  14975   Thu Oct 17 12:34:51 2019 gautamUpdateGeneralDaytime wishlistSome ideas that would help increase the
locking duty-cycle in the short term. 


Seismometer investigation
 DriftingTTs.pngFSSweirdness.png 
  14976   Thu Oct 17 16:49:53 2019 gautamUpdateASCPRMI ASC - first passI tried implementing a basic PRMI ASC using
the POP QPD as a sensor. The POP22
buildup RMS is reduced by a factor of a few.
 PRMI_ASC.pdf 
  14977   Fri Oct 18 17:35:07 2019 gautamUpdateSUSETMX sat box disconnectedKoji suggested systematic investigation
of the ETMX suspension electronics. The tests
to be done are:
  
  14978   Fri Oct 18 18:13:55 2019 KojiUpdatesafetyLaser interlock looks OKI've checked the state of the laser
interlock switch and everything looked normal.
  
  14979   Fri Oct 18 20:21:33 2019 shrutiUpdateALSAM measurement attempt at X end[Shruti, Rana]

- At the X end, we set up the network
analyzer to begin measurement of the AM transfer
  
  14980   Mon Oct 21 11:44:19 2019 gautamUpdatesafetyInterlock reconnected to Innolight controllerWe also took this opportunity to re-connect
the interlock to the Innolight controller
(after it was disconnected for diagnosing
  
  14981   Mon Oct 21 12:25:46 2019 gautamUpdateALSDFD electronics checkoutSummary:

There are no unexpected red-flags
in the performance of the DFD electronics.
 ALSnoiseAnomaly.pdfDFDcalib.pdfspectra.pdfPTgains.pdf 
  14982   Mon Oct 21 16:02:21 2019 gautamUpdateSUSETMX over the weekendLooking at the sensor and oplev trends
over the weekend, there was only one event
where the optic seems to have been macroscopically
 filteredData.pdf 
  14983   Tue Oct 22 00:52:27 2019 gautamUpdateLSCLocking updates
Transition of arms from POX/POY
to CARM/DARM was much smoother today - a
change was made at the EX PDH setup, see
 PRMI3f_ALS_Oct21sensMat.pdf 
  14984   Tue Oct 22 15:32:15 2019 gautamUpdateALSEX uPDH electronics checkoutSummary:

The EX PDH setup had what I thought
was insufficient phase and gain margins.
 uPDH_X_OLTFs.pdf 
  14985   Tue Oct 22 17:35:30 2019 gautamUpdateASCPRMI ASC - first passI made a change to the c1ass model to normalize
the PIT and YAW POP QPD outputs by the SUM
channel. A saturation block is used to prevent
 originalPOP_QPD.pngPOP_QPD_modified.png 
  14986   Wed Oct 23 10:23:26 2019 ranaUpdateALSEX uPDH electronics checkoutDuring our EX AM/PM setups, I don't
think we bumped the PDH gain knob (and I
hope that the knob was locked). Possible
  
  14987   Wed Oct 23 11:11:01 2019 gautamUpdateALSEX uPDH electronics checkoutThe closest thing I can think of is here.

  
  14988   Wed Oct 23 11:14:21 2019 gautamUpdateASCPRMI ASC with QPD signals normalized.Attachment #1 - comparison
of the POP QPD PIT and YAW output signal
spectra with and without them being
 PRMI_ASC_normalization.pdfPRMI_ASC_Oct22.pdf 
  14989   Wed Oct 23 11:49:21 2019 gautamUpdatePEMPEM BLRMS anomalyI looked into the seismometer situation
a bit more today. Here is the story so far
- I think more investigation is required:
 seisAll_20191021.pdfspecGrams.zip 
  14990   Wed Oct 23 18:40:58 2019 gautamUpdateCDSanother round of vertex FE rebootsI wanted to restart the c1oaf model. As
usual, the first time the model was restarted,
it came back online with a 0x2bad error.
  
  14991   Thu Oct 24 11:58:16 2019 gautamUpdateASCPRC angular feedforwardSummary:

I'd like to revive the PRC
angular feedforward system. However,
 ffPotential.pdf 
  14992   Thu Oct 24 18:37:15 2019 gautamUpdatePEMT240 checkoutSummary:

The Trillium T240 seismometer
needs 
  
  14993   Fri Oct 25 01:04:49 2019 gautamUpdateALSALS electronics chain was saturating[Koji, gautam]

Summary:

We think we got to the bottom of
  
  14994   Mon Oct 28 18:55:06 2019 ranaUpdateComputersrossa revivalback
on new Rossa from Xi computing


switched to using Display
  
  14995   Mon Oct 28 23:20:11 2019 gautamUpdateALSALS power budget 


IR
  
  14996   Tue Oct 29 01:24:45 2019 gautamUpdateLSCMore locking updatesSummary:


The two arm lengths can
be controlled reliably in the CARM/DARM basis
 POP22_feature.pngPRMI3f_ALS_Oct21sensMat.pdf 
  14997   Tue Oct 29 15:13:19 2019 gautamUpdateLSCMore locking updatesI looked at some signals for a 10 second
period when the PRMI was locked with at some
CARM offset, just before the PRMI lost lock,
 PRMI_lockloss.png 
  14998   Tue Oct 29 17:40:48 2019 gautamUpdateLSCMore locking updatesI set up a photodiode (PDA10CF) in the
IFO REFL beampath and the Agilent NA is sitting
on the east side of the PSL enclosure. This
 broadSweep.pdfzoomSweep.pdf 
  14999   Wed Oct 30 01:27:00 2019 gautamUpdateLSCMore locking updatesTried a bunch of things tonight.


Modified the "ELP300"
filter module in the MICH filter bank - this
 POP_ASS.png 
  15000   Wed Oct 30 11:53:41 2019 gautamUpdateLSCMICH loop shape tuningI changed the shape of the low pass filter
to reduce high frequency sensor noise injection
into the MICH control signal. The loop stability
 MICH_ELP.pdfMICH_ELP_TFs.pdf 
  15001   Wed Oct 30 17:08:40 2019 gautamUpdateLSCPOP22 investigationThe POP beam coming out of the vacuum chamber
is split by a 50/50 BS and half is diverted
to the POP22/POP110/POPDC photodiode (Thorlabs
 POP22anomaly.pdf 
  15002   Wed Oct 30 19:20:27 2019 gautamUpdateSUSPRM suspension issuesWhile I was trying to lock the PRMI this
evening, I noticed that I couldn't move
the REFL beamspot on the CCD field of view
 PRMUL.pdfPRMnormal.pdfPRM-Sensors_noise.pdfPRMsuspensionWonky.png 
  15003   Wed Oct 30 23:12:27 2019 KojiUpdateSUSPRM suspension issuesSigh... hard loch   
  15004   Thu Oct 31 10:44:40 2019 gautamUpdatePSLPMC re-lockedPMC got unlocked at ~4am. I re-locked it.
Also tweaked the input pointing into the
cavity. The misalignment was mostly in pitch.
  
  15005   Sat Nov 2 16:36:55 2019 YehonathanUpdatePSLUp to date sketch of the 1x1 and 1x2 EurocratesI reproduced Gautam's sketch of the
1x1 and 1x2 Eurocrates into a pdf image
that contains links to the appropriate DCCs
 1x1_1X2_Eurocrates_with_links.pdf 
  15006   Sat Nov 2 17:08:34 2019 YehonathanUpdatePSLUp to date sketch of the 1x1 and 1x2 EurocratesThanks. Please update this wiki page too.

https://wiki-40m.ligo.caltech.edu/Electronics/ElectronicsRacks#A1X1
  
  15007   Mon Nov 4 11:41:28 2019 shrutiUpdateComputer Scripts / ProgramsEpics installed on donatellaI've installed pyepics on Donatella
running

sudo yum install pyepics
  
  15008   Mon Nov 4 13:26:04 2019 YehonathanUpdatePSLUp to date sketch of the 1x1 and 1x2 EurocratesDone.




  
  15009   Mon Nov 4 15:29:47 2019 gautamUpdateLSCPOP signal pathThere are many versions of the POP22 signal
path I found on the elog, e.g. this
thread. But what I saw at the LSC rack
 POPchain.pdf 
  15010   Mon Nov 4 16:06:58 2019 gautamUpdateLSCPOP optical pathI did some re-alignment of the POP beam
on the IX in air table. Here are the details:


 IMG_8027.JPGlensRealignment.jpgPOPrealigned.pngPOPdither.pngPRMfixed.png 
  15011   Mon Nov 4 19:02:25 2019 YehonathanUpdatePSLMapping the PSL electronicsI created a spreadsheet (Attached) by taking Koji's
c1psl sheet from slow_channel_list and filtering
out the channels that do not need an Acromag.
 PSL_Wirings_-_Sheet1_(1).pdf 
  15012   Tue Nov 5 11:52:27 2019 gautamUpdateLSCLocking notesSummary:

I am still unable to achieve arm
powers greater than TRX/TRY ~10 while keeping
 PRMI3f_ALS_Nov4sensMat.pdf 
  15013   Tue Nov 5 12:37:50 2019 gautamUpdatePEMT240 interface unit pulled outI removed the Trillium T240 DAQ interface
unit from 1X4 for investigation.

It
 T240_recenter.pdfffPotential.pdf 
  15014   Wed Nov 6 02:08:48 2019 gautamUpdateLSCLocking updatesSummary:

There seems to be stronger-than-expected
coupling between CARM and the 3f sensors. 
  
  15015   Wed Nov 6 17:05:45 2019 gautamUpdateLSCCARM calibrationSummary:

A coarse calibration of the CARM
error point (when on ALS control) is 
 CARMscan.pdfCARMcalib.pdfscan.hdf5.zip 
  15016   Wed Nov 6 17:45:34 2019 gautamUpdateLSC~Here is a comparison of the response of
various DoFs in our various RFPD sensors
for two different CARM offsets. Even in the
  
  15017   Wed Nov 6 19:26:57 2019 gautamUpdatePSLSome PSL cable adminKoji and I taked about cleaning up some
of the flaky cable situation on the PSL table
a while ago. The changes were implemented
 PSLcableAdmin.jpg 
  Draft   Wed Nov 6 20:34:08 2019 KojiUpdateIOOEOM resonant box installed 




  
  15019   Wed Nov 6 20:34:28 2019 KojiUpdateIOOPower combiner loss (EOM resonant box installed)Gautam and I were talking about some modulation
and demodulation and wondered what is the
power combining situation for the triple
 power_combiner.pdf 
  15020   Thu Nov 7 17:46:10 2019 shrutiUpdateALSAM measurement at X endSome details:

- There
was a SR560+SR785 (not connected for measurement)
placed near the X end which I moved; it is
 AMTF20191107.png 
  15021   Thu Nov 7 17:55:37 2019 shrutiUpdateComputer Scripts / ProgramsPython packages on donatellaToday I realized that pip and other python2,3
packages were installed in the conda base
environment, so after running
  
  15022   Wed Nov 13 19:34:45 2019 gautamUpdatePEMFollow-up on seismometer discussionAttachment
#1 shows the spectra
 seisAll_20191111.pdfffPotential.pdf 
  15023   Wed Nov 13 20:15:56 2019 ranaUpdatePEMFollow-up on seismometer discussionthis
is due to the Equivalence Principle: local
  
  15024   Wed Nov 13 23:40:15 2019 gautamUpdatePEMFollow-up on seismometer discussionHere is some disturbance
in the spacetime curvature, where the local
 seisAll_20191111_1Hz.pdf 