40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 298 of 355  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  12825   Mon Feb 13 17:19:41 2017 yinziConfiguration configuring ethernet for raspberry piGautam and I were able to get the Raspberry
Pi up and running today, including being
able to ssh into it from the control room.
 Screen_Shot_2017-02-13_at_5.11.52_PM.png 
  3862   Thu Nov 4 17:24:49 2010 steveUpdateGeneralconflat flanges for MIT8 pieces of 10" CF blanks were shipped
to MIT
 P1070020.JPG 
  9802   Fri Apr 11 14:57:53 2014 steveUpdateLSCcongratulation 
 
 whenSheisHappy3h.pngmc4hArms3hrs.png 
  9803   Fri Apr 11 16:04:31 2014 KojiUpdateLSCcongratulationIt's
just one of the stepping stones, but not
yet a mile stone.
  
  990   Thu Sep 25 03:12:13 2008 ranaSummaryComputersconlog and linux1It would be nice to have conlog from outside.
Right now its on linux1 and so its unavailable.
To
  
  5379   Sat Sep 10 18:52:45 2011 ranaUpdateComputersconlog getting filled upOne of the reasons that conlog seems so
slow lately is that its been writing 100's
of MB of .log files every day since early
  
  8725   Wed Jun 19 16:04:56 2013 JamieConfigurationComputer Scripts / Programsconlog startup fixed, and restartedI cleaned up a bunch of conlog
stuff to make it all a little more sane and
simple.  I also fixed the messy startup
  
  8726   Wed Jun 19 16:47:34 2013 JamieConfigurationComputer Scripts / Programsconlog startup fixed, and restarted

    

       
            
  
  615   Tue Jul 1 14:24:58 2008 robHowToComputer Scripts / Programsconlog time machine
I've written a perl script (now in the $SCRIPTS/general
directory) which implements a "conlog restore"
  
  32   Tue Oct 30 19:32:13 2007 tobinProblem FixedComputersconlogger restartedI noticed that the conlogger wasn't running.
 It looks like it hasn't been running since
October 11th.  I modified the restart_conlogger
  
  1224   Tue Jan 13 11:10:42 2009 robConfigurationComputersconlogger restartedunknown how long it's been down.     
  1919   Mon Aug 17 09:52:04 2009 robSummaryGeneralconlogger restartedI restarted the conlogger on op340m. 
This needs to be done when op340m is rebooted--it
wasn't done for some reason and so we've
  
  1920   Mon Aug 17 17:43:11 2009 ranaSummaryGeneralconlogger restartedAdded the conlog directory to the SVN,
minus the enormous data directory. We are
now free to make changes to the conlog code.
  
  1921   Mon Aug 17 17:48:49 2009 robSummaryGeneralconlogger restarted


   
        
            
  
  6673   Thu May 24 12:23:00 2012 DenUpdateGeneralconnection error monitor for the websiteThe main page of connection error monitor
can be a scheme of computers and models with
connections. If there is an error in connection,
 errors_overview.pngerrors.png 
  100   Wed Nov 14 12:33:35 2007 tobinAoGEnvironmentconstructionThe construction crews are running a jack-hammer
right outside of the control room.
 DSC_0172.JPG 
  11188   Wed Apr 1 10:50:59 2015 SteveUpdatePEMconstruction aheadThe 40m fenced area will start storing
this large ~ 8000 lbs chamber on April 14.
The asphalt will be cut, jack hammered the
 largeMITchamber.jpg 
  2298   Thu Nov 19 09:48:54 2009 steveUpdatePEMconstruction effect8 days plot: Thurdsay, Friday, Sat and
Sun without construction
 varseism.png 
  2248   Thu Nov 12 09:43:29 2009 steveUpdatePEMconstruction has started at CESThe concrete  floor cutting has begun
next door at CES
 cuttingconcr.jpgcutcon1.JPGcutcon2.JPG 
  2272   Mon Nov 16 09:37:41 2009 steveUpdatePEMconstruction is getting noisier 
ATM1: Seismometers are saturating,
suspensions are OK
 4hces.pngP1050734.JPGP1050736.JPG 
  2561   Tue Feb 2 16:10:09 2010 steveUpdatePEMconstruction progress next doorCES construction is progressing. The 40m
suspensions are bearing well.
atm1, PEM  vs sus plots of 120
 pem120d.jpg02022010.JPG02022010b.JPG02022010c.JPGicewall.JPG 
  17123   Wed Aug 31 12:57:07 2022 ranaSummaryALScontrol of ALS beat freq from command line -easyThe PZT sweeps that we've been making
to characterize the ALS-X laser should probably
be discarded - the DFD was not setup correctly
 Untitled.png 
  14873   Thu Sep 12 09:49:07 2019 gautamUpdateComputerscontrol rm wkstns shutdownChub wanted to get the correct part number
for the replacement UPS batteries which necessitated
opening up the UPS. To be cautious, all the
 IMG_7943.JPG 
  14913   Mon Sep 30 11:42:36 2019 aaronUpdateComputerscontrol rm wkstns shutdownI booted Rossa in rescue mode; though I
see no errors on bootup, I still see the
same error ("a problem has occurred")
  
  3277   Fri Jul 23 15:32:02 2010 steveUpdatePEMcontrol room AC set point changedThe control room temp is warmer than usual.
The heat exchanger Office Pro 18 set point
was lowered from 70 to 68F yesterday.
  
  10061   Wed Jun 18 18:00:36 2014 ericqUpdateComputer Scripts / Programscontrol room bashrc changeSome time ago, Rana changed the PS1 prompt
codes on the control room computers. However,
the exit codes of commands weren't being
  
  10073   Thu Jun 19 14:52:20 2014 not ericqUpdateComputer Scripts / Programscontrol room bashrc change

    

       
            
  
  13160   Wed Aug 2 15:04:15 2017 gautamConfigurationComputerscontrol room workstation power distributionThe 4 control room workstation CPUs (Rossa,
Pianosa, Donatella and Allegra) are now connected
to the UPS.
  
  9743   Fri Mar 21 14:59:44 2014 steveUpdatePEMcontroling dustPlease take a look at the table top with
the flashlight before
 IMG_0044.JPG 
  13134   Mon Jul 24 09:55:29 2017 SteveOmnistructureVACcontroller failerIfo pressure was 5.5 mTorr this Monday
morning. The PSL shutter was still open.
TP2 controller failed. Interlock closed V1,
 TP2controllerFails.png 
  2735   Tue Mar 30 21:11:42 2010 kiwamuSummaryGreen Lockingconversion efficiency of PPKTPWith a
30mm PPKTP crystal the conversion efficiency
 efficiency_waist_edit.png 
  2736   Tue Mar 30 22:13:49 2010 KojiSummaryGreen Lockingconversion efficiency of PPKTPQuestion:
Why does the small spot size for
the case (A) have small efficiency as the
  
  3765   Fri Oct 22 19:53:27 2010 yutaSummaryCDSconversion failure in digital filters(Rana, Joe, Yuta)

We now understand that we never succeeded
  
  2482   Wed Jan 6 16:48:52 2010 steveBureaucracySAFETYcopied NPRO keyWe lost our key to the Lightwave 125/6-OPN-PS  
The key shop just made one look a like that
works.
 nprokey.JPG 
  15918   Fri Mar 12 21:15:19 2021 gautamUpdateLSCcoronaversary PRFPMiAttachment
#1 - proof that the
 PRFPMI.pngCARM_OLTF.pdf 
  13592   Wed Jan 31 15:46:05 2018 SteveUpdatesafetycrane inspectionAnnual crane inspection with load tests
is scheduled for Monday, Feb 5, 2018 from
8 to 11:30am
  
  8309   Tue Mar 19 10:30:00 2013 steveUpdateSAFETYcrane inspection 2013 
Professional crane inspector: Fred
Goodbar found two small leaks at the Vertex
 sippingOIL.jpg03191301.PDF 
  14601   Fri May 10 13:00:25 2019 ChubUpdateGeneralcrane inspection completeThe 40M jib cranes all passed inspection!  20190510_110245.jpg 
  3279   Fri Jul 23 16:00:35 2010 steveUpdateSAFETYcrane load test tomorrowAll 3 cranes will be load tested at 1 ton
tomorrow morning between 9am and 2pm
Do not come to the 40m lab during
  
  3810   Thu Oct 28 13:01:34 2010 steveUpdatePEMcrane repair guys left for the day


   
        
            
  
  9084   Wed Aug 28 11:23:41 2013 SteveUpdateVACcrane repair sheduled

    

       
            
  
  3477   Fri Aug 27 11:27:33 2010 steveUpdatePEMcrane safety documentI posted the crane safety document on the
40m wiki, vacuum page as 26 August 2010
Please add your comments and corrections.
  
  9359   Thu Nov 7 11:19:04 2013 SteveUpdateVACcrane work POSTPONED to Monday

    

       
            
  
  4487   Tue Apr 5 17:04:36 2011 steveSummarySAFETYcranes inspected and load testedMike Caton of Konecranes inspected and
loadtested all 3  of the 40m cranes
at max reach trolley positions with 1 ton.
 P1070522.JPGP1070532.JPG 
  5276   Mon Aug 22 11:40:08 2011 steveUpdateVACcranes checkedCranes are  checked and they are ready
for lifting. At the east end will use the
manual Genei-lift to put door on.
  
  8856   Tue Jul 16 13:48:26 2013 SteveUpdatePEMcranes cleanedKeven and Steve,
The 3 cranes tested and  wiped
off as preparation for upcoming vent.
  
  3378   Fri Aug 6 17:47:36 2010 steveSummaryGeneralcranes load tested at 1998 lbs


   
        
            
 0.9ton.PDFP1060523.JPGP1060532.JPGP1060541.JPG 
  6430   Tue Mar 20 16:53:48 2012 steveUpdatePEMcranes maintenance & certified inspection of 2012Fred Goodbar of Konecrane has completed
the annual certified crane inspection and
maintenance of our cranes as required in
  
  6266   Fri Feb 10 02:35:29 2012 kiwamuUpdateIOOcrazy ground motionI
gave up tonight's locking activity because
the MC can't stay locked.
 MCunlock.png 
  6268   Fri Feb 10 11:01:31 2012 steveUpdateIOOcrazy ground motion


   
        
            
 seism1davg.png 
ELOG V3.1.3-