40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 301 of 357  Not logged in ELOG logo
    Reply  Fri Oct 15 22:16:22 2010, kiwamu, Update, SUS, what's wrong with MC2 
Entry  Mon Oct 18 17:16:30 2010, Jenne, Update, SUS, Old PRM, SRM stored, new PRM drag wiped 
    Reply  Mon Oct 18 18:00:36 2010, Koji, Update, SUS, Old PRM, SRM stored, new PRM drag wiped 
Entry  Tue Oct 19 15:14:51 2010, Jenne, Update, SUS, PRM (little) update 
Entry  Wed Oct 20 18:17:35 2010, Suresh, Jenne, Update, SUS, PRM assembly 
Entry  Fri Oct 22 15:06:43 2010, Jenne, Update, SUS, Arts and Crafts! StatusTable.png
Entry  Mon Oct 25 11:39:06 2010, Jenne, Update, SUS, Magnets glued to PRM StatusTable.png
Entry  Tue Oct 26 15:57:10 2010, Jenne, Update, SUS, One magnet broken, reglued 
Entry  Wed Oct 27 16:15:35 2010, Suresh, Update, SUS, Re-glued magnet to the PRM 
Entry  Fri Oct 29 01:18:03 2010, Koji, Summary, SUS, PRM standoff glued IMG_3674.jpg
Entry  Fri Oct 29 14:16:26 2010, Jenne, Update, SUS, PRM baking 
Entry  Mon Nov 1 17:27:47 2010, Jenne, Update, SUS, PRM ready for installation into chamber 
Entry  Fri Nov 5 09:08:14 2010, steve, Update, SUS, epoxy 11081001.PDF
Entry  Thu Nov 11 01:34:27 2010, Jenne, Update, SUS, New-Old ETM towers assembled 
Entry  Fri Nov 12 00:13:34 2010, Suresh, Update, SUS, ETM assembly started 
Entry  Mon Nov 15 22:24:28 2010, Suresh, Update, SUS, Selection of Magnets 
Entry  Tue Nov 16 23:36:29 2010, Suresh, Jenne, Update, SUS, Assembly of ETMs StatusTable.png
Entry  Wed Nov 17 23:45:20 2010, Jenne, Update, SUS, A bad day for suspensions StatusTable.png
Entry  Fri Nov 19 04:23:12 2010, Suresh, Update, SUS, Cleaned and stuck magnets to dumbbells 7x
Entry  Fri Nov 19 16:13:09 2010, Jenne, Update, SUS, ETMU05: magnets glued to optic StatusTable.png
Entry  Fri Nov 19 18:20:59 2010, Suresh, Update, SUS, Glue dynamics! Too_much_glue_1.jpgToo_much_glue_2.jpgToo_much_glue_2.jpgToo_much_glue_3.jpg
Entry  Mon Nov 22 18:39:53 2010, Jenne, Update, SUS, ETMU07: magnets glued to optic. ETMU05: magnets removed StatusTable.png
Entry  Tue Nov 23 18:08:28 2010, Jenne, Update, SUS, ETMU07: Balanced, standoff glued. ETMU05: Magnets glued to optic StatusTable.png
Entry  Wed Nov 24 17:57:24 2010, Jenne, Update, SUS, ETMU07: Baking. ETMU05: Needs side magnets reglued StatusTable.png
Entry  Mon Nov 29 22:50:07 2010, Suresh, Update, SUS, ETMU05 Side Magnets glued back  
Entry  Tue Nov 30 12:45:36 2010, kiwamu, Update, SUS, found a loose connection : ITMX damping 
Entry  Tue Nov 30 18:15:52 2010, Jenne, Update, SUS, ETMX ready to be installed. ETMY ready for winching StatusTable.png
Entry  Wed Dec 1 02:39:00 2010, Suresh, Update, SUS, Installation of ETMU07 as ETMX 
    Reply  Thu Dec 2 02:50:12 2010, kiwamu, Update, SUS, ETMX installed 
Entry  Mon Dec 6 23:33:15 2010, Jenne, Update, SUS, ETMU05 winched, balanced, glued!!!!!! StatusTable.png
Entry  Tue Dec 7 18:37:15 2010, Suresh, Update, SUS, ETMU05 ready for baking 
Entry  Tue Dec 7 20:38:17 2010, kiwamu, Update, SUS, watchdogs off at ITMX and ETMX 
    Reply  Wed Dec 8 12:47:18 2010, kiwamu, Update, SUS, diagonalisation of ITMX input matrix 
Entry  Wed Dec 8 22:35:50 2010, kiwamu, Update, SUS, oplev installed on ITMX and ETMX 
    Reply  Wed Dec 8 22:47:09 2010, kiwamu, Update, SUS, watchdogs off at ITMX and ETMX 
Entry  Thu Dec 9 00:34:53 2010, Osamu, Update, SUS, ITMX oplev Pitch OLTF 2010128_01_ITMX_oplev_pit_oltf_fine.pdf2010128_01_ITMX_oplev_pit_oltf_fine.jpg
Entry  Thu Dec 9 01:14:42 2010, Osamu, Update, SUS,  20101208_ITMX_jump2.png
    Reply  Thu Dec 9 11:13:37 2010, Osamu, Update, SUS,  jump_oplev_offset.png
Entry  Thu Dec 9 12:24:46 2010, kiwamu, Update, SUS, strange ETMX suspension ETMX_spectr.png
    Reply  Thu Dec 9 22:04:40 2010, kiwamu, Update, SUS, Re:strange ETMX suspension 
Entry  Thu Dec 9 23:17:47 2010, kiwamu, Update, SUS, beam pointing has been done 
    Reply  Fri Dec 10 09:58:57 2010, Aidan, Update, SUS, beam pointing has been done 
Entry  Fri Dec 10 11:04:03 2010, Osamu, Update, SUS, ETM oplev mufunctioning 20101208_ETMX_oplev_sum.png
Entry  Fri Dec 10 11:51:20 2010, Osamu, Update, SUS, ITM seems bad 20101209_ITMX_drift.png20101209_ITMX_2stages.png
Entry  Mon Dec 13 18:06:43 2010, Jenne, Update, SUS, ETMY resuspended, ready to install. Tip Tilt realigned, ready to install. StatusTable.png
Entry  Mon Dec 13 22:21:41 2010, kiwamu, Summary, SUS, funny output matrix of ETMX: solved ! 
    Reply  Tue Dec 14 01:04:23 2010, kiwamu, Update, SUS, alignment of ITMs and PRM done 
    Reply  Tue Dec 14 15:15:19 2010, kiwamu, Update, SUS, put ETMY and aligned the beam 
    Reply  Tue Dec 14 22:42:56 2010, kiwamu, Update, SUS, installed the last TT . And some more progresses 
    Reply  Thu Dec 16 01:23:43 2010, kiwamu, Update, SUS, SRM OSEMs installed DSC_2757_ss.jpg
ELOG V3.1.3-