12054
|
Wed Mar 30 11:35:24 2016 |
steve | Update | safety | BS visitor's viewport is protected with lexan | [quote]The four horizontal viewports of arms
are protected
by 3/8" thick, 8.5" OD Lexan disk of MR10 |
|
12082
|
Tue Apr 19 10:58:53 2016 |
Steve | Update | safety | safety scans at PSL & tables | The PSL had one 1064 nm beam to be blocked
around the north east side. The end enclosures
are fine. |
|
12134
|
Wed May 25 11:51:40 2016 |
Steve | Update | safety | SURF 2016 safety |
|
|
12141
|
Tue May 31 16:52:58 2016 |
Steve | Update | safety | NONO | Please do not place anything on the top
of the cabinets that is not tied down. It
will end up on our head in an earth quake. |
|
12157
|
Wed Jun 8 10:20:14 2016 |
Steve | Update | safety | SURF 2016 safety | Aakash Patil received 40m specific basic
safety training.
|
|
12228
|
Wed Jun 29 15:34:00 2016 |
Steve | Update | safety | SURF 2016 safety | Praful Vasiceddy received 40m specific
basic safety training.
|
|
12311
|
Tue Jul 19 15:16:43 2016 |
Steve | Update | safety | safety training | Our new graduate student Lydia received
40m specific safety training. |
|
12479
|
Fri Sep 9 11:24:15 2016 |
Steve | Update | safety | safety training | Visiting
graduate student Teng Zhang from Glasglow |
|
12565
|
Mon Oct 17 14:48:12 2016 |
Steve | Update | safety | safety training | Ashley Fowler "high shool"
student received basic 40m safety training
and Lydia is her guarding angle. |
|
12705
|
Thu Jan 12 10:14:49 2017 |
Steve | HowTo | safety | closing a door | The door was not locked this morning.
Please do not use this door if
you can not close it! |
 |
12706
|
Thu Jan 12 13:43:02 2017 |
rana | HowTo | safety | closing a door | This is one of those unsolved door lock
acquisition problems. Its been happening
for years. |
|
12707
|
Thu Jan 12 13:45:58 2017 |
Steve | HowTo | safety | closing a door | It was requested this morning.
|
|
12868
|
Mon Mar 6 09:12:59 2017 |
Steve | Update | safety | crane inspection 2017 | All 3 cranes inspected by professional
Fred Goodbar of Konecranes and load tested
with 450 lbs at max reach on Friday, March |
|
12913
|
Tue Mar 28 16:47:40 2017 |
Steve | Update | safety | Projector bulb is out again | Three replacement
bulbs ordered
Rana can discribe |
|
12921
|
Fri Mar 31 10:16:07 2017 |
Steve | Update | safety | laser safety glasses annual inspection | Laser safety glasses cleaned in "
Dawn Ultra " mild soap - water solution
and measured for 1064 nm transmission at |
 |
12927
|
Tue Apr 4 11:24:21 2017 |
Steve | Update | safety | Projector bulb is out again | Shipped out for repair.
|
|
12970
|
Thu May 4 08:00:54 2017 |
Steve | Update | safety | safety training | Freshmen Rebecca Zhang as " work study
undergrad " received 40m specific
basic safety training yesterday. |
|
12994
|
Tue May 16 16:16:16 2017 |
Steve | Update | safety | safety training | Early surfs of India Jigyasa and
Kaustubh received basic 40m specific safety
traning. |
|
13095
|
Wed Jul 5 10:23:18 2017 |
Steve | Update | safety | liquid nitrogen boil off | The liquid nitrogen container has a pressure
releif valve set to 35 PSI This valve
will open periodically when contains LN2 |
|
13144
|
Tue Jul 25 14:27:19 2017 |
Steve | Update | safety | safety training | Kira Dubrovina and Naomi Wharton received
40m specific basic safety training. |
|
13406
|
Mon Oct 30 08:08:06 2017 |
Steve | Update | safety | safety training | Udit Kahndelwal received 40m specific basic
safety traning on Friday, Oct. 27 |
|
13496
|
Tue Jan 2 16:24:29 2018 |
gautam | Update | safety | Projector periodically shuts itself off | I noticed this behaviour since ~Dec 20th,
before the power failure. The bulb itself
seems to work fine, but the projector turns |
|
13592
|
Wed Jan 31 15:46:05 2018 |
Steve | Update | safety | crane inspection | Annual crane inspection with load tests
is scheduled for Monday, Feb 5, 2018 from
8 to 11:30am |
|
13630
|
Mon Feb 12 14:56:00 2018 |
Steve | Update | safety | crane inspection 2018 | Our 3 cranes passed professional
inspection. Fred Goodbar of Konacrane with
450 lbs load at full extension. |
  |
13843
|
Tue May 15 13:34:30 2018 |
Steve | Update | safety | surf safety training | Pooja and Keirthana received 40m specific
basic safety training. |
|
14031
|
Thu Jun 28 13:12:20 2018 |
Steve | Update | safety | surf safety training | Shruti and Sandrine received 40m specific
basic safety training this morning.
|
|
14199
|
Tue Sep 18 14:02:37 2018 |
Steve | Update | safety | safety training | Yuki Miyazaki received 40m specific basic
safety training.
|
|
14263
|
Thu Oct 25 16:17:14 2018 |
Steve | Update | safety | safety training | Chub Osthelder
received 40m specific basic safety traning
today. |
|
14978
|
Fri Oct 18 18:13:55 2019 |
Koji | Update | safety | Laser interlock looks OK | I've checked the state of the laser
interlock switch and everything looked normal. |
|
14980
|
Mon Oct 21 11:44:19 2019 |
gautam | Update | safety | Interlock reconnected to Innolight controller | We also took this opportunity to re-connect
the interlock to the Innolight controller
(after it was disconnected for diagnosing |
|
15508
|
Thu Aug 6 22:57:20 2020 |
gautam | Update | safety | New live HV Supplies | Be aware that there is now a KEPCO HV supply
that is energized, sitting on the floor immediately
adjacent to the OMC rack, east of the AP |
|
15544
|
Fri Aug 28 11:41:23 2020 |
gautam | Bureaucracy | safety | Crane inspection 2020 | Mr Fred Goodbar of Konacrane was in the
lab 830am-1130am today. All three cranes
in the VEA were inspected, loaded with 450lb |
|
15932
|
Wed Mar 17 15:02:06 2021 |
gautam | Update | safety | Door to outside from control room was unlocked | I came into the lab a few mins ago and
found the back door |
|
15938
|
Thu Mar 18 12:35:29 2021 |
rana | Update | safety | Door to outside from control room was unlocked | I think this is probably due to the safety
tour yesterday. I beleive Jordan showed them
around the office area and C&B. Not sure |
|
17659
|
Mon Jun 26 18:37:35 2023 |
Koji | Update | safety | 40m Lab Laser Safe | 40m Lab is now Laser Safe
- The PSL NPRO (Innolight) was
turned off with the OFF switch and the key. |
|
8285
|
Wed Mar 13 11:34:24 2013 |
Steve | Update | optical tables | table covers moved to CES | The two acrylic optical table enclosures
were moved from the carpenter shop to CES.
I need to order windows. The latest |
|
8342
|
Mon Mar 25 18:58:09 2013 |
Albert Yang | Update | optical tables | Optical Table Toolboxes | For those of you who spend annoying amounts
of time looking for tools, fear no more.
Toolboxes for each optical table are coming! |
|
8382
|
Mon Apr 1 16:16:16 2013 |
Albert | Update | optical tables | Optical Table Toolboxes Update | A heavy duty plastic box is the likeliest
candidate for the optical table toolbox.
It measures 5 9/16 in. x 11 5/8 in. x 4 5/8 |
|
8384
|
Mon Apr 1 16:35:42 2013 |
Albert | Update | optical tables | Optical Table Toolboxes Update |
|
|
8395
|
Tue Apr 2 21:11:42 2013 |
Rana | Update | optical tables | Optical Table Toolboxes Update |
|
|
8408
|
Wed Apr 3 19:01:06 2013 |
Albert | Update | optical tables | Optical Table Toolboxes Update |
|
|
8410
|
Wed Apr 3 23:22:20 2013 |
rana | Update | optical tables | Optical Table Toolboxes Update | There are some tips for how to appy
nail polish on YouTube from MKNails and MissJenFABULOUS.
Their tips on how to prepare the site for |
|
8445
|
Thu Apr 11 16:29:23 2013 |
Albert | Update | optical tables | Optical Table Toolboxes Update |
|
|
8457
|
Mon Apr 15 17:44:28 2013 |
Albert | Update | optical tables | Optical Table Toolboxes Update | I decided to go see what the electrical
tape looks like on the other tools.
These are the tools I felt were necessary |
|
8487
|
Wed Apr 24 18:51:12 2013 |
Koji | Configuration | optical tables | PD frequency response | The fibers should be routed beneath the
electrical cables.
They should be fixed on the table |
|
8502
|
Mon Apr 29 08:17:40 2013 |
Albert | Update | optical tables | Optical Table Toolboxes Update |
|
|
8505
|
Mon Apr 29 15:53:49 2013 |
Albert | Update | optical tables | Optical Table Boxes |
|
7x |
1020
|
Thu Oct 2 16:44:28 2008 |
steve | Summary | oplevs | optical levers | The idea is to push the UGF to 10 Hz of the
TM oplev servos with quiet HeNe laser.
We measured good intensity noise of JDS 1103P |
|
1245
|
Thu Jan 22 12:08:59 2009 |
pete | Update | oplevs | oplev calibration | Following the procedure described in Royal
Reinecke's 2006 SURF report, I've calibrated
the ETMY yaw oplev DOF. The idea is to sweep |
|
1247
|
Thu Jan 22 23:36:50 2009 |
pete | HowTo | oplevs | arm cavity oplev calibration | calibrated the y-arm oplevs. the procedure