  1735   Mon Jul 13 00:34:37 2009 AlbertoDAQComputersAll computers down


   
        
            
  
  1734   Sun Jul 12 23:14:56 2009 JenneOmnistructureGeneralWeb screenshots aren't being updatedBefore heading back to the 40m to check
on the computer situation, I thought I'd
check the web screenshots page that Kakeru
  
  1733   Sun Jul 12 20:06:44 2009 JenneDAQComputersAll computers downI popped by the 40m, and was dismayed to
find that all of the front end computers are
  
  1732   Sun Jul 12 20:05:06 2009 ranaOmnistructureEnvironmentChanged office tempThis is a 7-day minute trend. There's [B]no
obvious effect[/B] in any of the channels
looking back 2 days. 
 Picture_3.png 
  1731   Fri Jul 10 19:56:23 2009 rana, kojiOmnistructureEnvironmentChanged office tempI have increased the temperature setpoint
in the office area by ~0.75 deg F. Figure
attached. Also a few days ago I increased
 therm.JPG 
  1730   Fri Jul 10 17:32:08 2009 ranaUpdateEnvironmentseisBLRMS & mafalda restartedRana, Alberto

Mafalda's ethernet cable had fallen out of
  
  1729   Thu Jul 9 19:24:50 2009 ranaUpdatePEMmore mic position changes; mics not picking up high frequenciesMight be the insidious 850 Hz AA filters in
the black AA box which precedes the ADC.
  
  1728   Thu Jul 9 19:05:32 2009 ClaraUpdatePEMmore mic position changes; mics not picking up high frequenciesBonnie has been strung up on bungees in
the PSL so that her position/orientation
can be adjusted however we like. She is now
 6x 
  1727   Thu Jul 9 02:18:09 2009 ranaUpdatePEMBonnie moved to PSL, getting some coherence with the PMC_ERR channelMy guess is that we need a different acoustic
strategy. The microphones are mainly for
high frequencies, 
  
  1726   Wed Jul 8 19:42:37 2009 ClaraUpdatePEMBonnie moved to PSL, getting some coherence with the PMC_ERR channelIn her position overlooking whichever table
it is that is next to the PSL, Bonnie drummed
up some decent coherence with the PSL-PMC_ERR
 DSC_0567.JPGbonnie2_pmcerr.pdfbonnie_PSL.pdf 
  1725   Wed Jul 8 19:13:19 2009 AlbertoUpdatePSLPSL beam aligned to the Mode CleanerToday I tuned the periscope on the PSL
table to align the beam to the Mode Cleaner.
With the Wave Front Sensor control off, I
  
  1724   Wed Jul 8 18:46:56 2009 DmassAoGElectronicsBeam Scan FunkyThe beam scan (which has been living in
the bridge subbasement for a bit now) is
in a state of imperfection.
 beamscanhead3.pngbeamscanhead6.png 
  1723   Wed Jul 8 12:36:15 2009 ClaraUpdatePEMCoherences and thingsAfter setting up the microphones last week,
I modified the Wiener filtering programs
so as to include the microphone signals.
 7x 
  1722   Wed Jul 8 11:13:36 2009 AlbertoOmnistructureComputerswireless router disconnectedOnce again, this morning I found the wireless
router disconnected from the LAN cable. No
martian WiFi was available.
  
  1721   Wed Jul 8 11:08:43 2009 ZachUpdateCamerasGigE Phase CameraThe plan for the optical setup has been
corrected after it was realized that it would
be impossible to isolate a 29.501 MHz frequency
 fig1.pdffig2.pdf 
  1720   Wed Jul 8 11:05:40 2009 Chris ZimmermanUpdateGeneralWeek 3/4 UpdateThe last week I've spent mostly working
on calculating shot noise and other sensitivities
in three michelson sensor setups, the standard
 NSD_Displacement.png 
  1719   Wed Jul 8 10:56:04 2009 StephanieUpdateGeneralMultiply Resonant EOM UpdateThis week, I've been working on adapting
the last week's circuit to make it buildable.
Mostly this has involved picking components
 DSC_0566.JPGInitialBuiltCkt.pdfBuiltCkt_ExpectedResponse.png 
  1718   Tue Jul 7 16:06:59 2009 ClaraUpdateComputer Scripts / ProgramsDTT synchronization errors, help would be appreciatedI am attempting to use the DTT program
to look at the coherence of the individual
accelerometer signals with the MC_L signal.
  
  1717   Tue Jul 7 15:08:49 2009 KojiSummaryPhotos40 high school students visited 40MAlan and Alberto conducted a tour of 40
high-school students.
It may be the same tour that Rana
 IMG_1848.jpg 
  1716   Thu Jul 2 17:37:36 2009 steveUpdateVACV1 interlock testJoe, Alberto and Steve
We tested gate valve V1 interlock
by :
  
  1715   Thu Jul 2 16:45:06 2009 ClaraUpdatePEMBonnie and Clyde are officially in operation! (Butch Cassidy and the Sundance Kid are in temp position)I hooked up Bonnie and Clyde last night
and tested it today. First I tried some loud
noises to make sure I could identify them
 bonnie_test_marked.pngbonnie_test2_marked.pngbonniebutch_2sbeat_marked.png 
  1714   Thu Jul 2 06:31:35 2009 ClaraUpdatePEMFirst mic in place and connectedI clamped Bonnie (microphone) to the top
of a chamber near the vertex of the arms
and placed Clyde (pre-amp) on the table right
 bonnieandclyde.JPG 
  1713   Thu Jul 2 05:27:12 2009 ClaraUpdatePEMVoltage Divider OopsI tested the voltage dividers and was getting
up to about 3V. I retested the mic w/o the
voltage divider in place, and, lo and behold,
 voltage_divider_diagram.png 
  1712   Wed Jul 1 11:04:27 2009 ZachUpdateCamerasGigE Phase CameraThis past week, I have building a sine
wave rectifier and trying to write a simple
program that displays a ccd image to familiarize
 trigger.jpgfig1b.pdf 
  1711   Wed Jul 1 11:00:52 2009 StephanieUpdateGeneralMultiply Resonant EOM UpdateSince last week, I have come up with a
new circuit, which is shown in the attached
figure. The magnitude (solid) and phase (dashed)
 EOMCKT.pngPR1_VoltagePlot.pdf 
  1710   Wed Jul 1 10:56:42 2009 Chris ZimmermanUpdateGeneralWeek 2/3 UpdateI spent the last week working a lot with
the differences between a basic Michelson
readout and the new one as a displacement
  
  1709   Tue Jun 30 23:09:40 2009 AlbertoUpdateLockingchronicles of some locking attemptsTonight I tried to lock the interferometer.
At the first attempts the arm power didn't
go above about 4. The mode cleaner seemed
  
  1708   Sat Jun 27 03:16:16 2009 ClaraUpdatePEMExciting microphone things!So, I'm double-posting, but I figured the
last post was long enough as it was, and
this is about something different. After
 mic_voltage_out.pngvoltage_dividers.pngvoltage_divider_sketch.png 
  1707   Sat Jun 27 02:48:09 2009 ClaraUpdatePEMI moved accelerometers and made some pretty picturesI have been working on finding the best
spots to put the accelerometer sets in order
to best subtract out noise (seismometers
 6x 
  1706   Fri Jun 26 19:14:04 2009 ranaUpdateEnvironmentseisBLRMS for the past 3 weeks[COLOR=chocolate][SIZE=2]Restarted the seisBLRMS.m
on mafalda (running a term on op540m). Don't
know why it stopped - the
  
  1705   Fri Jun 26 18:00:36 2009 JenneUpdatePEMNew PEM channels for the fancy-pants new microphones[ Jenne, Clara ]
We made new channels for the microphones
which came in this week, by editing C1ADCU_PEM.ini
  
  1704   Fri Jun 26 15:22:28 2009 ClaraUpdatePEMXLR cables tested and labeledWe now have two 80-foot, female-to-female
XLR cables for our pretty new microphones,
one yellow and one purple. They have been
 NC3FXX-EMC.pdfCat11_p35.pdf 
  1703   Thu Jun 25 21:00:30 2009 ClaraUpdatePEMMC1 Accelerator set moved again; new XLR cablesI moved the MC1 set of accelerators. Might
have bumped things. If things aren't working,
look around the MC1 chamber.
  
  1702   Thu Jun 25 17:27:42 2009 ranaUpdateComputerstdsresp on linux I downloaded the tdsresp.pl from LLO and put
it into the various TDS/bin paths. Also updated
the LLO specific path stuff. It runs.
  
  1701   Thu Jun 25 10:28:58 2009 steveHowToVACCryopump is regeneratedThe Cryopump's VC1 valve to IFO was closed
yesterday.
The compressor 
Helium pressure was 235 PSI. The cold head
 Creg.jpg 
  1700   Wed Jun 24 17:08:16 2009 steveBureaucracySAFETYsurf student safetyThe 40m lab specific safety training is
done. The participants were
Stephanie Erickson, Clara Bennett,
  
  1699   Wed Jun 24 14:43:19 2009 robUpdateComputerstdsresp on linux => pzresp 
tdsresp is broken on our linux control
room machines.  I made a little perl
  
  1698   Wed Jun 24 12:09:24 2009 ClaraUpdatePEMWeek 1(ish)I spent the week reading up on filter algorithm
theory, particularly Wiener filtering. I
have also learned how to get data from specific
  
  1697   Wed Jun 24 12:04:22 2009 ZachUpdateCamerasSURF entryThis week, I've been reading some literature
concerning PLL and familiarizing myself with
LINUX, MATLAB, and high-pass filter circuits. 
  
  1696   Wed Jun 24 12:04:00 2009 ClaraUpdatePEMaccelerometer clarificationWhen I said "MC1/MC2 accelerometers,"
I meant the entire three-axis accelerometer
set at each point.
  
  1695   Wed Jun 24 11:20:40 2009 StephanieUpdateGeneralMultiply Resonant EOM UpdateI have created the attached EOM circuit
with resonances at 11 MHz, 29.5 MHz, and
55 MHz (the magnitude and phase of the voltage
 EOM_CktDiagram.JPGEOM_VoltagePlot.JPG 
  1694   Wed Jun 24 10:53:34 2009 Chris ZimmermanUpdateGeneralWeek 1/2 UpdateI've spent most of the last week doing
background reading; fourier transforms, shm,
e&m, and other physics that I didn't
  
  1693   Wed Jun 24 09:21:19 2009 steveConfigurationVACIFO RGA scan with Maglev & Cryo


   
        
            
 nmagd1ifo.jpgnmagCryopres.jpg 
  1692   Tue Jun 23 23:14:36 2009 ClaraConfigurationPEMAccelerometers relocatedBoth accelerometers have been moved in
an attempt to optimize their positions. The
MC1 accelerometer was moved from one green
  
  1691   Tue Jun 23 15:19:42 2009 steveConfigurationVACV1 is open


   
        
            
 V1_opennmag.jpg 
  1690   Tue Jun 23 10:06:03 2009 steveUpdateVACnew maglev RGA scan at day6The Maglev is running for 10 days with
V1 closed.  The pressure at the RGA-region
is  at 2e-9 torr on CC4 cold cathode
 newmagscand6.jpgnmagpresd10.jpg 
  1689   Sun Jun 21 00:08:26 2009 ranaConfigurationComputerselog rebooted 
nodus:log>dmesg
  
  1688   Fri Jun 19 14:30:47 2009 AlbertoConfigurationComputerselog rebooted


   
        
            
  
  1687   Fri Jun 19 13:39:29 2009 AidanUpdateGeneralUpper limit measurement of the scatter from the eLIGO beam dumps. 
 D0900095_ELIGO_35_WATT_AIR_COOLED_BEAM_DUMP_3INCH_P.POL-3.PDFbeam_dump_expt.pngscatter_measurement1.pdfBRDF1.pdfIMG_0308.JPG 
  1686   Fri Jun 19 13:38:42 2009 AlbertoConfigurationComputerselog rebootedToday I found the elog down, so I rebooted
it following the instructions in the wiki.
  
ELOG V3.1.3-