40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 304 of 341  Not logged in ELOG logo
ID Date Author Typedown Category Subject Text Attachments
  3684   Sun Oct 10 16:59:20 2010 KojiOmnistructureCOCPRM phase map measurement at Downs SB 014[Kiwamu, Yuta, Koji]
We went to the new metrology lab
at Downs subbasement (Rm014) in order to
 IMG_3646.jpgIMG_3647.jpg 
  3740   Tue Oct 19 00:24:07 2010 DmassOmnistructureElectronicsMassive restocking of the 40mI had a number of delinquent items on the
sign out list from the 40m. I returned about
half, and ordered replacements for most of
  
  3745   Wed Oct 20 16:41:41 2010 steveOmnistructureGeneral laser chiller leaving for MIT   P1060929.JPG 
  4235   Tue Feb 1 15:09:41 2011 KojiOmnistructureGeneralProjector - fixedThe projector in the controls room has
been fixed the orange blinking of the status
LED.
  
  4283   Mon Feb 14 01:40:14 2011 KojiOmnistructureCDSName of the green related channelsI propose to use C1:ALS-xxx_xxx for the
names of the green related channels, instead
of GCV, GCX, GCY, GFD...
  
  4297   Tue Feb 15 06:59:57 2011 Suresh, JenneOmnistructureGeneralX end enclosure left open[Jenne, Suresh]
 Jenne found the X-end table
enclosure had been left open.  She replaced
  
  4430   Wed Mar 23 09:54:46 2011 steveOmnistructurePhotosLSC visitorsThe 40m lab was visited by  ~ 30 LSC
members  the end of last week.
 P1070467.JPGP1000414.jpg 
  4873   Thu Jun 23 23:54:29 2011 KojiOmnistructureEnvironmentWe are savedSonali, Ishwita, and another anonymous
SURF saved the long-lasted water shortage
of the 40m
 IMG_0023.jpg 
  4985   Mon Jul 18 21:06:32 2011 PSL Table GuardianOmnistructurePSLDon't leave the PSL table open, unattended!!!!!!!!!!!!11111I found the
PSL table left open, and unattended again. 
  
  5090   Tue Aug 2 10:53:03 2011 JenneOmnistructureSAFETYRegular door out of service. Use Control Room Door only!!The hazardous waste people are moving chemicals
around outside our door, and have roped off
our regular front door. 
  
  5254   Wed Aug 17 12:14:27 2011 Josh SmithOmnistructureComputer Scripts / Programs40m summary page plansJosh Smith, Fabian Magana-Sandoval, Jackie
Lee (Fullerton)
Thanks to Jamie and Jenne for the
  
  5265   Thu Aug 18 22:24:08 2011 jamieOmnistructureVIDEOUpdated 'videoswitch' scriptI have updated the 'videoswitch' program
that controls the video MUX.  It now
includes the ability to query the video mux
  
  6081   Wed Dec 7 09:56:14 2011 rana imitation of steveOmnistructureEnvironmentTelephone Map This is the fone
storree 
  
  6463   Wed Mar 28 21:15:53 2012 ranaOmnistructureComputersWireless router for GCI installed a NETGEAR Wireless Router (WPN824N)
today on the 131 network. The admin password
for it as well as the wireless access password
  
  6465   Thu Mar 29 13:23:05 2012 JenneOmnistructureComputersWireless router for GC

    

       
            
 IMG_0079.JPG 
  6467   Thu Mar 29 19:13:56 2012 JamieOmnistructureComputersWireless router for GCI retrieved the newly "secured"
router from Junaid.  It had apparently
been hooked up to the GC network via it's
  
  6535   Sat Apr 14 00:19:35 2012 SureshOmnistructureLSCOptical Fibers for insitu RFPD characterisation    I have worked out the fibers
we need to get for the following distribution
scheme:
  
  6733   Thu May 31 17:47:25 2012 SureshOmnistructureGeneral40m Wireless NetworkMike Pedraza came by today to install a
new wireless network router configured for
the 40m lab network.  It has a 'secret'
 40m_Wifi.png 
  6741   Fri Jun 1 10:00:03 2012 steveOmnistructureGeneral40m Wireless Network

    

       
            
  
  6758   Tue Jun 5 22:03:22 2012 JenneOmnistructureGreen LockingIR beat signal at PSLYuta is going to bring this up at the 40m
meeting so it can be argued over, but we
(I) want a permanent IR beat setup at
  
  6857   Fri Jun 22 20:00:14 2012 JamieOmnistructureElectronicstwo RG-405 cables ran from 1X2 rack to control room[Yaakov, Eric, Jenne, Yuta]
Two of our surfs, Yaakov and Eric,
pulled two unused RG-405/SMA cables that
  
  7013   Mon Jul 23 20:34:38 2012 JamieOmnistructureComputersCHECK IN YOUR CHANGES TO THE SVNI'm seeing LOTS OF STUFF NOT CHECKED INTO
THE SVN!!!  both modified
  
  7342   Tue Sep 4 20:25:22 2012 jamieOmnistructureVACbetter in-air "lite" access connector neededWe really need something better to replace
the access connector when we're at air. 
This tin foil tunnel crap is dumb. 
  
  7343   Wed Sep 5 09:50:25 2012 SteveOmnistructureVACbetter in-air "lite" access connector needed

    

       
            
 IMG_1612.JPG 
  7344   Wed Sep 5 10:50:15 2012 jamieOmnistructureVACbetter in-air "lite" access connector needed

    

       
            
  
  7345   Wed Sep 5 13:11:43 2012 jamieOmnistructureVACbetter in-air "lite" access connector needed

    

       
            
  
  7407   Wed Sep 19 09:24:01 2012 SteveOmnistructureIOOaccess connector at athmoshere

    

       
            
 IMG_1641.JPGIMG_1642.JPGacetateAC.png 
  7431   Mon Sep 24 10:27:50 2012 SteveOmnistructureGeneraldo not leave stuff on optical table topsThe SP table was found open this morning.
 Please, do not make optics dirty!
  
  7518   Wed Oct 10 10:55:56 2012 SteveOmnistructureIOOaccess connector at athmoshere

    

       
            
 10101202.PDF 
  7620   Thu Oct 25 09:32:17 2012 SteveOmnistructureIOOusing access connector

    

       
            
 acclosing.jpg 
  7749   Tue Nov 27 00:26:00 2012 jamieOmnistructureComputersUbuntu update seems to have broken html input to elog on firefox After some system updates this evening,
firefox can no longer handle the html input
encoding for the elog.  I'm not sure
  
  7757   Wed Nov 28 17:40:28 2012 jamieOmnistructureComputerselog working again on firefox 17Koji and I figured out what the problem
is.  Apparently firefox 17.0 (specifically
it's user-agent string) breaks fckeditor,
  
  7786   Tue Dec 4 20:38:51 2012 jamieOmnistructureComputersnew (beta) version of nds2 installed on control room machinesI've installed the new nds2 packages on
the control room machines.
These new packages include some new
  
  7788   Tue Dec 4 23:08:46 2012 DenOmnistructureComputersnew (beta) version of nds2 installed on control room machines

    

       
            
  
  7791   Wed Dec 5 09:42:46 2012 ranaOmnistructureComputersnew (beta) version of NDS2 installed on control room machinesNDS2 is not designed for non DQ channels
- it gets data from the frames, not through
NDS1.
  
  7793   Wed Dec 5 16:54:29 2012 jamieOmnistructureComputersnew (beta) version of NDS2 installed on control room machines

    

       
            
  
  7805   Mon Dec 10 16:28:13 2012 jamieOmnistructureComputersprogressive retrieval of online data now possible with the new NDS2 clientLeo fixed an issue with the new nds2-client
packages that was preventing it from retrieving
online data.  It's working now from
  
  7921   Sat Jan 19 16:02:28 2013 ranaOmnistructureElectronicsPS cleanupDuring our 'Women in Physics' tours today,
we were reminded that there are several bench
power supplies being used as permanent inside.
  
  8180   Wed Feb 27 02:52:40 2013 JenneOmnistructureSAFETYBack door unlockedDid someone unlock the back door by the
(unofficial) bike storage lately?  Out
of habit, I checked the door behind me while
  
  9335   Mon Nov 4 12:07:55 2013 DmassOmnistructureGeneralReplaced Broken Drill BitsI broke a small bit while using the 40m
drill press to vent some 1/4-20 screws for
the cryo experiment.
  
  9385   Thu Nov 14 14:27:51 2013 nicolasOmnistructureGeneralSR785 Analyzer CRT replaced The 785 analyzer in the 40 had a
wonky hard to read screen. I was hoping that
a new white CRT would fix all the problems. 
 IMG_20131114_125728.jpgIMG_20131114_141425.jpg 
  10040   Sun Jun 15 14:26:30 2014 JamieOmnistructureCDScdsutils re-installed

    

       
            
  
  10041   Sun Jun 15 14:41:08 2014 JamieOmnistructureCDScdsutils re-installed

    

       
            
  
  10155   Tue Jul 8 17:59:12 2014 jamieOmnistructureElectronicsJamie 1811 power supply fixed!I finally made good on the LIFE TIME WARRANTY
on the ancient, Jamie-made 1811 power supply
with the faulty switch:
 20140708_165010.jpg 
  10156   Tue Jul 8 18:20:15 2014 jamieOmnistructureElectronicsJamie 1811 power supply fixed! Placed in PD cabinet in Y arm, next
to the OTHER Jamie-made 1811 power supply
from 1998.
  
  10177   Thu Jul 10 17:33:26 2014 jamieOmnistructureComputer Scripts / Programsubuntu12 software installed, gds 2.16.3.2Rana wanted the latest GDS installed (for
newest DTT), so I made an ubuntu 12 install
directory into which I installed
  
  10188   Fri Jul 11 22:02:52 2014 Jamie, ChrisOmnistructureCDScdsutils: multifarious upgradesTo make the latest cdsutils available in
the control room, we've done the following:
Upgrade pianosa to Ubuntu 12 (cdsutils
  
  10339   Wed Aug 6 13:17:21 2014 ericqOmnistructureCDScdsutils: multifarious upgradesI've checked out cdsutils-274 to /opt/rtcds/cdsutils,
and updated the /ligo/apps/ligoapps-user-env.sh
to have the newer machines use it by default.
  
  10426   Fri Aug 22 18:00:08 2014 jamieOmnistructureCDSubuntu12 awgstream installedI installed awgstream-2.16.14 in /ligo/apps/ubuntu12. 
As with all the ubuntu12 "packages",
you need to source the ubuntu12 ligoapps
  
  10628   Tue Oct 21 17:44:28 2014 jamieOmnistructureComputer Scripts / Programsnew version of cdsutils (351) installedI just installed cdsutils r351 at /ligo/apps/linux-x86_64/cdsutils. 
It should be available on all workstations.
It includes a bunch of bug fixes
  
ELOG V3.1.3-