Wire Co" from 24" od spool,
od 0.0017" used. Identical to the one
 43micr242grs.jpg 
  12357   Fri Jul 29 20:12:54 2016 gautamUpdateSUSthird time - no luck[lydia, gautam]

Summary:
  
  12359   Mon Aug 1 14:09:20 2016 SteveUpdateSUSthird time - no luckGautam and Steve,

The clamp's left side was jammed
onto the left guide pin. It was installed
  
  12362   Wed Aug 3 00:15:39 2016 gautamUpdateSUSETMX suspended[lydia, steve, ericq, gautam]

Summary:
  
  12363   Wed Aug 3 09:26:54 2016 LydiaUpdateSUSETMX suspended: photosHere are the photos we took showing the
magnet positions in the OSEMs, and others
showing the positions of the wire and unglued
 8x 
  12367   Wed Aug 3 15:36:57 2016 SteveUpdateSUSNi plated magnets & epoxy orderedNi plated SmCo magnets with specification
of LIGO-C1103521-v2 for SOS ordered from Electron
  
  12370   Thu Aug 4 03:14:39 2016 gautamUpdateSUSETMX suspended


  
  12377   Fri Aug 5 02:17:10 2016 gautamUpdateSUSETMX Ruby Wire Standoff Ready for GluingPart
1: Rotation of optic


 8x 
  12378   Fri Aug 5 04:43:09 2016 KojiUpdateSUSETMX Ruby Wire Standoff Ready for GluingIf only the LL magnet looks too low, doesn't
this mean that the OSEMs are not arranged
in a square shape?
  
  12379   Fri Aug 5 09:38:12 2016 SteveUpdateSUSSOS sus wire ordered0.0017" OD., 500ft steel music wire
ordered. Pictures of the existing roll are
below. It will be on 8" OD. spool too.
 0.0017.jpg0.0017spec.jpg 
  12381   Fri Aug 5 18:21:28 2016 gautamUpdateSUSETMX Ruby Wire Standoff GLUED
The latest twist in this apparently
never-ending saga was that even though fine
pitch balancing was achieved, the wire was
 11x 
  12382   Sun Aug 7 14:53:39 2016 ericq UpdateSUSETMX Standoff gluing was successfulI came in to check on ETMX. I freed the
earthquake stops, and found that the OSEMS
were reasonably, but not perfectly, centered.
 ETMX_resonances.pdfETMX_SUSspectra.zip 
  12384   Tue Aug 9 00:44:43 2016 gautam UpdateSUSETMY patch-upSummary:

Given that ETMX looks to be in
good shape and the optic and suspension tower
  
  12386   Tue Aug 9 15:27:57 2016 gautam UpdateSUSETMY patch-upThe pickle
pickers came off nicely and both magnets
seem to be glued on okay. The alignment of
 IMG_2996.JPGIMG_2997.JPG 
  12388   Tue Aug 9 16:19:27 2016 SteveUpdateSUStorque driver for wire clampNew
Wiha 28504 torque wrench for SOS wire
clamping. It's range 7.5  - 20 in-lb
  
  12390   Wed Aug 10 03:08:03 2016 gautam UpdateSUSETMY patch-up[lydia, gautam]

Rana felt it was alright to use
the wire clamp and suspension cage in its
  
ELOG V3.1.3-