40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 302 of 357  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  14389   Tue Jan 8 10:27:27 2019 gautamUpdateGeneralNear-term in-chamber work Here is a list of tasks I think we should
prioritize for the next two weeks. The idea
is to get back to the previous state of being
  
  14390   Tue Jan 8 19:13:39 2019 JonUpdateUpgradeReady for pumpdown tomorrowEverything is set for a second pumpdown
tomorrow. We'll plan to start pumping
after the 1pm meeting. Since the main volume
  
  14391   Wed Jan 9 11:07:09 2019 gautamUpdateVACNew Vac channel loggingLooks like I didn't restart all the
daqd processes last night, so the data was
not in fact being recorded to frames. I just
 Screenshot_from_2019-01-09_11-08-28.png 
  14392   Wed Jan 9 11:33:35 2019 gautamUpdateCDSTiming issues still persistSummary:

The gps time mismatch between /proc/gps
and gpstime seems to be resolved. However,
 gpstimeSync.pngScreenshot_from_2019-01-09_17-56-58.png 
  14393   Wed Jan 9 20:01:25 2019 JonUpdateVACSecond pumpdown completed[Jon, Koji, Chub, Gautam]

Summary

The
second pumpdown with the new vacuum system
 Screenshot_from_2019-01-09_20-00-39.pngIMG_3088.jpg 
  14394   Thu Jan 10 10:23:46 2019 gautamUpdateVACovernight leak rateOvernight, the pressure increased from
247 uTorr to 264 uTorr over a period of 30000
seconds. Assuming an IFO volume of 33,000
 OvernightLeak.png 
  14395   Thu Jan 10 11:32:40 2019 ChubUpdateVACManual valve interfaced with CDSConnected the manual gate valve status
indicator to the Acromag box this morning. 
Labeled the temporary cable (a 50' 9p
  
  14396   Thu Jan 10 19:59:08 2019 JonUpdateVACVac System Running Normally on Turbo Pumps[Jon, Gautam, Chub]

Summary

We continued
the pumpdown of the IFO today. The main volume
 Screen_Shot_2019-01-10_at_7.58.24_PM.pngCCs.pngTPs.png 
  14397   Fri Jan 11 16:38:57 2019 gautamUpdateGeneralSome alignment checksThe pumpdown seems to be progressing smoothly,
so I think we are going to stick with the
plan decided on Wednesday, and vent the IFO
 pd82.pngLSC_X.png 
  14398   Mon Jan 14 10:06:53 2019 gautamUpdateVACVent 82 complete[chub, gautam]


IFO pressure was ~2e-4
 Vent82Summary.png 
  14399   Tue Jan 15 10:52:38 2019 gautamUpdateSUSEY door opened[chub, bob, gautam]

We took the heavy door off the
EY chamber at ~930am.
  
  14400   Tue Jan 15 15:27:36 2019 gautamUpdateGeneralLasers and other stuff turned back onVEA is now a laser hazard area
as usual, several 1064nm lasers
in the lab have been turned back on. Apart
  
  14401   Tue Jan 15 15:49:47 2019 gautamUpdateSUSEY door openedWhile restoring OSEMs on ETMY, I noticed
that the open voltages for the UR and LL
OSEMs had significantly (>30%) changed
 EY_OSEMs.png 
  14402   Tue Jan 15 18:16:00 2019 gautamUpdateOptical LeversETMY Oplev HeNe needs replacementPerhaps the ETMY Oplev HeNe is also giving
up - the power has fallen by ~30% over 1
year (Attachment #2), nearly twice as much
 OLRIN.pdfOLsums.png 
  14403   Wed Jan 16 16:25:25 2019 gautamUpdateSUSYarm locked[chub, gautam]

Summary:

Y arm was locked at low power in
 Yarm_locked.png 
  14404   Fri Jan 18 12:52:07 2019 gautamUpdateOptical LeversBS/PRM Oplev HeNe replacedI replaced the BS/PRM Oplev HeNe with one
of the heads from the SP table where Steve
was setting up the OL RIN/pointing noise
 OLRIN_20190118.pdf 
  14405   Fri Jan 18 15:34:37 2019 gautamUpdateThermal CompensationElliptical reflector part numberNobody documented this, but here is the
part number with mechanical drawings of the
elliptical reflector installed at EY: 
  
  14406   Fri Jan 18 17:44:14 2019 gautamUpdateVACPumping on RGA volumeSteve came by the lab today, and looked
at the status of the upgraded vacuum system.
He recommended pumping on the RGA volume,
 CC4.png 
  14407   Fri Jan 18 21:34:18 2019 gautamUpdateSUSUnused optic on EY tableDoes anyone know what the purpose of the
indicated optic in Attachment #1 is? 
 IMG_5408.JPG 
  14408   Sat Jan 19 05:07:45 2019 KojiUpdateSUSUnused optic on EY tableI don't think it was used. It is not
on the diagram too. You can remove it.
  
  14409   Sat Jan 19 15:33:18 2019 gautamUpdateSUSETMY OSEMs faultyAfter diagnosis with the tester box, as
I suspected, the fully open DC voltages on
the two problematic channels, LL and UR,
 Screen_Shot_2019-01-19_at_3.32.35_PM.pngETMY_sensors_1231832635.pdf 
  14411   Tue Jan 22 20:36:53 2019 gautamUpdateSUSETMY OSEMs faultyShort update on latest Satellite box woes.


I checked the resistance
of all 5 OSEM coils on ETMY using a DB25
  
  14412   Tue Jan 22 20:45:21 2019 gautamUpdateVACNew N2 setupThe N2 ran out this weekend (again no reminder
email, but I haven't found the time to
setup the Python mailer yet). So all the
  
  14413   Wed Jan 23 12:39:18 2019 gautamUpdateSUSEY chamber workWhile Chub is making new cables for the
EY satellite box...


I removed the unused
 6x 
  14414   Wed Jan 23 18:11:56 2019 gautamUpdateElectronicsEthernet Power Strip IP conflictFor the last week, I noticed that I was
unable to turn the EY chamber illuminator
on using the remote python scripts. This
  
  14415   Wed Jan 23 23:12:44 2019 gautamUpdateSUSPrep for FC cleaningIn preparation for the FC cleaning, I did
the following:


Set up mini-cleanroom at
 IY_level_before.pdf 
  14416   Thu Jan 24 15:32:31 2019 gautamUpdateSUSY arm cavity side first contact appliedEY:


A clean cart was setup
adjacent to the HEPA-enclosed mini cleanroom
 Yarm_FC.pdfOSEMfilter.png 
  14417   Thu Jan 24 22:55:50 2019 gautamUpdateElectronicsSatellite box S/N 102 investigationI had taken Satellite box S/N 102, from
the SRM suspension, down to the Y-end as
part of debugging. However, at some point,
 IMG_7294.JPGD961289-B2.pdf 
  14418   Fri Jan 25 12:49:53 2019 gautamUpdateElectronicsEthernet Power Strip IP conflict resolvedTo avoid the annoying excercise of having
to manually toggle the illuminators, I solved
the IP conflict. Made a wiki
  
  14419   Fri Jan 25 16:14:51 2019 gautamUpdateVACVacuum interlock code, N2 warningI reset the remote of this git repo to
the 40m version instead of Jon's personal
one, to ensure consistency between what's
  
  14420   Tue Jan 29 16:12:21 2019 ChubUpdate  The foam in the cable tray wall passage
had been falling on the floor in little bite-sized
pieces, so I investigated and found a fiber
  
  14421   Tue Jan 29 17:19:16 2019 gautamUpdateElectronicsSatellite box S/N 105 repaired[chub,
koji, gautam]

 IMG_7301.JPG 
  14422   Tue Jan 29 22:12:40 2019 gautamUpdateSUSAlignment prepSince we may want to close up tomorrow,
I did the following prep work:


Cleaned up Y-end suspension
  
  14423   Wed Jan 30 11:54:24 2019 gautamUpdateSUSMore alignment prep[chub,
gautam]


ETMY cage was wiped down

Targeted
 IMG_5958.JPGIMG_5962.JPG 
  14424   Wed Jan 30 19:25:40 2019 gautamUpdateSUSXarm cavity alignmentSquishing cables at the ITMX satellite
box seems to have fixed the wandering ITM
that I observed yesterday - the sooner we
 Xarm.pngXarm_IR.png 
  14425   Fri Feb 1 01:24:06 2019 gautamUpdateSUSAlmost ready for pumpdown tomorrow[koji, chub, jon, rana, gautam]

Full story tomorrow, but we went
through most of the required pre close-up
  
  14426   Fri Feb 1 13:16:50 2019 gautamUpdateSUSPumpdown 83 underway[chub, bob, gautam]


Steps described in previous
elog were carried out
EY heavy
  
  14427   Fri Feb 1 14:44:14 2019 gautamUpdateSUSY arm FC cleaning and reinstall[Attachment
#1]: ITMY HR face
 IMG_5974.JPGIMG_5986.JPGIMG_5992.JPG 
  14428   Fri Feb 1 21:52:57 2019 gautamUpdateSUSPumpdown 83 underway[jon, koji, gautam]


IFO is at ~1 mtorr, but
pressure is slowly rising because of outgassing
  
  14429   Sat Feb 2 21:53:24 2019 KojiUpdateVACovernight leak rateThe pressure of the main volume increased
from ~1mtorr to 50mtorr for the past 24 hours
(86ksec). This rate is about x1000 of the
 Screen_Shot_2019-02-02_at_21.49.33.png 
  14430   Sun Feb 3 15:15:21 2019 gautamUpdateVACovernight leak rateI looked into this a bit today. Did a walkthrough
of the lab, didn't hear any obvious hissing
(makes sense, that presumably would signal
 Jan10_data.pngFeb1_data.png 
  14431   Sun Feb 3 20:52:34 2019 KojiUpdateVACovernight leak rateWe can pump down (or vent) annuli. If this
is the leak between the main volume and the
annuli, we will be able to see the effect
  
  14432   Mon Feb 4 12:23:24 2019 gautamUpdateVACpumpdown 83 - leak tests[koji, gautam]

As planned, we valved off the main
volume and the annuli from the turbo-pumps
 PD83.png 
  14433   Mon Feb 4 20:13:39 2019 gautamUpdateSUSETMY suspension oddnessI looked at the free-swinging sensor data
from two nights ago, and am struggling with
the interpretation. 
 ETMY_sensors_1_Feb_2019_2230_PST.pdfETMY_UL.pdfETMY_sensors_timeDomain.pdf 
  14434   Tue Feb 5 10:11:30 2019 gautamUpdateVACleak tests complete, pumpdown 83 resumedI guess we forgot to close V5, so we were
indeed pumping on the ITMY and ETMY annuli,
but the other three were isolated suggest
 Annuli.pngMainVol.png 
  14435   Tue Feb 5 10:22:03 2019 chubUpdate oil added to RP-1 & 3I added lubricating oil to roughing pumps
RP1 and RP3 yesterday and this morning. 
Also, I found a nearly full 5 gallon jug
  
  14436   Tue Feb 5 19:30:14 2019 gautamUpdateVACMain volume at 20 uTorrPumpdown looks healthy, so I'm leaving
the TPs on overnight. At some point, we should
probably get the RGA going again. I don't
 PD83.png 
  14437   Wed Feb 6 10:07:23 2019 ChubUpdate pre-construction inspectionThe Central Plant building will be undergoing
seismic upgrades in the near future. 
The adjoining north wall along the Y arm
  
  14438   Thu Feb 7 13:55:25 2019 gautamUpdateVACRGA turned on[chub, steve, gautam]

Steve came by the lab today. He
  
  14440   Thu Feb 7 19:28:46 2019 gautamUpdateVACIFO recovery[rana, gautam]

The full 1 W is again being sent
into the IMC. We have left the PBS+HWP combo
  
ELOG V3.1.3-