  16817   Thu Apr 28 11:53:10 2022 AnchalSummaryBHDPOP_SM4 and POP_SM5 AssemblyPOP_SM4

I
tried out this stack today and found some
change of plans.
  
  16816   Thu Apr 28 09:12:18 2022 AnchalUpdateBHDRestoring arm alignmentThis would be a daily first task in the
morning. We'll need to check the status
of arm alignment and optimize it back to
  
  16815   Wed Apr 27 16:28:57 2022 AnchalSummaryBHDBHD Upgrade - Retreiving arm cavity alignment[Anchal, Paco, JC]

We had to open ITMY, ETMY chamber
doors to get the cavity aligned again. Once
  
  16814   Wed Apr 27 10:05:55 2022 JCUpdateCoil DriversCoil Drivers Update18 (9 pairs) Coil Drivers have been modified.
Namely ETMX/ITMX/ITMY/BS/PRM/SRM/MC1/MC2/MC3.

 
  
  16813   Tue Apr 26 16:23:22 2022 TommyUpdateElectronicsRFSoC2x2 MTSWe connected a 8 MHz signal generator to
the device in order to sync up the ADCs and
DACs and hopefully get phase data. 
  
  16812   Mon Apr 25 18:00:03 2022 Ian MacMillanUpdateUpgradeCable supports updateI have designed new cable supports for
the new ribbon cables running up the side
of the tables in the vacuum chambers. 
 Chamber_Leg_Ribbon_Cable_Attachments.pdf 
  16811   Mon Apr 25 17:24:06 2022 AnchalUpdateCDSDAQ still downI investigated this issue today. At first,
it seemed that only new suspension testpoints
are inaccessible. I was able to use diaggui
  
  16810   Mon Apr 25 16:57:57 2022 AnchalUpdateBHDCable post installation[Anchal, Tega, JC]

We installed cable posts in ITMY,
BS, and ITMX chambers for all the new suspensions.
  
  16809   Mon Apr 25 14:49:02 2022 KojiUpdateGeneralNitrogen TankFor your (and mine) info:

N2 pressure can be monitored on
the 40m summary page: https://nodus.ligo.caltech.edu:30889/detcharsummary/day/20220425/vacuum/
  
  16808   Mon Apr 25 14:19:51 2022 JCUpdateGeneralNitrogen TankComing in this morning, I checked on the
Nitrogen tanks to check the level. One of
the tanks were empty, so I went ahead and
  
  16807   Sun Apr 24 13:17:08 2022 TommyUpdateElectronicsNew RFSoC2x2 OverlayWe recieved an overlay from Chris Stoughton
which he used for a ZCU11 board. The overlay
is supposed to be compatible with the RFSoC
  
  16806   Fri Apr 22 14:14:33 2022 JordanUpdateVACTP3 Forepump tip seal replacementJordan, JC

While the pumpspool is vented,
I thought it would be a convenient time to
 IMG_0572.jpegIMG_0573.jpeg 
  16805   Fri Apr 22 12:15:08 2022 AnchalUpdateBHDCable post installationIf someone gets time, let's put in
all the cable posts and clean up our cable
routing on the tables.
  
  16804   Fri Apr 22 12:09:51 2022 AnchalUpdateCoil DriversPlease update DCC pagesNice. Please put this information on the
DCC pages of the coil driver units. You'll
find links to all the units in this document
  
  16803   Fri Apr 22 12:03:09 2022 TegaUpdateBHDAS1 UR OSEM problem localized in the chamber[JC, Tega, Ian, Paco]

We found that the UR cable was
clamped to the table by one of the ITMY OPLEV
  
  16802   Fri Apr 22 07:01:58 2022 JcUpdateCoil DriversAdding Resistors and Reinstalling[Koji, JC]

Coil Drivers LO2, SR2, AS4, and
AS1 have been updated a reinstalled into
 8x 
  16801   Thu Apr 21 20:33:31 2022 KojiUpdateBHDAS1 UR OSEM problem localized in the chamberTega and Paco reported that the UR OSEM
of AS1 lost the response.

- I have checked the LED MON (left)
 Screenshot_from_2022-04-21_20-13-13.png 
  16800   Thu Apr 21 18:42:47 2022 TegaUpdateBHDPart V of BHR upgrade - Align LO and AS beams to BHD BS[Tega, Yuta, Paco]

We tried aligning the LO and AS
beams on to the BHD beamsplitter. During
  
  16799   Thu Apr 21 18:18:42 2022 yehonathanUpdateBHDPOX Alignment{Yehonathan, Paco}

BS, ITMX and ETMX were aligned
to get flashing in the X arm.
 POX11_alignment.png 
  16798   Thu Apr 21 17:32:35 2022 Ian MacMillanSummarySEISeismic Study of Buildings and Caltech Campus[Rana, Ian]

We built a power supply for the
accelerometer shown in Attachment 1 based
 IMG_1820.jpgScreen_Shot_2022-04-21_at_5.52.51_PM.png 
  16797   Thu Apr 21 16:49:01 2022 PacoUpdateBHDPart V of BHR upgrade - BS Oplev + LO1 offset[Paco, JC, Yuta]

We aligned the BS oplev using the
new BSOL mirror pair. The main change is
  
  16796   Thu Apr 21 16:36:56 2022 TegaUpdateVACcleanup work for vacuum git repogit repo - https://git.ligo.org/40m/vac

Finally incorporated the FRGs into
the main modbusIOC service and everything
  
  16795   Thu Apr 21 15:22:44 2022 KojiUpdateSUSOutpur resistors updates for SR2, LO2, AS1, and AS4 done[JC Koji]

Quick report: JC has done all the
mods for the coil driver circuit in the morning
  
  16794   Thu Apr 21 11:31:35 2022 JCUpdateVACGauges P3/P4[Jordan, JC]

It was brought to attention during
yesterday's meeting that the pressures
 IMG_0560.jpegIMG_0561.jpeg 
  16793   Thu Apr 21 10:35:23 2022 KojiUpdateCDSDAQ seemed downYesterday, when I worked on the damping
servo, I found that any of the daqvtools
(ndscope, dtt, dataviewer,...) is not available. 
  
  16792   Wed Apr 20 18:50:03 2022 KojiUpdateBHDPart V of BHR upgrade - PR2 weirdnessIt seemed that it comes from the servo
oscillation. This does not happen when the
output limitters were set to be 100-ish.
 Screenshot_2022-04-20_18-46-11.png 
  16791   Wed Apr 20 16:11:08 2022 KojiUpdateSUSOutpur resistors updated for LO1 coil drivers / for SR2, LO2, AS1, and AS4 in progress[JC Koji]

To give more alignment ranges for
the SUS alignment, we started updating the
 6x 
  16790   Wed Apr 20 14:56:06 2022 TommyUpdateElectronicsRFSoC 2x2 board -- setup for remote work & BALUN sagaHere are a few options for replacement
BALUNs from Mini Circuits and specs:

Current. TCM1-83X+, 10-8000 MHz,
  
  16789   Wed Apr 20 08:20:22 2022 PacoUpdateBHDPart V of BHR upgrade - PR2 weirdnessYesterday, I tried tuning the PR2 damping
gains by increasing the gain until the damping
gave the ~5 oscillations (by watching the
  
  16788   Tue Apr 19 18:10:10 2022 PacoUpdateBHDPart V of BHR upgrade - POX11 path, LO path, and ITMX Oplev[Yuta, Paco]

We set up POX11 beam path from
ITMX chamber to the ITMX in-air table. To
 DJI_0167.JPGDJI_0169.JPGDJI_0168.JPG 
  16787   Mon Apr 18 23:22:39 2022 KojiUpdateGeneralTool box and Work Station OrganizationWhoa! Thanks!  PXL_20220419_062101907.jpg 
  16786   Mon Apr 18 17:53:45 2022 PacoSummaryBHDPart IIa of BHR upgrade - POY11 debugging[Paco, Ian]

We aligned the X-arm IR laser


First fix pointing on the
  
  16785   Mon Apr 18 16:09:07 2022 YehonathanUpdateBHDBHD Readout simulationI'm planning on simulating the BHD
readout noise in a manner very similar to
the ALS noise model using Simulink. I've
 BHD_Simulink_Sketch.drawio.pdf 
  16784   Mon Apr 18 15:17:31 2022 JancarloUpdateGeneralTool box and Work Station OrganizationI cleaned up around the 40 m lab. All the
Laser Safety Glasses have been picked up
and placed on the rack at the entrance.
  
  16783   Mon Apr 18 14:52:47 2022 Ian MacMillanSummarySEISeismic Study of Buildings and Caltech Campus[Ian, JC]

I want to take measurements of
seismic noise at different places on Caltech's
 7x 
  16782   Fri Apr 15 11:59:16 2022 YehonathanUpdateIOOIMC completely misalignedCame this morning, opened the PSL and there
was not even a beam on the MC REFL.

Looking at the big monitor it seems
  
  16781   Thu Apr 14 18:39:13 2022 PacoSummaryBHDPart IIa of BHR upgrade - POY11 debugging[Paco]

In reply to Koji's questions;

Q1: What is the product number
  
  16780   Thu Apr 14 18:34:51 2022 PacoSummaryBHDITMY Oplev reinstalled (Re: 2 in oplev mirrors incompatible with LMR2V)[Paco, Yehonathan]

We installed ITMYOL1 and ITMYOL2
on the ITMY chamber. We aligned the ITMY
  
  16779   Thu Apr 14 11:52:57 2022 yehonathanSummaryBHDPart IIa of BHR upgrade - POY11 debugging{JC, Paco, Yehonathan, Ian}

POY lens was moved to infront of
the POY steering mirror to make the POU beam
 Screenshot_2022-04-14_15-53-39.pngPXL_20220414_220616875.jpg 
  16778   Thu Apr 14 10:18:35 2022 PacoSummaryBHD2 in oplev mirrors incompatible with LMR2V[Paco, JC]

We realized the 2 in oplev mirrors
(Thorlabs BB2-E02) for ITMYOL, SRMOL, and
  
  16777   Thu Apr 14 09:04:30 2022 JordanUpdateVACRGA Volume RGA ScansPrior to venting the RGA volume on Tuesday
(4/12/2022) I took an RGA scan of the volume
to be vented (RGA+TP1 volume+Manual Gate
 40mRGA_Overlay.pdfRGAVolume_4_12_22.PNG 
  16776   Wed Apr 13 18:55:54 2022 KojiUpdateCamerasCamera Battery TestI believe that the Nikon has an exposure
problem and that's why we bought the
Canon.
  
  16775   Wed Apr 13 16:23:54 2022 Ian MacMillanUpdateGeneralSmell in 40m[Ian, Paco, JC]

There is a strange smell in the
40m. It smells like a chemically burning
  
  16774   Wed Apr 13 15:57:25 2022 Ian MacMillanUpdateCamerasCamera Battery TestTested the Nikon batteries for the camera.
they are supposed to be 7V batteries but
they don't hold a charge. I confirmed
  
  16773   Wed Apr 13 12:50:07 2022 TegaUpdateVACNew Pressure Gauge Install/Pump Spool Vent[Jordan, JC, Tega]

We have installed all the FRGs
and updated the VAC medm screens to display
 VAC_FRG_UPGRADE.png 
  16772   Tue Apr 12 09:05:21 2022 JordanUpdateVACNew Pressure Gauge Install/Pump Spool VentToday, Tega and I would like to vent the
pump spool an dinstall the new FRG-400 Agilent
Pressure Gauges (per elog 15703). The attached
 6x 
  16771   Mon Apr 11 21:44:14 2022 KojiSummaryBHDPart IIa of BHR upgrade - POY11 debuggingWe took out the right most PD interface
board D990543 and removed the 74LS04 chips.
In fact two out of 4 were already replaced
 D990543A1.PDFPXL_20220412_023941730.jpgPXL_20220412_023950567.jpg 
  16770   Mon Apr 11 21:13:21 2022 PacoSummaryBHDPart IIa of BHR upgrade - POY11 debugging[Paco, Koji]

I asked Koji for some advice regarding
closing the loop on YARM using POY11. A few
  
  16769   Mon Apr 11 11:00:30 2022 JancarloUpdateVACC1VAC Reboot and Nitrogen tanks[Paco, JC, Ian, Jordan, Chub]

Checking in the morning, I walked
over to the Nitrogen tanks to check the levels.
  
  16768   Fri Apr 8 17:21:31 2022 Ian MacMillanSummaryBHDPart IIa of BHR upgrade - IR laser alignment on Yarm[Ian, Paco, Tega]

Paco and I opened the ETMY and
ITMY chamber to work on yesterdays efforts
  