Wed Oct 17 18:46:33 2007, rana, Configuration, General, eLog Change
|
Thu Oct 18 14:52:35 2007, rana, Routine, ASC, test
|
Thu Oct 18 15:03:14 2007, ajw, Routine, General, this is only a test 
|
Fri Oct 19 16:11:38 2007, pkp, Other, OMC, OMC PZT response   
|
Sat Oct 20 11:54:13 2007, waldman, Other, OMC, OMC and OMC-SUS work
|
Mon Oct 22 12:02:59 2007, ajw, Routine, General, STACIS as microseismic shaker
|
Mon Oct 22 19:27:14 2007, pkp, Other, OMC, PZT calibration/ transfer function.   
|
Tue Oct 23 09:01:00 2007, rana, Other, OMC, PZT calibration/ transfer function.
|
Tue Oct 23 11:08:20 2007, steve, Other, General, brush fires
|
Wed Oct 24 01:43:32 2007, Andrey Rodionov, Other, General, PDF-file -> Will report about first results for XARM during Wednesday meeting
|
Wed Oct 24 08:58:09 2007, steve, Other, PSL, laser headtemp is up
|
Thu Oct 25 17:52:45 2007, waldman, Other, OMC, OMCs with QPDs
|
Thu Oct 25 22:02:58 2007, rob, Routine, PSL, HEPAs maxed
|
Thu Oct 25 23:35:36 2007, waldman, Other, OMC, Hang the OMC! 
|
Fri Oct 26 09:10:17 2007, steve, Routine, PEM, PEM &PSL trend 
|
Fri Oct 26 16:19:29 2007, Tobin Fricke, Routine, IOO, MC resonances
|
Fri Oct 26 17:34:43 2007, waldman, Other, OMC, OMC + earthquake stops
|
Fri Oct 26 21:48:40 2007, waldman, Configuration, OMC, Fiber to 056
|
Sat Oct 27 19:00:44 2007, waldman, Configuration, OMC, Hanging, locked OMC with REFL extracted.
|
Sun Oct 28 03:03:42 2007, rana, Configuration, IOO, Three Way Excitement
|
Mon Oct 29 09:16:31 2007, steve, Routine, VAC, the rga is back
|
Mon Oct 29 09:46:50 2007, steve, Routine, VAC, vac & pem trend
|
Mon Oct 29 11:07:22 2007, waldman, Software Installation, OMC, Software install on OMS
|
Mon Oct 29 12:20:15 2007, waldman, Configuration, OMC, Changed OMS filters
|
Mon Oct 29 23:10:05 2007, waldman, Configuration, OMC, Lost in DAQspace 
|
Mon Oct 29 23:25:42 2007, tobin, Software Installation, CDS, frames mounted
|
Tue Oct 30 00:47:29 2007, rana, Other, IOO, MC Ringdowns   
|
Tue Oct 30 13:58:07 2007, ajw, Configuration, IOO, MC Ringdowns 
|
Tue Oct 30 16:55:40 2007, tobin, Routine, , Drag-wiping perfected
|
Tue Oct 30 19:32:13 2007, tobin, Problem Fixed, Computers, conlogger restarted
|
Tue Oct 30 20:15:24 2007, tobin, Other, Environment, earthquake
|
Wed Oct 31 08:33:54 2007, rana, Problem Fixed, SUS, Vent measurements
|
Wed Oct 31 08:34:35 2007, rana, Other, IOO, loss measurements
|
Wed Oct 31 08:38:35 2007, rana, Problem Fixed, IOO, MC autolocker
|
Wed Oct 31 09:45:28 2007, waldman, Other, OMC, Resolution to DAQland saga
|
Wed Oct 31 10:31:23 2007, Andrey Rodionov, Routine, VAC, Venting is in progress
|
Wed Oct 31 15:02:59 2007, tobin, Routine, IOO, Mode Cleaner Mode Tracking  
|
Wed Oct 31 15:22:59 2007, rob, Configuration, IOO, Mode Cleaner transfer function
|
Wed Oct 31 19:26:08 2007, Andrey Rodionov, Routine, General, Photographs of "Mode-Cleaner Entrance" 9x
|
Wed Oct 31 23:55:17 2007, waldman, Other, OMC, QPD tests 
|
Thu Nov 1 01:28:04 2007, waldman, Other, OMC, First digital lock of OMC   
|
Thu Nov 1 09:17:27 2007, steve, Routine, VAC, vent 64
|
Thu Nov 1 11:45:30 2007, tobin, Configuration, IOO, Mode cleaner drag-wiping
|
Thu Nov 1 16:34:47 2007, Andrey Rodionov, Summary, Computers, Limitation on attachment size of E-LOG
|
Thu Nov 1 16:42:48 2007, Andrey Rodionov, Summary, Environment, End of Daylight Saving Time this weekend
|
Thu Nov 1 16:51:33 2007, d40, AoG, General, D40
|
Thu Nov 1 19:53:02 2007, Andrey Rodionov, Bureaucracy, Photos, Tobin's picture
|
Thu Nov 1 19:53:34 2007, Andrey Rodionov, Bureaucracy, Photos, Robert's photo
|
Thu Nov 1 19:54:22 2007, Andrey Rodionov, Bureaucracy, Photos, Rana's photo
|
Thu Nov 1 19:55:03 2007, Andrey Rodionov, Bureaucracy, Photos, Andrey's photo
|
Thu Nov 1 19:55:59 2007, Andrey Rodionov, Bureaucracy, Photos, Andrey, Tobin, Robert - photo
|
Thu Nov 1 19:58:07 2007, Andrey Rodionov, Bureaucracy, Photos, Steve and Tobin's picture
|
Thu Nov 1 20:03:00 2007, Andrey Rodionov, Summary, Photos, Procedure "Drop and Drag" in pictures   
|
Fri Nov 2 08:59:30 2007, steve, Bureaucracy, SAFETY, the laser is ON
|
Fri Nov 2 12:18:47 2007, waldman, Summary, OMC, Locked OMC with DCPD 
|
Sat Nov 3 16:20:43 2007, waldman, Summary, OMC, A good day's work 6x
|
Sun Nov 4 23:22:50 2007, waldman, Update, OMC, OMC PZT and driver response functions 7x
|
Sun Nov 4 23:55:24 2007, rana, Update, IOO, Friday's In-Vac work
|
Mon Nov 5 07:29:35 2007, rana, Update, IOO, Friday's In-Vac work
|
Mon Nov 5 14:44:39 2007, waldman, Update, OMC, PZT response functions and De-whitening   
|
Mon Nov 5 22:24:38 2007, Andrey, Steve, Omnistructure, VAC, Pumping down goes smoothly
|
Tue Nov 6 09:14:37 2007, steve, Summary, VAC, pump down 65
|
Tue Nov 6 09:45:22 2007, steve, Summary, SUS, vent sus trend
|
Tue Nov 6 10:42:01 2007, rob, Configuration, IOO, mode cleaner locked
|
Tue Nov 6 14:51:03 2007, tobin, rob, Update, IOO, Mode cleaner length
|
Tue Nov 6 15:36:03 2007, rob, Update, LSC, XARM locked
|
Tue Nov 6 15:37:34 2007, rob, Configuration, SUS, rampdown script
|
Tue Nov 6 18:18:15 2007, tobin, Configuration, Computers, I broke (and fixed) conlogger
|
Tue Nov 6 16:48:54 2007, tobin, Configuration, Computers, scopes on the net
|
Tue Nov 6 23:45:38 2007, tobin, Configuration, Computers, tektronix scripts!
|
Wed Nov 7 00:51:33 2007, andrey, rob, tobin, Configuration, IOO, MC ringdowns
|
Wed Nov 7 02:14:08 2007, Andrey, Bureaucracy, IOO, More information about MC2 ringdown 9x
|
Wed Nov 7 09:38:01 2007, steve, Update, VAC, rga scan
|
Wed Nov 7 10:55:21 2007, ajw, Configuration, Computers, backup script restarted
|
Wed Nov 7 13:54:44 2007, rob, Configuration, IOO, Mode Cleaner transfer function
|
Wed Nov 7 14:01:31 2007, waldman, Omnistructure, OMC, Frequency and Intensity noise
|
Wed Nov 7 14:05:59 2007, tobin, Configuration, IOO, MC ringdown
|
Wed Nov 7 16:07:03 2007, steve, Update, PSL, PSL & IOO trend
|
Thu Nov 8 00:55:44 2007, pkp, Update, OMC, Suspension tests 9x
|
Thu Nov 8 11:40:21 2007, steve, Update, PEM, particle counts are up
|
Thu Nov 8 15:57:53 2007, tobin, Configuration, PSL, shelf removed
|
Fri Nov 9 00:01:24 2007, waldman, Omnistructure, OMC, OMC mechanical resonances (Tap tap tappy tap) 7x
|
Fri Nov 9 00:23:12 2007, pkp, Update, OMC, X and Z resonances 
|
Fri Nov 9 09:37:55 2007, steve, Update, PSL, head temp hiccup
|
Thu Nov 8 18:44:01 2007, tobin, Configuration, PSL, ISS
|
Fri Nov 9 17:33:33 2007, rob, Configuration, PSL, ISS
|
Mon Nov 12 10:53:58 2007, pkp, Update, OMC, Vertical Transfer functions
|
Mon Nov 12 14:09:19 2007, rob, DAQ, General, tpman dead on fb40m
|
Fri Nov 9 21:36:14 2007, rob, Configuration, PSL, FSS
|
Mon Nov 12 15:05:49 2007, rob, Configuration, PSL, FSS
|
Mon Nov 12 15:18:34 2007, rob, Update, PSL, ISS
|
Mon Nov 12 23:44:19 2007, John, Update, PSL, ISS
|
Tue Nov 13 14:33:40 2007, John, Update, PSL, ISS filter 
|
Wed Nov 14 07:48:38 2007, norna, Omnistructure, OMC, OMC Cable dressing 
|
Wed Nov 14 12:33:35 2007, tobin, AoG, Environment, construction
|
Wed Nov 14 16:54:54 2007, pkp, Update, OMC, Much better looking vertical transfer functions 
|
Wed Nov 14 12:47:19 2007, tobin, Update, PSL, ISS
|
Wed Nov 14 17:50:00 2007, tobin, Update, PSL, ISS
|
Thu Nov 15 04:18:11 2007, John, Summary, PSL, PMC cavity pole measurements
|
Thu Nov 15 17:09:37 2007, pkp, Update, OMC, Vertical Transfer functions with no cables attached.
|
Thu Nov 15 18:23:55 2007, John, HowTo, Computers, Swap CAPS and CTRL on a Windows 2000/XP machine
|
Thu Nov 15 18:36:48 2007, John, Summary, , PSL table work
|
Thu Nov 15 18:06:06 2007, tobin, Update, Computers, alex: linux1 root file system hard disk's dying
|
Thu Nov 15 18:37:06 2007, tobin, Update, Computers, possible replacement for linux1's disk
|
Fri Nov 16 11:27:18 2007, tobin, Update, Computers, script fix
|
Fri Nov 16 14:11:26 2007, tobin, Update, Computers, op140
|
Fri Nov 16 14:31:43 2007, tobin, Update, Computers, op140 disks
|
Fri Nov 16 18:46:49 2007, steve, Bureaucracy, PSL , MOPA was turned off & on
|
Mon Nov 19 14:19:25 2007, steve, Omnistructure, PEM, jackhammer 
|
Mon Nov 19 14:32:10 2007, steve, Bureaucracy, SAFETY, grad student safety training
|
Tue Nov 20 10:11:33 2007, John, Summary, PSL, PMC pole measurements
|
Tue Nov 20 11:10:07 2007, tobin, Update, Computers, epics access from matlab
|
Tue Nov 20 13:06:57 2007, tobin, Configuration, Computers, linux1 has new disk
|
Tue Nov 20 18:02:54 2007, John, Summary, Computers, PSL_Main screen
|
Tue Nov 20 18:35:20 2007, John, HowTo, Computers, MatLab in Emacs
|
Wed Nov 21 14:31:41 2007, rob, Update, PSL, FSS twiddle
|
Mon Nov 26 10:17:31 2007, steve, Omnistructure, SUS, etmy sus damping restored 
|
Tue Nov 27 15:45:08 2007, rob, Configuration, PSL, FSS loop
|
Tue Nov 27 15:47:17 2007, rob, Configuration, IOO, MC loop
|
Tue Nov 27 16:18:58 2007, rob, Configuration, IOO, MC loop
|
Tue Nov 27 20:47:00 2007, tobin, Update, PSL, FSS
|
Wed Nov 28 04:21:46 2007, rana, Update, PSL, FSS
|
Wed Nov 28 08:47:29 2007, steve, Omnistructure, VAC, rga is out of order
|
Wed Nov 28 12:43:53 2007, Andrey, Bureaucracy, , Here was the PDF-file of my presentation
|
Wed Nov 28 16:18:15 2007, Alberto, Metaphysics, Environment, so clean you can eat on it 
|
Wed Nov 28 16:46:28 2007, rana, Configuration, Computers, scientific linux 5.0
|
Wed Nov 28 17:15:26 2007, rana, Configuration, SUS, ETMY damping / watchdogs
|
Wed Nov 28 17:41:34 2007, rob, Update, PSL, FSS again
|
Wed Nov 28 19:02:41 2007, Andrey, Bureaucracy, WIKI-40M Update, New WIKI-40M page describing Matlab Suspension Modeling
|
Wed Nov 28 19:44:18 2007, tobin, Update, PSL, HEPA
|
Thu Nov 29 10:36:47 2007, alberto, Configuration, Computer Scripts / Programs, Agilent 82357B GPIB to USB Interface Installation Procedeure
|
Thu Nov 29 11:10:54 2007, rob, Omnistructure, VAC, RGAlogger sleeping
|
Thu Nov 29 14:29:22 2007, tobin, Configuration, Computers, linux1 httpd/conlogger fixed
|
Thu Nov 29 18:10:13 2007, Alberto, HowTo, Computer Scripts / Programs, GPIB Scripts
|
Thu Nov 29 19:35:14 2007, rana, HowTo, Computer Scripts / Programs, GPIB Scripts
|
Thu Oct 25 00:01:21 2007, rana, Software Installation, CDS, GEO DV => LIGO DV
|
Fri Nov 30 11:22:22 2007, ajw, Summary, CDS, GEO DV => LIGO DV
|
Fri Nov 30 11:44:57 2007, rob, Configuration, Electronics, ETMX oplev
|
Fri Nov 30 13:46:50 2007, rob, Configuration, Electronics, ETMX oplev dead again
|
Fri Nov 30 19:11:05 2007, rana, Configuration, Electronics, ETMX oplev dead again
|
Fri Nov 30 19:29:14 2007, rana, Configuration, SUS, new screen
|
Fri Nov 30 19:46:58 2007, rana, Configuration, Computers, EPICS Time Bad again
|
Fri Nov 30 20:13:57 2007, dmass, Summary, General, HeNe UniPhase Laser 
|
Fri Nov 30 20:17:26 2007, Andrey, Configuration, PEM, Accelerometers and alum.plates for them
|
Fri Nov 30 21:27:24 2007, rana, DAQ, PEM, weather / stacis / c1pem1
|
Sun Dec 2 17:37:33 2007, rana, Omnistructure, Computers, Network Cabling in the Office
|
Sun Dec 2 21:02:12 2007, rana, Configuration, IOO, MC SUS re-alignment
|
Sun Dec 2 21:07:39 2007, rana, Configuration, IOO, MC SUS re-alignment
|
Sun Dec 2 21:13:16 2007, rana, Configuration, IOO, MC SUS re-alignment
|
Mon Dec 3 16:24:47 2007, tobin, HowTo, Computers, GNU screen
|
Mon Dec 3 00:10:42 2007, rana, DAQ, Computer Scripts / Programs, linemon
|
Mon Dec 3 17:55:39 2007, tobin, HowTo, Computer Scripts / Programs, linemon
|
Mon Dec 3 19:06:49 2007, rana, DAQ, Computer Scripts / Programs, linemon
|
Mon Dec 3 19:44:58 2007, Accelerometers on new mounts, Configuration, PEM, Andrey  
|
Wed Nov 28 21:51:52 2007, tobin, Configuration, PSL, ISS
|
Thu Nov 29 15:17:53 2007, rob, Configuration, PSL, ISS
|
Mon Dec 3 22:20:09 2007, tobin, Configuration, PSL, ISS
|
Wed Dec 5 10:57:08 2007, alberto, HowTo, Computers, Connecting the GPIBto USB interface to the Dell laptop
|
Wed Dec 5 13:49:08 2007, alberto, Update, Electronics, RF AM PD lines monitor 
|
Wed Dec 5 16:57:36 2007, tobin, HowTo, Computer Scripts / Programs, SR785 data converter on linux
|
Wed Dec 5 18:08:36 2007, Andrey, Update, ASC, Optical Lever laser for ETMX is installed
|
Wed Dec 5 19:25:07 2007, rana, DAQ, CDS, DMF
|
Wed Dec 5 23:19:03 2007, Andrey, Configuration, PEM, Accelerometers are turned on 7x
|
Thu Dec 6 15:21:59 2007, alberto, Frogs, Electronics, RF Transfer Function of Stiff Aluminum Wires  
|
Thu Dec 6 15:22:42 2007, Andrey, Summary, Electronics, Pictures of the inside of He-Ne laser 
|
Thu Dec 6 18:11:15 2007, rob, HowTo, Computer Scripts / Programs, Making DMF monitors
|
Thu Dec 6 19:19:47 2007, Andrey, Configuration, SUS, Suspension damping Gain was restored
|
Fri Dec 7 00:02:26 2007, rana, Summary, IOO, MC/FSS Frequency Noise
|
Fri Dec 7 11:33:24 2007, waldman, Omnistructure, OMC, PZT wiring
|
Fri Dec 7 14:14:48 2007, rob, Metaphysics, Computer Scripts / Programs, tdsread problems on Solaris
|
Fri Dec 7 18:28:30 2007, tobin, Update, Computer Scripts / Programs, compiled matlab hoses itself
|
Fri Dec 7 18:31:30 2007, tobin, Update, Computer Scripts / Programs, compiled matlab hoses itself
|
Tue Dec 4 23:16:35 2007, tobin, Update, PSL, ISS
|
Wed Dec 5 17:49:57 2007, tobin, Update, PSL, ISS
|
Wed Dec 5 18:22:03 2007, tobin, Update, PSL, ISS dark noise
|
Wed Dec 5 20:32:51 2007, tobin, Update, PSL, ISS dark noise
|
Thu Dec 6 19:30:43 2007, tobin, Update, PSL, ISS dark noise - 60 Hz!
|
Fri Dec 7 19:14:30 2007, tobin, Update, PSL, ISS dark noise - ground loop enlightenment
|
Mon Dec 10 13:54:26 2007, rob, HowTo, Computer Scripts / Programs, Don't blame the Matlab compiler
|
Mon Dec 10 18:42:20 2007, tobin, Update, PSL, ISS RIN script
|
Mon Dec 10 19:08:03 2007, tobin, Configuration, PSL, MZ
|
Mon Dec 10 20:35:59 2007, tobin, Configuration, Computer Scripts / Programs, autolocking scripts
|
Wed Dec 12 16:22:22 2007, alberto, Omnistructure, Electronics, LC filter for the RF-AM monitor circuit  
|
Wed Dec 12 22:24:48 2007, tobin, Frogs, PEM, weather station
|
Thu Dec 13 12:05:36 2007, alberto, Omnistructure, Electronics, The new Butterworth seems to work quite well 
|
Thu Dec 13 23:56:02 2007, Andrey, Configuration, Computer Scripts / Programs, Overnight measurements
|
Sun Dec 16 16:52:40 2007, dmass, Update, Computers, Computer on the end Fixed
|
Mon Dec 17 11:47:13 2007, alberto, Update, Electronics, an alternative design for the RFAM monitor's filter at 33Mhz  
|
Mon Dec 17 23:42:08 2007, Andrey, Configuration, Computer Scripts / Programs, Overnight measurements in X-arm
|
Tue Dec 18 00:51:39 2007, Andrey, Update, Computer Scripts / Programs, Results of Saturday overnight measurements 11x
|
Tue Dec 18 16:50:35 2007, tobin, Update, SAFETY, uvex laser safety glasses defective 
|
Tue Dec 18 21:31:31 2007, tobin, Update, PSL, ISS RIN
|
Tue Dec 18 23:27:36 2007, Andrey, Configuration, Computer Scripts / Programs, New overnight measurements (this night from Tue to Wed)
|
Tue Dec 18 23:41:00 2007, Andrey, Summary, Computer Scripts / Programs, Results of Mon/Tue overnight measurements (entry #194) 12x
|
Wed Dec 19 11:31:01 2007, steve, Omnistructure, PEM, aircond filter maintenance
|
Wed Dec 19 15:51:00 2007, Andrey, Update, Computer Scripts / Programs, Daytime measurements in XARM and their results 11x
|
Wed Dec 19 16:07:37 2007, Andrey, Summary, Computer Scripts / Programs, Results of overnight measurements Tue/Wed night (entry #198) 11x
|
Wed Dec 19 16:40:12 2007, steve, Update, SAFETY, laser safety glasses measured
|
Wed Dec 19 20:28:27 2007, Andrey, DAQ, PEM, Names for all 6 accelerometers have been changed
|
Thu Dec 20 02:04:09 2007, Andrey, Update, Computer Scripts / Programs, New overnight measurements in XARM and their results 11x
|
Thu Dec 20 19:05:34 2007, waldman, HowTo, OMC, HOWTO build front ends
|
Thu Dec 20 19:10:03 2007, waldman, Update, OMC, Stressful reattachment of heater
|
Thu Dec 20 21:57:34 2007, Andrey, Update, Computer Scripts / Programs, Measurements in XARM today 
|
Thu Dec 20 21:58:28 2007, Andrey, Summary, Computer Scripts / Programs, Results for 2 previous XARM measurements have been added
|
Fri Dec 21 20:32:25 2007, tobin, Update, Photos, GigE camera
|
Sat Dec 22 00:52:57 2007, tobin, Configuration, PSL, ISS surgery
|
Sat Dec 22 15:32:11 2007, tobin, AoG, Environment, ants
|
Wed Dec 26 15:00:06 2007, rana, Update, SUS, ETMY tripping
|
Wed Dec 26 15:12:48 2007, rana, Update, SUS, ETMY tripping
|
Thu Dec 27 13:08:04 2007, rana, Update, SUS, ETMY tripping
|
Thu Dec 27 12:12:02 2007, pkp, Update, , Update on GigE Camera
|
Thu Dec 27 18:18:56 2007, rana, Update, Computers, Update on GigE Camera
|
Sun Dec 30 02:36:35 2007, pkp, Update, General, Another update
|
Wed Jan 2 11:38:56 2008, tobin, Summary, WIKI-40M Update, wiki spam
|
Thu Jan 3 08:53:55 2008, steve, Update, SUS, etmy vs etmx
|
Thu Jan 3 09:12:59 2008, steve, Update, PSL, MZ servo 
|
Thu Jan 3 09:55:11 2008, steve, Update, SUS, etmy sus damping restored
|
Fri Jan 4 08:42:03 2008, steve, Update, SUS, etmy trips again  
|
Mon Jan 7 09:01:39 2008, steve, Update, SUS, BS sus damping restored
|
Tue Jan 8 15:20:17 2008, Pkp, Update, Cameras, GigE update
|
Wed Jan 9 10:47:15 2008, fricke, Update, Computers, ethernet wiring in office/control room
|
Wed Jan 9 20:29:47 2008, Dmass, AoG, TMI, Coffee Carafe  
|
Wed Jan 9 20:36:42 2008, Go, Update, Treasure, Money in lab
|
Thu Jan 10 00:12:01 2008, tobin, Summary, Locking, DR
|
Thu Jan 10 10:38:02 2008, steve, Update, SUS, etmy damping restored 
|
Thu Jan 10 12:08:23 2008, steve, Update, SUS, why did the BS move?
|
Thu Jan 10 13:45:52 2008, Pkp, Update, Cameras, GLIBC Error
|
Thu Jan 10 15:04:04 2008, steve, Update, SUS, illuminator light effect on BS position
|
Fri Jan 11 17:01:51 2008, pkp, Update, Cameras, GigE again
|
Mon Jan 14 14:41:09 2008, steve, Update, SUS, etmy sus damping restored & mz relocked
|
Mon Jan 14 23:11:26 2008, tobin, Configuration, General, fiber
|
Tue Jan 15 13:15:27 2008, tobin, Update, Environment, lots of noise
|
Wed Jan 16 14:06:24 2008, rob, Update, LSC, monday's locking
|
Wed Jan 16 14:09:45 2008, rob, Update, LSC, tuesday's locking
|
Wed Jan 16 18:24:41 2008, rana, Update, SUS, ETMY Watchdog
|
Wed Jan 16 19:57:49 2008, tobin, Configuration, Photos, ISCT_EX
|
Thu Jan 17 14:13:20 2008, rob, Update, LSC, Wednesday's locking
|
Thu Jan 17 15:11:13 2008, josephb, Update, Cameras, Working on Malfalda
|
Thu Jan 17 20:50:55 2008, tobin, Update, General, fiber coupling
|
Thu Jan 17 18:22:14 2008, Alberto, Update, Electronics, RF Monitor Band-pass Filter  
|
Fri Jan 18 11:53:50 2008, Alberto, Update, Electronics, RF Monitor Band-pass Filter
|
Fri Jan 18 15:31:47 2008, rob, Update, LSC, Thursday's locking
|
Fri Jan 18 20:53:56 2008, tobin, Configuration, General, ETMY oplev
|
Mon Jan 21 23:30:03 2008, Andrey, Update, Computer Scripts / Programs, Matlab Program for Q-factor measurements (XARM -> ITMX and ETMX)
|
Tue Jan 22 02:33:45 2008, rob, Update, LSC, DRMI work
|
Tue Jan 22 13:11:03 2008, tobin, Update, ASC, ETMY oplev recentered
|
Wed Jan 23 09:27:55 2008, steve, Update, , etmy sus damping restored
|
Wed Jan 23 11:41:06 2008, steve, Update, PEM, sulfur smell in 40m
|
Wed Jan 23 12:31:36 2008, Andrey, Summary, SUS, Dissapointing Results of XARM optimization (PDF-file)
|
Wed Jan 23 20:52:40 2008, rana, Summary, Environment, Flooding from construction area 
|
Thu Jan 24 11:52:56 2008, steve, Update, PEM, the mud is cleaned up & MOPA shutter is opened
|
Thu Jan 24 12:50:50 2008, John, Summary, Treasure, Sugar Napoleons
|
Thu Jan 24 22:10:49 2008, Andrey, Configuration, Computer Scripts / Programs, Problem with channels - help of Rana, Robert or Steve is needed
|
Thu Jan 24 22:52:18 2008, Andrey, Bureaucracy, General, Ants around a dirty glass (David - please read!)
|
Fri Jan 25 09:22:21 2008, steve, Update, PEM, burned toast award goes to
|
Thu Jan 24 20:03:40 2008, Andrey, Configuration, SUS, Changes to Dataviewer channels (XARM)
|
Fri Jan 25 08:55:26 2008, rob, Configuration, General, Changes to Dataviewer channels (XARM)
|
Fri Jan 25 10:14:35 2008, rob, Configuration, SUS, Changes to Dataviewer channels (XARM)
|
Fri Jan 25 11:38:16 2008, josephb, Configuration, Cameras, Working GiGE video on Linux - sort of
|
Fri Jan 25 13:36:13 2008, josephb, Configuration, Cameras, Working GiGE video on Mafalda
|
Fri Jan 25 15:53:59 2008, Alberto, Update, Electronics, 40 dB from the 3rd order Chebyschev
|
Fri Jan 25 17:11:07 2008, Max , Andrey, Configuration, General, NEW_FETCH_SHOUROV and GET_DATA do not work
|
Fri Jan 25 21:36:40 2008, rana, Update, CDS, mDV / channel issues
|
Sat Jan 26 02:02:43 2008, John, Summary, General, New Channels
|
Sat Jan 26 02:08:53 2008, John, Omnistructure, LSC, Fibres
|
Sat Jan 26 02:34:34 2008, Andrey, Update, Computer Scripts / Programs, Overnight Measuremts in XARM
|
Sat Jan 26 18:12:45 2008, rana, HowTo, Computers, extra processes and crashes
|
Sat Jan 26 18:48:43 2008, John, Summary, Computers, Restart iscepics
|
Sat Jan 26 22:00:03 2008, John, Update, General, LSC-TRY_OUT and ETMY-QPD
|
Sun Jan 27 13:13:21 2008, tobin, Metaphysics, General, departure
|
Sun Jan 27 21:44:48 2008, rana, Update, CDS, Seismic BLRMS on Matlab
|
Mon Jan 28 12:42:48 2008, Dmass, Bureaucracy, TMI, Coffee
|
Mon Jan 28 15:11:38 2008, rob, HowTo, DMF, running compiled matlab DMF tools
|
Mon Jan 28 17:16:54 2008, Andrey, Configuration, Computers, Matlab libraries DO NOT WORK properly sometimes
|
Mon Jan 28 19:35:55 2008, rana, Summary, PEM, Accelerometer and Seismometer Coherences
|
Mon Jan 28 18:56:47 2008, rana, Update, DMF, seisBLRMS 1.0
|
Tue Jan 29 14:56:39 2008, rob, Update, DMF, seisBLRMS 1.0
|
Wed Jan 30 11:49:30 2008, Alberto, Summary, Electronics, RF monitor's filters final schematics and transfer functions 8x
|
Wed Jan 30 13:09:55 2008, Andrey, Update, SUS, New results for XARM (pdf) 
|
Wed Jan 30 20:39:31 2008, rob, Update, DMF, seisBLRMS
|
Thu Jan 31 12:39:14 2008, John, Configuration, General, Y arm test mass cameras
|
Thu Jan 31 16:53:41 2008, josephb, Configuration, Cameras, Improving camera user interface 
|
Fri Feb 1 10:43:05 2008, John, Update, Environment, Construction work
|
Fri Feb 1 12:37:39 2008, rob, Update, DMF, seisBLRMS trends 
|
Fri Feb 1 15:04:54 2008, josephb, Configuration, Cameras, Snap with looping functionality available
|
Fri Feb 1 17:17:05 2008, John, Summary, PSL, Mach-Zender tweaking
|
Sat Feb 2 14:11:27 2008, John, Summary, Computers, OPTLEVmaster screen
|
Sun Feb 3 05:02:41 2008, rana, Update, PEM, Seism 4 day
|
Mon Feb 4 22:01:57 2008, John, Summary, LSC, Fibres auxiliary locking - Fibers
|
Tue Feb 5 15:32:29 2008, josephb, Configuration, Cameras, PMC and the GigE Camera
|
Tue Feb 5 17:39:05 2008, jweiner, Configuration, PEM, PEM-AS_MIC taken down from AS table, will put in PSL enclosure soon
|
Wed Feb 6 09:17:31 2008, steve, Update, PEM, IST building construction continoues 
|
Wed Feb 6 16:50:47 2008, josephb, Configuration, Cameras, Regions of Interest and max frame rate
|
Wed Feb 6 19:39:11 2008, rana, Configuration, Cameras, Regions of Interest and max frame rate
|
Fri Feb 8 17:09:52 2008, Max Jones, Update, Computers, Changes to NoiseBudget
|
Fri Feb 8 17:55:53 2008, josh, Configuration, PEM, PEM-AS_MIC now in PSL enclosure
|
Sat Feb 9 13:05:48 2008, John, Summary, IOO, PMC camera/ HEPA
|
Sat Feb 9 13:32:07 2008, John, Summary, SUS, All watchdogs tripped
|
Sun Feb 10 20:47:01 2008, Alan, Summary, SUS, All watchdogs tripped
|
Sun Feb 10 21:43:16 2008, rob, Configuration, IOO, MC alignment tweaked
|
Mon Feb 11 14:24:19 2008, steve, Update, PEM, more earthquakes
|
Mon Feb 11 22:44:29 2008, rob, Configuration, DAQ, Change in channel trending on C1SUS2
|
Tue Feb 12 13:53:27 2008, rob, Omnistructure, VAC, Return of the RGA
|
Tue Feb 12 16:18:29 2008, rob, Configuration, Computer Scripts / Programs, autoburt cron moved to op340m
|
Tue Feb 12 16:39:52 2008, rob, Update, Locking, report
|
Wed Feb 13 11:41:00 2008, Alberto, Update, Electronics, Some characterization of the RF Monitor Box (StocMon) 
|
Wed Feb 13 20:37:11 2008, John, Update, LSC, Fibre locking - Fiber
|
Thu Feb 14 15:04:53 2008, rob, DAQ, DMF, DMF delay
|
Tue Feb 12 16:34:07 2008, rob, DAQ, DMF, seisBLRMS 1.1
|
Thu Feb 14 15:05:18 2008, rob, DAQ, DMF, seisBLRMS 1.1
|
Thu Feb 14 17:21:53 2008, Max Jones, Update, Computers, Noise budget code changes
|
Fri Feb 15 10:28:44 2008, rana, Update, Computers, Noise budget code changes
|
Fri Feb 15 22:16:04 2008, Andrey, Update, Computers, MATLAB is not working: "Licence checkout failed"
|
Tue Feb 19 15:21:47 2008, Andrey, Update, SUS, Earthquake tripped watchdogs in ETMY, ITMY
|
Tue Feb 19 18:28:41 2008, John, Update, PEM, More seismic in Baja California
|
Wed Feb 20 11:34:17 2008, steve, Update, PSL, laser head temp is up
|
Wed Feb 20 16:24:37 2008, steve, Update, PSL, the laser is recovering slowly
|
Thu Feb 21 09:56:26 2008, steve, Update, PSL, the laser is back
|
Fri Feb 22 02:51:20 2008, Andrey, Update, PEM, Accelerometer ITMX seems to be broken 
|
Fri Feb 22 11:11:00 2008, rob, Update, Electronics, REFLDD problem found
|
Fri Feb 22 14:45:06 2008, steve, Update, MOPA, laser power levels
|
Fri Feb 22 15:16:33 2008, Andrey, Update, PEM, ITMX Accelerometer is NOT broken 
|
Thu Feb 21 18:29:28 2008, John, Summary, General, HP Network Analyser Analyzer
|
Thu Feb 21 19:55:46 2008, rana, Update, Electronics, 2 BNC Cables, 1 Tee
|
Fri Feb 22 16:47:54 2008, rob, Update, Electronics, Baloney
|
Fri Feb 22 20:42:44 2008, Andrey, Summary, Computer Scripts / Programs, It seems I succeeded in theoretical simulations   
|
Sun Feb 24 10:51:58 2008, tf, Frogs, Environment, 40m in phdcomics?
|
Tue Feb 26 20:24:04 2008, Andrey, Summary, TMI, Sorrow
|
Wed Feb 27 22:05:03 2008, John, Update, LSC, Auxiliary locking
|
Fri Feb 22 21:19:38 2008, Andrey, Bureaucracy, Computer Scripts / Programs, MDV library does not work at "LINUX 2"
|
Thu Feb 28 12:31:33 2008, rob, Bureaucracy, Computer Scripts / Programs, MDV library does not work at "LINUX 2"
|
Thu Feb 28 16:19:37 2008, josephb, Configuration, Computers, Mafalda rewired and multiple cameras running
|
Thu Feb 28 19:37:41 2008, rob, Configuration, Computers, multiple cameras running and seisBLRMS
|
Mon Feb 18 12:04:39 2008, Alberto, Update, Electronics, RF Monitor (StocMon)
|
Fri Feb 22 08:29:07 2008, Alberto, Update, Electronics, RF Monitor (StocMon)
|
Fri Feb 22 11:13:15 2008, rob, Update, Electronics, RF Monitor (StocMon)
|
Fri Feb 22 08:33:18 2008, Alberto, Update, Electronics, RF Monitor (StocMon)
|
Thu Feb 28 19:49:21 2008, rob, Update, Electronics, RF Monitor (StocMon)
|
Fri Feb 29 13:51:17 2008, John, Summary, LSC, PD6 response
|
Sun Mar 2 23:43:45 2008, rana, HowTo, LSC, PD6 response
|
Tue Feb 19 10:14:13 2008, steve, Update, VAC, rga logging needs help
|
Thu Feb 28 13:04:59 2008, rob, Update, VAC, rga logging working again
|
Mon Mar 3 09:25:33 2008, steve, Update, VAC, rga scan logging is working now 
|
Mon Mar 3 13:58:10 2008, steve, Update, Computers, RFM Network are down
|
Mon Mar 3 19:34:40 2008, rana, Update, Computers, RFM Network are down
|
Tue Mar 4 00:42:51 2008, rana, Update, Computers, FB0 still down ?
|
Tue Mar 4 10:08:21 2008, rob, Update, Computers, green lights unreliable when c0daqctrl down
|
Tue Mar 4 19:14:09 2008, rana, Configuration, CDS, TDS & SVN
|
Tue Mar 4 20:14:02 2008, rana, Configuration, IOO, MC Alignment
|
Tue Mar 4 23:22:32 2008, rob, DAQ, Computers, c1susvme1&2 rebooted
|
Wed Mar 5 12:35:09 2008, John, Summary, Computer Scripts / Programs, Plot photodiode responses in MatLab  
|
Wed Mar 5 12:51:48 2008, John, Summary, LSC, Initial Ligo Arm finesse versus lambda
|
Wed Mar 5 17:35:24 2008, rana, Update, IOO, RFAM during MC lock
|
Thu Mar 6 00:17:37 2008, rob, Update, Locking, DD handoff working
|
Fri Mar 7 00:47:54 2008, rana, Configuration, PEM, Ranger SS-1
|
Fri Mar 7 17:10:01 2008, Max Jones, Update, Computers, Noise Budget work
|
Fri Mar 7 19:04:39 2008, steve, Omnistructure, PSL, laser pointer
|
Mon Mar 10 02:05:08 2008, rob, Update, Locking, DRMI+2ARMs working better
|
Mon Mar 10 20:46:41 2008, John, Configuration, LSC, ETMY Trans PD & QPD
|
Wed Mar 12 23:05:44 2008, rana, Update, IOO, MC WFS
|
Thu Mar 13 03:07:19 2008, Lisa, Metaphysics, Environment, Coolness at the 40m
|
Thu Mar 13 13:15:09 2008, aivanov, Update, Computer Scripts / Programs, new sfotware intall, backup files
|
Thu Mar 13 18:20:29 2008, John, Update, General, New Focus 4003 EOM 29.489MHz
|
Fri Mar 14 12:06:29 2008, josephb, Configuration, Cameras, GC750 looking at ETMX while locked
|
Fri Mar 14 14:59:51 2008, josephb, Configuration, Cameras, Comparison between GC650 (CCD) and GC750 (CMOS) looking at ETMX   
|
Thu Mar 13 12:11:58 2008, aivanov, Update, Computer Scripts / Programs, routing PEM -> ASS -> SUS_MCL
|
Fri Mar 14 15:06:24 2008, rob, Update, Computer Scripts / Programs, routing PEM -> ASS -> SUS_MCL
|
Fri Mar 14 15:52:07 2008, rob, Configuration, LSC, LSC code change
|
Fri Mar 14 16:56:03 2008, Dmass, Bureaucracy, Computers, New 40m control machine.
|
Sun Mar 16 17:03:32 2008, rob, Configuration, CDS, ASS code change
|
Tue Mar 11 23:14:01 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements
|
Wed Mar 12 00:36:52 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements
|
Wed Mar 12 00:40:35 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements
|
Wed Mar 12 00:47:26 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements
|
Mon Mar 17 18:30:48 2008, mevans, Configuration, PEM, Adaptive Filtering
|
Thu Mar 20 15:28:20 2008, steve, Update, VAC, tp2 's drypump replaced
|
Thu Mar 20 16:06:27 2008, rob, Configuration, LSC, LSC code change
|
Thu Mar 20 17:45:36 2008, rana, Summary, ASS, Adaptive Filtering in the ASS system
|
Fri Mar 21 09:02:03 2008, steve, Update, VAC, tp 2 failed
|
Fri Mar 21 11:54:38 2008, rob, Update, VAC, tp 2 failed
|
Fri Mar 21 17:01:21 2008, rana, Configuration, DMF, Locale change on Mafalda & seisBLRMS restart
|
Fri Mar 21 23:15:11 2008, rana, Configuration, PEM, Ranger SS-1: New Setup
|
Fri Mar 21 23:17:47 2008, rana, Configuration, DMF, seisBLRMS restarted
|
Sat Mar 22 22:39:02 2008, mevans, Summary, CDS, Direct Form 2 filters are bad  
|
Sun Mar 23 00:43:08 2008, mevans, HowTo, General, Online Adaptive Filtering
|
Sun Mar 23 00:56:42 2008, John, Update, LSC, More on 3f
|
Sun Mar 23 10:42:54 2008, Valera, Summary, Electronics, RFAM of the RF stabilization box is measured 
|
Mon Mar 24 13:03:54 2008, rob, Update, Electronics, HP4195A is back
|
Tue Mar 25 13:21:25 2008, Andrey, Update, Computers, c1susvme2 is not behaving itself again
|
Tue Mar 25 15:56:09 2008, John, Update, Treasure, Assorted pictures
|
Mon Mar 24 20:15:03 2008, John, Summary, Computers, c1susvme2
|
Tue Mar 25 10:44:24 2008, rob, Update, Computers, c1susvme2
|
Tue Mar 25 16:34:47 2008, rob, Update, Computers, c1susvme2
|
Wed Mar 26 13:41:53 2008, Andrey, HowTo, SUS, Modification of ''C1DRIFT_MONITOR''
|
Wed Mar 26 22:26:15 2008, John, Update, Computers, c1susvme
|
Mon Mar 31 14:01:40 2008, jamie, Summary, LSC, Summary of DC readout PD non-linearity measurements
|
Fri Mar 28 16:18:18 2008, rob, Update, Computers, c1susvme2 status
|
Mon Mar 31 14:14:16 2008, rob, Update, Computers, c1susvme2 status
|
Wed Apr 2 15:03:51 2008, steve, Update, General, reflectivity of black glass 
|
Thu Apr 3 18:33:17 2008, Andrey, Summary, Environment, Status of Weather Station
|
Thu Apr 3 18:46:04 2008, Andrey, Configuration, Computers, "Network switch board" and "c1pem1 crate" were touched
|
Thu Apr 3 19:27:50 2008, Andrey, Summary, Photos, Tour for prospective grad students
|
Fri Apr 4 16:54:06 2008, Andrey, Summary, Environment, Weather station is fully alive
|
Mon Apr 7 16:42:56 2008, rana, Update, Computers, eLog intermittent
|
Mon Apr 7 18:58:49 2008, steve, Update, General, reflectivity of SS304
|
Tue Apr 8 09:08:54 2008, steve, Configuration, PEM, weather station disconnected
|
Wed Apr 16 09:47:35 2008, Andrey, Summary, PEM, Weather Station 
|
Tue Apr 15 18:44:25 2008, rana, Configuration, Computers, Rosalba
|
Wed Apr 16 10:20:01 2008, Andrey, Update, Computers, Rosalba and linux3
|
Wed Apr 16 21:11:12 2008, rana, Summary, DAQ, AA/AI Filters for the DAQ & FE systems
|
Thu Apr 17 15:00:59 2008, steve, Update, VAC, vac controller computer to be replaced
|
Thu Apr 17 20:17:37 2008, Andrey, Update, PEM, Two issues with our weather station
|
Fri Apr 18 16:48:13 2008, Andrey, Update, PEM, Rain collector of weather station 
|
Sun Apr 20 18:23:27 2008, rana, Summary, LSC, locking attempts
|
Fri Apr 18 19:46:08 2008, rana, Update, ASS, check adaptive
|
Mon Apr 21 12:58:42 2008, rob, Update, ASS, check adaptive
|
Sun Apr 20 20:29:46 2008, rana, Update, Computer Scripts / Programs, tdsread bugs
|
Mon Apr 21 13:12:21 2008, rob, Update, Computer Scripts / Programs, tdsread bugs
|
Tue Apr 22 08:34:22 2008, josephb, Configuration, Cameras, Current Network Diagram
|
Sun Apr 20 23:39:57 2008, rana, Summary, SUS, MC1 electronics busted
|
Tue Apr 22 10:59:24 2008, rob, Update, SUS, MC1 electronics busted
|
Fri Apr 18 16:02:58 2008, alex, Update, SUS, end station sus front-end bug fix
|
Fri Apr 18 16:27:04 2008, rob, Update, SUS, end station sus front-end bug fix
|
Tue Apr 22 16:17:48 2008, rob, Update, SUS, end station sus front-end bug fix
|
Tue Apr 22 17:08:04 2008, Caryn, Update, IOO, no signal for C1:IOO-MC_L
|
Tue Apr 22 22:19:02 2008, rob, Metaphysics, lore, jiggling sliders
|
Tue Apr 22 22:51:30 2008, rana, Configuration, IOO, McWFS Status
|
Wed Apr 23 22:39:54 2008, Andrey, DAQ, Computer Scripts / Programs, Problem with "get_data" and slow PEM channels
|
Thu Apr 24 11:50:10 2008, josephb, Summary, Computer Scripts / Programs, Useful tidbits learned while tracking the network setup
|
Thu Apr 24 14:10:26 2008, rob, Update, Locking, locking work
|
Thu Apr 24 15:57:53 2008, steve, Configuration, SAFETY, Safety at AP-ISCT 
|
Thu Apr 24 22:06:47 2008, Andrey, Summary, Computers, Ethernet Cables and Hubs
|
Thu Apr 24 23:27:48 2008, rana, Update, PEM, acoustic noise in MC_F
|
Thu Apr 24 23:50:10 2008, rana, Update, General, Syringes in George the Freezer
|
Fri Apr 25 11:33:40 2008, Andrey, Configuration, Computers, Computer controlling vaccum equipment
|
Fri Apr 25 13:20:04 2008, Andrey, Update, PEM, Microphone test
|
Fri Apr 25 15:44:21 2008, steve, Update, PSL, scattering measurments 6x
|
Fri Apr 25 20:53:02 2008, rana, Configuration, IOO, MC WFS with more gain
|
Sat Apr 26 01:45:38 2008, Andrey, Summary, PEM, Weather Station enhancement
|
Sat Apr 26 11:21:15 2008, ajw, Omnistructure, Computers, backup of /cvs/cds restarted
|
Sun Apr 27 02:11:11 2008, rana, Configuration, IOO, MC WFS Notes
|
Sun Apr 27 05:09:30 2008, rana, Configuration, IOO, MC WFS Whitening turned on
|
Sun Apr 27 18:11:58 2008, rob, DAQ, Computers, br40m?
|
Sun Apr 27 22:57:15 2008, ajw, DAQ, Computers, br40m?
|
Mon Apr 28 23:44:33 2008, Andrey, Update, Computer Scripts / Programs, Weather.db
|
Tue Apr 29 21:09:12 2008, rana, DAQ, CDS, FE Filters 
|
Tue Apr 29 21:30:49 2008, Andrey, Update, PEM, In the process of renaming channels for Weather Station
|
Wed Apr 30 20:48:58 2008, Andrey, Summary, PEM, New Weather Channels
|
Thu May 1 08:31:51 2008, steve, Update, SUS, earthquake trips etmy & mc1
|
Thu May 1 12:46:02 2008, josephb, Configuration, Computers, Nodus gateway is up
|
Fri Apr 25 13:53:11 2008, josephb, Summary, Computers, Network setup
|
Mon May 5 11:04:30 2008, rob, Omnistructure, Computers, Network setup
|
Mon May 5 15:53:14 2008, steve, Update, VAC, drypump replaced & readbacks are out
|
Tue May 6 17:28:39 2008, rob, Configuration, LSC, AP33 -> POX33
|
Wed May 7 15:25:41 2008, rob, Configuration, LSC, AP33 -> POX33
|
Thu May 8 01:07:24 2008, rana, Summary, LSC, Frequency Noise test: MC Trans Backscatter
|
Thu May 8 01:50:25 2008, rana, Summary, ASC, Arm Cavity HOM Resonances
|
Thu May 8 02:06:13 2008, rana, Summary, COC, Thermal Lensing in the ITMs and BS may be a problem
|
Thu May 8 16:40:36 2008, josephb, Configuration, Cameras, Gige Camera currently on PSL table
|
Fri May 9 08:40:24 2008, steve, Update, SUS, ETMY sus damping restored
|
Fri May 9 10:15:36 2008, josephb, Update, Computers, Nodus has moved
|
Tue May 13 10:15:52 2008, steve, Update, SUS, restored damping of BS & PRM
|
Tue May 13 10:38:28 2008, steve, Update, Computers, rfm network is down
|
Wed May 14 13:14:19 2008, Andrey, Summary, Computers, Reflective Memory Network is restored
|
Wed May 14 14:05:40 2008, Andrey, Update, Computers, Computer Linux-2, MEDM screen "Watchdogs"
|
Thu May 15 10:40:21 2008, steve, HowTo, General, Lisa Goggin, PhD
|
Thu May 15 12:05:49 2008, josephb, Configuration, PSL, Path to PSL Position QPD
|
Thu May 15 14:39:33 2008, Caryn, Summary, PEM, filtering mode cleaner with mic 
|
Thu May 15 16:24:18 2008, josephb, Summary, Cameras,
|
Fri May 16 14:38:50 2008, josephb, Summary, Cameras, Two cameras setup
|
Fri May 16 17:27:55 2008, Andrey, Omnistructure, General, Toilets are broken, do not use them !!!
|
Sun May 18 18:14:30 2008, rana, Summary, Computer Scripts / Programs, autlockers and cron
|
Sun May 18 18:44:48 2008, rana, Summary, SUS, Optical Lever SUM Trend - 80 days
|
Sun May 18 18:59:15 2008, rana, Configuration, Computers, cron and hosts
|
Mon May 19 11:49:57 2008, steve, Update, SUS, etmy oplev laser replaced
|
Tue May 20 09:28:42 2008, steve, Bureaucracy, SAFETY, safety traning for 40m
|
Tue May 20 18:33:01 2008, Andrey, John, Configuration, IOO, Mode Cleaner is locked again
|
Wed May 21 15:21:33 2008, rob, Update, Computer Scripts / Programs, autolockers and cron
|
Thu May 22 11:21:45 2008, steve, Bureaucracy, SAFETY, early surf sudent
|
Thu May 22 11:25:19 2008, josephb, Configuration, Computers,
|
Fri May 23 08:24:24 2008, rana, AoG, Treasure, Yoichi Aso has arrived !
|
Fri May 23 21:21:52 2008, Caryn, Summary, General, filtering mode cleaner with wiener filter 10x
|
Sun May 25 16:20:27 2008, rana, Configuration, Computers, joinPDF
|
Sun May 25 19:33:16 2008, rana, Update, IOO, MC Bad after Re-alignment 
|
Sun May 25 20:30:25 2008, rana, Summary, PSL, PMC Mode Matching
|
Sun May 25 21:14:14 2008, tobin, Configuration, Computers, EPICS proxy server
|
Sun May 25 22:33:00 2008, rana, Update, SUS, ETMY Oplev Work
|
Tue May 27 16:24:54 2008, tobin, Configuration, Computer Scripts / Programs, ndsproxy
|
Wed May 28 12:51:32 2008, josephb, Configuration, Computers, Two more switches mounted
|
Wed May 28 14:19:47 2008, steve, Update, PSL, kaleidoscope of psl    
|
Thu May 29 15:58:44 2008, John, Summary, IOO, MC realignment
|
Thu May 29 16:49:49 2008, steve, Bureaucracy, Photos, Yoichi has arrived 
|
Fri May 30 12:03:08 2008, josephb, Andrey, Configuration, Cameras, Head to head comparison of cameras
|
Thu May 29 16:32:09 2008, steve, Update, SUS, etmy oplev is back 
|
Fri May 30 12:37:45 2008, rob, Update, SUS, etmy oplev is back
|
Fri May 30 21:30:15 2008, tobin, Configuration, Computers, svn on solaris
|
Sun Jun 1 19:25:10 2008, rana, Configuration, Computers, new monitor on op440m 
|
Sun Jun 1 19:39:35 2008, tobin, Configuration, Computers, elog, etc
|
Mon Jun 2 12:20:35 2008, josephb, Bureaucracy, Cameras, Beam scan has moved
|
Tue Jun 3 02:15:29 2008, Andrey, Summary, Cameras, Fitting results   
|
Tue Jun 3 10:19:45 2008, tobin, Configuration, Computers, big machine
|
Tue Jun 3 10:40:27 2008, tobin, Configuration, Computers, new dataviewer
|
Tue Jun 3 12:33:36 2008, Andrey, Update, Cameras, Andrey, Josephb
|
Wed Jun 4 10:18:52 2008, steve, Update, PSL, wedged SS beam trap 
|
Wed Jun 4 13:46:42 2008, josephb, Configuration, Cameras, Changing incident angle images   
|
Wed Jun 4 16:25:06 2008, Caryn, Summary, PEM, microphone moved
|
Wed Jun 4 16:57:12 2008, josephb, Configuration, Cameras, Dark images from cameras (electronics noise measurement)    
|
Thu Jun 5 10:46:26 2008, josephb, Configuration, Cameras, Approximately uniform reflected white light 
|
Thu Jun 5 13:35:23 2008, josephb, Configuration, Cameras, GC750 looking at 1064nm scattered light    
|
Fri Jun 6 11:19:13 2008, Caryn, Summary, PEM, Filtering MC_L and MC_F with PEM:ACC and microphone 8x
|
Fri Jun 6 15:56:00 2008, steve, Bureaucracy, SAFETY, Yoichi received safety training
|
Fri Jun 6 16:10:51 2008, steve, Update, PSL, HEPA filters are running at 100%
|
Fri Jun 6 16:47:04 2008, josephb, Configuration, Cameras, GC650 scatter images of 1064nm light  
|
Mon Jun 9 17:32:14 2008, Yoichi, Configuration, PSL, PMC transmittance
|
Mon Jun 9 17:57:59 2008, Yoichi, Configuration, PSL, PMC input power backed to the original
|
Tue Jun 10 08:37:18 2008, steve, Update, PSL, beam trap is being tested
|
Wed Jun 11 11:45:25 2008, steve, Update, PSL, ss trap works 
|
Wed Jun 11 15:30:55 2008, josephb, Configuration, Cameras, GC1280 
|
Thu Jun 12 01:51:23 2008, rob, Update, Locking, report
|
Thu Jun 12 15:09:33 2008, alan, Update, Locking, report
|
Thu Jun 12 15:55:15 2008, rob, Update, Locking, report
|
Fri Jun 13 11:17:25 2008, Yoichi, Update, PSL, PMC transmittance at high power
|
Mon Jun 16 18:26:01 2008, Max Jones, Update, Computer Scripts / Programs, Noise Budget Changes
|
Tue Jun 17 22:00:53 2008, John, HowTo, PSL, Problems turning MZ servo on/off
|
Wed Jun 18 00:19:29 2008, rob, Update, PSL, MOPA trend
|
Wed Jun 18 16:07:57 2008, rob, Summary, Computers, RFM network down
|
Wed Jun 18 16:37:54 2008, steve,rana, Update, SAFETY, CO2 test in the east arm
|
Wed Jun 18 18:20:10 2008, Yoichi, Update, PSL, Investigation on the NPRO temperature stabilization glitches 
|
Wed Jun 18 18:26:19 2008, Yoichi, Update, PSL, Finding the optimal operation temperature for the NPRO by the slow act scan
|
Wed Jun 18 18:32:09 2008, Max Jones, Update, Computer Scripts / Programs, NB Update
|
Wed Jun 18 18:50:09 2008, rana, Update, Computers, It can only be attributable to human error. (HAL - 2001)
|
Thu Jun 19 15:52:06 2008, Alberto, Configuration, Computers, Measure of the current absorbed by the new Megatron Computer
|
Thu Jun 19 20:22:03 2008, rana, Update, General, FE Computer Status
|
Fri Jun 20 01:38:55 2008, rana, Update, PEM, 20 day Weather
|
Fri Jun 20 02:20:33 2008, Yoichi, Update, , PMC transmittance degradation 
|
Fri Jun 20 08:30:27 2008, stiv, Update, Photos, 40m summer line up 2008 
|
Fri Jun 20 17:42:48 2008, steve, Update, PSL, SS trap scattering compared to black glass trap    
|
Sun Jun 22 21:38:49 2008, rob, HowTo, General, IFO CONFIGURE
|
Mon Jun 23 15:22:04 2008, rana, Bureaucracy, SAFETY, Laser Safety Walkthrough today
|
Mon Jun 23 19:33:01 2008, rana, jenne, Update, IOO, MC_F Noise check
|
Mon Jun 23 19:48:28 2008, rana,alberto, Summary, IOO, StochMon trends (80 days)
|
Mon Jun 23 21:51:19 2008, Alberto, Update, General, Arm Cavity Length Measurement
|
Tue Jun 24 10:24:43 2008, Koji, Update, General, Abs. Len. Meas. ~ Cavity Swing Measurement (2) 
|
Tue Jun 24 15:15:09 2008, John, Summary, LSC, Locking efforts
|
Tue Jun 24 17:12:10 2008, josephb, Eric, Configuration, Cameras, GC750 setup, 1X4 Hub connected, ETMX images  
|
Tue Jun 24 22:31:10 2008, Masha, Update, Auxiliary locking, my first step in fiber stabilization
|
Tue Jun 24 22:43:23 2008, rana, Summary, SEI, Stack TF
|
Wed Jun 25 00:35:40 2008, Koji, Summary, General, Optical Layout on the AP table 
|
Wed Jun 25 01:30:19 2008, John, Summary, IOO, Frequency noise after the MC
|
Wed Jun 25 09:46:45 2008, Sharon, Update, , Adaptive Filters
|
Wed Jun 25 11:01:45 2008, Masha, Update, Auxiliary locking, fiber stabilization
|
Wed Jun 25 11:36:14 2008, Max Jones, Update, Computer Scripts / Programs, First Week Update 
|
Wed Jun 25 12:25:28 2008, Eric, Summary, Cameras, 2D Gaussian Fitting Code
|
Wed Jun 25 13:38:22 2008, Koji, Update, General, Abs. Len. Meas. ~ Placement of the 700mW NPRO on the AP table
|
Wed Jun 25 13:56:56 2008, John, Summary, Locking, Tuesday night locking
|
Wed Jun 25 18:03:21 2008, Yoichi, Configuration, PSL, FSS Input Offset slider problem
|
Thu Jun 26 01:08:22 2008, rana, Configuration, General, Alarm Handler Revived
|
Thu Jun 26 01:10:18 2008, rana, Update, PEM, Alarm Handler indicates that dust level is high
|
Thu Jun 26 10:56:15 2008, Max Jones, Update, PEM, Removed Magnetometer
|
Thu Jun 26 12:30:40 2008, John, Summary, Locking, CARM on REFL_DC
|
Thu Jun 26 14:06:00 2008, Masha, Update, General, 500mW INNOLIGHT NPRO info
|
Thu Jun 26 18:24:28 2008, Yoichi, Update, PSL, FSS input ofset slider problem - fixed
|
Thu Jun 26 18:27:04 2008, rana, Update, Computer Scripts / Programs, No Dataviewer No Cry
|
Thu Jun 26 18:29:44 2008, Jenne, Update, , MC Back online
|
Thu Jun 26 20:59:22 2008, rana, Update, Computer Scripts / Programs, Alarm Handler
|
Thu Jun 26 21:07:11 2008, rana, Configuration, ASS, dust & MC1
|
Thu Jun 26 22:08:33 2008, Jenne, Update, Electronics, 3.7MHz bandstop filter in MC Servo   
|
Fri Jun 27 09:20:15 2008, steve, Frogs, PEM, dust particle count is up & alarm handler is on
|
Fri Jun 27 14:36:39 2008, John, Summary, Locking,
|
Fri Jun 27 15:20:52 2008, rob, DAQ, LSC, .ini file change
|
Fri Jun 27 18:03:46 2008, Jenne, Update, Electronics, Another bad cable in the MC servo
|
Fri Jun 27 18:21:01 2008, Jenne, Update, Electronics, Response of the LO input on the MC demod board
|
Fri Jun 27 19:59:44 2008, John, Update, Computers, c1iovme
|
Sat Jun 28 03:10:25 2008, rob, Update, Computers, c1iovme
|
Sat Jun 28 14:56:44 2008, John, Update, Computers, ini files
|
Sat Jun 28 23:23:50 2008, John, Update, Computers, Rebooting
|
Sun Jun 29 14:53:02 2008, rob, Update, Computers, Rebooting
|
Sun Jun 29 18:58:43 2008, rana, Summary, Computers, 1e20 is too big for AWG and/or IOVME
|
Sun Jun 29 19:19:47 2008, rana, Summary, IOO, Trends of the PSL/IOO Quads over 1000 days
|
Sun Jun 29 11:31:52 2008, John, Summary, PSL, ISS
|
Sun Jun 29 19:53:26 2008, John, Summary, PSL, ISS
|
Sun Jun 29 20:09:40 2008, John, Summary, IOO, mcup and mcdown indicators 
|
Sun Jun 29 20:29:48 2008, rana, Update, PSL, Correlation of PSL SLOW control v. Room temperature
|
Mon Jun 30 01:49:06 2008, John, Update, IOO, MC work
|
Mon Jun 30 08:59:23 2008, steve, Update, IOO, IOO-MC_DEMOD_LO is low
|
Mon Jun 30 09:46:15 2008, John, Update, IOO, MC WFS
|
Mon Jun 30 13:48:47 2008, John, Rob, Configuration, PSL, Don't put the bin in front of the air conditioning unit
|
Mon Jun 30 14:07:26 2008, Rob, Configuration, PSL, Don't put the bin in front of the air conditioning unit
|
Mon Jun 30 15:08:52 2008, John, Summary, PSL, MZ alignment
|
Mon Jun 30 15:56:22 2008, Jenne, Update, Electronics, Fixing the LO demod signal
|
Mon Jun 30 16:00:02 2008, josephb, sam, Configuration, Computers,
|
Mon Jun 30 18:36:01 2008, Yoichi, Update, PSL, MZ alignment again
|
Tue Jul 1 09:26:33 2008, steve, Update, Computers, RFM network is down
|
Tue Jul 1 10:15:22 2008, steve, Update, PSL, eventfull two days
|
Tue Jul 1 12:08:38 2008, John, Joe, Configuration, PSL, PMC input PD
|
Tue Jul 1 12:51:34 2008, John, Summary, General, IFO alignment
|
Tue Jul 1 11:53:38 2008, Yoichi, Update, Computers, RFM network back
|
Tue Jul 1 13:34:29 2008, rob, Update, Computers, RFM network back
|
Tue Jul 1 14:24:58 2008, rob, HowTo, Computer Scripts / Programs, conlog time machine
|
Tue Jul 1 11:57:24 2008, Yoichi, Configuration, PSL, MZ servo switch problem again
|
Tue Jul 1 16:48:42 2008, rob, john, Configuration, PSL, MZ servo switch problem resolved forever
|
Tue Jul 1 21:27:27 2008, rob, HowTo, Computer Scripts / Programs, slider twiddling after reboot
|
Tue Jul 1 21:45:48 2008, John, Update, PSL, Mach Zehnder script and screen
|
Wed Jul 2 00:59:13 2008, Masha, Update, Auxiliary locking, balanced detection, noise plots, progress 
|
Wed Jul 2 06:46:05 2008, Alberto, Configuration, General, NPRO on to warm up
|
Wed Jul 2 10:35:02 2008, Eric, Summary, Cameras, General Summary   
|
Wed Jul 2 13:56:10 2008, Rob, Yoichi, John, Update, Locking, 24.5 Hz resonance
|
Sun Jun 29 02:33:28 2008, Koji, Update, General, Abs. Len. Meas. ~ Optical setup (I)  
|
Mon Jun 30 05:33:38 2008, Koji, Update, General, Abs. Len. Meas. ~ Optical setup (II)
|
Tue Jul 1 21:54:05 2008, Koji, Update, General, Re: Abs. Length Meas. setup
|
Wed Jul 2 15:14:42 2008, steve, Update, General, added beam traps
|
Wed Jul 2 17:19:03 2008, John, Summary, Computers, op440m - shutdown and restarted
|
Wed Jul 2 18:30:01 2008, John, Update, IOO, QPD alignment 
|
Wed Jul 2 19:15:52 2008, Alberto, Update, General, Status of the alignment of the NPRO beam for the Absolute Length Measurement 
|
Thu Jul 3 11:53:30 2008, Koji, Update, General, Status of the alignment of the NPRO beam for the Absolute Length Measurement
|
Thu Jul 3 12:36:05 2008, Jonh, Summary, SUS, ETMY watchdog
|
Thu Jul 3 13:12:32 2008, Rob, Yoichi, John, Update, Locking, More oscillations  
|
Thu Jul 3 13:54:26 2008, rob, Configuration, Computers, mDV on rosalba
|
Thu Jul 3 16:18:51 2008, rob, Summary, Locking, specgrams  
|
Thu Jul 3 16:57:23 2008, John, Summary, General, FSS_RMTEMP 
|
Sun Jul 6 16:17:40 2008, tobin, HowTo, Computers, SVN
|
Thu Jul 3 18:48:09 2008, Alberto, Update, General, Beats of the two lasers in the absolute length measurement observed
|
Thu Jul 3 22:54:45 2008, Koji, Update, General, Beats of the two lasers in the absolute length measurement observed
|
Mon Jul 7 11:22:02 2008, Alberto, Update, General, Beats of the two lasers in the absolute length measurement observed
|
Mon Jul 7 13:06:38 2008, Koji, Update, General, Beats of the two lasers in the absolute length measurement observed
|
Mon Jul 7 13:49:27 2008, Yoichi, HowTo, PSL, MZ offset, gain tips
|
Mon Jul 7 13:58:37 2008, Eric, josephb, DAQ, PEM, Using unused PEM channels to test camera code
|
Mon Jul 7 14:02:05 2008, Yoichi, Update, Computers, SVN conversion progress
|
Mon Jul 7 16:30:08 2008, steve, Update, PSL, PSL-PEM 16 days trend
|
Mon Jul 7 19:15:38 2008, Alberto, Update, General, Optics alignement on the ABS length experiment
|
Tue Jul 8 00:14:28 2008, John, Summary, Computers, Alarm handler
|
Tue Jul 8 08:16:56 2008, steve, Update, PSL, PMC problem
|
Tue Jul 8 10:20:10 2008, steve, Update, PEM, HEPA turned on
|
Tue Jul 8 10:26:30 2008, Masha, Update, Auxiliary locking, setup updates
|
Tue Jul 8 12:25:54 2008, John, Summary, PSL, ISS gain set to 2dB
|
Tue Jul 8 21:46:38 2008, Yoichi, Configuration, PSL, GC650M moved to the PMC transmission
|
Tue Jul 8 21:58:22 2008, alberto, Update, General, Secondaty beam aligned to the IFO beam again
|
Wed Jul 9 12:42:14 2008, John, Update, Locking, Hand off to RF CARM
|
Wed Jul 9 15:04:22 2008, steve, Metaphysics, Photos, SURFs helping hands
|
Wed Jul 9 17:58:19 2008, John, Summary, General, Illuminator alarms
|
Thu Jul 10 13:47:12 2008, Yoichi, HowTo, Computers, svn access via https
|
Thu Jul 10 19:12:07 2008, Alberto, Update, General, abs cavity length measurement experiment
|
Thu Jul 10 23:27:57 2008, John, Metaphysics, Cameras, Secret handshakes
|
Fri Jul 11 00:30:24 2008, rob, Metaphysics, Computers, strange SUS controllers
|
Fri Jul 11 09:29:02 2008, steve, Update, PSL, the PMC still hangs up
|
Fri Jul 11 20:16:01 2008, Eric, DAQ, Cameras, Taking data from the GC 750 Camera
|
Thu Jul 10 14:59:01 2008, rob, Update, Locking, RF common mode at zero offset 
|
Fri Jul 11 23:55:25 2008, alan, Update, Locking, RF common mode at zero offset
|
Sat Jul 12 23:28:31 2008, rana, Update, PSL, PMC needs help
|
Sun Jul 13 17:19:29 2008, rana, Summary, PSL, MOPA SLOWM Calibration
|
Sun Jul 13 22:39:16 2008, John, Summary, General, Edited medm screens
|
Mon Jul 14 00:36:19 2008, John, Summary, PSL, Slow sweep of laser temp - PMC PZT response
|
Mon Jul 14 10:57:00 2008, Koji, Frogs, Environment, Someone at 40M sent LHO water of life
|
Mon Jul 14 12:43:07 2008, John, Summary, Computers, Restarted fb40m, tpman and c1ass
|
Mon Jul 14 19:15:43 2008, Alberto, Update, General, abs cavity length measurement experiment
|
Mon Jul 14 21:34:10 2008, Alberto, Update, General, abs cavity length measurement experiment
|
Tue Jul 15 09:47:09 2008, steve, Update, PEM, lab temps and particles
|
Tue Jul 15 10:09:42 2008, Eric, DAQ, Cameras, Did anyone kill the picture taking process on Mafalda?
|
Tue Jul 15 10:24:57 2008, steve, Update, PSL, PMC temp & pzt voltage
|
Tue Jul 15 11:47:56 2008, Jenne, DAQ, PEM, Accelerometer channels in ASS Adapt MEDM screen
|
Tue Jul 15 12:23:22 2008, Jenne, Update, General, MC2 Watchdog tripped
|
Tue Jul 15 12:44:08 2008, John, Summary, Locking, DRFPMI with DC readout
|
Tue Jul 15 19:15:57 2008, rana, Summary, SUS, ETMX Dewhitening characterization
|
Wed Jul 16 09:27:17 2008, steve, Update, ALARM, PSL-FSS_RMTEMP alarm is false
|
Wed Jul 16 10:50:55 2008, Eric, Summary, Cameras, Weekly Summary
|
Wed Jul 16 11:00:15 2008, Masha, Update, Auxiliary locking, improving ADC input for the mach zehnder setup and completely unrelated happenings
|
Wed Jul 16 11:26:47 2008, Max Jones, Update, , This Week
|
Wed Jul 16 15:59:04 2008, josephb, Eric, Configuration, Cameras, PMC trans camera path
|
Wed Jul 16 16:28:14 2008, josephb, Configuration, Computers, Fixed IP address on Switch
|
Wed Jul 16 16:59:07 2008, Alberto, Update, General, Aligment
|
Wed Jul 16 17:36:51 2008, John, DAQ, PSL, FSS input offset
|
Wed Jul 16 17:51:58 2008, Masha, Update, Auxiliary locking, long measurement
|
Wed Jul 16 22:29:05 2008, Masha, Update, Auxiliary locking, long measurement
|
Thu Jul 17 00:59:18 2008, Jenne, Summary, General, Funny signal coming out of VCO 
|
Thu Jul 17 08:30:15 2008, steve, Update, PSL, PMC relocked manually
|
Thu Jul 17 12:15:21 2008, Eric, Update, PSL, Swept PMC PZT voltage range
|
Thu Jul 17 13:08:37 2008, John, Summary, LSC, HOM resonances in the arms
|
Thu Jul 17 16:39:58 2008, Max Jones, Update, DAQ, Magnetometer Installed
|
Thu Jul 17 20:13:34 2008, Yoichi, Update, PSL, PMC alignment/mode matching effort
|
Fri Jul 18 12:24:15 2008, josephb, Eric, Configuration, Cameras, Changed Lenses on GC750 at ETMX
|
Fri Jul 18 16:57:37 2008, Jenne, Update, IOO, Calibrated MC_F 
|
Fri Jul 18 17:06:20 2008, Jenne, Update, Computers, Computers down for most of the day, but back up now
|
Fri Jul 18 17:12:35 2008, Jenne, Update, IOO, Checking out the MC Servo Board
|
Fri Jul 18 19:15:15 2008, Jenne, Update, IOO, Checking out the MC Servo Board
|
Fri Jul 18 19:30:20 2008, Masha, Update, Auxiliary locking, moving from 40m
|
Fri Jul 18 19:43:55 2008, Yoichi, DAQ, Computers, PSL fast channels cannot be read by dataviewer
|
Fri Jul 18 19:41:09 2008, Yoichi, Update, PSL, PMC PZT investigation 
|
Fri Jul 18 23:24:24 2008, rob, Update, PSL, PMC PZT investigation
|
Sat Jul 19 19:39:44 2008, rob, Update, PSL, PMC PZT investigation
|
Sat Jul 19 19:41:56 2008, Yoichi, AoG, PSL, The author of the entry 702 is Yoichi not Rob
|
Mon Jul 21 09:52:05 2008, Sharon, Update, , Adaptive code changes
|
Mon Jul 21 10:00:42 2008, steve, Update, PEM, ifo room temp
|
Mon Jul 21 11:54:00 2008, Jenne, Update, General, MC Servo Board
|
Mon Jul 21 14:26:11 2008, Max, Summary, PEM, Added Channels
|
Mon Jul 21 15:52:22 2008, steve, Bureaucracy, SAFETY, fire alarms test
|
Mon Jul 21 19:48:57 2008, Sharon, Update, , how tp restart C1ASS
|
Mon Jul 21 19:55:16 2008, rana,jenne, Configuration, IOO, Noise in MC_F
|
Tue Jul 22 09:24:17 2008, steve, Update, PSL, laser power
|
Tue Jul 22 11:55:22 2008, rana, Update, PSL, Note from R. Abbott re: the PMC
|
Tue Jul 22 13:15:14 2008, rob, Update, PSL, Note from R. Abbott re: the PMC
|
Tue Jul 22 03:03:22 2008, John, Rob, Update, PSL, FSS open loop transfer function
|
Tue Jul 22 13:16:09 2008, John, Rob, Update, PSL, FSS open loop transfer function
|
Tue Jul 22 16:50:09 2008, steve, Metaphysics, Environment, professorial clean up of work bench 
|
Tue Jul 22 22:11:58 2008, Yoichi, Update, LSC, X-arm g factor measurement
|
Tue Jul 22 22:25:31 2008, rana, Update, LSC, Looptickle for existing 40m
|
Wed Jul 23 01:42:26 2008, rana, Configuration, PSL, FSS RFPD: Examined, "repaired", and re-installed
|
Wed Jul 23 10:47:05 2008, Sharon, Update, , Weekly update
|
Wed Jul 23 10:49:37 2008, Max, Update, Computer Scripts / Programs, Weekly Progress Report
|
Wed Jul 23 12:42:23 2008, Eric, Summary, Cameras, Weekly Summary  
|
Wed Jul 23 13:52:26 2008, Sharon, Update, , MEDM changes
|
Wed Jul 23 16:31:02 2008, Alberto, Configuration, Computers, Megatron connected
|
Wed Jul 23 17:19:48 2008, Alberto, Configuration, Computers, Megatron connected
|
Wed Jul 23 18:42:18 2008, Jenne, Update, PSL, Alignment of AOM
|
Wed Jul 23 21:48:30 2008, rob, Configuration, General, restore IFO when you're done with it
|
Thu Mar 13 02:52:06 2008, Lisa, Configuration, LSC, Locking with 3f
|
Thu Jul 24 01:04:01 2008, rob, Configuration, LSC, IFR2023A (aka MARCONI) settings
|
Thu Jul 24 03:08:20 2008, rob, Update, Locking, +f2 DRMI+2ARMS
|
Wed Jul 23 22:34:07 2008, Yoichi, Update, LSC, Arm cavity g-factor measurement
|
Thu Jul 24 01:27:00 2008, Koji, Update, LSC, Arm cavity g-factor measurement
|
Thu Jul 24 02:57:26 2008, rob, Update, LSC, Arm cavity g-factor measurement
|
Thu Jul 24 08:09:26 2008, Yoichi, Update, LSC, Arm cavity g-factor measurement
|
Thu Jul 24 11:49:07 2008, Masha, Summary, Auxiliary locking, belated weekly summary 
|
Thu Jul 24 19:29:26 2008, Yoichi, Configuration, PSL, C1:PSL-STAT_FSS_NOM_C_GAIN is changed from 30 to -0.7
|
Thu Jul 24 21:04:58 2008, rana, Update, PSL, FSS
|
Thu Jul 24 21:53:00 2008, rana, Summary, Treasure, High School Tour group and the PMC
|
Fri Jul 25 13:30:53 2008, Sharon, Update, , Changes in ASS computer
|
Fri Jul 25 17:32:46 2008, Sharon, Update, , ASS computer
|
Fri Jul 25 19:57:18 2008, Jenne, Update, PSL, Ref Cav & PMC
|
Sat Jul 26 15:09:57 2008, Aidan, Update, Computers, Reboot of op440m
|
Sun Jul 27 20:25:49 2008, rana, Configuration, Environment, Office Temperature increased to 75 F
|
Sun Jul 27 23:06:17 2008, rana, Update, PSL, PMC, MZ, MC-MMT, etc.
|
Mon Jul 28 11:20:13 2008, Jenne, Update, PSL, Work on the FSS and Reference Cavity
|
Mon Jul 28 12:02:32 2008, Sharon, Update, , accelerometers settings
|
Mon Jul 28 17:44:07 2008, rana, Update, PSL, PMC PZT v. temperature
|
Mon Jul 28 17:58:05 2008, Sharon, Update, , TOP screen changes
|
Mon Jul 28 23:41:07 2008, rob, Configuration, PSL, FSS/MC gains twiddled
|
Tue Jul 29 01:03:17 2008, rob, Configuration, IOO, MC length measurement
|
Tue Jul 29 09:12:43 2008, Koji, Configuration, IOO, MC length measurement
|
Tue Jul 29 11:50:01 2008, Jenne, Update, Environment, 5.6 Earthquake
|
Tue Jul 29 18:15:36 2008, rob, Update, IOO, MC locked
|
Tue Jul 29 13:54:08 2008, rana, Update, SUS, ETMY and PRM have EQ related problems
|
Tue Jul 29 14:38:02 2008, rob, Update, SUS, ETMY and PRM have EQ related problems
|
Tue Jul 29 19:53:19 2008, Koji, Update, SUS, PRM photos from the south window 
|
Tue Jul 29 21:04:55 2008, Sharon, Update, , OSEM's Power Spectrum 8x
|
Tue Jul 29 19:41:38 2008, Yoichi, Update, PSL, FSS loop transfer functions 7x
|
Tue Jul 29 23:04:34 2008, Yoichi, Update, PSL, FSS loop transfer functions 
|
Wed Jul 30 00:42:04 2008, rana, Update, SUS, Trends and file formats
|
Wed Jul 30 01:08:50 2008, rana, Summary, SUS, SUS Drift Screen
|
Wed Jul 30 12:03:44 2008, Masha, Summary, Auxiliary locking, weekly summary  
|
Wed Jul 30 12:36:19 2008, Sharon, Update, , Weekly update
|
Wed Jul 30 13:08:44 2008, Max Jones, Update, Computer Scripts / Programs, Weekly Summary
|
Wed Jul 30 13:09:40 2008, josephb, Eric, Configuration, PSL, PMC scan experiment
|
Wed Jul 30 13:52:41 2008, Eric, Summary, Cameras, Weekly Summary
|
Wed Jul 30 13:14:03 2008, Koji, Summary, IOO, History of the MC abs length
|
Wed Jul 30 15:12:08 2008, rana, Summary, IOO, History of the MC abs length
|
Wed Jul 30 15:28:08 2008, rob, Update, LSC, Y arm locked
|
Wed Jul 30 18:45:01 2008, rana, Configuration, SUS, New SUS Drift Technology
|
Thu Jul 31 10:24:32 2008, Koji, Update, General, IFO status
|
Wed Jul 30 16:35:56 2008, Eric, Update, PSL, PMC Scan Graphs   
|
Thu Jul 31 10:27:17 2008, rana, Update, PSL, PMC Scan Graphs
|
Thu Jul 31 16:11:22 2008, josephb, Configuration, Computers, Matlab on Megatron
|
Fri Aug 1 10:45:46 2008, josephb, Configuration, Computers, Megatron now running tcsh
|
Fri Aug 1 11:51:15 2008, justing, Omnistructure, Computers, added /cvs/cds/site directory
|
Fri Aug 1 01:13:32 2008, rana, Configuration, PSL, PSL Quad change and new script
|
Fri Aug 1 16:33:52 2008, rana, Configuration, PSL, PSL Quad change and new script
|
Sat Aug 2 13:07:23 2008, Koji, Configuration, General, The AP table cleaned
|
Sat Aug 2 16:05:38 2008, rana, Configuration, Computer Scripts / Programs, mDV update
|
Sat Aug 2 18:37:41 2008, rana, Update, SUS, OSEM Spectra
|
Sun Aug 3 20:53:54 2008, rana, Configuration, PEM, Guralp
|
Mon Aug 4 00:56:07 2008, Koji, HowTo, General, Abs. Len. Meas. ~ Auto freq scanner with GPIB
|
Mon Aug 4 12:12:20 2008, steve, Configuration, VAC, the ifo is at atm 
|
Mon Aug 4 13:43:02 2008, Yoichi, Summary, PSL, FSS loop calibration   
|
Mon Aug 4 16:20:20 2008, Dmass, Configuration, Photos, ITMX magnet position relative to OSEMS 
|
Tue Aug 5 02:39:55 2008, Koji, Configuration, General, Abs. Len. Meas. ~ Optical Layout on the AP / PSL table 2008-Aug-05   
|
Tue Aug 5 10:23:00 2008, steve, Update, SUS, earthquake and venting effects 
|
Tue Aug 5 10:56:05 2008, Alberto, Configuration, General, ITMX chamber opened and mirror released
|
Tue Aug 5 12:52:28 2008, Yoichi, Update, SUS, ITMX, SRM OSEM spectra 
|
Tue Aug 5 17:56:23 2008, Alberto, Configuration, General, SRM and PRM inspection 
|
Wed Aug 6 13:15:57 2008, Yoichi, Update, SUS, SRM ETMX freeswing spectra
|
Wed Aug 6 13:57:44 2008, Masha, Summary, Auxiliary locking, weekly summary
|
Wed Aug 6 19:01:15 2008, Alberto, Update, General, ITMX and SRM OSEM post-earthquake diagnostic
|
Wed Aug 6 22:19:07 2008, Yoichi, Update, SUS, BS alignment
|
Thu Aug 7 10:07:13 2008, Yoichi, Update, SUS, Free swinging OSEM spectra
|
Thu Aug 7 10:27:59 2008, rana, Update, SUS, Free swinging OSEM spectra
|
Thu Aug 7 12:20:52 2008, Yoichi, Update, SUS, PRM stand-offs and wire  
|
Thu Aug 7 17:32:23 2008, Jenne, Update, SUS, Afternoon PRM activities
|
Thu Aug 7 11:54:26 2008, josephb, Configuration, Cameras, New code + gstreamer allows for easy saving and compression of images
|
Fri Aug 8 09:54:10 2008, rana, Update, Cameras, New code + gstreamer allows for easy saving and compression of images
|
Fri Aug 8 10:58:05 2008, josephb, Configuration, Cameras, Cameras and gstreamer
|
Fri Aug 8 11:04:34 2008, Sharon, Update, , MCL Wiener filter
|
Fri Aug 8 12:21:57 2008, josephb, Configuration, Computers, Switched X end ethernet connections over to new switch
|
Fri Aug 8 13:29:54 2008, Yoichi, Update, SUS, No groove in the stand-off ... wait, it is not even a stand-off !  
|
Fri Aug 8 15:10:35 2008, Yoichi, Update, SUS, No groove in the stand-off ... wait, it is not even a stand-off !
|
Fri Aug 8 17:54:52 2008, Jenne, Update, SUS, Standoffs and Guide Rods
|
Sun Aug 10 16:57:02 2008, rana, Summary, Photos, Photos from Vent 8/4 - 8/8
|
Mon Aug 11 00:58:31 2008, rana, Update, PEM, 2 years of temperature trend
|
Mon Aug 11 09:39:29 2008, rana, Update, PEM, 2 years of temperature trend
|
Mon Aug 11 11:36:11 2008, josephb, Steve, Configuration, Computers, c1susvme1 minor problems
|
Mon Aug 11 12:42:04 2008, josephb, Configuration, Computers, Continuing saga of c1susvme1
|
Mon Aug 11 13:59:23 2008, josephb, Configuration, Computers,
|
Mon Aug 11 15:07:49 2008, josephb, Configuration, Computers, Procyon aka fb40m switched to new switch
|
Mon Aug 11 19:09:28 2008, Jenne, DAQ, PEM, Seismometer DAQ is being funny 
|
Tue Aug 12 12:05:36 2008, Yoichi, Update, Computers, HP color printer is back
|
Tue Aug 12 12:21:13 2008, josephb, Configuration, Cameras, Variation in fit over 140 images for GC650 and GC750
|
Tue Aug 12 19:48:24 2008, Jenne, Update, IOO, PRM standoff is in....mostly
|
Wed Aug 13 17:00:59 2008, steve, Configuration, SUS, BS sat amp removed
|
Wed Aug 13 20:13:35 2008, Yoichi, Update, SUS, PRM stand-off is glued
|
Thu Aug 14 10:26:45 2008, steve, HowTo, SUS, sus cable pin cheater for out of vac damping
|
Thu Aug 14 11:39:06 2008, steve, Update, PEM, particle counter is out of order
|
Thu Aug 14 15:51:35 2008, josephb, Summary, Cameras, FOUND! The Missing Standoff!
|
Thu Aug 14 19:08:14 2008, Yoichi, Configuration, SUS, Free swing measurement going on
|
Thu Aug 14 19:35:54 2008, Jenne, Summary, IOO, PRM in the chamber, ready to pump!
|
Fri Jul 25 10:48:13 2008, Koji, Update, General, Abs. Len. Meas. ~ Realignment / beating / PLL trial
|
Mon Jul 28 15:54:04 2008, Koji, Update, General, Abs. Len. Meas. ~ More on the beat / the PLL setup 
|
Thu Jul 31 11:19:30 2008, Koji, Update, General, Abs. Len. Meas. ~ Resonance search trial
|
Sat Aug 2 12:53:43 2008, Koji, Update, General, Abs. Len. Meas. ~ New PLL at the PSL table
|
Mon Aug 4 00:37:58 2008, Koji, Update, General, Abs. Len. Meas. ~ RF PD at the Y end / Manual frequency scan  
|
Mon Aug 4 05:23:57 2008, Koji, Update, General, Abs. Len. Meas. ~ Measurement for Y-arm completed
|
Mon Aug 4 21:48:24 2008, Koji, Update, General, Abs. Len. Meas. ~ Scan for TEM00/01/10  
|
Mon Aug 4 22:31:10 2008, Koji, Update, General, Abs. Len. Meas. ~ Simple Test for TEM01/10 split
|
Tue Aug 5 00:05:57 2008, Koji, Update, General, Abs. Len. Meas. ~ IFR2023A calibration
|
Wed Aug 6 11:10:34 2008, Koji, Update, General, Abs. Len. Meas. ~ analysis of the TEM00 scan 
|
Wed Aug 6 11:43:52 2008, Koji, Update, General, Abs. Len. Meas. ~ analysis of the TEM01 scan
|
Thu Aug 14 21:52:51 2008, Koji, Summary, General, Abs. Len. Meas. ~ summary of my Summer
|
Fri Aug 15 11:52:32 2008, josephb, Configuration, Cameras, Multi-computer display and recording of digital camera output
|
Fri Aug 15 14:12:31 2008, steve, Bureaucracy, SAFETY, safety glasses required
|
Fri Aug 15 16:45:43 2008, Sharon, Update, , Converting from FIR to IIR  
|
Fri Aug 15 17:38:41 2008, Yoichi, Update, SUS, OSEM free swinging spectra before the pump down 
|
Fri Aug 15 19:32:49 2008, steve, Configuration, VAC, pumpdown complete
|
Mon Aug 18 08:07:10 2008, Yoichi, Configuration, SUS, Suspension free swinging
|
Mon Aug 18 09:19:55 2008, steve, Summary, VAC, 11 days at atm
|
Mon Aug 18 11:50:29 2008, Yoichi, Update, SUS, In vacuum free swinging results 
|
Mon Aug 18 15:32:18 2008, josephb, Configuration, Cameras, How to multicast with gstreamer and Gige Cameras
|
Mon Aug 18 17:37:14 2008, rob, Update, Locking, recovery progress
|
Mon Aug 18 22:47:12 2008, Yoichi, Update, IOO, MC unlock study
|
Tue Aug 19 10:36:34 2008, Sharon, Update, , Calibrating accelerometers
|
Tue Aug 19 13:12:55 2008, Jenne, Update, SUS, Diagonalized PRM Input Matrix
|
Tue Aug 19 13:34:58 2008, josephb, Configuration, Computers, Switched c1pem1, c0daqawg, c0daqctrl over to new switches
|
Tue Aug 19 14:25:38 2008, Sharon, Update, PEM, Accelerometer's calibration - update 
|
Tue Aug 19 17:00:19 2008, Sharon, Update, , Wiener TF calibration - update
|
Tue Aug 19 17:15:34 2008, Sharon, Update, , MEDM
|
Tue Aug 19 18:55:41 2008, Yoichi, Update, IOO, MC unlock study update
|
Tue Aug 19 19:14:17 2008, Yoichi, Configuration, DAQ, Fixed C1:IOO-MC_RFAMPDDC
|
Wed Aug 20 11:42:49 2008, John, Summary, Computers, pdftk
|
Wed Aug 20 11:50:10 2008, John, Summary, Computers, StripTools on op540m
|
Wed Aug 20 12:04:47 2008, Jenne, Update, SUS, Better diagonalization of PRM input matrix 
|
Wed Aug 20 12:39:11 2008, Eric, Summary, Cameras, Weekly Summary   
|
Wed Aug 20 13:23:32 2008, rob, Update, Locking, DRMI locked
|
Wed Aug 20 17:02:01 2008, Sharon, Update, , More FIR to IIR
|
Wed Aug 20 18:09:48 2008, Yoichi, Update, IOO, MC still unlocks
|
Thu Aug 21 10:24:20 2008, steve, Configuration, SAFETY, laser safe mode condition
|
Thu Aug 21 16:28:59 2008, steve, Configuration, SAFETY, safety glasses required
|
Thu Aug 21 17:55:14 2008, rana, HowTo, IOO, MC WFS DC Offsets
|
Thu Aug 21 18:13:24 2008, rana, Update, IOO, MC WFS Control signals not responsible for lock losses
|
Fri Aug 22 10:39:41 2008, Jenne, Update, SUS, Taking Free Swinging spectra of PRM, SRM, ITMX, BS
|
Fri Aug 22 13:58:39 2008, Sharon, Summary, , Trend of the Wiener TF 
|
Fri Aug 22 16:06:29 2008, steve, Update, PEM, particle counter replaced, flowbenches & HEPAs checked
|
Fri Aug 22 17:03:41 2008, Yoichi, Update, IOO, MC open loop TF
|
Sat Aug 23 09:39:51 2008, rana, jenne, Update, PSL, PMC Survey
|
Mon Aug 25 10:07:35 2008, Jenne, Update, PSL, Numbers for the PMC servo board (Re: entry # 873)
|
Mon Aug 25 10:23:53 2008, steve, HowTo, General, cable killer 
|
Mon Aug 25 10:51:06 2008, steve, Update, PSL, psl headtemp is coming down
|
Mon Aug 25 11:43:55 2008, Yoichi, Frogs, IOO, MC REFL PD cable had been disconnected through out the weekend
|
Mon Aug 25 12:13:49 2008, Jenne, Update, PSL, Broken PMC Servo Board
|
Mon Aug 25 14:18:36 2008, Jenne, Update, PSL, PMC servo board is fixed
|
Mon Aug 25 14:42:09 2008, Eric, Configuration, Cameras, ETMX Digital Camera
|
Mon Aug 25 17:45:34 2008, rana, josephb, rob, HowTo, PEM, Accelerometer range
|
Mon Aug 25 21:15:23 2008, rana, Configuration, LSC, aux NPRO off
|
Tue Aug 26 09:04:59 2008, rana, Configuration, PSL, PMC Servo Board: Out for Repairs
|
Tue Aug 26 09:58:59 2008, steve, Omnistructure, COC, ETMX is #03 
|
Tue Aug 26 12:00:45 2008, Jenne, Summary, PEM, Transfer function of Ranger seismometer
|
Tue Aug 26 15:06:16 2008, steve, Configuration, VAC, rga scan
|
Tue Aug 26 18:19:16 2008, rana, Omnistructure, Electronics, Resistor Noise at the 40m
|
Tue Aug 26 19:07:37 2008, Yoichi, HowTo, Computers, Reading data from Agilent 4395A analyzer through GPIB from *Linux* machine
|
Wed Aug 27 10:55:35 2008, Yoichi, HowTo, Computers, Annoying behavior of the touch pads of the lab. laptops is fixed
|
Wed Aug 27 12:09:10 2008, Eric, Summary, Cameras, Weekly Summary 
|
Thu Aug 28 19:02:25 2008, rana, josephb, rob, Summary, Computers, big boot
|
Wed Aug 27 13:55:43 2008, rana,jenne, Update, PSL, PMC Servo Board
|
Fri Aug 29 02:40:43 2008, rana,jenne, Update, PSL, PMC Servo Board  
|
Fri Aug 29 11:01:49 2008, josephb, Configuration, Computers, Attempt to change a channel gain in ICS-110B
|
Fri Aug 29 11:05:11 2008, josephb, Summary, Computers, c1asc was down this morning
|
Fri Aug 29 12:41:26 2008, josephb, Eric, Configuration, Computers, More front ends moved to new network
|
Fri Aug 29 12:43:44 2008, josephb, Summary, Computers, c1susvme1 down
|
Fri Aug 29 15:01:45 2008, steve, Update, PSL, MOPA_HTEMP in increasing
|
Thu Aug 28 18:56:14 2008, rana, Configuration, PSL, beam block distorted
|
Fri Aug 29 10:20:32 2008, Yoichi, Configuration, PSL, beam block distorted
|
Fri Aug 29 16:35:18 2008, Yoichi, Configuration, PSL, beam block distorted
|
Fri Aug 29 17:39:25 2008, rana, Configuration, PSL, PMC: ADC Channels
|
Fri Aug 29 18:24:48 2008, rana, HowTo, PSL, PMC: PZT Calibration 
|
Sat Aug 30 13:28:01 2008, rana, Configuration, PSL, PMC: List of changes
|
Fri Aug 29 22:57:48 2008, Yoichi, Update, PSL, FSS loop transfer functions 
|
Mon Sep 1 04:34:00 2008, rana, Update, PSL, FSS loop transfer functions    
|
Tue Sep 2 07:58:34 2008, rana, Summary, PSL, FSS & PMC LO trends for 2 years
|
Mon Sep 1 19:23:17 2008, Yoichi, Configuration, PSL, FSS on an auxiliary loop
|
Tue Sep 2 09:58:42 2008, Yoichi, Configuration, PSL, FSS on an auxiliary loop
|
Tue Sep 2 10:09:03 2008, steve, Update, PSL, head temp is cooling down
|
Tue Sep 2 14:28:41 2008, Yoichi, Update, PSL, FSS EOM driving signal spectra 
|
Tue Sep 2 22:43:16 2008, Yoichi, Configuration, PSL, Updated FSS open loop TF
|
Wed Sep 3 12:26:49 2008, Eric, Summary, Cameras, Weekly Summary
|
Wed Sep 3 18:43:19 2008, Yoichi, Configuration, Electronics, Two more active probes
|
Wed Sep 3 18:45:01 2008, Alberto, Configuration, , PD3 gain
|
Wed Sep 3 19:09:56 2008, Yoichi, DAQ, Computers, c1iovme power cycled
|
Thu Sep 4 00:38:14 2008, rana, Update, PSL, c1iovme power cycled
|
Thu Sep 4 07:29:52 2008, Yoichi, Update, PSL, c1iovme power cycled
|
Thu Sep 4 07:46:10 2008, Yoichi, Update, IOO, MC is now happy
|
Thu Sep 4 10:13:48 2008, Jenne, Update, IOO, We unlocked the MC temporarily
|
Thu Sep 4 13:48:50 2008, Yoichi, Update, PSL, FSS modulation depth
|
Thu Sep 4 14:43:58 2008, Jenne, Update, PSL, PMC Open Loop Gain
|
Thu Sep 4 11:33:25 2008, josephb, Eric, Jenne, Configuration, Computers, Attempt to increase gain for C1:PSL-ISS_INMONPD_F via 110B
|
Thu Sep 4 16:24:56 2008, rana, Configuration, Computers, Attempt to increase gain for C1:PSL-ISS_INMONPD_F via 110B
|
Thu Sep 4 17:03:25 2008, Yoichi, Update, PSL, RF oscillator noise comparison
|
Thu Sep 4 17:12:57 2008, Yoichi, Update, PSL, FSS open loop TF
|
Thu Sep 4 17:17:03 2008, Yoichi, Update, IOO, MC open loop TF
|
Thu Sep 4 17:44:27 2008, Yoichi, Update, PSL, FSS error signal spectrum
|
Thu Sep 4 18:02:34 2008, rana, josephb, Configuration, PEM, Accelerometer gains increased by 10
|
Fri Sep 5 08:34:03 2008, steve, Update, PSL, MZ locked
|
Fri Sep 5 09:56:14 2008, josephb, Eric, Configuration, Computers, Funny channels, reboots, and ethernet connections
|
Mon Sep 8 10:57:49 2008, steve, Update, IOO, the psl and mc are back to normal  
|
Fri Sep 5 10:36:34 2008, steve, Update, PEM, thermostate setting changed
|
Fri Sep 5 15:09:50 2008, rana, Update, PEM, thermostate setting changed
|
Mon Sep 8 13:47:35 2008, steve, Update, PEM, thermostate setting changed
|
Mon Sep 8 15:38:57 2008, Yoichi, Configuration, PSL, POY RF amp is back to its original task
|
Wed Sep 10 08:57:03 2008, steve, Update, General, etmy illuminator turned off
|
Wed Sep 10 13:28:25 2008, Yoichi, Summary, Electronics, IOO rack lost -24V (recovered)
|
Wed Sep 10 19:53:53 2008, Alberto, Update, General, abs length experiment
|
Thu Sep 11 11:29:14 2008, josephb, Configuration, Computers, Final netgear switch in place in 1Y2
|
Thu Sep 11 14:27:53 2008, steve, Bureaucracy, SAFETY, safety training
|
Thu Sep 11 23:28:35 2008, alberto, Update, General, abs cavity length experiment
|
Fri Sep 12 11:09:20 2008, Alberto, Update, General, abs cavity length experiment
|
Sat Sep 13 23:13:01 2008, Alberto, Update, General, abs cavity length experiment
|
Sun Sep 14 18:30:32 2008, Alberto, Update, General, ABSL: measured X arm
|
Sun Sep 14 19:29:07 2008, Alberto, Update, General, ABSL: measured X arm
|
Mon Sep 15 14:00:52 2008, josephb, Configuration, Computers, 1Y9 Hub and C1asc
|
Tue Sep 16 10:57:45 2008, Yoichi, Configuration, PEM, Particle counter gain
|
Tue Sep 16 13:04:22 2008, Yoichi, Configuration, PEM, C1:PSL-FSS_RMTEMP alarm level changed
|
Tue Sep 16 16:47:01 2008, pete, Configuration, PSL, Prototype FSS reference installed
|
Wed Sep 17 12:55:28 2008, rob, Configuration, IOO, MC length
|
Wed Sep 17 12:58:12 2008, rob, Update, Locking, bad
|
Wed Sep 17 13:58:36 2008, Alberto, Update, General, ABSL: results from the X arm
|
Wed Sep 17 17:31:24 2008, Yoichi, Update, PSL, FSS calibration  
|
Wed Sep 17 13:43:54 2008, Yoichi, Configuration, PSL, RC sweep going on
|
Wed Sep 17 15:22:31 2008, Yoichi, Configuration, PSL, RC sweep going on
|
Wed Sep 17 17:58:35 2008, Yoichi, Configuration, PSL, RC sweep going on
|
Wed Sep 17 19:13:47 2008, Alberto, Update, General, ABSL: status
|
Thu Sep 18 09:30:12 2008, steve, Update, General, low noise metal film resistors are in 
|
Thu Sep 18 01:14:23 2008, rob, Summary, Computers, EPICS BAD
|
Thu Sep 18 12:16:01 2008, Yoichi, Update, Computers, EPICS BACK
|
Thu Sep 18 13:05:05 2008, Yoichi, Update, Computers, EPICS BACK
|
Thu Sep 18 14:36:54 2008, josephb, Configuration, Computers, Name server and Epics
|
Thu Sep 18 18:38:14 2008, Yoichi, HowTo, Computers, How to compile an SNL code for VxWorks
|
Thu Sep 18 23:31:26 2008, rana, Update, PSL, ISS: Saturating too often at nominal gain
|
Fri Sep 19 00:06:54 2008, rana, Update, IOO, MC_F: Too much frequency noise around 100 Hz
|
Fri Sep 19 01:55:41 2008, rana, Summary, SUS, SUS Drift Screen Updated  
|
Fri Sep 19 08:09:55 2008, steve, Update, PSL, psl HEPAs turned on
|
Fri Sep 19 00:18:14 2008, rana, Update, Computers, svn is old
|
Fri Sep 19 09:49:42 2008, Yoichi, Update, Computers, svn is old
|
Fri Sep 19 11:21:45 2008, josephb, Configuration, Computers, Nameserver and Rosalba
|
Fri Sep 19 11:48:14 2008, steve, Update, Computers, old hubs can make one happy
|
Mon Sep 22 12:06:58 2008, rob, Update, SUS, ITMY UL OSEM
|
Mon Sep 22 15:02:45 2008, rana, Frogs, Treasure, Mantis found outside the 40m door at night
|
Mon Sep 22 18:54:54 2008, Jenne, Update, PSL, PMC transfer functions with various brick-on-top configurations 
|
Mon Sep 22 20:00:35 2008, Alberto, Update, General, ABSL: running measurement
|
Mon Sep 22 21:54:05 2008, rana, Update, ASS, New Wiener result with x10 gain in ACC
|
Mon Sep 22 21:30:06 2008, rana, Configuration, PSL, bad FSS
|
Mon Sep 22 22:24:19 2008, rana, Configuration, PSL, bad FSS
|
Mon Sep 22 16:51:27 2008, Yoichi, HowTo, Computers, Network GPIB
|
Tue Sep 23 00:47:24 2008, Yoichi, HowTo, Computers, Network GPIB
|
Tue Sep 23 11:17:59 2008, steve, Update, PSL, PMC scattering spot 
|
Tue Sep 23 13:25:07 2008, rob, Update, Locking, a bit better
|
Tue Sep 23 15:28:06 2008, pete, Configuration, PSL, new 21.5 MHz FSS reference installed 
|
Wed Sep 24 17:57:04 2008, Alberto, Update, General, ABSL: FSS Slow Actuator Control
|
Wed Sep 24 19:13:06 2008, rana, Configuration, Computer Scripts / Programs, updatedb & locate: megatron & rosalba
|
Thu Sep 25 02:35:21 2008, rana, Summary, PSL, FAST is moving alot 
|
Thu Sep 25 03:12:13 2008, rana, Summary, Computers, conlog and linux1
|
Thu Sep 25 10:48:29 2008, Yoichi, Update, PSL, FSS calibration again 
|
Thu Sep 25 14:03:08 2008, josephb, Configuration, Computers,
|
Thu Sep 25 15:24:05 2008, Yoichi, Update, IOO, MC_F VCO calibration
|
Thu Sep 25 17:14:31 2008, rana, Configuration, General, new sitemap
|
Fri Sep 26 00:19:54 2008, Jenne, Update, PSL, Filter-action with the PMC
|
Fri Sep 26 09:05:47 2008, steve, Update, SUS, MC2 damping restored
|
Fri Sep 26 14:10:21 2008, Yoichi, Configuration, Computers, Lab laptops maintenance
|
Fri Sep 26 16:08:39 2008, rob, Update, Locking, some progress
|
Fri Sep 26 16:13:57 2008, rana, Update, IOO, MC_L / MC_F crossover
|
Fri Sep 26 18:35:17 2008, Jenne, Update, PSL, PMC filter is out for tuning
|
Fri Sep 26 19:08:43 2008, rana, Configuration, PSL, Refcav Trans: PD + Camera + Dumps
|
Fri Sep 26 19:18:39 2008, Jenne, Update, IOO, MC2 is having a bad day
|
Mon Sep 29 01:19:40 2008, rana, Summary, PSL, Laser chiller running a little hot
|
Mon Sep 29 13:23:40 2008, rob, Summary, PSL, Laser chiller running a little hot
|
Mon Sep 29 13:33:39 2008, josephb, Configuration, Computers, Gigabit network finished and conlog available on Nodus
|
Mon Sep 29 15:09:36 2008, steve, Update, PSL, almost 4 yrs plot of power & temps
|
Mon Sep 29 17:53:33 2008, Yoichi, Update, PSL, ISS update
|
Tue Sep 30 19:50:27 2008, Jenne, Update, PSL, Quicky Summary - more details later
|
Tue Sep 30 13:43:43 2008, rob, Update, Locking, last night
|
Wed Oct 1 00:24:54 2008, rana, Update, Locking, last night
|
Wed Oct 1 02:10:03 2008, rana, Update, IOO, MZ is going bad 
|
Wed Oct 1 02:47:53 2008, rana, Update, PSL, PSL ERR & LODET: Too much offset
|
Wed Oct 1 02:54:03 2008, rob, Update, Locking, bad
|
Wed Oct 1 12:05:58 2008, Alberto, Configuration, Computers, "StochMon" added to the Alarm Handler
|
Wed Oct 1 12:09:25 2008, Alberto, Configuration, Computers, "StochMon" added to the Alarm Handler
|
Wed Oct 1 23:05:14 2008, Yoichi, Update, PSL, ISS RIN spectra 
|
Wed Oct 1 23:21:03 2008, Yoichi, Configuration, PSL, Reference cavity reflection camera
|
Thu Oct 2 02:45:50 2008, rob, Update, Locking, marginally better
|
Thu Oct 2 16:44:28 2008, steve, Summary, oplevs, optical levers
|
Thu Oct 2 18:56:19 2008, rana, Summary, SUS, Resistivity of Suspension Wire
|
Fri Oct 3 12:15:21 2008, Alberto, Configuration, IOO, C1iool0 rebooted
|
Fri Oct 3 15:09:58 2008, rob, Update, PSL, FAST/SLOW
|
Fri Oct 3 15:57:05 2008, rob, Update, Locking, last night, again
|
Fri Oct 3 19:38:02 2008, rob, Metaphysics, Environment, The Gatekeeper
|
Sat Oct 4 07:23:42 2008, Koji, Metaphysics, Environment, The Gatekeeper
|
Mon Oct 6 10:00:49 2008, steve, Update, MOPA, MOPA_HTEMP is up
|
Mon Oct 6 12:45:41 2008, Alberto, DAQ, LSC, C1LSC in coma
|
Mon Oct 6 16:41:33 2008, Alberto, DAQ, LSC, C1LSC in coma
|
Tue Oct 7 10:49:29 2008, Alberto, Update, General, Displaced Photodiode
|
Tue Oct 7 12:17:57 2008, Alberto, Configuration, Computers, Time reset on MEDM
|
Tue Oct 7 21:19:40 2008, Yoichi, Update, IOO, MC_F calibrated spectrum  
|
Wed Oct 8 12:35:56 2008, josephb, Configuration, Computers, New Network diagram for the 40m
|
Wed Oct 8 19:17:55 2008, Yoichi, Configuration, PSL, Laser power is slowly recovering
|
Wed Oct 8 21:26:20 2008, Yoichi, Update, PSL, Attempt to replace the DC-DC converter (aborted) 
|
Wed Oct 8 22:23:43 2008, Yoichi, Configuration, Electronics, Electronics work bench cleanup
|
Wed Oct 8 23:18:23 2008, Yoichi, Update, PSL, Correlation between the Sorensen switching noise and the FSS error signal 
|
Fri Oct 10 00:34:52 2008, rob, Omnistructure, Computers, FEs are down
|
Fri Oct 10 10:20:42 2008, Alberto, Omnistructure, Computers, FEs are down
|
Fri Oct 10 13:57:33 2008, Alberto, Omnistructure, Computers, Problems in locking the X arm
|
Fri Oct 10 20:03:35 2008, Yoichi, Configuration, Computers, medm, dataviewer, dtt on 64 bit linux
|
Mon Oct 13 13:51:49 2008, pete, Configuration, PSL, attempt to measure FSS ref phase
|
Mon Oct 13 11:32:50 2008, Yoixhi, Update, PSL, MOPA is in trouble now
|
Mon Oct 13 13:56:03 2008, Yoichi, Update, PSL, MOPA is not that much in trouble now
|
Mon Oct 13 18:59:39 2008, Yoichi, Update, PSL, NPRO EMI and FSS error signal correlation   
|
Tue Oct 14 14:19:36 2008, pete, Configuration, PSL, FSS ref phase
|
Tue Oct 14 19:18:18 2008, Yoichi, Update, Computers, BootFest
|
Tue Oct 14 19:24:34 2008, Yoichi, Configuration, PSL, FSS light power reduced
|
Wed Oct 15 17:40:50 2008, rana, Update, PSL, PMC Offset adjusted
|
Thu Oct 16 09:44:49 2008, Yoichi, Update, PSL, Bad cable for FSS
|
Wed Oct 15 22:07:52 2008, pete, Configuration, PSL, FSS ref phase measurements
|
Thu Oct 16 09:47:49 2008, Yoichi, Configuration, PSL, FSS ref phase measurements
|
Thu Oct 16 13:12:58 2008, pete, Configuration, PSL, phase between FSS reference outputs
|
Thu Oct 16 16:26:26 2008, pete, Configuration, PSL, FSS phase matching cable installed
|
Fri Oct 17 16:43:10 2008, Yoichi, Configuration, Computers, mcup/down scripts on linux
|
Mon Oct 20 09:45:56 2008, steve, Update, PEM, PSL HEPA on
|
Fri Oct 17 21:41:09 2008, Yoichi, Update, Computer Scripts / Programs, burtwb missing on Solaris but installed on linux64
|
Mon Oct 20 12:18:38 2008, Alan, Update, Computer Scripts / Programs, burtwb missing on Solaris but installed on linux64
|
Mon Oct 20 15:02:00 2008, Yoichi, Configuration, Computers, /cvs/cds restored
|
Mon Oct 20 16:18:00 2008, Alan, Configuration, Computers, /cvs/cds restored
|
Mon Oct 20 20:50:09 2008, Yoichi, Configuration, PSL, FSS board chip replacement
|
Tue Oct 21 16:17:45 2008, Yoichi, Update, PSL, AD797 Oscillation in the FSS board
|
Tue Oct 21 17:52:30 2008, rana, Summary, PSL, FSS Photo: early October
|
Tue Oct 21 18:19:42 2008, Yoichi, Configuration, Computers, LISO and Eagle installed   
|
Wed Oct 22 09:42:41 2008, Alberto, DAQ, Computers, c1iool0 rebooted and MC autolocker restarted
|
Wed Oct 22 12:37:47 2008, josephb, Update, Computers, Network spreadsheet 
|
Wed Oct 22 16:22:53 2008, steve, Bureaucracy, SAFETY, Caryn received safety training
|
Tue Oct 21 16:14:42 2008, steve, Update, General, divergence of He Ne 1035P
|
Wed Oct 22 17:48:58 2008, Yoichi, Update, General, Lenses for focusing the optical lever laser (Re:divergence of He Ne 1035P)  
|
Wed Oct 22 20:50:30 2008, Alberto, Omnistructure, Computers, GPS
|
Thu Oct 23 11:26:25 2008, steve, Bureaucracy, VAC, optosigma forks for vacuum
|
Thu Oct 23 15:27:19 2008, Alberto, Update, General, Abs length
|
Thu Oct 23 18:23:47 2008, Alberto, Update, General, Abs length
|
Thu Oct 23 18:27:04 2008, Alberto, Update, General, Abs length
|
Thu Oct 23 18:45:18 2008, Alberto, Omnistructure, Computer Scripts / Programs, Python code for GPIB devices developed for the Absl length experiment 
|
Thu Oct 23 18:51:19 2008, Alberto, Metaphysics, Computers, eLog
|
Thu Oct 23 20:47:28 2008, pete, Configuration, PSL, FSS LO calibration for MEDM
|
Thu Oct 23 21:52:27 2008, Yoichi, Update, PSL, FSS UGF now 450kHz
|
Thu Oct 23 23:09:18 2008, Yoichi, Update, PSL, MC UGF is now 75kHz 
|
Fri Oct 24 10:06:16 2008, Yoichi, Configuration, IOO, MC gain and FSS gain changed
|
Fri Oct 24 11:09:08 2008, steve, Update, SAFETY, more lexan plates under cameras
|
Fri Oct 24 11:21:26 2008, pete, Configuration, PSL, FSS LO input calibrated in dBm
|
Fri Oct 24 11:42:48 2008, Alberto, Update, General, Abs length: locking the X arm cavity in TEM01/10
|
Fri Oct 24 15:05:13 2008, steve, Update, VAC, rga is out of order
|
Fri Oct 24 17:21:13 2008, Alberto, Update, General, Abs length: the right amount of beam clipping
|
Fri Oct 24 18:05:01 2008, Alberto, Update, General, Abs length: transverse mode spacing measured for the X arm
|
Fri Oct 24 21:49:15 2008, Jenne, Configuration, PEM, Short Seismometer Cable
|
Fri Oct 24 22:30:38 2008, Jenne,rana, Update, PEM, Noise from Guralp Seismometer
|
Sun Oct 26 21:02:18 2008, rana, Update, Computer Scripts / Programs, SVN medm problem
|
Mon Oct 27 10:02:16 2008, Yoichi, Update, Computer Scripts / Programs, SVN medm problem
|
Mon Oct 27 11:16:23 2008, Alberto, Configuration, IOO, StochMon Calibration
|
Mon Oct 27 11:23:10 2008, steve, Update, Photos, new Olympus camera with IR vision
|
Mon Oct 27 14:48:27 2008, Yoichi, Configuration, PSL, EO shutter installed to the reference cavity
|
Tue Aug 12 21:38:19 2008, John, Update, LSC, Accidental higher order mode resonances in the arms 
|
Tue Oct 28 11:10:18 2008, Alberto, Update, LSC, Higher Order Mode resonances in the X arms
|
Fri Oct 24 20:54:41 2008, rana, Configuration, Computers, linux2
|
Tue Oct 28 12:01:01 2008, josephb, Configuration, Computers, linux2
|
Wed Oct 29 12:23:04 2008, Yoichi, Configuration, PSL, MZ alignment touched and the alarm level changed
|
Wed Oct 29 12:54:28 2008, Jenne, Update, PEM, Calibrated Guralp Noise compared to average ground motion
|
Thu Oct 30 11:07:25 2008, Yoichi, Update, Computers, Wireless bridges arrived
|
Thu Oct 30 20:39:47 2008, caryn, Configuration, PEM, temperature sensor
|
Fri Oct 31 08:52:19 2008, steve, Update, SUS, ETMY damping restored
|
Sun Nov 2 21:37:22 2008, rana, Update, PEM, Ranger recovery
|
Mon Nov 3 09:59:47 2008, steve, Update, PSL, PSL HEPAs turned on
|
Mon Nov 3 19:12:27 2008, alberto, Update, General, Transverse mode spacing measurement for the X arm
|
Mon Nov 3 19:18:47 2008, Alberto, Configuration, General, new elog
|
Mon Nov 3 21:38:32 2008, Yoichi, Configuration, General, new elog
|
Sun Nov 2 20:44:58 2008, rana, Update, ASS, Wiener Filter performance over 5 hours 
|
Mon Nov 3 22:35:40 2008, rana, Update, ASS, Wiener Filter performance over 5 hours
|
Tue Nov 4 00:47:53 2008, rana, Update, ASS, Wiener Filter performance over 5 hours 
|
Tue Nov 4 01:03:01 2008, rana, Summary, PEM, periodic thump noise in MC1_ACC 
|
Wed Nov 5 12:41:36 2008, Alberto, Update, LSC, Absolute Length and g-factor measurements conclusions  
|
Thu Nov 6 09:45:27 2008, steve, Update, MOPA, head temp hick-up vs power
|
Thu Nov 6 10:06:41 2008, steve, Update, Locking, arms lock degradation
|
Fri Nov 7 08:08:00 2008, steve, Update, PEM, AC turned off in IFO room
|
Fri Nov 7 16:05:55 2008, steve, Bureaucracy, SAFETY, insect killer sprayed at kitchen area !
|
Fri Nov 7 18:38:19 2008, Alberto, DAQ, PSL, MC temperature sensor hooked up
|
Mon Nov 10 11:06:09 2008, rob, HowTo, IOO, mode cleaner locked
|
Mon Nov 10 11:32:49 2008, rob, Update, Computers, c1iscex rebooted
|
Mon Nov 10 16:44:14 2008, steve, Update, PEM, particle counter at MC2
|
Wed Nov 12 11:14:59 2008, Caryn, DAQ, PSL, MC temp sensor hooked up incorrectly
|
Wed Nov 12 11:36:13 2008, Jenne, Update, PEM, Guralp Breakout Box is ~50% hooked up
|
Thu Nov 13 11:33:25 2008, Alberto, HowTo, Treasure, Making (good) Matlab figures
|
Thu Nov 13 15:50:44 2008, Alberto, Configuration, General, GPS 10MHz clock
|
Fri Nov 14 11:33:19 2008, steve, Update, VAC, SRS-RGA installed
|
Fri Nov 14 17:41:50 2008, Jenne, Omnistructure, Electronics, Sweet New Soldering Iron
|
Mon Nov 17 11:01:15 2008, Alberto, HowTo, Electronics, Calibrating the Frequency Standard of the Marconi 
|
Fri Nov 14 19:20:42 2008, Yoichi, Update, PSL, Reference cavity ring down
|
Fri Nov 14 20:35:47 2008, rana, Update, PSL, Reference cavity ring down
|
Fri Nov 14 22:40:51 2008, Yoichi, Update, PSL, Reference cavity ring down
|
Mon Nov 17 15:07:06 2008, Yoichi, Update, PSL, Reference cavity ring down
|
Mon Nov 17 16:59:22 2008, Jenne, Update, PEM, Seismometer hooked up, reading channels on DataViewer
|
Mon Nov 17 20:47:19 2008, Caryn, Summary, General, Drove MC at 28kHz to excite drum modes
|
Tue Nov 18 19:37:23 2008, Yoichi, Update, IOO, MC1 OSEM signals sign flipped and c1susvme1 restart problem
|
Tue Nov 18 19:44:53 2008, Alberto, Update, General, X Arm Cavity "Negative" FSRs Measured
|
Wed Nov 19 10:32:11 2008, Alberto, Configuration, Electronics, All the Marconi Set to the Rubidium Frequency Standard
|
Wed Nov 19 18:02:18 2008, rana, Configuration, Electronics, All the Marconi Set to the Rubidium Frequency Standard
|
Tue Nov 18 13:28:08 2008, Caryn, DAQ, IOO, new channel for MC drum modes
|
Wed Nov 19 18:12:35 2008, rana, Configuration, IOO, new channel for MC drum modes
|
Thu Nov 20 09:37:39 2008, steve, Update, PSL, MZ vs temp
|
Fri Nov 21 16:03:50 2008, rana, HowTo, General, Recharging Batteries
|
Fri Nov 21 16:52:48 2008, Jenne, Update, PEM, Guralp seismometer's Channel Problems are solved
|
Fri Nov 21 16:11:26 2008, rana, alberto, rob, Update, PSL, Mach Zender alignment
|
Fri Nov 21 20:29:43 2008, rana, alberto, rob, Update, PSL, Mach Zender alignment
|
Fri Nov 21 17:27:47 2008, Jenne, Update, PEM, Guralp noise measurement
|
Fri Nov 21 19:47:26 2008, rana, Update, PEM, Guralp noise measurement
|
Fri Nov 21 21:20:24 2008, rana, Update, PEM, Guralp noise measurement
|
Fri Nov 21 21:28:32 2008, rana, Summary, Computers, c0daqawg restart
|
Sat Nov 22 10:55:51 2008, Caryn, Configuration, IOO, Drum modes Lock-In settings changed
|
Mon Nov 24 16:43:34 2008, rana, Configuration, Computers, Alex and Jay took away some computers from the racks
|
Mon Nov 24 17:14:44 2008, rana, Update, PSL, Mach Zender trends
|
Tue Nov 25 18:38:03 2008, Alberto, Rob, Update, PSL, MC Periscope Alignment
|
Mon Nov 24 19:15:16 2008, rana, alberto, john, Configuration, Environment, temperature
|
Tue Nov 25 19:29:15 2008, rana, alberto, john, Configuration, Environment, temperature
|
Thu Nov 27 22:56:42 2008, rana, Configuration, Environment, temperature
|
Tue Dec 2 17:56:56 2008, Alberto, Rana, Configuration, PSL, MC Alignment
|
Mon Aug 25 15:50:18 2008, rana, Summary, PEM, Ranger SS-1
|
Tue Dec 2 19:18:10 2008, rana, Summary, PEM, Ranger SS-1
|
Mon Dec 1 15:09:27 2008, rob, Update, PEM, half-micron particle count is alarming
|
Tue Dec 2 19:51:32 2008, rana, Update, PEM, half-micron particle count is alarming 
|
Wed Dec 3 11:58:10 2008, Alberto, Update, PSL, MC Alignment
|
Wed Dec 3 12:49:11 2008, jenne, Update, Computers, something sketchy with NDS ... or something
|
Wed Dec 3 19:21:09 2008, rana, Configuration, PEM, Ranger move 
|
Wed Dec 3 20:10:09 2008, Jenne, Rana, Update, PEM, Comparing Wiener subtraction with different seismometers
|
Wed Dec 3 20:36:07 2008, Jenne, Rana, Update, PEM, Comparing Wiener subtraction with different seismometers  
|
Thu Dec 4 13:49:39 2008, Jenne, Update, PEM, More of: Comparing Wiener subtraction using different sensors
|
Thu Dec 4 16:29:20 2008, josephb, Configuration, Computers, Error message on Frame Builder Raid Array
|
Fri Dec 5 01:41:33 2008, Yoichi, Configuration, Computers, MEDM screen snapshot now works on linux machines
|
Fri Dec 5 01:58:58 2008, Yoichi, Configuration, ASC, tdscntr.pl now works at 40m
|
Fri Dec 5 14:13:41 2008, rana, Summary, IOO, MC trend for the last 4 days
|
Fri Dec 5 20:40:38 2008, Yoichi, HowTo, Computers, Elog multi-keyword search
|
Thu Dec 4 17:42:23 2008, caryn, Update, IOO, drum modes observable without excitation 
|
Fri Dec 5 09:29:59 2008, rana, Update, IOO, drum modes observable without excitation
|
Fri Dec 5 21:31:11 2008, Yoichi, Update, IOO, drum modes observable without excitation
|
Sun Dec 7 16:02:46 2008, rana, Update, General, Mag 5.1 EQ halfway to Vegas 
|
Sun Dec 7 16:12:53 2008, rana, Update, DAQ, booted awg
|
Mon Dec 8 00:10:42 2008, caryn, Summary, General, calibrating the jenne laser   
|
Mon Dec 8 11:41:27 2008, Yoichi, Summary, VAC, The rough pump for the TP2 replaced
|
Mon Dec 8 11:54:27 2008, Yoichi, Update, General, IFO mirrors aligned
|
Mon Dec 8 17:50:21 2008, Yoichi, Update, SUS, ITMY drift   
|
Tue Dec 9 10:48:17 2008, Caryn, Summary, General, calibrating the jenne laser: impedance mismatch?
|
Fri Dec 12 22:51:23 2008, Yoichi, Update, PSL, Reference cavity ring down measurement again
|
Tue Dec 16 19:06:01 2008, Yoichi, Update, PSL, Reference cavity ring down repeated many times 
|
Thu Dec 18 12:52:00 2008, Alberto, Configuration, SUS, Mode Cleaner Cavity Alignment
|
Thu Dec 18 19:15:54 2008, Alberto, Yoichi, Configuration, SUS, Mode Cleaner Cavity Alignment
|
Fri Dec 19 11:18:52 2008, Alberto, Configuration, General, Mode Cleaner Temperature Monitor
|
Fri Dec 19 11:29:16 2008, Alberto, Yoichi, Configuration, MZ, MZ Trans PD
|
Fri Dec 19 14:35:58 2008, Yoichi Alberto, Update, IOO, MC WFS and IOO-POS QPD re-centering
|
Fri Dec 19 16:38:09 2008, steve, Update, LSC, all optlevs centered
|
Sat Dec 20 23:37:43 2008, rob, Omnistructure, General, Saturday Night Fever after presumed power failure
|
Sun Dec 21 13:00:06 2008, steve, Update, all down cond., vac and laser back on
|
Sun Dec 21 14:18:04 2008, Yoichi, Update, Computers, RFM network bypass box's power supply is dead
|
Mon Dec 22 13:48:22 2008, Yoichi, Update, Computers, RFM network bypass box's power supply is dead
|
Tue Dec 23 10:35:40 2008, Yoichi, Update, Computers, RFM network breakdown mostly fixed
|
Wed Dec 24 10:33:24 2008, Yoichi, Update, Computers, Several fixes. Test point problem remains.
|
Wed Dec 24 12:46:54 2008, Yoichi, Update, Computers, Test points are back
|
Mon Dec 29 18:01:07 2008, Aidan, Update, Auxiliary locking, Updated 40m Upgrade Document T080074-00-R
|
Mon Dec 29 21:51:02 2008, Yoichi, Configuration, Computers, Web server on nodus
|
Tue Dec 30 18:51:18 2008, rana,yoichi, Configuration, Electronics, Illuminator Power Supply reset
|
Thu Jan 1 00:55:39 2009, Yoichi, Update, ASC, Alignment scripts for Linux
|
Wed Dec 31 22:59:40 2008, Yoichi, Summary, Environment, Particle counts going crazy
|
Thu Jan 1 01:07:03 2009, Yoichi, Summary, Environment, Particle counts going crazy
|
Fri Jan 2 17:20:44 2009, rana, Summary, Computer Scripts / Programs, 40m GWINC
|
Fri Jan 2 18:49:54 2009, Yoichi, Update, LSC, LSC modulation frequencies adjusted
|
Sun Jan 4 13:17:23 2009, Alan, Omnistructure, Computer Scripts / Programs, New 40mWebStatus
|
Mon Jan 5 11:21:05 2009, Alan, Omnistructure, Computer Scripts / Programs, New 40mWebStatus
|
Sun Nov 2 20:21:58 2008, rana, Configuration, lore, HP 5550dtn (Grazia) set up on allegra
|
Thu Jan 8 16:49:37 2009, rana, Configuration, lore, HP 5550dtn (Grazia) set up on allegra
|
Thu Jan 8 20:26:17 2009, rob, Omnistructure, General, Earthquake in San Bernardino
|
Fri Jan 9 09:14:17 2009, steve, Update, PEM, ifo is recovered after eq
|
Fri Jan 9 16:52:18 2009, steve, Update, VAC, tp3 forline pump replaced
|
Mon Dec 29 21:38:57 2008, Yoichi, Update, Computers, Snapshots of MEDM screens
|
Fri Jan 9 17:30:10 2009, Kakeru, Update, Computers, Snapshots of MEDM screens
|
Tue Jan 13 11:10:42 2009, rob, Configuration, Computers, conlogger restarted
|
Thu Jan 1 01:15:45 2009, Yoichi, Summary, VAC, N2 line leak ?
|
Wed Jan 14 09:22:43 2009, steve, HowTo, VAC, N2 supply pressure lowered for vac valves
|
Wed Jan 14 10:59:06 2009, steve, Bureaucracy, VAC, rga waiting to be "connected"
|
Thu Jan 15 09:19:32 2009, steve, Update, IOO, MC locking
|
Fri Jan 16 11:28:54 2009, Yoichi, Update, Computers, Lab. laptop needs wireless lan driver update
|
Thu Jan 15 22:30:32 2009, rana, Configuration, DMF, DMF start script
|
Fri Jan 16 11:33:59 2009, rob, Configuration, DMF, DMF start script
|
Fri Jan 16 18:25:32 2009, Yoichi, Kakeru, Rana, Update, LSC, Arms were unstable   
|
Fri Jan 16 18:29:08 2009, Yoichi, Update, SUS, Oplevs QPDs centered
|
Fri Jan 16 18:33:54 2009, Yoichi, Summary, Computers, c1lsc rebooted to fix 16Hz glitches
|
Fri Jan 16 18:45:20 2009, Yoichi, Configuration, IOO, MC_L gain increased by a factor of 2 
|
Mon Jan 19 13:58:53 2009, Yoichi, Update, ASC, Better ditherServo.pl
|
Mon Jan 19 15:10:37 2009, Yoichi, HowTo, Computers, loadLIGOData a GUI for mDV 
|
Mon Jan 19 18:21:41 2009, rana, Update, Computers, loadLIGOData a GUI for mDV
|
Tue Jan 20 15:28:42 2009, Yoichi, Update, Computers, loadLIGOData a GUI for mDV
|
Mon Jan 12 10:57:38 2009, rob, Update, General, some stuff
|
Mon Jan 12 18:53:03 2009, Yoichi, Update, LSC, AS CCD centering and ASDD demod phase
|
Tue Jan 13 18:59:09 2009, Kakeru, Update, LSC, AS CCD centering and ASDD demod phase
|
Wed Jan 21 16:18:17 2009, Kakeru, Update, LSC, AS CCD centering and ASDD demod phase
|
Wed Jan 21 22:53:08 2009, rana, Update, LSC, AS CCD centering and ASDD demod phase
|
Thu Jan 22 08:34:10 2009, steve, Bureaucracy, SAFETY, safety training
|
Thu Jan 22 11:54:09 2009, Alberto, Configuration, PSL, Mach Zehnder Output Beam QPD
|
Thu Jan 22 12:08:59 2009, pete, Update, oplevs, oplev calibration
|
Tue Nov 4 17:58:42 2008, Alberto, DAQ, PSL, MC temperature sensor
|
Wed Jan 14 15:53:32 2009, steve, DAQ, PSL, MC temperature sensor
|
Thu Jan 22 14:38:41 2009, caryn, DAQ, PSL, MC temperature sensor
|
Fri Jan 23 10:00:21 2009, steve, Update, PSL, PMC transmission is down
|
Fri Jan 23 14:00:02 2009, Yoichi, Update, PSL, PMC transmission is down
|
Fri Jan 23 16:33:27 2009, pete, Update, oplevs, x-arm oplev calibrations
|
Sat Jan 24 11:50:24 2009, Alberto, Configuration, Electronics, Photodiode Filters' Transfer Functions
|
Mon Jan 26 14:51:54 2009, josephb, Configuration, VAC,
|
Wed Jan 28 12:42:51 2009, Yoichi, Update, PSL, MOPA dying 
|
Wed Jan 28 12:51:32 2009, Yoichi, Update, Computers, Megatron is dying
|
Wed Jan 28 19:08:50 2009, Yoichi, Update, PSL, Laser is back (sort of)
|
Thu Jan 29 13:52:34 2009, Yoichi, Update, PSL, Laser is back (sort of)
|
Thu Jan 29 16:50:53 2009, josephb, alberto, Configuration, Computers, Megatron fixed
|
Fri Jan 30 17:30:31 2009, Alberto, Josephb, Configuration, Computers, New computer Ottavia set up
|
Thu Jan 29 18:10:13 2009, Yoichi, Update, PSL, ISS Bad
|
Fri Jan 30 19:38:57 2009, Kakeru, Update, PSL, ISS Bad
|
Mon Feb 2 17:25:44 2009, Alberto, Configuration, General, Some little problem with the new elog
|
Mon Feb 2 18:32:54 2009, Alberto, Configuration, General, Some little problem with the new elog
|
Mon Feb 2 12:35:22 2009, Alberto, Configuration, General, New Elog 2.7.5 in Service on Nodus
|
Mon Feb 2 18:51:02 2009, Alberto, Configuration, General, New Elog 2.7.5 in Service on Nodus
|
Mon Feb 2 19:23:53 2009, Yoichi, Update, General, New optical layout plan
|
Tue Feb 3 15:01:38 2009, Alberto, Frogs, Computers, megatron slow?
|
Tue Feb 3 19:24:14 2009, Yoichi, Update, General, New optics layout wiki page
|
Tue Feb 3 23:44:44 2009, Kakeru, Peter, Yoichi, Update, PSL, ISS unstability 
|
Thu Feb 5 09:12:29 2009, steve, Bureaucracy, SAFETY, safety updates & fire alarm test
|
Wed Feb 4 17:45:39 2009, Yoichi, Update, General, Mode matching of the upgraded IFO
|
Wed Feb 4 19:22:57 2009, Yoichi, Update, General, Do we need off-axis parabolic mirrors ?
|
Thu Feb 5 10:42:33 2009, Yoichi, Update, General, Do we need off-axis parabolic mirrors ? No way !
|
Thu Feb 5 16:21:07 2009, Jenne, Frogs, Computers, Belladonna connects to the wireless Martian network again
|
Fri Feb 6 09:56:11 2009, Kakeru, Update, PSL, ISS servo transfar function 
|
Fri Feb 6 10:46:40 2009, Kakeru, Update, PSL, ISS servo and noise
|
Fri Feb 6 14:49:31 2009, steve, Summary, SAFETY, laser inventory
|
Fri Feb 6 16:20:52 2009, Yoichi, Update, PSL, MOPA current slider fixed
|
Fri Feb 6 16:23:54 2009, steve, Update, MOPA, MOPAs of 7 years
|
Mon Feb 9 16:05:01 2009, Yoichi, Update, LSC, DRMI OK
|
Mon Feb 9 17:09:51 2009, Yoichi, Update, Computers, A bunch of updates for the network GPIB stuff.
|
Mon Feb 9 19:50:48 2009, Yoichi, Configuration, PSL, ISS disconnected
|
Tue Feb 10 10:48:48 2009, steve, Bureaucracy, SAFETY, safety glasses scanned 
|
Wed Feb 11 00:50:24 2009, caryn, Update, General, ants?
|
Wed Feb 11 10:52:22 2009, Yoichi, Configuration, DAQ, C1:PEM-OSA_APTEMP and C1:PEM-OSA_SPTEMP disconnected
|
Wed Feb 11 11:39:17 2009, steve, Configuration, General, vac envelope ground
|
Wed Feb 11 15:01:47 2009, josephb, Configuration, Computers, Allegra
|
Thu Feb 5 21:42:28 2009, Yoichi, Update, PSL, My thoughts on ISS
|
Fri Feb 6 09:52:35 2009, Kakeru, Update, PSL, Current shunt transfar function 
|
Fri Feb 6 23:23:48 2009, Kakeru, Yoichi, Update, PSL, ISS is fixed 
|
Mon Feb 9 16:02:42 2009, Yoichi, Update, PSL, PSL relative intensity noise 
|
Tue Feb 10 23:36:25 2009, Kakeru, Update, PSL, PA current and laser output
|
Wed Feb 11 07:28:25 2009, Yoichi, Update, PSL, PA current and laser output
|
Wed Feb 11 23:51:53 2009, Kakeru, Update, PSL, PA current and laser output
|
Thu Feb 12 11:21:54 2009, Yoichi, Update, LSC, Locking effort resumed
|
Thu Feb 12 14:39:07 2009, rana, Summary, General, Silicon Beam Dump test
|
Thu Feb 12 17:43:33 2009, Yoichi, Update, LSC, SRC strangeness solved
|
Thu Feb 12 18:35:10 2009, Kakeru, Configuration, PSL, PA current limitter
|
Fri Feb 13 08:38:03 2009, steve, Update, IOO, MC2 damping restored
|
Fri Feb 13 16:30:49 2009, steve, Configuration, General, status quo is disturbed
|
Sat Feb 14 16:15:19 2009, rob, Configuration, Computers, c1susvme1
|
Fri Feb 13 13:35:38 2009, Yoichi, Update, LSC, Locking status
|
Sat Feb 14 16:53:26 2009, rob, Update, LSC, Locking status
|
Sun Feb 15 09:35:00 2009, Yoichi, Update, LSC, Locking status
|
Sun Feb 15 15:53:21 2009, Rob, Update, LSC, Locking status
|
Mon Feb 16 10:18:13 2009, Alberto, Update, LSC, FE system rebooted
|
Mon Feb 16 14:12:21 2009, Yoichi, Update, LSC, FE system rebooted
|
Mon Feb 16 00:43:46 2009, rana, Update, Computers, medm directory wiped on nodus
|
Mon Feb 16 15:54:07 2009, Yoichi, Update, Computers, medm directory wiped on nodus
|
Mon Feb 16 16:26:29 2009, rob, Update, Computers, medm directory wiped on nodus
|
Mon Feb 16 20:47:48 2009, rana, Configuration, IOO, Mode Cleaner WFS Loop Gain change   
|
Mon Feb 16 21:49:06 2009, Kakeru, Rana, Update, IOO, WFS
|
Mon Feb 16 22:58:51 2009, rana, yoichi, Configuration, SUS, Hysteresis in SUS from Misalignments
|
Mon Feb 16 23:09:52 2009, rana, Update, Electronics, MC Servo Board offset gone bad!
|
Tue Feb 17 05:20:11 2009, Yoichi, Update, LSC, Locking
|
Wed Feb 18 03:17:40 2009, Yoichi, Update, LSC, Locking
|
Wed Feb 18 03:25:25 2009, Yoichi, Update, Computers, medm directory back
|
Wed Feb 18 15:31:38 2009, steve, Bureaucracy, SAFETY, emergency back-up lights checked
|
Wed Feb 18 19:13:20 2009, rana, Configuration, Computers, SVN & MEDM & old medm files
|
Wed Feb 18 21:03:22 2009, rana, Update, Cameras, ETMY Camera work not elogged!
|
Thu Feb 19 04:16:17 2009, Yoichi, Update, LSC, Locking status
|
Thu Feb 19 11:51:56 2009, steve, Update, MOPA, HTEMP variation is too much
|
Thu Feb 19 22:40:33 2009, Kiwamu, Update, Electronics, PSL angle QPD
|
Thu Feb 19 23:50:31 2009, pete, Update, Locking, aligned pd's on AP table
|
Fri Feb 20 01:54:18 2009, Kakeru, Update, Computer Scripts / Programs, tdsdata might have a bug
|
Fri Feb 20 03:52:23 2009, Yoichi, Update, Locking, Locking Tonight
|
Fri Feb 20 19:31:16 2009, Yoichi, Update, LSC, MICH low gain problem
|
Sun Feb 22 23:43:07 2009, caryn, Summary, General, temperature sensor 12x
|
Mon Feb 23 11:07:01 2009, steve, Bureaucracy, SAFETY, Kiwamu receives safety training
|
Mon Feb 23 16:42:08 2009, josephb, Configuration, Cameras, Camera Beta Testing
|
Tue Feb 24 02:23:40 2009, Yoichi, Update, Locking, Locking - MC board bad
|
Tue Feb 24 18:42:15 2009, pete, Update, Locking, mc board repair
|
Wed Feb 25 03:10:24 2009, Yoichi, Update, Locking, Locking status
|
Wed Feb 25 11:48:02 2009, Jenne, Update, PEM, Wiener filtering update - work on filtering some S5 DARM_CTRL data 
|
Thu Feb 26 00:36:53 2009, Yoichi, Summary, Computers, C1:LSC-TRX_OUT broken (and fixed later).
|
Thu Feb 19 16:29:43 2009, Yoichi, Update, Computers, Martian wireless router bad
|
Thu Feb 26 01:24:44 2009, Yoichi, Update, Computers, Martian wireless is back
|
Thu Feb 26 19:20:08 2009, Yoichi, Configuration, General, ETMX camera centered. POX, POY PDs centered
|
Thu Feb 26 19:59:23 2009, Yoichi, Update, Locking, Daytime locking  
|
Thu Feb 26 20:09:32 2009, Yoichi, HowTo, Computers, SR785 python scripts now produce plots
|
Fri Feb 27 13:49:19 2009, rob, Update, Locking, thurs night
|
Mon Mar 2 03:57:44 2009, Yoichi, Update, Locking, Sunday night locking
|
Mon Mar 2 16:27:40 2009, Alberto, Configuration, Electronics, MC Drum Mode SR560 Preamplifier Replaced
|
Tue Mar 3 08:44:31 2009, steve, Update, PEM, air cond. maintenance today
|
Tue Mar 3 10:39:07 2009, Alberto, Update, LSC, c1lsc discontinued functioning
|
Tue Mar 3 11:39:50 2009, Osamu, DAQ, Computers, 2 PCs in Martian
|
Mon Mar 2 21:16:32 2009, Yoichi, Update, Locking, Low-gain High-gain PD switching may not be working well
|
Tue Mar 3 19:26:44 2009, Yoichi, Update, Locking, Low-gain High-gain PD switching may not be working well
|
Tue Mar 3 23:59:26 2009, Yoichi, Update, Locking, Low-gain High-gain PD switching may not be working well
|
Wed Mar 4 03:37:51 2009, Yoichi, Update, Locking, Low-gain High-gain PD switching may not be working well
|
Wed Mar 4 03:50:17 2009, Yoichi, Update, Locking, Still won't go above arm power 10  
|
Wed Mar 4 12:38:07 2009, Alberto, Update, Computer Scripts / Programs, 3f locking simulations  
|
Wed Mar 4 17:20:04 2009, josephb, Update, Cameras, Camera code upgrades
|
Wed Mar 4 23:42:45 2009, rana, Configuration, PSL, psl db change
|
Thu Mar 5 00:06:32 2009, Kakeru, Rana, Update, IOO, WFS centering
|
Thu Mar 5 01:09:29 2009, rana, alberto, Update, DMF, still not working
|
Thu Mar 5 02:24:19 2009, rana, Configuration, Computers, yum.repos.d
|
Thu Mar 5 05:07:09 2009, Yoichi, Update, Locking, Wednesday night locking 
|
Fri Mar 6 01:04:49 2009, Kiwamu IZUMI, Configuration, IOO, !! lock-in amp disconnected !!
|
Fri Mar 6 05:44:14 2009, Yoichi, Update, Locking, Locking distracted by the QPD whitenning problem again
|
Fri Mar 6 15:23:39 2009, Yoichi, Update, Locking, Locking distracted by the QPD whitenning problem again 
|
Fri Mar 6 18:14:58 2009, Yoichi, Update, Computers, awg not working
|
Fri Mar 6 18:22:42 2009, Yoichi, Summary, Computers, Scripts to restart the FE computers
|
Wed Mar 4 17:59:14 2009, Yoichi, Configuration, Computers, ezca tools and tds tools work around
|
Fri Mar 6 18:26:37 2009, Yoichi, Configuration, Computers, ezca tools and tds tools work around
|
Mon Mar 9 10:59:05 2009, Alan, Omnistructure, Computers, ssh agent on fb40m restarted for backup
|
Sat Mar 7 16:50:25 2009, Yoichi, Update, Computers, Not even data retrieval working
|
Sun Mar 8 23:09:26 2009, rana, Update, Computers, Not even data retrieval working
|
Mon Mar 9 11:09:33 2009, Alberto, Update, Computers, Re: Not even data retrieval working
|
Mon Mar 9 12:04:18 2009, Yoichi, Update, Computers, TPs and AWG are back
|
Mon Mar 9 17:11:38 2009, Alberto, Configuration, oplevs, optical levers centering
|
Mon Mar 9 19:27:16 2009, rana, Configuration, Computers, Move of the CLIO Digital Controls test setup
|
Thu Mar 5 23:18:38 2009, Kakeru, Configuration, Computers, tdsdata doesn't work
|
Sun Mar 8 23:14:52 2009, rana, Update, Computer Scripts / Programs, tdsdata doesn't work
|
Mon Mar 9 14:57:30 2009, Kakeru, Update, Computer Scripts / Programs, tdsdata doesn't work 
|
Mon Mar 9 16:54:52 2009, Kakeru, Rana, Update, Computer Scripts / Programs, tdsdata doesn't work
|
Mon Mar 9 23:13:22 2009, Yoichi, Update, Computer Scripts / Programs, tdsdata doesn't work
|
Tue Mar 10 04:55:41 2009, Yoichi, Update, Locking, Locking: 3.7kHz large oscillation    
|
Wed Mar 11 01:16:40 2009, rana, Summary, IOO, rogue trianglewave in the MC Servo offset slider  
|
Wed Mar 11 04:33:57 2009, rana, Configuration, Computer Scripts / Programs, wild ndsproxy tclshexe
|
Wed Mar 11 11:30:15 2009, josephb, Configuration, Cameras,
|
Wed Mar 11 14:51:01 2009, Kakeru, Joe, Rob, Update, IOO, MC alignment
|
Wed Mar 11 16:41:22 2009, steve, Update, MOPA, spare NPRO power
|
Wed Mar 11 21:03:51 2009, Kakeru and Kiwamu, Update, IOO, PSL angle QPD
|
Wed Mar 11 23:41:33 2009, Kakeru, Yoichi, Update, IOO, WFS centering
|
Thu Mar 12 00:29:39 2009, Jenne, Omnistructure, DMF, DMF being whiny again
|
Thu Mar 12 02:18:42 2009, Yoichi, Update, Locking, MC_I spectra (RF_AM) 
|
Thu Mar 12 18:44:02 2009, Yoichi, Update, PSL, MZ aligned
|
Thu Mar 12 18:48:37 2009, Yoichi, Update, IOO, MC aligned but ...
|
Thu Mar 12 15:57:53 2009, Yoichi, Update, IOO, MC drift is terrible 
|
Thu Mar 12 19:11:27 2009, rana, Update, IOO, MC drift is terrible
|
Thu Mar 12 20:59:04 2009, Kakeru, Update, IOO, MC drift is terrible
|
Fri Mar 13 05:16:21 2009, Yoichi, Update, Locking, Locking update 
|
Fri Mar 13 20:23:37 2009, Yoichi, Update, LSC, AO path transfer function with X-arm locked
|
Wed Mar 11 16:53:48 2009, Yoichi, Update, Locking, Junks in around kHz 
|
Wed Mar 11 22:57:48 2009, Yoichi, Update, Locking, Calibrated XARM error signal spectrum
|
Fri Mar 13 22:07:14 2009, Yoichi, Update, Locking, Calibrated XARM error signal spectrum
|
Sun Mar 15 21:50:29 2009, Kakeru, Kiwamu, Osamu, Update, Computers, Some computers are rebooted
|
Mon Mar 16 01:20:40 2009, rana, Configuration, IOO, MCWFS noise filtered on the SUS-MC
|
Mon Mar 16 15:19:52 2009, Osamu, DAQ, Electronics, SR785
|
Mon Mar 16 12:26:59 2009, Yoichi, Configuration, IOO, MC1 drift
|
Tue Mar 17 08:44:37 2009, Yoichi, Configuration, IOO, MC1 drift
|
Thu Mar 19 02:45:36 2009, Yoichi, Configuration, IOO, A loose wire found for MC1
|
Thu Mar 19 10:45:43 2009, Yoichi, Configuration, IOO, A loose wire found for MC1
|
Fri Mar 20 11:01:02 2009, steve, Update, PEM, particle counts are high
|
Fri Mar 20 12:07:19 2009, Yoichi, Configuration, ASC, ETMY beam centering
|
Fri Mar 20 15:54:29 2009, steve, Omnistructure, General, 480V crane power switch on MEZ
|
Sun Mar 22 22:39:24 2009, rana, Summary, LSC, Calibration of the ITM and ETM Actuation
|
Mon Mar 9 19:33:10 2009, rana, Update, DMF, seisBLRMS in temp condition
|
Fri Mar 13 19:26:09 2009, Yoichi, Update, DMF, seisBLRMS compiled
|
Sun Mar 22 22:47:58 2009, rana, Update, DMF, seisBLRMS compiled but still dying
|
Mon Mar 9 23:55:38 2009, Osamu, DAQ, Computers, bscteststand and kami1 outside martian
|
Sun Mar 22 23:16:41 2009, rana, DAQ, Computer Scripts / Programs, tpman restart
|
Mon Mar 23 15:50:44 2009, rana, Configuration, LSC, filters deleted, lsc rebooted
|
Tue Mar 24 03:05:25 2009, Yoichi, Update, Locking, Locking tonight
|
Tue Mar 24 09:04:02 2009, steve, Update, SUS, 4.8 mag earthquake
|
Tue Mar 24 13:10:07 2009, Alberto, Configuration, PSL, new mirror installed on the AP table
|
Tue Mar 24 13:54:49 2009, Jenne, Update, SUS, Op Levs Centered
|
Tue Mar 24 19:55:24 2009, Jenne, Update, LSC, New PO DC
|
Tue Mar 24 23:23:05 2009, rana, Update, LSC, New PO DC
|
Wed Mar 25 04:18:28 2009, Yoichi, Update, Locking, Tuesday Locking
|
Wed Mar 25 09:55:45 2009, steve, Update, IOO, glitching sensors of MC
|
Wed Mar 25 17:22:58 2009, Yoichi, Update, IOO, MC lock without FSS
|
Wed Mar 25 20:41:43 2009, Jenne, Update, IOO, Mode Cleaner Servo Board Transfer Functions (to be updated)  
|
Thu Mar 26 00:45:24 2009, Jenne, Update, IOO, Mode Cleaner Servo Board Transfer Functions (to be updated)  
|
Thu Mar 26 04:01:24 2009, Yoichi, Update, PSL, FSS Open Loop Gain
|
Thu Mar 26 04:09:38 2009, Yoichi, Update, IOO, Single X arm lock spectra with different MC lock schemes 
|
Thu Mar 26 04:27:26 2009, Yoichi, Update, Locking, 3.8kHz peak as a function of the arm power
|
Thu Jan 22 23:36:50 2009, pete, HowTo, oplevs, arm cavity oplev calibration 
|
Fri Jan 23 12:48:12 2009, Kakeru, Update, oplevs, arm cavity oplev calibration
|
Thu Jan 29 17:24:41 2009, Kakeru, Update, oplevs, arm cavity oplev calibration
|
Sat Mar 14 22:53:12 2009, Kakeru, Update, oplevs, arm cavity oplev calibration
|
Fri Mar 20 15:37:58 2009, Kakeru, Update, oplevs, arm cavity oplev calibration
|
Thu Mar 26 09:08:18 2009, Kakeru, Update, oplevs, arm cavity oplev calibration
|
Fri Mar 27 02:50:54 2009, Yoichi, Update, Locking, DD demodulation phase suspicious
|
Fri Mar 27 02:40:06 2009, pete, Summary, IOO, MC glitch investigation
|
Fri Mar 27 15:05:42 2009, Yoichi, Update, IOO, MC glitch investigation 
|
Fri Mar 27 17:52:16 2009, Yoichi, Update, IOO, MC glitch investigation
|
Sun Mar 29 13:44:27 2009, steve, Update, SUS, ETMY sus damping restored
|
Mon Mar 30 12:29:17 2009, Yoichi, Configuration, , MC1 glitches not seen during the weekend
|
Mon Mar 30 12:46:36 2009, Yoichi, Configuration, IOO, IOO QPDs were missing the beam
|
Sun Mar 29 17:54:41 2009, Yoichi, Update, SUS, MC1 drift investigation continued
|
Mon Mar 30 09:07:22 2009, rana, Update, SUS, MC1 drift investigation continued
|
Mon Mar 30 13:29:40 2009, Yoichi, Update, SUS, MC1 drift investigation continued
|
Mon Mar 30 15:51:27 2009, steve, Update, Electronics, HP4291A left the lab to be repaired
|
Mon Mar 30 17:02:46 2009, Yoichi, Configuration, General, AP OSA aligned
|
Tue Mar 31 09:42:32 2009, steve, Update, PEM, ETMY sus damping restored again
|
Wed Apr 1 10:22:13 2009, steve, Update, VAC, RGA logging is working
|
Wed Apr 1 15:47:48 2009, Yoichi, Update, Locking, 3.8kHz peak looks like a real optical response of the interferometer 
|
Wed Apr 1 16:14:36 2009, Yoichi, Update, Locking, 3.8kHz peak does not change with SRC offset
|
Wed Mar 25 01:37:35 2009, rana, yoichi, Summary, IOO, No Reference Cavity Required
|
Wed Apr 1 23:18:07 2009, rana, koji, Summary, IOO, No Reference Cavity Required
|
Fri Apr 3 10:01:50 2009, steve, Update, VAC, rgascan with temp plot 
|
Fri Apr 3 14:52:38 2009, Jenne, Omnistructure, PEM, Guralp is finally back!
|
Fri Apr 3 17:20:05 2009, Yoichi, Update, Locking, The 3.8kHz peak seems like the DARM RSE (not 100% sure though)    
|
Mon Apr 6 19:09:15 2009, Jenne, Update, PEM, Old Guralp is hooked back up to the ADC
|
Mon Apr 6 21:50:43 2009, rana, Update, LSC, Arm Locking via pushing MC2  
|
Wed Apr 8 02:47:42 2009, Yoichi, Update, Locking, Locking status  
|
Tue Apr 7 21:39:57 2009, Yoichi, Configuration, Computers, LSC code recompiled with a fix for denormalization problem
|
Wed Apr 8 18:18:33 2009, rana, Configuration, Computers, LSC code recompiled with a fix for denormalization problem
|
Wed Apr 8 18:46:50 2009, rana, Configuration, General, DMF, SVN, x2mc, and matlab
|
Thu Apr 9 11:27:19 2009, steve, Update, VAC, vac gauge reading problem 
|
Thu Apr 9 12:23:49 2009, pete, Update, Locking, tuning ETM common mode
|
Thu Apr 9 20:56:12 2009, Yoichi, HowTo, General, Restore the alignment. Write elog entries.
|
Fri Apr 10 01:24:08 2009, rana, Update, Computers, allegra update (sort of)
|
Thu Apr 9 23:11:27 2009, rob, Summary, Locking, Laser PM to PO-DC transfer functions at multiple CARM offsets  
|
Thu Apr 9 23:20:35 2009, rob, Summary, Locking, Laser PM to REFL-DC transfer functions at multiple CARM offsets  
|
Fri Apr 10 03:10:08 2009, rana, Summary, Locking, Laser PM to REFL-DC transfer functions at multiple CARM offsets
|
Fri Apr 10 04:54:24 2009, Yoichi, Update, Locking, REFL_DC for CARM
|
Fri Apr 10 18:11:18 2009, Jenne, Update, PSL, ISS has a bad cable?
|
Fri Apr 10 19:10:53 2009, Jenne, Update, General, Xarm locked?
|
Sun Apr 12 01:19:30 2009, Yoichi, Configuration, Computers, New FE codes for suspensions not successful
|
Sun Apr 12 19:31:43 2009, rana, Summary, Electronics, Amphony 2500 Headphones
|
Fri Apr 10 19:09:48 2009, Jenne, Update, PSL, PMC LO Calibration 
|
Sat Apr 11 00:45:41 2009, Yoichi, Update, PSL, PMC LO Calibration
|
Sun Apr 12 19:27:20 2009, rana, Update, PSL, PMC LO Calibration
|
Mon Apr 13 08:59:57 2009, steve, Update, PSL, mixers on order
|
Mon Apr 13 17:55:37 2009, Jenne, Update, PSL, PMC LO Mon Calibration
|
Tue Apr 14 02:59:02 2009, Yoichi, Update, Locking, Power up until 26
|
Mon Apr 13 18:57:03 2009, Alberto, Frogs, Computers, GPIB/ETH Interface Troubles 
|
Tue Apr 14 12:10:11 2009, Alberto, Frogs, Computers, GPIB/ETH Interface Troubles
|
Tue Apr 14 17:20:36 2009, Yoichi, Update, Computer Scripts / Programs, Parallel Optickle
|
Wed Apr 15 02:18:42 2009, rana, Configuration, Computers, nodus vfstab changed for rigel
|
Wed Apr 15 02:20:46 2009, rana, yoichi, Update, DMF, DMF now working copy
|
Wed Apr 15 03:52:27 2009, rana, Update, DMF, NDS client32 updated for DMF
|
Wed Apr 8 09:36:20 2009, steve, Configuration, VAC, valve condition changed to BG to calibrate the RGA
|
Wed Apr 15 11:25:21 2009, steve, Configuration, VAC, RGA cal completed
|
Wed Apr 15 17:11:37 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon
|
Thu Apr 16 11:17:56 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon
|
Thu Apr 16 16:26:57 2009, pete, Update, Locking, Wed. night locking
|
Thu Apr 16 16:37:42 2009, Alberto, Update, Auxiliary locking, the zipper
|
Thu Apr 16 17:19:44 2009, Alberto, Update, Auxiliary locking, the zipper 
|
Fri Apr 17 11:05:22 2009, Yoichi, Update, Locking, Thursday night locking status
|
Thu Apr 16 17:48:00 2009, Yoichi, Configuration, Computer Scripts / Programs, AutoDTT
|
Fri Apr 17 11:37:32 2009, Yoichi, Configuration, Computer Scripts / Programs, AutoDTT
|
Sun Apr 19 03:34:05 2009, Yoichi, Update, Locking, Saturday night lock
|
Sun Apr 19 11:34:33 2009, josephb, HowTo, Cameras, USB Frame Grabber - How to
|
Mon Apr 20 05:18:42 2009, Yoichi, Configuration, Locking, FM6 and FM10 of LSC-MC were restored
|
Mon Apr 20 18:17:44 2009, rob, Summary, Locking, CARM offset/Power rubric
|
Sun Apr 19 11:51:05 2009, josephb, Update, Cameras, Mafalda may need an update
|
Mon Apr 20 11:57:27 2009, rob, Update, Cameras, Mafalda may need an update
|
Mon Apr 20 18:36:37 2009, rana, Update, Cameras, Mafalda may need an update
|
Mon Apr 20 20:00:44 2009, rana, Configuration, IOO, McWFS gains re-allocated
|
Mon Apr 20 20:45:25 2009, rana, Configuration, General, SVN: project area added
|
Wed Apr 22 11:16:26 2009, steve, Configuration, VAC, Cryo pump is ON and the Maglev is dead
|
Thu Apr 23 13:55:43 2009, josephb, peter, Update, Computers, RCG example
|
Thu Apr 23 16:27:24 2009, Yoichi, Update, Locking, Locking with the cryo-pump
|
Thu Apr 23 16:35:23 2009, Yoichi, Summary, Computer Scripts / Programs, restoreWatchdog script
|
Thu Apr 23 16:38:33 2009, steve, Update, VAC, vac valve relay box is shorting
|
Thu Apr 23 18:09:11 2009, Yoichi, Update, Environment, Effect of cryopump
|
Thu Apr 23 21:13:37 2009, Yoichi, Summary, Environment, Mag. 4 earthquake in LA tripped the watchdogs of the most optics
|
Fri Apr 24 16:24:25 2009, rob, Omnistructure, VAC, Paschen 
|
Fri Apr 24 03:57:30 2009, Yoichi, Update, Locking, DARM demod phase
|
Fri Apr 24 04:38:49 2009, Yoichi, Update, Locking, DARM demod phase
|
Fri Apr 24 11:34:32 2009, rob, Update, Locking, DARM demod phase
|
Fri Apr 24 17:26:57 2009, Yoichi, Update, Locking, DARM demod phase
|
Sat Apr 25 00:45:31 2009, Yoichi, Configuration, VAC, Reflector for the cryopump temperature monitor changed
|
Sat Apr 25 02:54:25 2009, Yoichi, Configuration, VAC, Reflector for the cryopump temperature monitor changed
|
Sat Apr 25 03:27:34 2009, Yoichi, Update, Locking, Locking status
|
Sun Apr 26 02:13:18 2009, Yoichi, Update, Locking, Two more successes of RF CARM handoff
|
Mon Apr 27 18:31:44 2009, steve, Configuration, VAC, VC1 closed
|
Tue Apr 28 01:48:45 2009, pete, Configuration, VAC, VC1 open
|
Tue Apr 28 04:30:16 2009, Yoichi, Update, Locking, RF full lock
|
Tue Apr 28 09:27:32 2009, steve, Configuration, VAC, cryopump deserves some credit 
|
Tue Apr 28 12:55:57 2009, Caryn, DAQ, PEM, Unplugged Guralp channels
|
Tue Apr 28 16:36:24 2009, rob, HowTo, Locking, setting the RF CARM demod phase 
|
Tue Apr 28 17:51:13 2009, rob, HowTo, Locking, setting the RF CARM demod phase 
|
Fri Apr 24 16:02:31 2009, steve, HowTo, VAC, cryo pump interlock rule
|
Wed Apr 29 10:20:14 2009, steve, HowTo, VAC, cryo pump interlock rule is waved
|
Wed Apr 29 15:56:43 2009, rob, Update, Locking, effect of SRCL detune on ARM powers in a CARM sweep
|
Thu Apr 30 05:49:06 2009, Yoichi, Update, Locking, 166MHz LO phase changed
|
Wed Apr 29 04:03:51 2009, Yoichi, Update, Locking, CARM RF changed to REFL_2I
|
Thu Apr 30 15:10:54 2009, rob, Update, Locking, CARM RF changed to REFL_2I
|
Fri May 1 01:32:43 2009, Yoichi, Update, Locking, 166MHz LO phase adjustment
|
Fri May 1 10:04:10 2009, rob, Update, Locking, 166MHz LO phase adjustment
|
Fri May 1 18:24:36 2009, Alberto, Summary, General, jitter of REFL beam ?
|
Fri May 1 18:51:34 2009, Alberto, Summary, Environment, earthquake
|
Sat May 2 16:34:31 2009, caryn, DAQ, PEM, Guralp channels plugged back in
|
Sun May 3 22:48:12 2009, Yoichi, Update, Locking, Some measurements at the lock point  
|
Tue May 5 09:22:46 2009, caryn, Update, PEM, zeros 
|
Mon May 4 10:38:52 2009, steve, Update, MOPA, laser power is dropped
|
Mon May 4 16:49:56 2009, Alberto, Update, MOPA, laser power is dropped
|
Tue May 5 10:42:18 2009, steve, Update, MOPA, laser power is back
|
Tue May 5 05:16:12 2009, Yoichi, Update, Locking, DC Readout and DARM response
|
Tue May 5 08:26:56 2009, rob, Update, Locking, DC Readout and DARM response
|
Tue May 5 11:44:33 2009, rob, Update, Locking, DARM response 
|
Tue May 5 14:02:16 2009, rob, Update, LSC, DARM DC response varies with DARM offset   
|
Wed May 6 02:39:20 2009, Yoichi, HowTo, Locking, How to go to DC readout
|
Wed May 6 16:56:35 2009, rana, alex, joe, Configuration, Computers, daqd log, cront, etc.
|
Mon Apr 20 23:27:59 2009, rana, Summary, VAC, c1vac2 rebooted: non-functional for several months
|
Wed May 6 19:04:11 2009, rana, Summary, VAC, vac images
|
Tue Apr 21 18:18:27 2009, steve, Update, VAC, maglev failed
|
Thu May 7 10:28:20 2009, steve, Update, VAC, retrofitted maglev's needs
|
Thu May 7 12:21:36 2009, josephb, alex, Configuration, Computers, fb40m
|
Thu May 7 15:22:19 2009, josephb, alberto, Configuration, Computers, fb40m
|
Thu May 7 17:59:23 2009, Alberto, Configuration, , MC WFS
|
Thu May 7 18:12:12 2009, pete, Update, Locking, arm power curve
|
Thu May 7 23:21:04 2009, pete, Update, Locking, arm power curve
|
Thu May 7 23:34:59 2009, rob, Update, SEI, seisBLRMS already lost
|
Fri May 8 02:08:59 2009, pete, Update, Locking, lock stretches
|
Fri May 8 02:39:02 2009, pete, rana, Update, Locking, crossover 
|
Fri May 8 04:46:01 2009, rana, yoichi, Summary, oplevs, BS/PRM/SRM table bad!
|
Fri May 8 10:05:40 2009, Alan, Omnistructure, Computers, Restarted backup since fb40m was rebooted
|
Fri May 8 15:40:44 2009, pete, Update, Locking, progressively weaker locks
|
Fri May 8 16:03:31 2009, Jenne, Update, PEM, Update on Jenne's Filtering Stuff 
|
Fri May 8 04:31:35 2009, rana, Update, Computer Scripts / Programs, elog and NDS
|
Fri May 8 16:29:53 2009, rana, Update, Computer Scripts / Programs, elog and NDS
|
Sun May 10 13:41:17 2009, steve, Update, VAC, ETMY damping restored, VC1 opened
|
Mon May 11 12:25:03 2009, josephb,Alex, Update, Computers, fb40m down for patching
|
Tue May 12 01:22:51 2009, Yoichi, Update, LSC, Arm loss
|
Tue May 12 01:11:55 2009, Yoichi, Update, LSC, DARM response (DC Readout) 
|
Tue May 12 15:22:09 2009, Yoichi, Update, LSC, Arm Finesse
|
Tue May 12 17:26:56 2009, pete, Update, oplevs, etmy oplev quad was bad
|
Wed May 13 03:05:13 2009, pete, Update, oplevs, etmy oplev quad was bad
|
Wed May 13 12:41:14 2009, josephb, Update, Cameras, Timing and stability tests of GigE Camera code 
|
Thu May 14 02:36:05 2009, pete, Update, Locking, unstable IFO
|
Wed May 13 02:53:12 2009, rob, Summary, lore, Channel Hopping: That ancient enemy (MC problems)
|
Wed May 13 14:43:29 2009, rob, Summary, lore, Channel Hopping: That ancient enemy (MC problems)
|
Wed May 13 21:15:04 2009, rana, Summary, SUS, Channel Hopping: That ancient enemy (MC problems)
|
Thu May 14 00:15:39 2009, rob, Summary, SUS, Channel Hopping: That ancient enemy (MC problems)
|
Thu May 14 15:28:28 2009, steve, Summary, SUS, April 24 earthquake effect on MC2
|
Thu May 14 16:07:20 2009, pete, Summary, SUS, Channel Hopping: That ancient enemy (MC problems)
|
Fri May 15 14:05:14 2009, Dmass, HowTo, Computers, How To: Crash the Elog
|
Fri May 15 16:47:44 2009, josephb, Update, Cameras, Improved camera code
|
Fri May 15 17:30:00 2009, rob, Update, LSC, arms, coils, locks
|
Sat May 16 16:20:33 2009, rob, Update, LSC, arms, coils, locks, #2  
|
Sun May 17 14:35:52 2009, Yoichi, Update, VAC, VC1 opened
|
Sun May 17 21:45:40 2009, rob, Update, ASC, ITMX oplev centered
|
Sun May 10 13:34:32 2009, caryn, Update, PEM, Unplugged Guralp channels
|
Mon May 18 01:54:35 2009, rana, Update, PEM, Unplugged Guralp channels
|
Mon May 18 10:06:56 2009, caryn, Update, PEM, Temp sensor  
|
Mon May 18 15:31:11 2009, rana, Update, PEM, Temp sensor
|
Mon May 18 21:34:18 2009, rana, Configuration, SUS, ETMY f2pRatio script run
|
Tue May 19 12:30:41 2009, rob, Configuration, SUS, ETMY f2pRatio script run
|
Tue May 19 15:54:29 2009, Jenne, Update, PEM, More Plots for the S5 H1:DARM Wiener Filtering.... 6x
|
Tue May 19 15:57:07 2009, steve, Update, IOO, MC2 damping restored after EQ
|
Mon May 18 02:18:17 2009, rana, Summary, SEI, Using STACIS w/ a good position sensor
|
Tue May 19 16:08:03 2009, rana, Summary, SEI, EUCLID
|
Mon May 18 19:44:52 2009, rana, steve, Configuration, VAC, Cryo Pump turned off and valved off: 1 beer can only
|
Mon May 18 20:16:20 2009, rana, Configuration, VAC, not it
|
Tue May 19 09:34:29 2009, steve, Configuration, VAC, IFO is not pumped & CRYO is being regenerated 
|
Tue May 19 16:18:45 2009, steve, Configuration, VAC, IFO pressure is 4.2e-7 Torr with CRYO pump
|
Wed May 20 01:41:19 2009, pete, Update, VAC, cryopump probably not it
|
Wed May 20 01:53:48 2009, rob, pete, Update, Locking, violin mode filters in drstep_bang
|
Wed May 20 09:55:18 2009, steve, Update, PEM, oplev servos turned off
|
Sun May 17 20:50:38 2009, rob, Omnistructure, Environment, mag 5.0 earthquake in inglewood
|
Wed May 20 10:43:17 2009, steve, Omnistructure, Environment, accelerometers sensitivity
|
Wed May 20 16:03:52 2009, steve, Omnistructure, Environment, using OSEMs to look at seismic activity
|
Thu May 21 12:58:32 2009, rob, Configuration, ALARM, PEM count-half disabled
|
Fri May 15 00:02:34 2009, pete, Update, SUS, ETMX coils look OK
|
Thu May 21 18:05:03 2009, pete, Update, SUS, ETMX coils look OK
|
Sat May 9 00:15:21 2009, Yoichi, Update, PSL, Laser head temperature oscillation
|
Sat May 9 02:20:11 2009, Jenne, Update, PSL, Laser head temperature oscillation
|
Sat May 9 15:19:10 2009, rana, Update, PSL, Laser head temperature oscillation
|
Mon May 11 11:49:20 2009, steve, Update, PSL, MOPA cooling water lines are backwards
|
Thu May 21 18:07:32 2009, rana, Update, PSL, Screw on Needle valve loosened
|
Thu May 21 18:21:57 2009, rana, Summary, Treasure, Yoichi's words
|
Fri May 22 00:43:24 2009, rob, Configuration, Computer Scripts / Programs, IFO configure scripts for XARM and YARM
|
Fri May 22 01:27:14 2009, pete, Update, SUS, 200 days of MC3 side
|
Fri May 22 17:03:14 2009, rob, steve, Update, PSL, MOPA takes a holiday
|
Fri May 22 17:05:24 2009, rob, pete, Update, Computers, hard reboot of vertex suspension controllers
|
Sun May 24 11:24:08 2009, rob, Update, Computers, elog restarted
|
Mon May 25 21:31:47 2009, caryn, Update, PEM, plugged in Guralp channels
|
Tue May 26 17:05:44 2009, rob, Update, PSL, MOPA re-activated 
|
Tue May 26 17:34:14 2009, rob, Update, PSL, MOPA re-deactivated
|
Wed May 27 10:54:09 2009, rob, Update, PSL, we don't understand the chiller (broken)
|
Wed May 27 15:59:44 2009, rob, Update, PSL, we don't understand the chiller (broken)
|
Thu May 28 14:34:25 2009, rob, Update, PSL, chiller diagnosis
|
Thu May 28 18:41:26 2009, steve, Update, PSL, the saga of the chiller is ending
|
Fri May 29 18:57:09 2009, steve, Update, PSL, the laser is back
|
Sat May 30 11:24:56 2009, rob, Configuration, PSL, NPRO slow scan
|
Sat May 30 12:03:34 2009, rob, Update, PSL, MC locked
|
Sat May 30 12:36:52 2009, rob, Update, Computers, c1susvme2, c1iscex running late 
|
Mon Jun 1 13:25:00 2009, rob, Update, Computers, c1susvme2, c1iscex running late
|
Mon Jun 1 14:33:42 2009, rob, Configuration, Computer Scripts / Programs, op540m Monitor added to web status
|
Mon Jun 1 14:49:07 2009, rob, Summary, PSL, psl thoughts
|
Mon Jun 1 13:56:52 2009, Alberto, Update, PSL, Laser Power after fixing the laser chiller
|
Mon Jun 1 15:01:31 2009, rana, Update, PSL, Laser Power after fixing the laser chiller: more traces
|
Mon Jun 1 19:19:26 2009, rana, Update, PSL, 1000 days of hour-trend
|
Tue Jun 2 02:28:58 2009, pete, Update, Locking, DD handoff work
|
Tue Jun 2 23:12:08 2009, rob, Configuration, Computers, ntp on op440m
|
Tue Jun 2 23:53:12 2009, pete, DAQ, Computers, reset c1susvme1
|
Tue Jun 2 23:55:45 2009, Alberto, Update, oplevs, oplevs centerd
|
Wed Jun 3 03:22:16 2009, pete, Update, Locking, DD handoff
|
Wed Jun 3 03:30:52 2009, rana, Update, MOPA, NPRO current adjust
|
Wed Jun 3 11:28:01 2009, caryn, Update, PEM, Unplugged Guralp channels
|
Wed Jun 3 12:31:13 2009, caryn, Update, PEM, plugged in guralp channels
|
Wed Jun 3 18:55:27 2009, rana, Update, COC, snapshot of upgrade layout
|
Thu Jun 4 01:32:20 2009, rob, Configuration, LSC, AS port mode scan
|
Thu Jun 4 15:53:15 2009, steve, Update, PSL, NPRO cooling flowrate adjusted
|
Thu Jun 4 16:54:19 2009, pete, Update, Locking, daytime DD handoff
|
Thu Jun 4 23:39:23 2009, pete, Update, PEM, 5 days, 20 days of accelerometers 
|
Fri Jun 5 01:10:13 2009, rob, pete, Update, Locking, undermined
|
Fri Jun 5 02:59:03 2009, pete, alberto, Update, Locking, tdsavg failure in cm_step script
|
Fri Jun 5 13:51:49 2009, rob, Update, Locking, tdsavg failure in cm_step script
|
Fri Jun 5 16:45:28 2009, rob, pete, HowTo, Computers, tdsavg failure in cm_step script
|
Fri Jun 5 17:22:55 2009, pete, Update, Locking, daytime locking
|
Mon Jun 8 18:22:27 2009, Alberto, DAQ, LSC, Added PD11 I amd Q slow channels
|
Tue Jun 9 11:29:07 2009, Jenne, Update, oplevs, Measured ETMY oplev beam size...put everything back
|
Sat Jun 6 01:44:53 2009, rob , Update, Locking, ?
|
Sun Jun 7 04:57:39 2009, Yoichi, Update, Locking, ?
|
Tue Jun 9 23:25:24 2009, rob, Update, Locking, ?
|
Wed Jun 10 01:52:34 2009, Alberto, Update, Electronics, MC length and Marconis' frequencies
|
Wed Jun 10 09:06:12 2009, steve, Update, PEM, particle counts and turbulance
|
Wed Jun 10 09:28:14 2009, steve, Update, PSL, PMC
|
Thu Jun 11 03:15:15 2009, Alberto, Update, LSC, DD Handoff attempts
|
Thu Jun 11 14:54:18 2009, josephb, alberto, Update, Computers, Wireless network
|
Thu Jun 11 22:14:10 2009, Alberto, Update, LSC, DD Handoff for the Short DOFs completed
|
Fri Jun 12 02:01:03 2009, rob, Update, Computer Scripts / Programs, DRM matrix diagonalization
|
Mon Jun 15 15:17:33 2009, josephb, Steve, Configuration, VAC, Vacuum control and monitor screens
|
Fri Jun 12 09:56:38 2009, steve, Configuration, VAC, new maglev installed
|
Fri Jun 12 15:34:49 2009, steve, Configuration, VAC, maglev is running
|
Mon Jun 15 16:31:36 2009, steve, Configuration, VAC, RGA is scanning new Maglev
|
Tue Jun 16 02:09:31 2009, rob, Update, Locking, DD handoff finally working
|
Tue Jun 16 03:43:04 2009, rob, Update, Locking, same troubles
|
Tue Jun 16 09:02:30 2009, steve, Configuration, VAC, new maglev RGA scan 
|
Tue Jun 16 14:02:16 2009, rob, Update, Locking, locked
|
Tue Jun 16 16:10:01 2009, pete, Update, Locking, input matrix experiments
|
Tue Jun 16 17:38:35 2009, rob, Update, Locking, DeWhites ON
|
Tue Jun 16 20:03:41 2009, Alberto, Update, Electronics, Requirements on Wenzel Multiplier
|
Wed Jun 17 01:07:50 2009, rob, Configuration, Computers, matapps on /cvs/cds
|
Wed Jun 17 01:09:47 2009, rob, Update, Computers, /cvs/cds 91% full
|
Thu Jun 18 23:08:46 2009, rob, Update, Locking, spectrum 
|
Thu Jun 18 23:20:40 2009, rob, Summary, LSC, I-Q ratio with RF detected DARM
|
Fri Jun 19 13:39:29 2009, Aidan, Update, General, Upper limit measurement of the scatter from the eLIGO beam dumps.    
|
Fri Jun 19 13:38:42 2009, Alberto, Configuration, Computers, elog rebooted
|
Fri Jun 19 14:30:47 2009, Alberto, Configuration, Computers, elog rebooted
|
Sun Jun 21 00:08:26 2009, rana, Configuration, Computers, elog rebooted
|
Tue Jun 23 23:14:36 2009, Clara, Configuration, PEM, Accelerometers relocated
|
Tue Jun 23 10:06:03 2009, steve, Update, VAC, new maglev RGA scan at day6 
|
Tue Jun 23 15:19:42 2009, steve, Configuration, VAC, V1 is open
|
Wed Jun 24 09:21:19 2009, steve, Configuration, VAC, IFO RGA scan with Maglev & Cryo 
|
Wed Jun 24 10:53:34 2009, Chris Zimmerman, Update, General, Week 1/2 Update
|
Wed Jun 24 11:20:40 2009, Stephanie, Update, General, Multiply Resonant EOM Update 
|
Wed Jun 24 12:04:00 2009, Clara, Update, PEM, accelerometer clarification
|
Wed Jun 24 12:04:22 2009, Zach, Update, Cameras, SURF entry
|
Wed Jun 24 12:09:24 2009, Clara, Update, PEM, Week 1(ish)
|
Wed Jun 24 17:08:16 2009, steve, Bureaucracy, SAFETY, surf student safety
|
Thu Jun 25 10:28:58 2009, steve, HowTo, VAC, Cryopump is regenerated
|
Wed Jun 24 14:43:19 2009, rob, Update, Computers, tdsresp on linux => pzresp
|
Thu Jun 25 17:27:42 2009, rana, Update, Computers, tdsresp on linux
|
Thu Jun 25 21:00:30 2009, Clara, Update, PEM, MC1 Accelerator set moved again; new XLR cables
|
Fri Jun 26 15:22:28 2009, Clara, Update, PEM, XLR cables tested and labeled 
|
Fri Jun 26 18:00:36 2009, Jenne, Update, PEM, New PEM channels for the fancy-pants new microphones
|
Sat Jun 27 02:48:09 2009, Clara, Update, PEM, I moved accelerometers and made some pretty pictures 6x
|
Sat Jun 27 03:16:16 2009, Clara, Update, PEM, Exciting microphone things!  
|
Tue Jun 30 23:09:40 2009, Alberto, Update, Locking, chronicles of some locking attempts
|
Wed Jul 1 10:56:42 2009, Chris Zimmerman, Update, General, Week 2/3 Update
|
Wed Jul 1 11:00:52 2009, Stephanie, Update, General, Multiply Resonant EOM Update 
|
Wed Jul 1 11:04:27 2009, Zach, Update, Cameras, GigE Phase Camera 
|
Thu Jul 2 05:27:12 2009, Clara, Update, PEM, Voltage Divider Oops
|
Thu Jul 2 06:31:35 2009, Clara, Update, PEM, First mic in place and connected
|
Thu Jul 2 16:45:06 2009, Clara, Update, PEM, Bonnie and Clyde are officially in operation! (Butch Cassidy and the Sundance Kid are in temp position)  
|
Thu Jul 2 17:37:36 2009, steve, Update, VAC, V1 interlock test
|
Tue Jul 7 15:08:49 2009, Koji, Summary, Photos, 40 high school students visited 40M
|
Tue Jul 7 16:06:59 2009, Clara, Update, Computer Scripts / Programs, DTT synchronization errors, help would be appreciated
|
Wed Jul 8 10:56:04 2009, Stephanie, Update, General, Multiply Resonant EOM Update  
|
Wed Jul 8 11:05:40 2009, Chris Zimmerman, Update, General, Week 3/4 Update
|
Wed Jul 8 11:08:43 2009, Zach, Update, Cameras, GigE Phase Camera 
|
Wed Jul 8 11:13:36 2009, Alberto, Omnistructure, Computers, wireless router disconnected
|
Wed Jul 8 12:36:15 2009, Clara, Update, PEM, Coherences and things 7x
|
Wed Jul 8 18:46:56 2009, Dmass, AoG, Electronics, Beam Scan Funky 
|
Wed Jul 8 19:13:19 2009, Alberto, Update, PSL, PSL beam aligned to the Mode Cleaner
|
Wed Jul 8 19:42:37 2009, Clara, Update, PEM, Bonnie moved to PSL, getting some coherence with the PMC_ERR channel  
|
Thu Jul 9 02:18:09 2009, rana, Update, PEM, Bonnie moved to PSL, getting some coherence with the PMC_ERR channel
|
Thu Jul 9 19:05:32 2009, Clara, Update, PEM, more mic position changes; mics not picking up high frequencies 6x
|
Thu Jul 9 19:24:50 2009, rana, Update, PEM, more mic position changes; mics not picking up high frequencies
|
Sun May 17 23:22:19 2009, rana, Update, Environment, seisBLRMS for the past 3 weeks
|
Fri Jun 26 19:14:04 2009, rana, Update, Environment, seisBLRMS for the past 3 weeks
|
Fri Jul 10 17:32:08 2009, rana, Update, Environment, seisBLRMS & mafalda restarted
|
Sun Jul 12 20:06:44 2009, Jenne, DAQ, Computers, All computers down
|
Mon Jul 13 00:34:37 2009, Alberto, DAQ, Computers, All computers down
|
Mon Jul 13 00:53:50 2009, Alberto, DAQ, Computers, All computers down
|
Mon Jul 13 15:14:57 2009, Alberto, Update, Computers, DAQAWG
|
Mon Jul 13 16:59:10 2009, Zach, Update, , GigE Phase Camera
|
Tue Jul 14 14:54:19 2009, steve, Configuration, Computers, fb40m2 in 1Y6
|
Tue Jul 14 16:31:46 2009, Clara, Update, PEM, Frequency Response of Microphone (Bonnie) 
|
Fri Jul 10 19:56:23 2009, rana, koji, Omnistructure, Environment, Changed office temp
|
Sun Jul 12 20:05:06 2009, rana, Omnistructure, Environment, Changed office temp
|
Mon Jul 13 15:48:05 2009, rana, Omnistructure, Environment, Removal of the cold air deflection device for the MOPA chiller
|
Mon Jul 13 23:03:14 2009, rob, alberto, Omnistructure, Environment, Removal of the cold air deflection device for the MOPA chiller
|
Tue Jul 14 00:32:46 2009, rob, alberto, Omnistructure, Environment, Removal of the cold air deflection device for the MOPA chiller
|
Tue Jul 14 17:48:20 2009, Jenne, Omnistructure, Environment, Removal of the cold air deflection device for the MOPA chiller
|
Wed Jul 15 12:11:17 2009, Stephanie, Update, General, Multiply Resonant EOM Update  
|
Wed Jul 15 12:44:28 2009, Chris Zimmerman, Update, General, Week 4/5 Update
|
Wed Jul 15 17:18:24 2009, Jenne, DAQ, Computers, DAQAWG gone, now back
|
Wed Jul 15 14:42:31 2009, Zach, Update, Cameras, GigE Phase Camera
|
Wed Jul 15 18:22:15 2009, Koji, Update, Cameras, Re: GigE Phase Camera
|
Wed Jul 15 18:35:11 2009, Stephanie, Update, General, Multiply Resonant EOM Update 
|
Tue Jul 14 00:57:11 2009, Alberto, Update, Locking, photodiode alignment check
|
Wed Jul 15 12:14:08 2009, Alberto, Update, Locking, photodiode alignment check
|
Thu Jul 16 01:00:56 2009, Alberto, Update, Locking, PD9 aligned
|
Wed Jul 15 08:59:30 2009, steve, Update, Computers, fb40m
|
Thu Jul 16 09:49:52 2009, Alan, Update, Computers, fb40m
|
Thu Jul 16 10:52:58 2009, Clara, Update, PEM, Single Channel TRS-RNC Cable
|
Wed Jul 15 11:38:31 2009, rob, Update, Locking, MC_F channel dead
|
Thu Jul 16 14:41:38 2009, rob, Update, Locking, MC_F channel dead 
|
Thu Jul 16 14:54:05 2009, rob, Update, Locking, MC_F channel dead
|
Sun Jul 12 23:14:56 2009, Jenne, Omnistructure, General, Web screenshots aren't being updated
|
Sun Jul 19 22:38:24 2009, rob, Omnistructure, General, Web screenshots aren't being updated
|
Mon Jul 20 10:35:06 2009, steve, Update, VAC, UPS batteries replaced
|
Mon Jul 20 12:35:21 2009, rob, Configuration, Locking, alignment biases funny
|
Fri Jul 17 18:04:54 2009, Clara, Update, PEM, Guralp Box Fail  
|
Sat Jul 18 19:49:48 2009, rana, Update, PEM, Guralp Box Fail  
|
Mon Jul 20 17:06:29 2009, Jenne, Update, PEM, Guralp Box Fail
|
Tue Jul 21 01:11:30 2009, Dmass, AoG, Computers, Alarms going off
|
Tue Jul 21 13:55:08 2009, Clara, Update, PEM, Guralp Box Success!
|
Tue Jul 21 17:01:18 2009, pete, DAQ, DAQ, temp channel PEM-PETER_FE
|
Tue Jul 21 15:32:47 2009, Jenne, Update, IOO, MC_L flatlined
|
Tue Jul 21 17:52:12 2009, Jenne, Update, IOO, MC_L flatlined
|
Wed Jul 22 10:49:40 2009, Alberto, Update, PSL, MC Alignment Trend 
|
Wed Jul 22 11:08:36 2009, Stephanie, Update, General, Multiply Resonant EOM Update    
|
Tue Jul 21 18:46:47 2009, steve, Configuration, Computers, computers are down
|
Wed Jul 22 01:57:19 2009, Alberto, Configuration, Computers, computers are down
|
Wed Jul 22 09:04:10 2009, Alberto, Configuration, Computers, computers are down
|
Wed Jul 22 11:14:11 2009, Alberto, Configuration, Computers, computers are down
|
Wed Jul 22 11:18:49 2009, rob, Configuration, Computers, sticky sliders
|
Wed Jul 22 14:44:57 2009, Zach, Update, Cameras, GigE Phase Camera
|
Wed Jul 22 18:04:14 2009, rob, Omnistructure, Computers, weird noise coming from Gigabit switch
|
Wed Jul 22 20:11:26 2009, pete, Update, Computers, RCG front end
|
Thu Jul 23 07:34:45 2009, Aidan, Update, CDS, Added C2 MEDM screens to 40m SVN.
|
Thu Jul 23 10:05:38 2009, Alberto, Update, PSL, Summary of the latest adventures with the alignment of the mode cleaner
|
Thu Jul 23 20:30:23 2009, Alberto, Update, PSL, Beam aligned to the Farady
|
Fri Jul 24 17:20:48 2009, Jenne, Update, oplevs, ETMY oplev is iffy
|
Wed Jul 22 16:15:52 2009, Chris Zimmerman, Update, General, Week 5/6 Update  
|
Sat Jul 25 13:34:58 2009, Koji, Update, General, Week 5/6 Update
|
Fri Jul 24 17:47:52 2009, Stephanie, Update, General, Multiply Resonant EOM Update  
|
Sat Jul 25 13:49:28 2009, Koji, Update, General, Multiply Resonant EOM Update
|
Fri Jul 24 21:02:46 2009, Alberto, Update, PSL, Aligning the beam to the Faraday
|
Sat Jul 25 16:04:32 2009, rob, Update, PSL, Aligning the beam to the Faraday
|
Sat Jul 25 19:04:01 2009, Koji, Update, PSL, Aligning the beam to the Faraday
|
Sun Jul 26 13:19:54 2009, rana, Update, PSL, Aligning the mode cleaner
|
Sun Jul 26 16:05:17 2009, Alberto, Update, PSL, Aligning the mode cleaner
|
Mon Jul 27 09:34:07 2009, steve, Summary, IOO, Aligning the mode cleaner
|
Mon Jul 27 14:12:14 2009, rana, Summary, SUS, TM Coil Noise Spectra
|
Mon Jul 27 14:43:34 2009, Chris, Update, , Photodetectors
|
Mon Jul 27 17:48:44 2009, Jenne, Update, oplevs, ETMY oplev is still down for the count
|
Mon Jul 27 19:55:19 2009, Koji, HowTo, IOO, Lens selection: plano-convex? or bi-convex?
|
Tue Jul 28 16:03:14 2009, Clara, Update, PEM, Guralp Seismometer cable pin diagram
|
Tue Jul 28 18:32:21 2009, Koji, Update, CDS, RCG work
|
Wed Jul 29 11:15:06 2009, steve, Bureaucracy, SAFETY, Kevin receives safety training
|
Wed Jul 29 11:58:57 2009, Alberto, Update, PSL, MC not locking
|
Wed Jul 29 12:14:40 2009, pete, Update, Computers, RCG work 
|
Wed Jul 29 14:22:33 2009, Zach, Update, Cameras, GigE Phase Camera
|
Wed Jul 29 14:56:44 2009, Jenne, Update, PEM, MiniEarthquakes due to construction
|
Fri Jul 24 11:04:11 2009, Alberto, Configuration, Computers, elog restarted
|
Wed Jul 29 19:31:17 2009, rana, Configuration, Computers, elog restarted
|
Wed Jul 29 19:41:58 2009, Chris, Configuration, General, EUCLID-setup configuration change
|
Wed Jul 29 13:15:35 2009, Clara, Update, PEM, Dents = Bad??  
|
Wed Jul 29 19:46:04 2009, rana, alberto, Update, PEM, Dents = Bad??
|
Thu Jul 30 03:10:18 2009, rob, Update, IOO, MC tweaked further
|
Wed Jul 29 12:00:49 2009, Stephanie, Update, General, Multiply Resonant EOM Update    
|
Thu Jul 30 19:55:23 2009, Koji, Update, General, Multiply Resonant EOM Update 
|
Wed Feb 18 21:10:21 2009, rana, Update, IOO, MC Drumhead mode lost again
|
Thu Jul 30 21:26:16 2009, rana, Update, IOO, MC Drumhead mode
|
Fri Jul 31 09:52:38 2009, Stephanie, Update, General, Multiply Resonant EOM Update   
|
Fri Jul 31 11:04:42 2009, Stephanie, Update, General, Multiply Resonant EOM Update 
|
Mon Aug 3 01:08:20 2009, Alberto, Update, PSL, MC unlocked
|
Mon Aug 3 12:57:09 2009, Alberto, Update, PSL, MC unlocked
|
Mon Aug 3 13:47:42 2009, pete, Update, Computers, RCG work
|
Mon Aug 3 14:15:50 2009, Jenne, Update, IOO, WFS recentered
|
Mon Aug 3 14:47:53 2009, Jenne, Update, IOO, MC locks again
|
Mon Aug 3 18:56:59 2009, Zach, Update, Cameras, GigE Phase Camera
|
Mon Aug 3 22:54:53 2009, Jenne, Koji, rana, Update, IOO, MC_trans is now better, but not best 
|
Tue Aug 4 11:45:29 2009, Zach, Update, Cameras, GigE Phase Camera
|
Tue Aug 4 11:54:20 2009, Jenne, Update, IOO, MC_trans readout on LOCK_MC screen now normalized
|
Tue Aug 4 13:40:17 2009, pete, Update, Computers, RCG work - rate
|
Tue Aug 4 15:48:25 2009, Jenne, Update, Computers, mini boot fest
|
Tue Aug 4 16:12:27 2009, rob, Update, Computers, mini boot fest
|
Tue Aug 4 17:51:25 2009, pete, Update, Computers, RCG work
|
Wed Aug 5 07:33:04 2009, steve, DAQ, Computers, fb40m is down
|
Wed Aug 5 09:25:57 2009, Alberto, DAQ, Computers, fb40m is up
|
Wed Aug 5 11:49:49 2009, Stephanie, Update, General, Multiply Resonant EOM Update  
|
Wed Aug 5 15:18:12 2009, Stephanie, Update, General, Multiply Resonant EOM Update
|
Wed Aug 5 15:57:05 2009, Alberto, Configuration, Computers, PMC MEDM screen changed
|
Wed Aug 5 16:33:50 2009, steve, Configuration, PSL, new PSL output iris
|
Wed Aug 5 17:41:54 2009, pete, Update, Computers, RCG work - daq fixed
|
Thu Aug 6 09:05:29 2009, steve, Update, VAC, large O-rings of vacuum envelope 
|
Wed Aug 5 15:33:05 2009, rob, alberto, DAQ, General, can't get trends
|
Thu Aug 6 09:22:17 2009, Alberto, DAQ, General, can't get trends
|
Tue Aug 4 23:03:56 2009, alberto, Update, Locking, IFO Alignment
|
Wed Aug 5 09:48:05 2009, alberto, Update, Locking, IFO Alignment 
|
Thu Aug 6 09:33:08 2009, alberto, Update, Locking, FSS Transmitted and Reflected Power Trends 
|
Thu Aug 6 10:32:45 2009, alberto, rob, Update, Locking, More PSL trends: NPRO, MOPA, FSS, PMC and MZ
|
Thu Aug 6 17:51:21 2009, Chris, Update, General, Displacement Sensor Update 
|
Thu Aug 6 18:21:03 2009, Chris, Update, General, Displacement Sensor Update
|
Thu Aug 6 18:26:26 2009, Jenne, Update, PSL, Ref Cav and PMC aligned
|
Thu Aug 6 17:45:37 2009, Jenne, Update, PSL, HEPAs on high
|
Thu Aug 6 19:54:04 2009, Stephanie, Update, PSL, HEPAs back to normal
|
Thu Aug 6 20:03:10 2009, Koji, Update, General, We left two carts near PSL table.
|
Fri Aug 7 11:39:13 2009, Alberto, Update, PSL, MZ Alignment
|
Fri Aug 7 13:42:12 2009, ajw, Omnistructure, Computers, backup of frames restored
|
Fri Aug 7 14:31:39 2009, Alberto, Update, PSL, DAQ REstarted
|
Fri Aug 7 09:50:57 2009, steve, Configuration, VAC, IFO pressure rose to 2.3 mTorr
|
Fri Aug 7 16:11:11 2009, steve, rob, Configuration, VAC, IFO pressure rose to 2.3 mTorr
|
Fri Aug 7 16:53:35 2009, Clara, Update, PEM, Guralp breakout box noise, finally 
|
Thu Aug 6 23:29:47 2009, Jenne, Update, PSL, Ref cav reflection PD is funky
|
Fri Aug 7 00:10:14 2009, rana, Update, PSL, Ref cav reflection PD is funky
|
Fri Aug 7 17:05:34 2009, Jenne, Update, PSL, Ref cav reflection PD is funky
|
Fri Aug 7 17:46:21 2009, Zach, Update, Cameras, The phase camera is sort of working 
|
Fri Aug 7 17:51:50 2009, Zach, Update, Cameras, CMOS vs. CCD
|
Fri Aug 7 18:06:24 2009, rob, Omnistructure, VAC, opening V1 when PTP1 is broken
|
Fri Aug 7 19:55:08 2009, steve, Summary, VAC, opening V1 when PTP1 is broken
|
Sat Aug 8 15:08:14 2009, rana, Configuration, PSL, SMOO settings updated in psl.db and SVN updated
|
Fri Aug 7 20:43:35 2009, Clara, Jenne, Rana, Jan, Update, PEM, Two Guralps plugged in, prepped for huddle test
|
Sat Aug 8 17:19:07 2009, rana, Update, PEM, Two Guralps plugged in, prepped for huddle test
|
Sat Aug 8 17:23:29 2009, rana, Update, PEM, offensive 2 Hz sine wave removed
|
Fri Aug 7 16:00:17 2009, pete, Update, Computers, RCG work. MDC MDP open loop transfer function
|
Sun Aug 9 16:32:18 2009, rana, Update, Computers, RCG work. MDC MDP open loop transfer function
|
Mon Aug 10 11:33:58 2009, Jenne, Update, PSL, Non-Elogged Beam dump on the PSL table - BadBadBad
|
Mon Aug 10 15:21:15 2009, Jenne, Update, PSL, Non-Elogged Beam dump on the PSL table - BadBadBad
|
Mon Aug 10 15:24:17 2009, rob, Summary, PSL, MZ bad
|
Mon Aug 10 15:56:12 2009, rob, Summary, PSL, MZ bad redux
|
Mon Aug 10 16:37:27 2009, rob, Update, PSL, MZ alignment touched
|
Mon Aug 10 16:41:31 2009, Alberto, Configuration, PSL, PMC Visibility
|
Mon Aug 10 17:27:47 2009, rob, Configuration, LSC, TRX, TRY gain
|
Mon Aug 10 17:36:32 2009, pete, Update, Computers, RCG work. PIT, YAW, POS in MDP/MDC system
|
Mon Aug 10 17:49:10 2009, pete, Update, Computers, RCG work - plans
|
Mon Aug 10 14:58:01 2009, Jenne, Update, PEM, 2nd set of Guralp channels plugged into ADCU
|
Mon Aug 10 18:12:25 2009, Jenne, Update, PEM, 2nd set of Guralp channels plugged into ADCU
|
Mon Aug 10 20:49:13 2009, Alberto, Rana, Update, PSL, PMC Mode Matching Lenses Tuning
|
Tue Aug 11 01:21:55 2009, rob, Update, PSL, MZ needs some attention
|
Tue Aug 11 02:15:20 2009, Clara, Update, PEM, Guralp breakout box circuit diagram 
|
Tue Aug 11 14:15:28 2009, Stephanie, Update, General, Multiply Resonant EOM Update
|
Tue Aug 11 23:55:04 2009, rana, rich, Summary, OMC, Quantum Efficiency and Dark Current measurements of eLIGO Photodiodes
|
Wed Aug 12 02:00:32 2009, rob, Update, Locking, report
|
Tue Aug 11 23:17:21 2009, rana, Summary, Computers, Nodus rebooted / SVN down
|
Wed Aug 12 10:35:17 2009, jenne, Summary, Computers, Nodus rebooted / SVN down
|
Wed Aug 12 12:08:16 2009, Stephanie, Update, General, Multiply Resonant EOM Update  
|
Wed Aug 12 13:35:03 2009, josephb, Alex, Configuration, Computers, Tested old Framebuilder 1.5 TB raid array on Linux1
|
Wed Aug 12 15:02:33 2009, Alberto, Configuration, Computers, elog restarted
|
Wed Aug 12 23:45:03 2009, Chris, Update, General, Long range michelson
|
Thu Aug 13 02:17:56 2009, Jenne, Update, IOO, Mode Cleaner Alignment
|
Thu Aug 13 00:11:43 2009, Jenne, Update, IOO, Mode Cleaner Unlock
|
Thu Aug 13 09:22:06 2009, rana, Update, PEM, ranger
|
Thu Aug 13 11:20:43 2009, janosch, HowTo, PEM, three-channel self-noise estimation
|
Thu Aug 13 22:53:48 2009, Yoichi, Configuration, PSL, FSS nominal common gain changed, MC WFS centered
|
Fri Aug 14 02:57:46 2009, Clara, Update, PEM, Redo of the Huddle Test
|
Fri Aug 14 15:29:43 2009, Jenne, Update, Computers, c1susvme2 was unmounted from /cvs/cds
|
Fri Aug 14 18:33:02 2009, Clara, Update, , Record of Accelerometer and Seismometer Movements
|
Fri Aug 14 23:45:14 2009, Chris, Update, General, Long Range Readout  
|
Sat Aug 15 05:08:55 2009, Yoichi, Update, Locking, Friday night locking
|
Fri Aug 14 14:19:25 2009, Koji, Summary, Computers, nodus rebooted
|
Fri Aug 14 14:33:51 2009, Jenne, Summary, Computers, nodus rebooted
|
Fri Aug 14 15:20:42 2009, josephb, Summary, Computers, Linux1 now has 1.5 TB raid drive
|
Fri Aug 14 15:32:50 2009, Yoichi, HowTo, Computers, nodus boot procedure
|
Sat Aug 15 10:36:02 2009, Alan, HowTo, Computers, nodus boot procedure
|
Sat Aug 15 18:35:14 2009, Clara, Frogs, Computers, How far back is complete data really saved? (or, is the cake a lie?)
|
Sat Aug 15 22:50:18 2009, Clara, Update, Locking, Mode Cleaner is out of lock again
|
Sun Aug 16 04:33:11 2009, Clara, Update, Locking, Mode Cleaner is out of lock again
|
Mon Aug 17 02:12:53 2009, Yoichi, Summary, Computers, FE bootfest
|
Mon Aug 17 02:05:49 2009, Yoichi,rana, Update, PSL, Reference cavity reflection looks bad 
|
Mon Aug 17 04:16:13 2009, Yoichi, Update, PSL, Reference cavity reflection looks bad
|
Mon Aug 17 07:01:09 2009, Clara, Update, PEM, ADC noiseness
|
Mon Aug 17 09:52:04 2009, rob, Summary, General, conlogger restarted
|
Mon Aug 17 17:43:11 2009, rana, Summary, General, conlogger restarted
|
Mon Aug 17 17:48:49 2009, rob, Summary, General, conlogger restarted
|
Tue Aug 18 01:16:01 2009, Jenne, Update, PSL, Mach Zehnder is realigned
|
Tue Aug 18 14:24:43 2009, Yoichi, Summary, PSL, Reference Cavity Inspection
|
Tue Aug 18 15:16:15 2009, rob, Update, IOO, MC WFS working again
|
Tue Aug 18 15:52:27 2009, Jenne, Update, PSL, MZ
|
Tue Aug 18 19:57:47 2009, rana, Jenne, Update, PSL, MZ  
|
Wed Aug 19 17:11:33 2009, Jenne, Update, IOO, QPDs aligned
|
Wed Aug 19 18:02:22 2009, Jenne, Update, LSC, RF PDs aligned
|
Wed Aug 19 23:57:35 2009, rob, Update, Locking, report
|
Wed Aug 19 02:17:52 2009, rana, Omnistructure, Environment, Control Room Workstation desks lowered to human height
|
Thu Aug 20 09:16:32 2009, steve, HowTo, Photos, Control Room Workstation desks lowered to human height    
|
Fri Aug 21 17:05:04 2009, Jenne, Update, General, restarted the elog
|
Fri Aug 21 17:28:50 2009, Kevin, rana, Summary, PEM, Magnetic Field Measurements Around the Lab 
|
Fri Aug 21 17:49:47 2009, Yoichi, Summary, Computers, Upgrade FE conceptual plan
|
Mon Aug 24 10:43:27 2009, Alberto, Omnistructure, Computers, RFM Network Failure
|
Fri Aug 7 16:14:57 2009, rob, Omnistructure, VAC, UPS failed
|
Fri Aug 7 19:34:40 2009, steve, Summary, VAC, UPS failed
|
Sat Aug 15 18:57:48 2009, rana, Update, VAC, UPS failed
|
Mon Aug 24 16:48:57 2009, steve, HowTo, VAC, new UPS installed
|
Fri Aug 21 18:37:16 2009, Jenne, Update, General, Transfer function of Mode Cleaner Stacks
|
Tue Aug 25 00:35:04 2009, rana, Update, General, Transfer function of Mode Cleaner Stacks
|
Tue Aug 25 02:37:53 2009, rana, Configuration, Computer Scripts / Programs, Firefox 3.5 installed for 64 bit linux in apps/
|
Tue Aug 25 03:30:23 2009, Yoichi, Summary, WIKI-40M Update, Green lock and phase noise
|
Tue Aug 25 21:26:12 2009, Alberto, Update, Computers, elog restarted
|
Tue Aug 25 23:16:09 2009, Alberto, rana, Configuration, Computers, elog moved in to the cvs path
|
Wed Aug 26 14:45:14 2009, steve, Update, PSL, PSL-FSS_RCTEMP of 4 years
|
Tue Aug 25 11:02:39 2009, rana, Summary, PSL, Temperature Box
|
Tue Aug 25 18:42:42 2009, steve, Update, PSL, reference cavity temp box temporarly out of order
|
Tue Aug 25 21:36:28 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order
|
Tue Aug 25 21:55:11 2009, rana, Update, PSL, reference cavity temp box temporarly out of order 
|
Wed Aug 26 15:42:17 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order
|
Wed Aug 26 16:11:41 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order
|
Wed Aug 26 16:31:34 2009, steve, Update, PSL, reference cavity temp box temporarly out of order
|
Thu Aug 27 12:34:48 2009, Yoichi, Update, Locking, up to arm power 70
|
Wed Aug 26 19:58:14 2009, Rana, Alberto, Update, PSL, Reference Cavity Temperature Control: MINCO PID removed
|
Thu Aug 27 13:42:08 2009, rana, Summary, PSL, Reference Cavity Temperature Control: psl.db changes
|
Thu Aug 27 16:14:28 2009, steve, Summary, OMC, burned photodiode 
|
Fri Aug 28 12:56:17 2009, Yoichi, Update, Locking, RF CARM hand off problem
|
Fri Aug 28 13:49:07 2009, rob, Update, Locking, RF CARM hand off problem
|
Fri Aug 28 15:30:15 2009, steve, Configuration, General, POX rfpd removed
|
Tue Sep 1 13:52:06 2009, steve, Configuration, General, POX rfpd is back & needs alignment
|
Thu Sep 3 10:19:35 2009, steve, alberto, Update, PEM, particle counts and burning hillsides   
|
Tue Sep 1 11:23:36 2009, steve, Update, General, electrical ground
|
Thu Sep 3 11:20:26 2009, steve, Update, General, electrical ground in place 
|
Thu Sep 3 23:41:32 2009, Alberto, Configuration, LSC, POX (PD3) aligned
|
Mon Sep 7 23:18:01 2009, Alberto, Update, Locking, Some locking attempts
|
Thu Aug 27 14:00:33 2009, rana, Update, PSL, RC thermal servo impulse response
|
Mon Sep 7 20:05:18 2009, rana, Update, PSL, RCTEMP v. RMTEMP 
|
Mon Sep 7 23:35:03 2009, rana, Update, PSL, RC thermal servo: PID script modified, database + screen added
|
Mon Sep 7 23:51:48 2009, rana, Configuration, Computers, matlab installed: 64-bit linux
|
Tue Sep 8 12:26:16 2009, Alberto, Update, PSL, Connection of the RC heater's power supply replaced
|
Fri Aug 14 10:39:50 2009, josephb, Configuration, Computers, Raid update to Framebuilder (specs)
|
Tue Aug 25 01:27:09 2009, rana, Configuration, Computers, Raid update to Framebuilder (not quite)
|
Tue Sep 8 15:14:26 2009, rana, alex, Configuration, DAQ, RAID update to Framebuilder: directories added + lookback increased
|
Tue Sep 8 16:01:52 2009, steve, Configuration, VAC, RGA was separeted from IFO
|
Tue Sep 8 17:57:30 2009, Jenne, Update, PEM, All the Acc/Seis working again
|
Tue Sep 8 19:36:52 2009, Jenne, Omnistructure, DMF, DMF restarted
|
Tue Sep 8 20:25:03 2009, Jenne, Omnistructure, DMF, DMF restarted
|
Tue Sep 8 20:15:33 2009, rana, jenne, Summary, PSL, RC temperature servo: Heater Voltage noise 
|
Wed Sep 9 10:13:31 2009, steve, Bureaucracy, General, the use of FAX machine, scanner & toaster
|
Thu Sep 10 15:55:44 2009, Jenne, Update, Computers, c1ass rebooted
|
Thu Sep 10 17:47:25 2009, Jenne, Update, Computers, changes to the startass scripts
|
Fri Sep 11 17:07:45 2009, Jenne, Update, Adaptive Filtering, Minor changes to ASS_TOP_PEM screen.
|
Fri Sep 11 17:11:15 2009, Sanjit, Update, ASS, OAF: progress made
|
Tue Sep 8 19:30:33 2009, rana, Update, PSL, c1psl rebooted for new RCPID database settings  
|
Thu Sep 10 18:25:15 2009, rana, Update, PSL, c1psl rebooted for new RCPID database settings
|
Sat Sep 12 15:40:15 2009, rana, Update, PSL, RC response v. can temperature 
|
Tue Sep 15 15:46:05 2009, steve, Update, PEM, PEM and VAC 
|
Wed Sep 16 11:58:11 2009, Jenne, Update, Adaptive Filtering, New Filters for Adaptive Filtering
|
Thu Sep 17 14:17:04 2009, rob, Update, Computers, awgtpman on c1omc failing to start
|
Thu Sep 17 15:05:47 2009, rob, Update, Computers, awgtpman on c1omc failing to start
|
Fri Sep 18 14:25:00 2009, rob, Omnistructure, PSL, water under the laser chiller
|
Fri Sep 18 16:05:08 2009, Jenne, Omnistructure, PSL, water under the laser chiller
|
Fri Sep 18 16:26:02 2009, steve, Summary, PSL, Neslab chiller is OK
|
Wed Sep 23 17:32:37 2009, rob, AoG, Computers, Gremlins in the RFM
|
Wed Sep 23 20:02:11 2009, Jenne, AoG, Computers, Gremlins in the RFM
|
Thu Sep 24 15:45:27 2009, rob, Update, IOO, MC OLG
|
Thu Sep 24 19:35:20 2009, rana, HowTo, Photos, 40m Google account
|
Thu Sep 24 20:17:05 2009, rana, Summary, LSC, Comparison of Material Properties for the new RFPD Mounts
|
Fri Sep 25 16:10:17 2009, Jenne, Update, Adaptive Filtering, Some progress on OAF, but more still to be done
|
Fri Sep 25 16:45:29 2009, Jenne, Update, MOPA, Total MOPA power is constant, but the NPRO's power has decreased after last night's activities?
|
Fri Sep 25 17:51:51 2009, Koji, Update, MOPA, Solved (Re: Total MOPA power is constant, but the NPRO's power has decreased after last night's activities?)
|
Sat Sep 26 13:55:20 2009, Jenne, Update, MZ, MZ was locked in a bad place
|
Thu Sep 24 21:04:15 2009, Jenne, Update, MOPA, Increasing the power from the MOPA
|
Sun Sep 27 12:52:56 2009, rana, Update, MOPA, Increasing the power from the MOPA
|
Sun Sep 27 14:45:45 2009, Koji, Update, PSL, SLOWscan result 
|
Sun Sep 27 15:25:58 2009, Koji, Update, PSL, SLOWscan result
|
Sun Sep 27 23:21:14 2009, rana, Update, PSL, SLOWscan result
|
Fri Sep 25 19:55:59 2009, Jenne, Update, Adaptive Filtering, Subtraction of the microseism using Adaptive Filtering!
|
Mon Sep 28 02:24:05 2009, rana, Update, Locking, MC1/3 Dewhitening found OFF: Turned back ON 
|
Mon Sep 28 11:52:23 2009, Jenne, Update, Treasure, OAF screen added to the screenshots webpage
|
Mon Sep 28 17:39:34 2009, rob, Update, PSL, problems 
|
Mon Sep 28 23:44:18 2009, Koji, Omnistructure, SAFETY, Crappy power outlet
|
Tue Sep 29 01:50:10 2009, rob, Configuration, LSC, new modulation frequencies
|
Tue Sep 29 10:44:29 2009, Koji, Update, MZ, MZ investigation
|
Mon Sep 28 23:13:14 2009, Jenne, Configuration, Electronics, Rob is breaking stuff....
|
Tue Sep 29 16:14:44 2009, rob, Configuration, Electronics, Rob is breaking stuff....
|
Tue Sep 29 12:47:08 2009, Koji, Update, MZ, MZ unlocked
|
Tue Sep 29 18:21:41 2009, Koji, Update, MZ, MZ work done
|
Tue Sep 29 21:37:09 2009, rana, Update, MZ, MZ work done : some noise checking
|
Tue Sep 29 21:51:32 2009, Koji, Update, MZ, MZ work done : some noise checking
|
Tue Sep 29 22:51:20 2009, Koji, Update, MZ, Possible gain mis-calibration at other places (Re: MZ work done)
|
Tue Sep 29 23:43:46 2009, rob, Update, SUS, ITMY UL OSEM
|
Tue Sep 29 23:43:49 2009, rana, AoG, all down cond., Cosmic
|
Wed Sep 30 01:04:56 2009, rob, Update, Computers, grief
|
Wed Sep 30 12:21:08 2009, Jenne, Update, Computers, restarted the elog
|
Wed Sep 30 17:49:21 2009, Jenne, Update, Adaptive Filtering, New UP/DOWN scripts for OAF
|
Thu Oct 1 03:12:56 2009, rob, Update, Locking, some progress
|
Thu Oct 1 08:37:43 2009, steve, Update, SUS, suspention damping restored and MZ HV stuck
|
Thu Oct 1 09:36:09 2009, Koji, Update, MZ, MZ relocked (Re:suspention damping restored and MZ HV stuck)
|
Thu Oct 1 13:12:41 2009, Koji, Update, MZ, MZ Work from 13:00-
|
Thu Oct 1 19:04:05 2009, Koji, Update, MZ, MZ work done (Re: MZ Work from 13:00-)
|
Thu Oct 1 10:23:00 2009, steve, Update, PSL, MC2 damping restored again
|
Thu Oct 1 11:39:47 2009, Jenne, Update, SUS, MC2 damping restored again
|
Thu Oct 1 14:22:28 2009, rob, Update, SUS, all suspensions undamped
|
Thu Oct 1 19:18:24 2009, Koji, Update, SUS, all suspensions undamped
|
Fri Oct 2 02:55:07 2009, rob, Update, Locking, more progress
|
Fri Oct 2 15:24:29 2009, sanjit, rana, Summary, IOO, mcwfs centered
|
Fri Oct 2 17:00:06 2009, Alberto, Update, General, 40m Update - Requirements on the 5x Frequency Multiplier
|
Fri Oct 2 18:04:45 2009, rob, Update, CDS, DTT no good for OMC channels  
|
Fri Oct 2 18:26:32 2009, rob, AoG, Environment, earthquake
|
Sat Oct 3 14:53:24 2009, rob, Update, Locking, more progress
|
Mon Oct 5 02:51:08 2009, rob, Update, Locking, almost there
|
Mon Oct 5 13:43:37 2009, Zach, Update, PSL, PSL table photos
|
Mon Oct 5 14:18:41 2009, Zach, Update, PSL, PSL table photos
|
Mon Oct 5 14:37:29 2009, Alberto, Update, ABSL, Absolute Length Meaasurement NPRO is on
|
Mon Oct 5 09:31:05 2009, Alberto, Frogs, PSL, PSL laser accidentally turned off
|
Mon Oct 5 10:41:31 2009, Koji, Update, PSL, PSL laser accidentally turned off
|
Mon Oct 5 19:39:26 2009, Koji, Update, PSL, PSL laser accidentally turned off
|
Tue Oct 6 01:41:20 2009, rob, Update, Locking, DC Readout
|
Tue Oct 6 10:09:55 2009, Zach, Update, PSL, More pictures
|
Tue Oct 6 20:09:50 2009, Jenne, Omnistructure, Environment, RF area is clean!
|
Tue Oct 6 23:39:54 2009, Koji, Omnistructure, Environment, RF area is clean!
|
Wed Oct 7 06:26:09 2009, rana, HowTo, IOO, MC_L calibration + some DTT lore 
|
Wed Oct 7 11:18:40 2009, kiwamu, Summary, Electronics, racks of electronics
|
Mon Oct 5 18:34:26 2009, Jenne, Update, Adaptive Filtering, Attempts to take a TF of the OAF system
|
Tue Oct 6 11:13:53 2009, Jenne, Update, Adaptive Filtering, Attempts to take a TF of the OAF system
|
Wed Oct 7 03:49:49 2009, rana, Update, Adaptive Filtering, Attempts to take a TF of the OAF system
|
Wed Oct 7 19:23:49 2009, Jenne, Update, Adaptive Filtering, (Final?) PEM cabling changes
|
Wed Oct 7 07:42:55 2009, rana, Update, Adaptive Filtering, Attempts to take a TF of the OAF system
|
Thu Oct 8 11:10:50 2009, josephb, jenne, Update, Computers, EPICs Computer troubles
|
Thu Oct 8 11:37:59 2009, josephb, Update, Computers, Reboot of dcuepics helped, c1susvme1 having problems
|
Thu Oct 8 14:41:46 2009, jenne, Update, Computers, c1susvme1 is back online
|
Thu Oct 8 20:18:56 2009, Koji, Summary, General, Arm cavity loss
|
Thu Oct 8 21:32:59 2009, Koji, Summary, General, Recycling cavity loss
|
Thu Oct 8 22:17:15 2009, rana, Configuration, DMF, input channels changed
|
Fri Oct 9 03:53:56 2009, Jenne, Update, Adaptive Filtering, Remaking the ASS
|
Fri Oct 9 01:31:56 2009, rana, Configuration, DAQ, tpchn mystery
|
Fri Oct 9 14:23:53 2009, Alex Ivanov, Configuration, DAQ, tpchn mystery
|
Fri Oct 9 17:37:21 2009, Jenne, Update, IOO, MC2 trans beam is dumped
|
Wed Sep 30 02:01:28 2009, rob, Update, Locking, week
|
Thu Oct 1 15:42:55 2009, rob, Update, Locking, c1susvme2 timing problems update
|
Fri Oct 2 14:52:55 2009, rana, Update, Computers, c1susvme2 timing problems update
|
Fri Oct 2 15:11:44 2009, rob, Update, Computers, c1susvme2 timing problems update update
|
Mon Oct 12 14:51:41 2009, rob, Update, Computers, c1susvme2 timing problems update update update
|
Mon Oct 12 17:14:39 2009, rob, Update, Locking, stability
|
Mon Oct 12 18:37:55 2009, Zach, Update, PSL, Inventory
|
Mon Oct 12 17:27:20 2009, Koji, Configuration, SAFETY, Stray beam blocking
|
Mon Oct 12 18:38:07 2009, Jenne, Configuration, SAFETY, Stray beam blocking
|
Mon Oct 12 20:01:13 2009, Koji, Configuration, SAFETY, Stray beam blocking
|
Mon Oct 12 22:15:15 2009, rana, Configuration, PSL, Stray beam blocking
|
Mon Oct 12 19:53:44 2009, Koji, Configuration, SAFETY, Stray beam blocking
|
Tue Oct 13 10:31:11 2009, Zach, Update, PSL, one more time
|
Tue Oct 13 10:50:58 2009, Zach, Update, PSL, one more time
|
Wed Oct 14 15:48:26 2009, Mott, HowTo, General, Phase Noise measurement
|
Wed Oct 14 16:59:37 2009, rob, Update, Locking, daytime locking
|
Wed Oct 14 23:02:41 2009, rana, Update, Locking, daytime locking
|
Thu Oct 15 01:21:31 2009, rana, Summary, COC, Thermal Lensing in the ITM 
|
Thu Oct 15 02:38:10 2009, rana, rob, Update, OMC, Dark Port Mode Scan using the OMC
|
Thu Oct 15 02:41:04 2009, rana, Update, COC, Choice of folding mirrors in the RC cavities
|
Thu Oct 15 12:35:09 2009, Zach, Update, PSL, inventory
|
Thu Oct 15 12:57:23 2009, Zach, Update, PSL, inventory
|
Thu Oct 15 09:23:07 2009, steve, Summary, Locking, never had it so good
|
Thu Oct 15 17:12:00 2009, rana, Summary, Locking, never had it so good
|
Fri Oct 16 12:40:59 2009, Koji, Configuration, General, Some questions
|
Fri Oct 16 16:44:39 2009, Alberto, Sanjit, Update, Computers, elog restarted
|
Sun Oct 18 15:46:08 2009, Alberto, Configuration, General, Antique, unused QPD removed from the AS table
|
Fri Oct 16 16:08:00 2009, rob, Configuration, ASC, loop opened on PZT2 YAW at 3:40 pm
|
Fri Oct 16 18:46:36 2009, rana, Configuration, ASC, loop opened on PZT2 YAW at 3:40 pm
|
Sun Oct 18 16:09:34 2009, rana, Configuration, ASC, loop opened on PZT2 YAW at 3:40 pm
|
Sun Oct 18 19:55:45 2009, rana, Configuration, Electronics, IP POS is back: ND filter gone, new resistors in 
|
Sun Oct 18 22:06:15 2009, rana, Configuration, Electronics, IP POS is back: ND filter gone, new resistors in
|
Sun Oct 18 22:05:40 2009, kiwamu, Update, LSC, LSC timing issue 
|
Sun Oct 18 23:02:03 2009, Koji, Update, LSC, LSC timing issue
|
Mon Oct 19 10:00:52 2009, kiwamu, Update, LSC, RE: LSC timing issue
|
Mon Oct 19 11:00:52 2009, steve, HowTo, SAFETY, 40m safety training
|
Mon Oct 19 13:00:53 2009, Mott, Update, General, Phase Noise Measurement  
|
Fri Oct 16 03:16:50 2009, rana, rob, Summary, LSC, funny timing setup on the LSC
|
Fri Oct 16 13:25:18 2009, Koji, Summary, LSC, funny timing setup on the LSC
|
Mon Oct 19 14:48:15 2009, rana, rob, Summary, Electronics, piezo jena measuring box 
|
Fri Oct 9 17:41:04 2009, Jenne, Update, PEM, Accelerometers relocated
|
Sun Oct 11 04:12:44 2009, rana, Update, PEM, Accelerometers relocated
|
Mon Oct 19 17:12:54 2009, jenne, Update, PEM, accelerometers and seismomters are all good.
|
Mon Oct 19 18:14:28 2009, rob, Update, Cameras, video switch broken
|
Mon Oct 19 23:14:32 2009, kiwamu, Update, LSC, LSC timing issue  
|
Tue Oct 20 02:14:29 2009, rob, Update, IOO, MC2 alignment bias changed
|
Tue Oct 20 10:46:18 2009, steve, Update, IOO, clipping IP-ANG beam at ETMX chamber 
|
Wed Oct 7 20:32:21 2009, rana, Update, Adaptive Filtering, extra delay and noise in PEM -> ASS/OAF system
|
Mon Oct 19 11:31:55 2009, Jenne, Update, Adaptive Filtering, extra delay and noise in PEM -> ASS/OAF system
|
Mon Oct 19 19:37:39 2009, Sanjit, Jenne, Update, Adaptive Filtering, extra delay and noise in PEM -> ASS/OAF system
|
Tue Oct 20 11:38:10 2009, rana, rolf, Update, Adaptive Filtering, extra delay and noise in PEM -> ASS/OAF system
|
Tue Oct 20 16:35:24 2009, rob, Configuration, LSC, 33MHz Mod depth
|
Wed Oct 21 15:07:45 2009, Alberto, Update, WIKI-40M Update, Photodiodes' configuration for the Upgrade
|
Wed Oct 21 16:18:12 2009, Steve, Summary, SAFETY, LIGO Safety Officers visited the 40m
|
Wed Oct 21 17:12:30 2009, Alberto, Update, elog, Browser context menu enabled on the Elog under HTM editing mode
|
Fri Oct 16 10:15:02 2009, steve, Update, IOO, IP ang & pos recentered
|
Thu Oct 22 08:45:58 2009, steve, Update, IOO, IP ang & pos recentered
|
Thu Oct 22 15:44:16 2009, Zach, Update, WIKI-40M Update, MOPA diagram
|
Wed Oct 21 11:41:29 2009, Zach, Update, WIKI-40M Update, PSL Table Diagram wiki entry
|
Wed Oct 21 13:07:54 2009, Koji, Update, WIKI-40M Update, PSL Table Diagram wiki entry
|
Thu Oct 22 15:49:29 2009, Zach, Update, WIKI-40M Update, PSL Table Diagram wiki entry
|
Thu Oct 22 21:58:26 2009, Koji, Update, WIKI-40M Update, PSL Table Diagram wiki entry
|
Thu Oct 22 23:14:54 2009, Zach, Update, WIKI-40M Update, PSL Table Diagram wiki entry
|
Fri Oct 23 09:13:45 2009, steve, Summary, VAC, RGA scan 
|
Fri Oct 23 15:02:00 2009, rob, Update, lore, marconi phase
|
Sat Oct 24 04:57:33 2009, rana, Update, lore, marconi phase
|
Sun Oct 25 14:29:45 2009, haixing, kiwamu, Configuration, General, SR785 spectrum analyzer
|
Mon Oct 26 17:45:34 2009, Jenne, Update, Adaptive Filtering, New changes to the OAF fe code
|
Mon Oct 26 18:15:57 2009, rob, Update, IOO, MC OLG
|
Mon Oct 26 18:49:18 2009, kiwamu, Update, LSC, OMC-LSC timing issue  
|
Mon Oct 26 19:12:50 2009, kiwamu, Update, LSC, diagnostic script for LSC timing
|
Mon Oct 26 15:40:01 2009, steve, Update, PSL, laser power is down
|
Mon Oct 26 23:14:08 2009, Koji, Update, PSL, laser power is down
|
Tue Oct 27 01:45:02 2009, rob, Update, Locking, MZ
|
Tue Oct 27 15:55:04 2009, Koji, Update, General, ISS injection work / HEPA is on
|
Tue Oct 27 17:58:25 2009, Jenne, Configuration, PEM, Unknown PEM channels in the PEM-ADCU?
|
Tue Oct 27 18:01:49 2009, rob, Update, PSL, hmmm
|
Tue Oct 27 19:37:03 2009, kiwamu, Update, LSC, cron job to diagnose LSC-timing
|
Wed Oct 28 05:02:28 2009, rob, Update, Locking, back
|
Wed Oct 28 09:12:18 2009, steve, Update, PSL, PMC power on the rise?
|
Wed Oct 28 14:39:10 2009, steve, Update, PEM, after the tour of the 40m
|
Wed Oct 28 17:20:21 2009, rana, Summary, COC, ETM HR reflectivity plot
|
Mon Oct 26 03:57:06 2009, rob, Update, Locking, bad
|
Tue Oct 27 18:19:14 2009, rob, Update, Locking, bad 
|
Thu Oct 29 21:51:07 2009, rob, Update, Locking, bad
|
Fri Oct 30 04:41:37 2009, rob, Update, Locking, working again
|
Thu Oct 29 13:48:32 2009, Koji, Update, PSL, NPRO LTMP lowered 9.5deg
|
Thu Oct 29 20:21:14 2009, Koji, Update, PSL, NPRO LTMP lowered 9.5deg
|
Fri Oct 30 09:24:45 2009, steve, HowTo, MOPA, how to squeeze more out of little
|
Fri Oct 30 10:52:56 2009, Jenne, Update, PSL, HEPAs
|
Sun Nov 1 17:58:44 2009, Jenne, Update, General, Update on Video Switch
|
Mon Nov 2 10:56:09 2009, kiwamu, Update, LSC, cron job works succesfully & no timing jitter
|
Mon Nov 2 13:00:55 2009, Koji, Update, IOO, PMC aligned, MC WFS aligned
|
Mon Nov 2 13:34:36 2009, kiwamu, Configuration, PSL, removed multiply resonant EOM
|
Mon Nov 2 15:27:08 2009, Jenne, Update, PEM, Gur2 cables have been moved
|
Fri Oct 9 16:36:13 2009, rob , Update, IOO, frequency noise problem
|
Tue Nov 3 03:45:04 2009, rob , Update, IOO, frequency noise problem 
|
Tue Nov 3 12:47:01 2009, Koji, Configuration, CDS, 1Y9 Rack configuration update
|
Wed Nov 4 16:49:32 2009, Alberto, Update, LSC, Arm Cavity Finesse Measurement
|
Wed Nov 4 18:35:19 2009, Alberto, Update, LSC, Arm Cavity Finesse Measurement
|
Wed Nov 4 21:46:18 2009, Alberto, Update, LSC, Arm Cavity Finesse Measurement
|
Thu Nov 5 12:34:26 2009, kiwamu, Update, Computers, elog rebooted
|
Thu Nov 5 16:24:59 2009, Koji, Update, CDS, ETMY CDS test stuff
|
Thu Nov 5 16:30:56 2009, pete, Update, Computers, moving megatron
|
Thu Nov 5 16:41:14 2009, josephb, Configuration, Computers, Megatron's personal network
|
Wed Nov 4 23:17:51 2009, Alberto, Update, LSC, X Arm Cavity transfer Function
|
Thu Nov 5 05:07:22 2009, rana, Update, LSC, X Arm Cavity transfer Function
|
Thu Nov 5 19:25:11 2009, Alberto, Update, LSC, X Arm Cavity transfer Function
|
Thu Nov 5 22:30:09 2009, Alberto, Update, LSC, X Arm Cavity Transfer Function
|
Fri Nov 6 00:23:34 2009, Alberto, Configuration, Computers, Elog just rebooted
|
Fri Nov 6 07:55:59 2009, steve, Update, Computers, RFMnetwork is down
|
Fri Nov 6 09:17:53 2009, steve, Omnistructure, PEM, PSL HEPAs turned on
|
Fri Nov 6 10:35:56 2009, josephb, Update, Computers, RFM reboot fest and re-enabled ITMY coil drivers
|
Fri Nov 6 12:56:30 2009, Haixing, Update, SUS, Magnet has been levitated 
|
Fri Nov 6 16:27:15 2009, Jenne, Update, PEM, Ranger moved
|
Fri Nov 6 17:04:01 2009, josephb, Configuration, Computers, RFM and Megatron
|
Fri Nov 6 18:02:22 2009, josephb, Update, Computers, Elog restarted
|
Fri Nov 6 18:13:34 2009, josephb, Update, Computers, Megatron woes
|
Fri Nov 6 18:52:09 2009, pete, Update, Computers, RCG ETMY plan
|
Thu Oct 29 18:04:02 2009, Jenne, Update, Adaptive Filtering, More work on saving coeffs on the OAF screen
|
Thu Oct 29 18:25:33 2009, Sanjit, Update, Adaptive Filtering, More work on saving coeffs on the OAF screen
|
Mon Nov 2 21:09:15 2009, Sanjit, Update, Adaptive Filtering, More work on saving coeffs on the OAF screen
|
Fri Nov 6 19:25:31 2009, Sanjit, Jenne, Joe, Update, Adaptive Filtering, More work on saving coeffs on the OAF screen
|
Fri Nov 6 19:29:24 2009, Jenne, Update, elog, elog acting up
|
Fri Nov 6 20:10:15 2009, Jenne, Update, elog, elog acting up
|
Fri Nov 6 23:02:44 2009, Haixing, Update, General, SR785 Spectrum Analyzer
|
Sat Nov 7 23:50:45 2009, Haixing, Update, General, Open-loop transfer function of the magnetic levitation system  
|
Sun Nov 8 14:18:25 2009, Alberto, Update, SUS, ETMY Watchdogs tripped
|
Sun Nov 8 22:50:29 2009, Alberto, Update, ASC, IFO Alignment
|
Mon Nov 9 01:52:56 2009, rana, Update, PEM, coherence v. time for 2 accelerometers
|
Mon Nov 9 08:43:16 2009, steve, Update, SUS, MC2 damping restored
|
Mon Nov 9 11:11:19 2009, Alberto, Configuration, LSC, MC2 Watchdogs tripped
|
Mon Nov 9 11:14:57 2009, Alberto, Update, ABSL, Started working on the PSL table
|
Mon Nov 9 12:09:10 2009, Alberto, Omnistructure, Environment, BNC Cable Laid Down from South End to East VErtex
|
Mon Nov 9 13:17:07 2009, Alberto, Configuration, ABSL, NPRO on
|
Mon Nov 9 13:22:08 2009, josephb,alex, Update, Computers, Megatron update
|
Mon Nov 9 14:59:34 2009, josephb, alex, Update, Computers, The saga of Megatron continues
|
Mon Nov 9 13:26:19 2009, Alberto, Omnistructure, Environment, Tidying up BNC cables rack around the lab
|
Mon Nov 9 14:53:47 2009, Alberto, Omnistructure, Environment, Tidying up BNC cables rack around the lab
|
Mon Nov 9 15:08:29 2009, Koji, Omnistructure, Environment, Tidying up BNC cables rack around the lab
|
Fri Nov 6 00:40:29 2009, Alberto, Update, LSC, Everything put back as it was
|
Mon Nov 9 15:11:02 2009, Alberto, Update, LSC, Everything put back as it was
|
Thu Nov 5 16:24:40 2009, Jenne, Update, General, Drill Press is down for the count
|
Mon Nov 9 15:21:37 2009, Jenne, Update, General, Drill Press is down for the count
|
Mon Nov 9 16:32:36 2009, Alberto, Frogs, Environment, Shot of the white board yesterday before erasing 
|
Mon Nov 9 18:27:30 2009, Alberto, Frogs, Computers, OMC DCPD Interface Box Disconnected from the power Supply
|
Mon Nov 9 18:32:38 2009, rob, Update, Computers, OMC FE hosed
|
Mon Nov 9 19:04:23 2009, rob, Update, Computers, OMC FE hosed
|
Mon Nov 9 19:44:38 2009, rob, rana, Update, Computers, OMC FE hosed
|
Tue Nov 10 10:51:00 2009, josephb, alex, Update, Computers, Megatron on, powercycled c1omc, and burt restored from 3am snapshot
|
Thu Nov 5 23:09:34 2009, Alberto, Update, LSC, Y Arm Cavity Transfer Function
|
Fri Nov 6 00:24:06 2009, Alberto, Update, LSC, Y Arm Cavity Transfer Function
|
Tue Nov 10 13:02:36 2009, Alberto, Update, LSC, X and Y Arm Cavity Poles Measurement 
|
Tue Nov 10 17:01:33 2009, Alberto, Configuration, IOO, c1ioovme and c1iool0 rebooted
|
Tue Nov 10 19:19:57 2009, Alberto, Update, ABSL, Rotated polarizer on the PSL table, along the MC input pick off beam
|
Tue Nov 10 19:21:53 2009, Alberto, Update, ABSL, PLL Alignment
|
Tue Nov 10 17:49:20 2009, Alberto, Metaphysics, Computers, Test Point Number Mapping
|
Tue Nov 10 21:46:31 2009, rana, Summary, Computers, Test Point Number Mapping
|
Wed Nov 11 00:55:47 2009, Jenne, Update, Adaptive Filtering, Terms put on some ADC inputs
|
Wed Nov 11 01:33:52 2009, pete, Update, CDS, RCG ETMY code update
|
Wed Nov 11 09:48:04 2009, steve, Update, IOO, where is IOO-RFAMPD_DCMON ?
|
Wed Nov 11 12:29:44 2009, Alberto, Frogs, PSL, MC Locked on the wrong mode?
|
Wed Nov 11 18:43:57 2009, rana, koji, HowTo, Photos, Illuminated Paintbrush Technique 
|
Wed Nov 11 20:46:07 2009, pete, Update, CDS, RCG ETMY phase I update
|
Wed Nov 11 20:57:06 2009, kiwamu, Update, Electronics, Multi-resonant EOM --- LC tank circuit --- 
|
Wed Nov 11 21:30:20 2009, Haixing, Update, General, magnetic levitation modelling files uploaded to svn
|
Thu Nov 12 01:18:34 2009, haixing, Update, SUS, open-loop transfer function of mag levi system (comparison between simulink and measurement)  
|
Thu Nov 12 02:02:18 2009, rana, Summary, LSC, Arm Locking with no feedback to the ETM or ITM
|
Thu Nov 12 09:43:29 2009, steve, Update, PEM, construction has started at CES  
|
Thu Nov 12 10:45:02 2009, Alberto, Update, PSL, Abandoned Frequency Generator
|
Thu Nov 12 11:19:10 2009, Koji, Update, PSL, Abandoned Frequency Generator
|
Thu Nov 12 12:50:35 2009, Alberto, Update, Computers, StochMon calibrated channels added to the data trend
|
Thu Nov 12 10:45:36 2009, Alberto, Update, ABSL, Working on the AP table
|
Thu Nov 12 12:51:45 2009, Alberto, Update, ABSL, Working on the AP table
|
Thu Nov 12 15:40:27 2009, josephb, koji, peter, Update, Computers, ETMY and Megatron test take 1
|
Wed Nov 11 15:04:52 2009, Alberto, Update, ABSL, Working on the AP table
|
Wed Nov 11 16:18:57 2009, Alberto, Update, ABSL, Working on the AP table
|
Wed Nov 11 17:10:51 2009, Jenne, Update, ABSL, Working on the AP table
|
Wed Nov 11 17:33:54 2009, Koji, Update, ABSL, Working on the AP table
|
Thu Nov 12 11:34:38 2009, Alberto, Update, ABSL, Working on the AP table
|
Thu Nov 12 16:53:59 2009, Alberto, Update, ABSL, Working on the AP table
|
Thu Nov 12 17:24:29 2009, Koji, Joe, Peter, Configuration, CDS, ETMY CDS test started
|
Thu Nov 12 16:13:05 2009, Alberto, Update, PSL, MC Trans Offset
|
Thu Nov 12 17:15:43 2009, Koji, Update, PSL, MC Trans Offset
|
Thu Nov 12 17:42:04 2009, Koji, Update, PSL, MC Trans Offset
|
Thu Nov 12 18:10:27 2009, Alberto, Update, ABSL, PLL Locked
|
Fri Nov 13 03:38:47 2009, kiwamu, Update, Electronics, multi-resonant EOM --- impedance of LC tank circuit ---- 
|
Fri Nov 13 05:03:09 2009, kiwamu, Update, Electronics, multi-resonant EOM --- input impedance of LC tank ---- 
|
Fri Nov 13 09:47:18 2009, josephb, Update, Computers, Megatron status lights lit
|
Fri Nov 13 09:54:14 2009, josephb, Configuration, Computers, Megatron switched to tcsh
|
Fri Nov 13 10:28:03 2009, josephb, alex, Update, Computers, Megatron is back to its old self
|
Sun Nov 15 18:42:10 2009, Alberto, Update, Locking, Interferometer fully locked for 3331 seconds
|
Mon Nov 16 09:37:41 2009, steve, Update, PEM, construction is getting noisier  
|
Mon Nov 16 15:13:25 2009, josephb, Update, Computers, ezcaread updated to Yoichi style ezcawrite
|
Mon Nov 16 15:18:10 2009, haixing, Update, SUS, Stable magnetic levitation without eddy-current damping 
|
Mon Nov 16 15:58:02 2009, josephb, Configuration, General, Added Gige camera to AP table, added some screens
|
Mon Nov 16 17:24:28 2009, josephb, Configuration, Computers, Camera medm functionality improved
|
Mon Nov 16 17:35:59 2009, kiwamu, Update, LSC, OMC-LSC timing get synchronized !
|
Fri Nov 13 14:04:27 2009, josephb, koji, Update, Computers, Updated wiki with RCG instructions/tips
|
Fri Nov 13 15:01:07 2009, Jenne, Update, Computers, Updated wiki with RCG instructions/tips
|
Fri Nov 13 22:01:54 2009, Koji, Update, Computers, Updated wiki with RCG instructions/tips
|
Sat Nov 14 06:46:48 2009, Koji, Update, Computers, Updated wiki with RCG instructions/tips
|
Tue Nov 17 00:42:12 2009, Koji, Update, Computers, Updated wiki with RCG instructions/tips
|
Tue Nov 17 10:09:57 2009, josephb, Update, Environment, Fumes
|
Tue Nov 17 15:54:34 2009, rana, Summary, PEM, 40 days of weather
|
Tue Nov 17 21:09:17 2009, Jenne, rana, Update, General, Little Thorlabs Photodiode
|
Tue Nov 17 21:21:30 2009, rob, Update, SUS, ETMY UL OSEM
|
Tue Nov 17 21:10:35 2009, rana, Summary, Electronics, Busby Low Noise Box: Photos and Upgrades 
|
Wed Nov 18 00:38:33 2009, rana, Summary, Electronics, Voltage Noise of the SR560's OUTPUTs (the back panel)
|
Wed Nov 18 01:12:15 2009, rana, Update, PEM, seismometers were not saturating during Halloween weekend
|
Wed Nov 18 14:55:59 2009, kiwamu, Update, Electronics, multi-resonant EOM --- circuit design ----  
|
Tue Nov 17 11:09:43 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC
|
Tue Nov 17 13:39:37 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC
|
Tue Nov 17 15:23:06 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC
|
Tue Nov 17 21:10:30 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC
|
Wed Nov 18 11:27:33 2009, Koji, josephb, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC
|
Wed Nov 18 12:33:30 2009, Koji, josephb, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC
|
Wed Nov 18 16:24:25 2009, pete, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC
|
Wed Nov 18 16:58:36 2009, kiwamu, Update, Electronics, multi-resonant EOM --- EOM characterization ---
|
Wed Nov 18 22:38:17 2009, Koji, Update, Electronics, multi-resonant EOM --- EOM characterization ---
|
Thu Nov 19 09:25:19 2009, steve, Update, MOPA, water was added to the laser chiller
|
Thu Nov 19 09:48:54 2009, steve, Update, PEM, construction effect
|
Thu Nov 19 09:55:41 2009, josephb, Update, Computers, Trying to get testpoints on megatron
|
Thu Nov 19 10:19:04 2009, josephb, Update, Computers, Megatron tst status
|
Thu Nov 19 11:33:15 2009, josephb, Configuration, Computers, Megatron
|
Thu Nov 19 16:04:48 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes
|
Thu Nov 19 18:49:55 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes
|
Fri Nov 20 11:01:58 2009, josephb, alex, Configuration, Computers, Where to find RFM offsets
|
Fri Nov 20 11:14:22 2009, josephb, alex, Configuration, Computers, test points working on megatron and we may have filters with switch outputs built in
|
Fri Nov 20 11:32:48 2009, Haixing, Update, SUS, Magnetic levitation  
|
Fri Nov 20 13:54:45 2009, Alberto, Omnistructure, Environment, New Paper and Cardboard Recycling Bins Introduced to the 40m 
|
Fri Nov 20 17:44:38 2009, Jenne, Update, Adaptive Filtering, Some svn shenanigans
|
Mon Nov 23 00:46:09 2009, rana, rob, Update, PSL, ISS RIN: Its too high by 10x
|
Wed Sep 23 19:36:41 2009, rana, Update, PSL, RC temperature performance  
|
Mon Nov 23 10:11:03 2009, steve, Update, PEM, long term temp fluctuation of the 40m lab
|
Fri Nov 20 16:18:56 2009, rob, Configuration, SUS, watchdog rampdown
|
Mon Nov 23 11:03:00 2009, steve, Update, SUS, jackhammer special well under control 
|
Fri Nov 20 00:18:45 2009, rana, Summary, Cameras, Video MUX Selection Wiki page
|
Mon Nov 23 16:28:12 2009, steve, Summary, Cameras, Video swicher options
|
Mon Nov 23 19:36:28 2009, Jenne, Update, Adaptive Filtering, How to add ASS channels, so that they're saved to frames
|
Mon Nov 23 21:36:38 2009, Koji, Update, IOO, Aligned PMC/RC
|
Tue Nov 24 18:24:54 2009, Sanjit, Configuration, Adaptive Filtering, ASS channels added to framebuilder
|
Tue Nov 24 14:33:22 2009, Alberto, Update, ABSL, working on the AP table
|
Tue Nov 24 19:16:02 2009, Alberto, Update, ABSL, working on the AP table
|
Mon Nov 23 17:53:08 2009, Jenne, Update, Computers, 40m frame builder backup acting funny
|
Tue Nov 24 16:06:45 2009, Jenne, Update, Computers, 40m frame builder backup acting funny
|
Wed Nov 25 11:10:05 2009, Jenne, Update, Computers, 40m frame builder backup acting funny
|
Wed Nov 25 12:28:22 2009, Jenne, Update, SUS, MC2 tripped
|
Wed Nov 25 08:43:08 2009, Alberto, Update, ABSL, Working on the AP table
|
Wed Nov 25 15:42:27 2009, Alberto, Update, ABSL, Working on the AP table
|
Mon Nov 23 21:30:29 2009, Jenne, Update, LSC, Measured MC length
|
Tue Nov 24 08:00:16 2009, rana, Update, LSC, Measured MC length
|
Tue Nov 24 10:36:21 2009, Koji, Update, LSC, Measured MC length
|
Wed Nov 25 03:05:15 2009, rob, Update, Locking, Measured MC length
|
Wed Nov 25 14:29:08 2009, rob, Update, Locking, Measured MC length--FSS trend
|
Wed Nov 25 16:13:27 2009, rana, Update, PSL, Measured MC length--FSS trend
|
Wed Nov 25 16:44:52 2009, Koji, Update, PSL, Measured MC length--FSS trend
|
Wed Nov 25 15:38:08 2009, rob, Update, Locking, Measured MC length
|
Wed Nov 25 10:20:47 2009, Alberto, Update, ABSL, AbsL PLL not able to lock
|
Wed Nov 25 11:02:54 2009, Alberto, Update, ABSL, AbsL PLL not able to lock
|
Wed Nov 25 20:14:58 2009, Alberto, Update, ABSL, AbsL PLL not able to lock: problem fixed
|
Wed Nov 25 20:28:17 2009, Alberto, Update, ABSL, Stopped working on the AbsL
|
Wed Nov 25 20:44:48 2009, kiwamu, Update, Electronics, Multi-resonant EOM --- Q-factor ----   
|
Thu Nov 26 02:08:34 2009, Koji, Update, Electronics, Multi-resonant EOM --- Q-factor ----
|
Wed Nov 25 20:24:49 2009, Alberto, Update, ABSL, PLL Open Loop Gain Measured 
|
Fri Nov 27 02:25:26 2009, rana, Update, ABSL, PLL Open Loop Gain Measured
|
Sat Nov 28 20:27:12 2009, Koji, Update, PSL, FSS oscillation: Total gain reduced
|
Sun Nov 29 16:56:56 2009, rob, AoG, all down cond., sea of red
|
Mon Nov 30 10:28:47 2009, Alberto, AoG, all down cond., sea of red
|
Mon Nov 30 11:29:40 2009, Alberto, AoG, all down cond., sea of red
|
Mon Nov 30 11:45:54 2009, Jenne, Update, Computers, Wireless is back
|
Mon Nov 30 16:23:51 2009, Jenne, Update, Computers, c1omc restarted
|
Mon Nov 30 19:23:50 2009, Jenne, Update, MZ, MZ down
|
Thu Dec 3 15:55:24 2009, Alberto, AoG, LSC, RF AM Stabilizer Output Power
|
Fri Dec 4 18:54:03 2009, Jenne, Update, PEM, Ranger moved
|
Sat Dec 5 14:41:07 2009, rob, AoG, all down cond., sea of red, again
|
Sat Dec 5 15:20:10 2009, Jenne, AoG, all down cond., sea of red, again
|
Fri Dec 4 21:48:01 2009, Jenne, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered
|
Fri Dec 4 23:17:55 2009, rob, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered
|
Sat Dec 5 01:40:11 2009, Koji, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered
|
Sat Dec 5 18:23:48 2009, Koji, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered
|
Sat Dec 5 17:34:30 2009, rob, Update, IOO, frequency noise problem
|
Sat Dec 5 22:31:52 2009, rob, Update, IOO, frequency noise problem
|
Mon Dec 7 09:38:05 2009, Koji, Update, VAC, Vent started
|
Mon Dec 7 19:02:22 2009, Mott, Update, General, Reflectivity Measurements  
|
Tue Dec 8 03:53:49 2009, kiwamu, Update, SUS, Free swinging spectra of ETMX
|
Tue Dec 8 09:18:07 2009, Jenne, Update, Computers, A *great* way to start the day....
|
Tue Dec 8 10:20:33 2009, Alberto, DAQ, Computers, Bootfest succesfully completed
|
Mon Dec 7 18:18:55 2009, Jenne, Update, COC, ETMX drag wiped
|
Tue Dec 8 13:03:26 2009, Koji, Update, COC, ETMY drag wiped
|
Wed Dec 9 09:07:32 2009, steve, Update, PEM, high seismic activity   
|
Wed Dec 9 10:53:41 2009, josephb, Update, Cameras, Camera client wasn't able to talk to server on port 5010, reboot fixed it.
|
Tue Dec 8 16:27:13 2009, Jenne, Update, COC, ITMX wiped
|
Wed Dec 9 18:01:06 2009, Koji, Update, COC, Wiping finished
|
Tue Dec 8 23:13:32 2009, kiwamu, Update, SUS, free swinging spectra of ETMY and ITMX 
|
Wed Dec 9 00:23:28 2009, Koji, Update, SUS, free swinging spectra of ETMY and ITMX
|
Wed Dec 9 21:09:28 2009, kiwamu, Update, SUS, Re: free swinging spectra of ETMY and ITMX
|
Thu Dec 10 00:46:15 2009, Koji, Update, SUS, Re: free swinging spectra of ETMY and ITMX
|
Thu Nov 19 08:53:12 2009, pete, Frogs, Environment, diesel fumes
|
Thu Dec 10 08:43:25 2009, steve, Frogs, Environment, diesel fumes are less
|
Thu Dec 10 09:51:06 2009, rob, Update, PSL, RCPID settings not saved
|
Thu Dec 10 09:56:32 2009, Koji, Update, PSL, RCPID settings not saved
|
Thu Dec 10 08:40:12 2009, Alberto, Update, Computers, Fronte-ends down
|
Thu Dec 10 08:50:33 2009, Alberto, Update, Computers, Fronte-ends down
|
Thu Dec 10 10:01:16 2009, Jenne, Update, Computers, Fronte-ends down
|
Thu Dec 10 10:31:18 2009, Jenne, Update, Computers, Fronte-ends down
|
Thu Dec 10 13:13:08 2009, Jenne, Update, Computers, fb40m backup restarted
|
Thu Dec 10 13:50:02 2009, Jenne, Update, VAC, All doors on, ready to pump
|
Thu Dec 10 15:18:55 2009, Jenne, Update, VAC, seisBLRMS
|
Thu Dec 10 16:51:35 2009, steve, Update, VAC, pumpdown will start tomorrow morning
|
Thu Dec 10 17:05:21 2009, Alberto, Configuration, LSC, 166 MHz LO SMA-to-Heliax connection repaired
|
Wed Dec 9 17:51:03 2009, kiwamu, Update, SUS, watchdogs
|
Thu Dec 10 17:13:36 2009, kiwamu, Update, SUS, Free swiging spectra under the atmospheric pressure
|
Thu Dec 10 18:27:48 2009, Mott, Update, General, Updated R & T Measurements 6x
|
Fri Dec 11 08:35:04 2009, steve, Configuration, VAC, pumpdown has started
|
Fri Dec 11 13:18:17 2009, Alberto, Configuration, VAC, pumpdown has started
|
Fri Dec 11 14:19:22 2009, Koji, Configuration, VAC, pumpdown has started
|
Fri Dec 11 15:21:40 2009, steve, Configuration, VAC, pumpdown#67 is completed 
|
Fri Dec 11 17:36:37 2009, kiwamu, Update, General, IFO restoring plan
|
Thu Dec 10 13:10:25 2009, Alberto, Configuration, LSC, 166 LO Disconnected
|
Thu Dec 10 18:31:44 2009, Alberto, Configuration, LSC, 166 LO Disconnected
|
Fri Dec 11 09:30:09 2009, Koji, Configuration, LSC, 166 LO Disconnected
|
Fri Dec 11 11:42:26 2009, Alberto, Configuration, LSC, 166 LO Disconnected
|
Fri Dec 11 14:12:32 2009, rana, Configuration, LSC, 166 LO Disconnected
|
Fri Dec 11 19:51:13 2009, Alberto, Configuration, LSC, 166 LO Disconnected
|
Sat Dec 12 07:36:56 2009, rana, HowTo, Electronics, How to Measure the Length of a Cable: Interferometry
|
Sun Dec 13 17:43:10 2009, kiwamu, Update, SUS, free swinging spectra (vacuum)
|
Sun Dec 13 20:50:45 2009, rana, Summary, IOO, Mach Zender Calibration
|
Sun Dec 13 23:18:09 2009, rana, Summary, IOO, Displacement noise on the PSL table
|
Mon Dec 14 00:37:28 2009, Koji, Omnistructure, Environment, Ants in the coffee maker
|
Mon Dec 14 11:21:23 2009, steve, Omnistructure, Environment, Ants in the coffee maker
|
Mon Dec 14 12:13:52 2009, Jenne, Update, Treasure, We are *ROCKSTARS* ! IFO is back up
|
Mon Dec 14 13:08:33 2009, Koji, Update, Treasure, LOCKSTARS
|
Mon Dec 14 14:16:14 2009, Alberto, Update, Treasure, LOCKSTARS
|
Mon Dec 14 13:17:33 2009, rob, Update, Treasure, We are *ROCKSTARS* ! IFO is back up
|
Mon Dec 14 15:18:18 2009, Jenne, Update, lore, armLoss script ran....results confidential
|
Mon Dec 14 22:32:56 2009, Koji, Update, General, Arm cavity loss ~ result
|
Tue Dec 15 00:02:10 2009, rana, Update, PEM, Noise of the Ranger SS-1 Seismometer 
|
Mon Dec 14 19:33:04 2009, Alberto, Update, General, Arm Cavity Poles measured again after cleaning the optics last week  
|
Tue Dec 15 05:29:31 2009, Alberto, Update, General, Arm Cavity Poles measured again after cleaning the optics last week
|
Tue Dec 15 17:16:22 2009, Koji, Update, General, Table distance measurements 
|
Tue Dec 15 21:39:34 2009, Alberto, Update, ABSL, brief summary of this afternoon's measurements
|
Wed Dec 16 11:46:25 2009, Alberto, Update, ABSL, Absl PLL Open Loop Gain
|
Wed Dec 16 11:21:20 2009, Alberto, Update, ABSL, Universal PDH Box Servo Filters 
|
Wed Dec 16 11:55:47 2009, rana, Update, ABSL, Universal PDH Box Servo Filters
|
Wed Dec 16 20:29:08 2009, rana, Update, COC, ETM Coating study
|
Thu Dec 17 02:57:08 2009, Jenne, Update, WienerFiltering, L1 DARM Static Wiener Filtered data
|
Thu Dec 17 07:47:29 2009, Jenne, Update, WienerFiltering, L1 DARM Static Wiener Filtered data   
|
Thu Dec 17 17:13:50 2009, Alberto, Omnistructure, Environment, STACIS stuff
|
Thu Dec 17 09:30:08 2009, Alberto, HowTo, Computers, Nodus sluggish
|
Thu Dec 17 19:03:14 2009, Alberto, HowTo, Computers, Nodus sluggish
|
Thu Dec 17 23:27:23 2009, rana, Update, PEM, Ranger Noise: sim w. Rai FET box as readout
|
Fri Dec 18 15:40:33 2009, Koji, Update, IOO, MC2 spot centered / MCT QPD issue
|
Sat Dec 19 14:33:25 2009, Koji, Configuration, Computers, PDFlib lite / gnuplot 4.2.6 on Rosalba/Allegra
|
Sun Dec 20 14:34:24 2009, Koji, Update, SUS, ETMY watchdog tripped Sunday 5:00AM local
|
Sun Dec 20 23:42:44 2009, Jenne, Update, IOO, New Input Mode Matching Telescope
|
Mon Dec 21 01:14:08 2009, rana, Summary, Electronics, Noise measurement of the Rai Weiss FET preamp box  
|
Mon Dec 21 08:16:54 2009, steve, Metaphysics, PEM, jackhammering next door
|
Tue Dec 22 11:23:51 2009, kiwamu, Steve, Update, IOO, MC relocked
|
Tue Dec 22 10:04:41 2009, steve, Omnistructure, PEM, miracle in the 40m
|
Tue Dec 22 13:14:37 2009, Alan, Omnistructure, PEM, miracle in the 40m
|
Tue Dec 22 15:49:31 2009, kiwamu, Update, General, e-log restarted
|
Tue Dec 22 18:42:40 2009, Sanjit, Koji, Configuration, Adaptive Filtering, Readded DAQ channels to active list
|
Sun Dec 20 21:39:40 2009, rana, jenne, kiwamu, Update, ASS, OAF Model update and build instructions
|
Mon Dec 21 02:22:31 2009, rana, jenne, kiwamu, Update, ASS, OAF Model update and build instructions
|
Mon Dec 21 19:24:29 2009, rana, Update, ASS, OAF Model update and build instructions
|
Tue Dec 22 02:50:09 2009, rana, kiwamu, jenne, Update, ASS, OAF Feedaround ON and doing something good 
|
Wed Dec 23 17:33:14 2009, rana, Update, ASS, OAF Feedaround ON and doing something good
|
Mon Dec 21 07:30:58 2009, ???, Update, ASS, OAF Model update and build instructions
|
Mon Dec 21 10:09:06 2009, jenne, Update, ASS, OAF Model update and build instructions
|
Thu Dec 24 01:25:29 2009, kiwamu, Update, Electronics, impedance analyzing 
|
Sat Dec 26 19:22:13 2009, Koji, Summary, General, Mode coupling of two astigmatic beams
|
Sun Dec 27 20:05:28 2009, kiwamu, Update, Computers, can not communicate with front-ends
|
Wed Dec 23 16:34:25 2009, Koji, Update, IOO, MCT QPD/MC REFL QPD disabled
|
Thu Dec 24 19:13:29 2009, Koji, Update, IOO, MCT QPD investigation
|
Sun Dec 27 23:44:59 2009, rana, Update, Electronics, MCT QPD investigation
|
Mon Dec 28 01:17:01 2009, Koji, Update, Electronics, MCT QPD investigation
|
Mon Dec 28 10:29:31 2009, Jenne, Update, Computers, Monday Morning Bootfest
|
Mon Dec 28 12:35:57 2009, Jenne, Update, SUS, MC2 is having a bad day
|
Mon Dec 28 12:45:55 2009, Koji, Update, SUS, MC2 is having a bad day
|
Mon Dec 28 15:19:19 2009, Alberto, Update, Computers, Burtrestored to Dec 26 at 20:00
|
Mon Dec 28 15:34:14 2009, Alberto, Update, ABSL, Working on the AP table
|
Mon Dec 28 18:35:27 2009, Alberto, Update, ABSL, Working on the AP table
|
Mon Dec 28 23:56:44 2009, kiwamu, rana, Update, Computers, add the HILO drift channels to the burt
|
Tue Dec 29 04:28:27 2009, kiwamu, rana, haixing, Update, Cameras, New Video Switch Installed
|
Tue Dec 29 13:57:20 2009, Rana, Kiwamu, and Haixing, Update, Photos, Photos of video switch box
|
Wed Dec 30 09:57:53 2009, steve, Update, PSL, thirsty water chiller
|
Wed Dec 30 10:58:48 2009, Alberto, Update, General, All watchdogs tripped this morning
|
Wed Dec 30 18:01:03 2009, Alberto, Rana, Update, General, All watchdogs tripped this morning
|
Wed Dec 30 20:33:36 2009, rana, alberto, Configuration, Cameras, ITMY & MC2 Camera work  
|
Wed Dec 30 22:17:07 2009, kiwamu, Update, General, Camera input and monitor output
|
Sun Jan 3 08:23:39 2010, rana, Configuration, CDS, autoburt.pl 'fixed' for post 2009 years
|
Mon Jan 4 09:52:40 2010, rana, Configuration, Cameras, ITMX camera and PSL channels
|
Mon Jan 4 17:26:01 2010, Mott, Update, General, T & R plots for Y1 and Y1S mirrors
|
Tue Jan 5 09:18:38 2010, Alberto, Omnistructure, Electronics, Universal PDH Box Stored in the RF Cabinet
|
Tue Jan 5 10:26:32 2010, Alberto, Steve, Omnistructure, Environment, Added new wall cable-racks 
|
Tue Jan 5 11:00:04 2010, rana, Omnistructure, Environment, Added new wall cable-racks
|
Tue Jan 5 13:23:45 2010, Alberto, Omnistructure, Environment, turning page
|
Tue Jan 5 01:31:09 2010, Jenne, Update, WienerFiltering, New Wiener Filters installed in PEM IIR matrix on OAF screen 
|
Tue Jan 5 17:32:59 2010, Jenne, Update, WienerFiltering, New Wiener Filters installed in PEM IIR matrix on OAF screen
|
Mon Jan 4 17:21:30 2010, Jenne, Configuration, IOO, Elusive Mode Matching Solution found!
|
Wed Jan 6 03:44:41 2010, Koji, Configuration, IOO, Elusive Mode Matching Solution found!
|
Wed Jan 6 16:48:52 2010, steve, Bureaucracy, SAFETY, copied NPRO key
|
Thu Jan 7 14:08:46 2010, Jenne, Update, Computers, We haven't had a bootfest yet this week.....so today's the day
|
Thu Jan 7 14:55:36 2010, Jenne, Update, Computers, We haven't had a bootfest yet this week.....so today's the day
|
Fri Jan 8 10:03:04 2010, Alberto, Omnistructure, LSC, SPOB shutter was closed
|
Fri Jan 8 10:38:35 2010, josephb, koji, Update, Computers, RFM and Megatron
|
Fri Jan 8 11:43:22 2010, josephb, alex, Update, Computers, RFM and Megatron
|
Fri Jan 8 15:40:14 2010, josephb, alex, Update, Computers, RFM and RCG
|
Fri Jan 8 18:20:12 2010, steve, Metaphysics, Treasure, Rob now can concentrate on his thesis  
|
Fri Jan 8 20:13:49 2010, Alberto, JoB, Configuration, Computers, The 40m Kaiser Permanent Reboot Marathon
|
Sat Jan 9 09:47:03 2010, Alberto, Update, LSC, Problems trying to lock the arms
|
Sat Jan 9 11:07:30 2010, Alberto, Update, LSC, Problems trying to lock the arms
|
Sat Jan 9 15:02:01 2010, Alberto, Update, ABSL, PRC scanning
|
Sun Jan 10 13:32:09 2010, Haixing, Update, SUS, transfer function measurement of the quadrant maglev circuit 6x
|
Sun Jan 10 15:47:26 2010, Koji, Update, SUS, transfer function measurement of the quadrant maglev circuit
|
Sun Jan 10 16:50:34 2010, Haixing, Update, SUS, transfer function measurement of the quadrant maglev circuit
|
Sun Jan 10 17:15:25 2010, Koji, Update, SUS, transfer function measurement of the quadrant maglev circuit
|
Mon Jan 11 09:18:44 2010, Alberto, Update, General, Measurement running
|
Mon Jan 11 11:06:53 2010, Alberto, Update, ABSL, Measurement running
|
Mon Jan 11 16:59:14 2010, Alberto, Update, ABSL, Interferometer Busy
|
Mon Jan 11 19:36:13 2010, Alberto, Update, ABSL, Measurement running
|
Mon Jan 11 21:49:17 2010, Jenne, Update, ABSL, Measurement running
|
Sun Jan 10 23:22:56 2010, Jenne, Summary, General, Scattering Measurements of 35W Beam Dumps 
|
Tue Jan 12 09:14:52 2010, steve, Summary, General, Scattering Measurements of 35W Beam Dumps
|
Tue Jan 12 09:37:05 2010, Alberto, Update, ABSL, IFO available
|
Tue Jan 12 13:24:50 2010, Haixing, Update, SUS, Quadrant Magnetic Levitation
|
Sun Jan 10 16:05:51 2010, Alberto, Omnistructure, Environment, Lab Thermostats Temperature Lowered by 1 deg F
|
Mon Jan 11 10:01:06 2010, Alberto, Omnistructure, Environment, Lab Thermostats Temperature Lowered by 1 deg F
|
Tue Jan 12 14:28:01 2010, steve, Summary, Environment, lab temp of 7 years
|
Wed Jan 13 12:01:06 2010, Alberto, Update, Computers, c1dcuepics, c1lsc rebooted this morning
|
Wed Jan 13 12:03:00 2010, Alberto, Update, ABSL, Measurement now running. Please be careful
|
Thu Jan 14 11:44:06 2010, josephb, Summary, Computers, Memory locations for TST model for ITMY
|
Fri Jan 15 11:21:05 2010, josephb, Update, Computers, Megatron and tst model for ETMY
|
Fri Jan 15 18:53:05 2010, josephb,peter,koji, Update, Computers, Attempted locking with Megatron replacing ETMY front end
|
Sun Jan 17 05:22:42 2010, rana, Configuration, Computers, ELOG script change
|
Mon Jan 18 09:44:36 2010, Alberto, Bob, Omnistructure, Environment, No rain water infiltrations so far
|
Mon Jan 18 18:34:01 2010, Alberto, Update, ABSL, Measurement in progress
|
Mon Jan 18 20:58:40 2010, Alberto, Update, ABSL, Measurement in progress
|
Tue Jan 19 02:39:57 2010, kiwamu, Update, Electronics, design complete --- triple resonant circuit for EOM --- 
|
Tue Jan 19 03:20:28 2010, Koji, Update, Electronics, design complete --- triple resonant circuit for EOM ---
|
Sun Jan 17 19:18:55 2010, Alberto, Update, Computers, Boot fest to restart the computer and c1iscey not responding.
|
Tue Jan 19 10:30:29 2010, josephb, Update, Computers, Boot fest to restart the computer and c1iscey not responding.
|
Tue Jan 19 12:54:39 2010, Alberto, Update, ABSL, Measurement in progress
|
Tue Jan 19 16:21:18 2010, Alberto, Update, ABSL, Watchdogs not working and then fixed
|
Mon Jan 18 23:44:19 2010, kiwamu, Update, Electronics, triple resonant circuit for EOM 
|
Tue Jan 19 00:10:44 2010, rana, Update, Electronics, triple resonant circuit for EOM
|
Tue Jan 19 02:40:38 2010, Koji, Update, Electronics, triple resonant circuit for EOM
|
Tue Jan 19 03:04:14 2010, Koji, Update, Electronics, triple resonant circuit for EOM
|
Tue Jan 19 03:27:47 2010, kiwamu, Update, Electronics, Re: triple resonant circuit for EOM
|
Tue Jan 19 23:26:07 2010, kiwamu, Update, Electronics, Re:Re: triple resonant circuit for EOM  
|
Thu Jan 21 10:09:27 2010, Koji, Summary, IOO, Photos of the optical tables
|
Wed Jan 20 20:11:56 2010, Alberto, Update, ABSL, Some preliminary results from measuring PRC's transmissivity for an amplitude modulated beam
|
Thu Jan 21 10:31:13 2010, Koji, Update, ABSL, Some preliminary results from measuring PRC's transmissivity for an amplitude modulated beam
|
Thu Jan 21 11:08:30 2010, kiwamu, steve, Update, VAC, Dry Pump replacement
|
Thu Jan 21 15:16:16 2010, josephb, koji, Summary, Computers, Megatron used to lock Y arm
|
Thu Jan 21 17:23:30 2010, josephb,alex,koji, HowTo, Computers, RCG code fixes
|
Fri Jan 22 12:33:37 2010, josephb, alex, Update, Computers, Modified CDS_PARTS for Binary output
|
Fri Jan 22 02:54:06 2010, Alberto, Update, ABSL, Overnight measurement
|
Fri Jan 22 14:40:49 2010, Alberto, Update, ABSL, Overnight measurement
|
Mon Jan 25 11:42:24 2010, josephb, Update, Computers, Megatron and BO board
|
Mon Jan 25 16:30:37 2010, Alberto, Update, ABSL, 166 MHz sideband turned off
|
Mon Jan 25 16:46:33 2010, Alberto, Update, ABSL, 166 MHz sideband turned off
|
Tue Jan 26 03:28:56 2010, rana, Update, ABSL, 166 MHz sideband turned off
|
Tue Jan 26 20:18:32 2010, rana, Configuration, ALARM, op540m: alarms and BLRMS and StripTool restored
|
Wed Jan 27 11:02:30 2010, Alberto, Update, ABSL, PRC Cavity Length 
|
Thu Jan 28 09:14:51 2010, Alberto, Configuration, Computers, c1iscey, c1iscex, c1lsc, c1asc rebooted
|
Thu Jan 28 09:17:32 2010, Alberto, Update, LSC, 166 Modulation turned off
|
Fri Jan 29 12:06:58 2010, Alberto, Update, ABSL, Measurement running today at lunch time
|
Fri Jan 29 13:14:49 2010, Alberto, Update, ABSL, Measurement running today at lunch time
|
Mon Feb 1 18:33:10 2010, steve, Update, MOPA, Ve half the lazer! 
|
Tue Feb 2 10:38:30 2010, josephb, Update, Computers, Megatron BO test
|
Tue Feb 2 13:14:09 2010, Koji, HowTo, IOO, Anatomy of New Focus Resonant EOM
|
Tue Feb 2 15:30:03 2010, Alberto, Frogs, Treasure, Wild Oats
|
Tue Feb 2 16:10:09 2010, steve, Update, PEM, construction progress next door    
|
Tue Feb 2 18:15:47 2010, Alberto, Update, elog, Elog restarted it
|
Wed Feb 3 07:57:01 2010, steve, Update, PSL, PMC transmission is low
|
Tue Feb 2 22:39:12 2010, Jenne, Update, PSL, IFO isn't playing nice tonight
|
Wed Feb 3 01:17:19 2010, Koji, Update, PSL, IFO isn't playing nice tonight
|
Wed Feb 3 09:01:42 2010, rob, Update, lore, IFO isn't playing nice tonight
|
Wed Feb 3 11:13:15 2010, steve, Configuration, General, planed power outage for Sat. Feb 20
|
Wed Feb 3 10:46:12 2010, Alberto, Update, elog, elog restarted
|
Thu Feb 4 00:59:52 2010, rana, Update, elog, elog restarted
|
Thu Feb 4 12:29:04 2010, josephb, Update, Computers, Martian IP switch over notes
|
Fri Feb 5 11:01:49 2010, steve, Configuration, VAC, slow pumpdown valve
|
Fri Feb 5 14:31:46 2010, Jenne, Update, SUS, 2 SOS towers assembled
|
Fri Jan 15 12:04:26 2010, Sanjit, mevans, Update, Adaptive Filtering, Canceling noise again!
|
Tue Jan 26 19:51:44 2010, Sanjit, rana, Update, Adaptive Filtering, OAF details  
|
Mon Feb 1 18:31:00 2010, Sanjit, Update, Adaptive Filtering, OAF details
|
Mon Feb 1 21:51:12 2010, Sanjit, Update, Adaptive Filtering, OAF details
|
Fri Feb 5 00:52:55 2010, Sanjit, Update, Adaptive Filtering, OAF at 0.1-1.0 Hz 
|
Fri Feb 5 01:04:58 2010, Sanjit, Update, Adaptive Filtering, OAF at > 5Hz
|
Sat Feb 6 00:10:08 2010, Sanjit, Update, Adaptive Filtering, OAF at > 5Hz
|
Mon Feb 8 14:56:17 2010, Alberto, Update, ABSL, Suddenly a much better alignment of PRC
|
Mon Feb 8 15:01:46 2010, rob, Update, ABSL, Suddenly a much better alignment of PRC
|
Mon Feb 8 15:41:51 2010, Alberto, Update, ABSL, Suddenly a much better alignment of PRC
|
Mon Feb 8 17:00:36 2010, josephb, Update, Computers, Megatron ETMY model updated (tst.mdl)
|
Mon Feb 8 14:13:03 2010, Alberto, Update, ABSL, PLL Characterization  
|
Tue Feb 9 09:07:06 2010, Alberto, Update, ABSL, PLL Characterization
|
Tue Feb 9 10:10:58 2010, Alberto, Update, ABSL, back to analog
|
Tue Feb 9 17:18:45 2010, josephb, Summary, Computers, Locking Y arm successful with fully replaced front-end for ITMY
|
Tue Feb 9 17:51:48 2010, Jenne, Summary, IOO, Input Mode Matching Telescope design is complete
|
Wed Feb 10 16:27:47 2010, steve, Configuration, General, IFO beam heights
|
Wed Feb 10 23:44:56 2010, Koji, Summary, COC, Phase Map Analysis 
|
Wed Feb 10 17:28:02 2010, kiwamu, Update, Electronics, triple resonant EOM ---- preliminary result
|
Wed Feb 10 23:15:37 2010, Koji, Update, Electronics, triple resonant EOM ---- preliminary result
|
Thu Feb 11 16:52:53 2010, kiwamu, Update, Electronics, triple resonant EOM ---- preliminary result
|
Thu Feb 11 15:53:59 2010, steve, Configuration, VAC, PSL output shutter is closed
|
Thu Feb 11 18:53:57 2010, steve, Configuration, VAC, VAC NORMAL is back
|
Thu Feb 11 18:33:54 2010, josephb, alex, Update, Computers, Status of the IP change over
|
Thu Feb 11 19:20:44 2010, rana, Update, Computers, Status of the IP change over
|
Fri Feb 12 11:44:11 2010, josephb, Update, Computers, Status of the IP change over
|
Fri Feb 12 11:56:02 2010, josephb, Update, Computers, Nodus slow ssh fixed
|
Fri Feb 12 13:56:16 2010, josephb, Update, Computers, Finishing touches on IP switch over
|
Fri Feb 12 14:19:28 2010, rana, steve, HowTo, lore, International Fax
|
Fri Feb 12 15:59:16 2010, josephb, Update, Computers, Testpoints not working
|
Fri Feb 12 13:15:41 2010, kiwamu, Update, Electronics, triple resonant EOM --- liniaryity test
|
Sat Feb 13 13:21:53 2010, Koji, Update, Electronics, triple resonant EOM --- liniaryity test
|
Sat Feb 13 18:58:31 2010, josephb, alex, Update, Computers, fb40m testpoints fixed
|
Tue Feb 16 10:01:16 2010, Alberto, Configuration, LSC, Arms and PRC not locking
|
Tue Feb 16 14:10:06 2010, josephb, rob, koji, Configuration, LSC, Arms and PRC not locking
|
Tue Feb 16 15:25:00 2010, Alberto, Configuration, LSC, Arms and PRC not locking
|
Fri Feb 12 18:58:46 2010, kiwamu, Update, Green Locking, take some optics away from the ETM end table 
|
Tue Feb 16 09:51:22 2010, Alberto, Update, Green Locking, take some optics away from the ETM end table
|
Tue Feb 16 11:12:51 2010, kiwamu, Update, Green Locking, Re:take some optics away from the ETM end table
|
Tue Feb 16 16:24:30 2010, kiwamu, Update, Green Locking, Re:Re:take some optics away from the ETM end table
|
Wed Feb 17 12:45:19 2010, josephb, Update, Computers, Updated Megatron and its firewall
|
Wed Feb 17 19:36:05 2010, Koji, Update, COC, Arm visibility
|
Thu Feb 18 10:10:43 2010, steve, Configuration, General, 480 V AC power turned off
|
Fri Feb 19 00:31:17 2010, Jenne, Update, COC, New ITMX guiderods glued
|
Fri Feb 19 02:38:32 2010, Koji, Configuration, oplevs, Intsant green oplevs for ITMs shooting from the ends
|
Fri Feb 19 10:18:19 2010, Jenne, Update, VAC, The P1 vac pressure is almost to 3mTorr
|
Fri Feb 19 15:29:14 2010, kiwamu, Update, COC, Gluing dumbbells and magnets
|
Fri Feb 19 16:40:43 2010, kiwamu, Update, Green Locking, rearrange the optics on the end table 
|
Mon Feb 22 10:25:37 2010, Jenne, Update, COC, ITMY standoff and guiderod epoxied
|
Mon Feb 22 11:38:05 2010, joe, jenne and steve, Configuration, VAC, vacuum is back to normal
|
Fri Feb 19 13:28:44 2010, Koji, Update, General, Prep for Power Supply Stop
|
Sun Feb 21 17:44:35 2010, rana, Update, General, Prep for Power Supply Stop
|
Mon Feb 22 07:25:58 2010, rana, Update, General, Prep for Power Supply Stop
|
Mon Feb 22 09:45:34 2010, josephb, Update, General, Prep for Power Supply Stop
|
Mon Feb 22 11:42:48 2010, Koji, Update, General, Prep for Power Supply Stop
|
Mon Feb 22 11:46:55 2010, josephb, Update, Computers, fb40m
|
Mon Feb 22 12:48:31 2010, josephb, alex, koji, Update, Computers, FE machines now coming up
|
Mon Feb 22 13:08:27 2010, josephb, Update, Computers, Minor tweaks to c1omc
|
Mon Feb 22 21:07:26 2010, Jenne, Update, COC, Magnets glued to ITMX
|
Tue Feb 23 06:47:57 2010, Koji, Update, General, IFO situations / low power MC lock 
|
Tue Feb 23 14:56:24 2010, steve, Update, General, ETMX optical table mass
|
Thu Feb 18 15:39:16 2010, Koji and Steve, Configuration, VAC, valve condition: ALL OFF
|
Tue Feb 23 16:20:44 2010, steve, Configuration, VAC, outgassing + leak
|
Tue Feb 23 16:42:02 2010, rana, Configuration, Computer Scripts / Programs, SVN restarted on NODUS
|
Tue Feb 23 19:00:45 2010, kiwamu, Configuration, VAC, vent finished
|
Tue Feb 23 13:37:04 2010, kiwamu and steve, Configuration, VAC, venting the 40m vac envelope
|
Tue Feb 23 19:07:43 2010, kiwamu and steve, Configuration, VAC, vent is completed
|
Wed Feb 24 12:08:31 2010, Koji, Update, Computers, RFM goes red -> recovered by the nuclear option
|
Thu Feb 25 11:21:06 2010, Koji, Update, General, Tanks opened
|
Thu Feb 25 15:49:05 2010, Alberto, AoG, CDS, New IO Chassis for the new CDS
|
Thu Feb 25 19:59:50 2010, Koji, Configuration, SUS, ITMX OSEMs
|
Fri Feb 26 01:00:07 2010, Jenne, Update, COC, Suspension Progress
|
Fri Feb 26 11:48:36 2010, Koji, Update, General, MC incident beam shift
|
Sun Feb 28 16:45:05 2010, rana, Summary, General, Power ON Recovery
|
Mon Mar 1 08:49:37 2010, steve, Bureaucracy, SAFETY, safety audit
|
Sun Feb 28 23:47:52 2010, rana, Update, Computers, rosalba
|
Mon Mar 1 22:38:12 2010, rana, Update, Computers, RC sensitivity to RIN
|
Tue Mar 2 12:20:54 2010, kiwamu, Update, PSL, stray beam
|
Thu Mar 4 02:25:14 2010, Jenne, Update, COC, Further details on the magnet story, and SRM guiderod glued
|
Wed Mar 3 18:32:25 2010, Alberto, Update, 40m Upgrading, 11 MHz RFPD elctronics 
|
Thu Mar 4 08:43:35 2010, Alberto, Update, 40m Upgrading, 11 MHz RFPD elctronics
|
Thu Mar 4 19:53:56 2010, Alberto, Update, 40m Upgrading, 11MHz PD designed adjusted for diode's resistance; 55 MHz RFPD designed 6x
|
Thu Mar 4 22:07:21 2010, rana, Update, 40m Upgrading, 11MHz PD not yet designed
|
Tue Mar 2 23:11:43 2010, Koji, Update, SUS, ITMX hung
|
Wed Mar 3 02:57:29 2010, Jenne, Update, SUS, ITMX hung
|
Fri Mar 5 11:21:18 2010, steve, Update, SUS, used OSEMs are magnetic
|
Fri Mar 5 18:04:56 2010, rana, Update, SUS, used OSEMs are magnetic
|
Tue Mar 9 09:04:20 2010, steve, Update, PEM, keep vacuum chamber closed
|
Tue Mar 9 09:32:31 2010, Koji, Summary, General, Wideband measurement of Fast PZT response
|
Fri Feb 26 15:32:13 2010, steve, Configuration, VAC, preparation for power outage: vacuum all off
|
Mon Mar 1 11:21:50 2010, steve, Configuration, VAC, vacuum contoller is back to normal
|
Thu Mar 11 15:24:51 2010, steve, Metaphysics, Environment, IFO was well protected
|
Thu Mar 11 17:51:04 2010, Koji, Update, SUS, Recent status of SOSs
|
Fri Mar 12 13:52:18 2010, Zach, Update, elog, elog restarted
|
Fri Mar 12 17:08:22 2010, steve, Configuration, VAC, bg-RGAscan at d18
|
Sun Mar 7 07:01:21 2010, rana, Update, WienerFiltering, Guralp Huddle Test software
|
Sat Mar 13 22:16:03 2010, rana, Update, WienerFiltering, Guralp Huddle Test software
|
Mon Mar 15 09:43:47 2010, steve, Update, PEM, more sandblasting today
|
Tue Mar 16 04:22:02 2010, Jenne, Update, Environment, Earthquake, Mag 4.4
|
Tue Mar 16 05:10:39 2010, koji, Update, Environment, Earthquake, Mag 4.4
|
Tue Mar 16 09:37:30 2010, steve, Update, SUS, eq 4.4 seen by oplevs and osems  
|
Thu Mar 18 15:33:17 2010, kiwamu, Summary, Electronics, advantege of our triple resonant EOM
|
Thu Mar 18 19:00:04 2010, Koji, Summary, Electronics, advantege of our triple resonant EOM
|
Sat Mar 20 18:34:19 2010, kiwamu, Summary, Electronics, RE:advantege of our triple resonant EOM
|
Sun Mar 21 20:08:20 2010, kiwamu, rana, Update, PSL, EOM wasit size 
|
Sun Mar 21 21:02:39 2010, Koji, Update, PSL, EOM waist size
|
Mon Mar 22 02:03:57 2010, rana, Summary, Electronics, UPDH Box #17: Ready
|
Mon Mar 22 10:07:30 2010, Koji, Summary, Electronics, UPDH Box #17: Ready
|
Mon Mar 22 11:37:09 2010, steve, Update, PEM, jackhammering
|
Mon Mar 22 16:57:45 2010, josephb,daisuke, alex, Configuration, Computers, Megatron test points working again
|
Tue Mar 23 10:11:13 2010, steve, Update, PEM, small air cond unit failed yesterday
|
Tue Mar 23 15:38:26 2010, Alberto, Update, elog, elog just restarted
|
Tue Mar 23 00:31:51 2010, Koji, Update, IOO, MC realigned 
|
Tue Mar 23 09:37:36 2010, steve, Update, IOO, vac envelope has to be sealed as antproof for overnight 
|
Tue Mar 23 09:55:20 2010, Koji, Update, IOO, vac envelope has to be sealed as antproof for overnight
|
Wed Mar 24 02:06:24 2010, Koji, Update, IOO, vac envelope has to be sealed as antproof for overnight
|
Wed Mar 24 12:38:17 2010, Hartmut, Configuration, Green Locking, Broadband PD for green PLL 
|
Wed Mar 24 12:40:25 2010, daisuke, Configuration, General, Periscope for green laser delivery from the BSC to PSL table  
|
Tue Mar 23 22:46:43 2010, Alberto, Update, 40m Upgrading, REFL11 upgraded
|
Wed Mar 24 14:57:21 2010, Alberto, Update, 40m Upgrading, REFL11 upgraded
|
Thu Mar 18 10:46:51 2010, Koji, Update, ABSL, PLL reconstructed
|
Thu Mar 18 12:27:56 2010, Alberto, Update, ABSL, PLL reconstructed
|
Thu Mar 18 13:40:35 2010, Koji, Update, ABSL, PLL reconstructed
|
Thu Mar 18 21:42:26 2010, Koji, Update, ABSL, PLL reconstructed
|
Mon Mar 22 22:11:26 2010, Mott, Update, ABSL, PLL reconstructed
|
Mon Mar 22 23:37:32 2010, Mott, Update, ABSL, PLL reconstructed 
|
Tue Mar 23 18:44:46 2010, Mott, Update, ABSL, PLL reconstructed
|
Wed Mar 24 03:58:18 2010, kiwamu, matt, koji, Update, Green Locking, leave PLL locked
|
Wed Mar 24 04:22:51 2010, kiwamu, matt, Update, Green Locking, two NPRO PLL
|
Wed Mar 24 14:52:02 2010, Alberto, Update, Green Locking, two NPRO PLL
|
Wed Mar 24 15:59:59 2010, kiwamu, matt, Update, Green Locking, leave PLL locked
|
Thu Mar 25 17:29:48 2010, kiwamu, mott, Update, Green Locking, PLL two NPROs
|
Thu Mar 25 17:32:42 2010, Alberto, Update, 40m Upgrading, REFL55 Upgraded 
|
Fri Mar 26 10:48:35 2010, steve, Update, SAFETY, safety glasses measured 
|
Mon Mar 29 01:45:26 2010, daisuke, Configuration, General, Periscope version B for green laser ...  
|
Sun Mar 28 20:05:33 2010, rana, Summary, PSL, FSS Work from Sunday: AOM/VCO level set wrong
|
Sun Mar 28 20:51:31 2010, rana, Summary, PSL, FSS Work from Sunday: Cavity Suspension is Ridiculously Undamped!
|
Sun Mar 28 23:17:46 2010, rana, Summary, PSL, FSS Work from Sunday: noise spec
|
Sun Mar 28 23:47:47 2010, rana, Summary, PSL, FSS Work from Sunday: Open Loop Gain 
|
Mon Mar 29 01:11:33 2010, rana, Summary, PSL, FSS Work from Sunday: RF Out Spectrum   
|
Mon Mar 29 02:07:50 2010, Koji, Summary, PSL, FSS Work from Sunday: Open Loop Gain
|
Sun Mar 28 20:00:17 2010, rana, Update, Cameras, GigE camera no work from screen
|
Mon Mar 29 10:40:59 2010, josephb, Update, Cameras, GigE camera no work from screen
|
Mon Mar 29 18:41:34 2010, Koji, Configuration, SUS, Started to build TTs
|
Sat Mar 27 16:23:10 2010, Koji, Update, SUS, another SRM sidemagnet glued
|
Mon Mar 29 18:50:14 2010, Koji, Update, SUS, PRM sidemagnet glued
|
Tue Mar 30 11:16:05 2010, josephb, HowTo, Computers, ezca update information (CDS SVN)
|
Mon Mar 29 15:26:47 2010, Mott, HowTo, Computers, New script for controlling the AG4395A
|
Wed Mar 31 03:45:49 2010, Mott, HowTo, Computers, New script for controlling the AG4395A
|
Wed Mar 31 10:34:02 2010, josephb, Update, elog, Elog not responding this morning
|
Tue Mar 30 21:11:42 2010, kiwamu, Summary, Green Locking, conversion efficiency of PPKTP
|
Tue Mar 30 22:13:49 2010, Koji, Summary, Green Locking, conversion efficiency of PPKTP
|
Wed Mar 31 11:52:32 2010, kiwamu, Summary, Green Locking, Re:conversion efficiency of PPKTP
|
Wed Mar 31 16:55:05 2010, josephb, Update, Computers, 2 computers from Alex and Rolf brought to 40m
|
Wed Mar 31 19:29:58 2010, Hartmut, Update, Electronics, (1cm-) Si PD transfer functions update
|
Sun Mar 28 17:28:26 2010, matt, kiwamu, Update, Green Locking, frequency discriminator for green PLL 6x
|
Mon Mar 29 15:19:33 2010, mevans, Update, Green Locking, frequency discriminator for green PLL
|
Wed Mar 31 02:57:48 2010, kiwamu, Update, Green Locking, frequency counter for green PLL
|
Wed Mar 31 12:30:31 2010, rana, Update, Green Locking, frequency counter for green PLL
|
Thu Apr 1 15:21:12 2010, rana, Update, Green Locking, frequency counter for green PLL
|
Thu Apr 1 16:34:29 2010, Hartmut, Update, Green Locking, Silicon PDs
|
Thu Apr 1 17:35:24 2010, Koji, Update, SUS, Working on ITMX/Y
|
Thu Apr 1 20:29:02 2010, Hartmut, Update, Green Locking, simple PD test circuit
|
Fri Apr 2 08:52:21 2010, Alberto, Update, elog, elog restarted
|
Sat Apr 3 19:54:19 2010, Alberto, Update, 40m Upgrading, REFL11 and REFL55 PDs Noise Spectrum 
|
Sun Apr 4 00:21:42 2010, rana, koji, Summary, Electronics, Checkout of EG&G (PARC) preamp model #113, s/n 49135
|
Sun Apr 4 17:32:07 2010, Alberto, Metaphysics, General, new y-arm?
|
Wed Feb 24 16:11:15 2010, Jenne, Update, PEM, Seismic witnesses near MC1 tank moved
|
Sun Mar 7 23:05:39 2010, rana, Update, PEM, Seismic witnesses near MC1 tank moved
|
Mon Mar 8 18:15:27 2010, rana, Update, PEM, Styrofoam Cooler on the Seismos
|
Tue Mar 9 12:06:53 2010, rana, Jenne, Update, PEM, Styrofoam Cooler on the Seismos
|
Wed Mar 10 15:02:58 2010, rana, Update, PEM, Styrofoam Cooler on the Seismos 
|
Sat Mar 13 21:30:22 2010, rana, Update, PEM, Styrofoam Cooler on the Seismos
|
Mon Mar 15 16:39:36 2010, steve, Update, PEM, Guralp2 centered
|
Thu Mar 18 08:49:51 2010, steve, Update, PEM, Guralp2 centered again ?
|
Fri Mar 19 18:00:14 2010, jenne, Update, PEM, Guralp2 centered again
|
Fri Mar 19 21:15:33 2010, rana, Update, PEM, Guralp2 centered again
|
Fri Mar 19 23:03:41 2010, rana, Update, PEM, Guralp2 centered again
|
Sun Mar 21 19:25:29 2010, rana, Update, PEM, Guralp2 centered again
|
Thu Mar 25 09:07:08 2010, steve, Update, PEM, Guralp2 x problem is back
|
Wed Mar 31 16:31:44 2010, steve, Update, PEM, Guralp interface box turned off
|
Mon Apr 5 01:02:07 2010, rana, Update, PEM, Guralp interface box turned off
|
Mon Apr 5 08:43:48 2010, steve, Update, PEM, earthquake mag 7.2
|
Mon Apr 5 10:23:40 2010, Alberto, Update, 40m Upgrading, REFL11 Low Frequency Oscilaltion Reduced  
|
Mon Apr 5 09:48:57 2010, Koji, Update, SUS, ITMs placed on the tables in the chambers
|
Mon Apr 5 11:39:41 2010, steve, Update, SUS, ITM-south installation
|
Mon Apr 5 10:33:12 2010, Alberto, Omnistructure, Electronics, soldering iron broken
|
Mon Apr 5 13:07:36 2010, Jenne, Omnistructure, Electronics, soldering iron broken
|
Mon Apr 5 13:20:16 2010, Koji, Omnistructure, Electronics, soldering iron broken
|
Mon Apr 5 13:52:45 2010, Alberto, Update, Computers, Front-ends down. Rebooted
|
Mon Apr 5 14:10:06 2010, steve, Update, SUS, sus damping restored
|
Mon Mar 29 21:43:27 2010, Alberto, Configuration, PSL, Reference Cavity PD Noise Spectrum 
|
Tue Mar 30 06:37:32 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum
|
Wed Mar 31 15:31:53 2010, steve, Update, PSL, Reference Cavity RF PD base upgraded
|
Sat Apr 3 11:35:47 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum
|
Sat Apr 3 16:07:40 2010, Alberto, Configuration, PSL, Reference Cavity PD Noise Spectrum
|
Tue Apr 6 11:27:11 2010, Alberto, Update, Computer Scripts / Programs, Data formats in the Agilent AG4395a Spectrum Analyzer
|
Tue Apr 6 16:55:28 2010, Alberto, Update, Computer Scripts / Programs, Data formats in the Agilent AG4395a Spectrum Analyzer
|
Tue Apr 6 22:54:34 2010, Koji, Update, SUS, ITMY (south) aligned
|
Wed Apr 7 09:00:01 2010, steve, HowTo, PEM, prepare to open chamber
|
Wed Apr 7 10:48:04 2010, Alberto, Update, Electronics, REFL11 Noise Simulation
|
Wed Apr 7 10:58:15 2010, Koji, Update, Electronics, REFL11 Noise Simulation
|
Wed Apr 7 11:11:19 2010, Alberto, Update, Electronics, REFL11 Noise Simulation
|
Sun Apr 11 13:51:04 2010, Alberto, Omnistructure, Computers, Where are the laptops?
|
Sun Apr 11 19:05:34 2010, Koji, Omnistructure, Computers, Where are the laptops?
|
Mon Apr 12 16:20:05 2010, Alberto, Configuration, 40m Upgrading, REFL55 improved
|
Mon Apr 12 17:48:32 2010, Aidan, Update, Computer Scripts / Programs, elog restarted
|
Thu Apr 8 10:17:52 2010, Alberto, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent
|
Thu Apr 8 10:24:33 2010, Alberto, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent
|
Thu Apr 8 20:53:13 2010, Koji, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent
|
Fri Apr 9 06:45:28 2010, Alberto, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent
|
Mon Apr 12 17:09:30 2010, Alberto, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent
|
Mon Apr 12 22:44:30 2010, Koji, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent
|
Mon Apr 12 22:51:31 2010, Koji, Update, SUS, ITMX installed and aligned
|
Mon Apr 12 19:50:30 2010, Aidan, Summary, Green Locking, Temperature sweep of the Lightwave: df/dT = 2.8GHz/K 
|
Mon Apr 12 20:48:51 2010, Aidan, Mott, Summary, Green Locking, Temperature sweep of the Innolight: df/dT ~ 3.3GHz/K 
|
Tue Apr 13 12:39:51 2010, Aidan, Mott, Summary, Green Locking, Temperature sweep of the Innolight: df/dT ~ 3.3GHz/K
|
Mon Apr 12 17:37:52 2010, josephb, Update, Computers, Y end simulated plant progress 
|
Tue Apr 13 12:49:35 2010, josephb, Update, Computers, Y end simulated plant progress
|
Thu Apr 1 00:43:33 2010, Mott, Update, General, PZT response for the innolight
|
Thu Apr 1 07:17:15 2010, Koji, Update, General, PZT response for the innolight
|
Thu Apr 1 10:21:58 2010, Mott, Update, General, PZT response for the innolight 
|
Thu Apr 1 10:47:48 2010, Koji, Update, General, PZT response for the innolight
|
Thu Apr 1 12:07:22 2010, rana, Update, General, PZT response for the innolight
|
Thu Apr 1 18:05:29 2010, Mott, Update, General, PZT response for the innolight 
|
Thu Apr 1 18:44:40 2010, Koji, Update, General, PZT response for the innolight
|
Thu Apr 1 19:59:32 2010, Mott, Update, General, PZT response for the innolight    
|
Mon Apr 12 14:20:10 2010, kiwamu, Update, Green Locking, PZT response for the innolight
|
Tue Apr 13 19:53:06 2010, Mott, Update, Green Locking, PZT response for the innolight and lightwave 6x
|
Tue Apr 13 20:02:02 2010, Koji, Update, SUS, BS chamber opened, PRM/SRM SOS removed from the table
|
Thu Apr 15 14:47:28 2010, steve, Update, Electronics, 25MHZ oscillation of HP4195A 
|
Fri Apr 16 17:46:54 2010, Koji, Update, VAC, Peeting mirrors aligned
|
Mon Apr 19 07:38:07 2010, rana, HowTo, Electronics, Repair and Calibration of SR560: s/n 59650
|
Sat Apr 17 18:30:12 2010, Zach, Update, Green Locking, 1W NPRO output profile
|
Mon Apr 19 11:31:04 2010, Aidan, Update, Green Locking, 1W NPRO output profile
|
Mon Apr 19 13:23:03 2010, josephb, Configuration, Computers, yum update fixed on control room machines
|
Mon Apr 19 16:31:42 2010, Kevin, Update, PSL, Innolight 2W Laser
|
Fri Apr 16 17:26:23 2010, Jenne, Update, PEM, Guralp Breakout Box pulled
|
Tue Apr 20 00:32:30 2010, Jenne, Update, PEM, Guralp Breakout Box put back 
|
Tue Apr 20 07:48:42 2010, steve, Update, PSL, ion pump HV turned on
|
Tue Apr 20 08:00:52 2010, steve, Update, SUS, ETMY damping restored
|
Tue Apr 20 09:15:15 2010, steve, Summary, SAFETY, annual safety audit
|
Tue Apr 20 10:55:10 2010, steve, Bureaucracy, SAFETY, Kevin Kuns received safety training
|
Mon Apr 19 16:27:13 2010, Aidan, Update, Green Locking, Raicol crystals arrived and we investigated them
|
Tue Apr 20 11:14:31 2010, Aidan, Update, Green Locking, Raicol crystals arrived and we investigated them
|
Tue Apr 20 13:00:52 2010, Zach, Update, elog, elog restarted
|
Tue Apr 20 18:02:22 2010, Jenne, Update, COC, New SRM and PRM Hung
|
Tue Apr 20 13:02:14 2010, Zach, Update, Green Locking, 1W NPRO output profile
|
Tue Apr 20 13:37:36 2010, Jenne, Update, Green Locking, 1W NPRO output profile
|
Tue Apr 20 19:37:02 2010, Koji, Update, Green Locking, 1W NPRO output profile
|
Wed Apr 21 11:32:31 2010, josephb, Update, CDS, 40m CDS hardware update and software requests
|
Wed Apr 21 15:53:57 2010, Jenne, Update, PEM, Seismometers now on the granite slab
|
Wed Apr 21 16:48:38 2010, josephb, Update, CDS, Hardware update
|
Wed Apr 21 21:46:53 2010, Koji, Update, IOO, MC spot diagnosis
|
Thu Apr 22 15:44:34 2010, josephb, Update, Computers,
|
Wed Apr 21 21:56:27 2010, Kevin, Update, PSL, Innolight 2W Vertical Beam Profile 
|
Wed Apr 21 22:11:48 2010, rana, Update, PSL, Innolight 2W Vertical Beam Profile
|
Wed Apr 21 23:35:37 2010, Koji, Update, PSL, Innolight 2W Vertical Beam Profile
|
Thu Apr 22 21:42:24 2010, Alberto, Update, PSL, Innolight 2W Vertical Beam Profile
|
Fri Apr 23 18:30:49 2010, Aidan, Jenne, Koji, Summary, Green Locking, Green means GO! 
|
Fri Apr 23 21:02:14 2010, rana, joe, Update, LSC, Started dev of LSC FE
|
Sun Apr 25 02:56:07 2010, rana, Update, LSC, Started dev of LSC FE
|
Sun Apr 25 10:40:21 2010, Koji, Update, LSC, Started dev of LSC FE
|
Mon Apr 26 10:21:45 2010, josephb, Update, LSC, Started dev of LSC FE
|
Thu Apr 22 09:03:54 2010, steve, Omnistructure, PEM, aircondition can not be turned off
|
Mon Apr 26 11:13:28 2010, steve, Omnistructure, PEM, AC on/off is working
|
Mon Apr 26 11:14:04 2010, Koji, Update, Green Locking, Temperature scan for PPKTP
|
Mon Apr 26 11:29:37 2010, josephb, Update, Computers, Updated bitwise.pm in RCG SVN plus other fixes
|
Mon Apr 26 12:24:58 2010, josephb, Update, General, Daily Downs update
|
Mon Apr 26 21:12:53 2010, Koji, Update, SUS, PRM/SRM standoffs glued
|
Tue Apr 27 11:16:13 2010, josephb, Configuration, CDS, Wiki page with CDS .mdl names, shared memory allocation
|
Wed Apr 28 08:55:19 2010, Zach, Update, elog, elog restarted
|
Wed Apr 28 09:21:16 2010, Zach, Update, elog, elog restarted
|
Sat Apr 24 15:05:41 2010, Kevin, Update, PSL, 2W Vertical Beam Profile
|
Sat Apr 24 15:50:47 2010, Koji, Update, PSL, re: 2W Vertical Beam Profile
|
Mon Apr 26 16:51:37 2010, Kevin, Update, PSL, re: 2W Vertical Beam Profile
|
Mon Apr 26 17:34:31 2010, Koji, Update, PSL, re: 2W Vertical Beam Profile
|
Tue Apr 27 15:29:16 2010, Kevin, Update, PSL, re: 2W Vertical Beam Profile 
|
Wed Apr 28 14:22:36 2010, Kevin, Update, PSL, re: 2W Vertical Beam Profile
|
Tue Apr 27 22:28:58 2010, Zach, Update, IOO, MC alignment
|
Wed Apr 28 12:05:44 2010, Zach, Update, IOO, MC alignment
|
Wed Apr 28 14:15:58 2010, Alberto, Update, IOO, MC alignment
|
Wed Apr 28 14:42:55 2010, Zach, Update, IOO, MC alignment
|
Wed Apr 28 16:15:02 2010, Kevin, Update, PSL, Accelerometer Calibration
|
Thu Apr 29 14:37:16 2010, josephb, Update, CDS, New Channel Name to Memory Location file
|
Thu Apr 29 15:48:47 2010, josephb, Update, CDS, New CDS overview diagram in wiki
|
Fri Apr 30 23:16:51 2010, Koji, Update, SUS, SRM/PRM ready for baking
|
Sun May 2 15:28:25 2010, Koji, Update, IOO, Spot Positions of MC1/MC3
|
Sun May 2 13:04:51 2010, Koji, Summary, SUS, Coil Actuator Balancing and Spot Position
|
Sun May 2 15:38:12 2010, rana, Summary, SUS, Coil Actuator Balancing and Spot Position
|
Sun May 2 16:52:44 2010, Koji, Summary, SUS, Coil Actuator Balancing and Spot Position
|
Sun May 2 17:16:43 2010, Koji, Update, SUS, How to steer the incident beam to the MC?
|
Mon May 3 00:36:49 2010, Koji, Update, SUS, How to steer the incident beam to the MC?
|
Mon May 3 01:35:41 2010, Koji, Update, SUS, Lessons learned from MC spot centering
|
Mon May 3 15:39:39 2010, josephb, Update, CDS, Daily Downs update
|
Mon May 3 16:53:27 2010, josephb, Update, CDS, Updated lsc.mdl and the ifo plant model with memory locations
|
Mon May 3 19:21:43 2010, Alberto, DAQ, Environment, Boot fest
|
Tue May 4 14:57:53 2010, josephb, Update, Computers, Ottavia has moved
|
Mon Apr 19 05:54:50 2010, rana, Configuration, PSL, RC Temperature Servo Turned OFF temporarily
|
Mon May 3 17:49:41 2010, rana, Configuration, PSL, RC Temperature Servo Turned OFF temporarily
|
Tue May 4 02:28:38 2010, rana, Configuration, PSL, RC Temperature Servo Turned OFF temporarily
|
Tue May 4 06:32:58 2010, alberto, Configuration, PSL, RC Temperature Servo Turned OFF temporarily
|
Wed May 5 02:37:55 2010, rana, Configuration, PSL, RC Temperature Servo Turned OFF temporarily
|
Wed May 5 16:32:39 2010, Alberto, Update, 40m Upgrading, New REFL55 PD, 11MHz rejection
|
Wed May 5 16:58:21 2010, Koji, Update, PSL, 2W hooked up to the interlock service
|
Wed May 5 01:19:05 2010, Koji, Update, IOO, MC spot centering cont"d
|
Thu May 6 01:06:16 2010, Koji, Update, IOO, MC spot centering cont'd (Triumph)
|
Tue May 4 13:14:43 2010, josephb, Update, CDS, lsc.mdl and ifo.mdl to build (with caveats)
|
Thu May 6 11:34:35 2010, rob, Update, CDS, lsc.mdl and ifo.mdl to build (with caveats)
|
Thu May 6 17:47:01 2010, Alberto, kiwamu, Jc The 3rd (aka The Drigg), Omnistructure, TMI, Minutes from the Lab Organization Commitee meeting
|
Thu May 6 17:54:44 2010, Zach Korth -- Committee Oversight (Fun Division), Omnistructure, TMI, Minutes from the Lab Organization Commitee meeting
|
Thu May 6 18:25:20 2010, Jenne, Update, PEM, Acc power supply turned on
|
Mon Nov 9 19:09:09 2009, Jenne, Update, PEM, Noise floor of the Ranger Seismometer
|
Thu May 6 18:43:58 2010, rana, Update, PEM, Noise floor of the Ranger Seismometer
|
Thu May 6 19:23:54 2010, Frank, Summary, Computers, svn problems
|
Thu May 6 19:51:22 2010, Jenne, Update, PEM, New 'Seismic Spectrum of the 40m'
|
Fri May 7 14:51:04 2010, josephb, Update, CDS, Working on meta .mdl file scripts
|
Thu May 6 16:18:37 2010, Alberto, Update, 40m Upgrading, New improved design for the 11MHz photodiode
|
Thu May 6 19:57:26 2010, Alberto, Update, 40m Upgrading, New improved design for the 11MHz photodiode
|
Fri May 7 11:21:49 2010, koji, Update, 40m Upgrading, New improved design for the 11MHz photodiode
|
Fri May 7 18:18:02 2010, Alberto, Update, 40m Upgrading, New improved design for the 11MHz photodiode
|
Fri May 7 19:02:27 2010, rana, Update, 40m Upgrading, New improved design for the 11MHz photodiode
|
Fri May 7 21:55:59 2010, kiwamu, Update, PSL, remove Mach-Zehnder
|
Sat May 8 02:38:08 2010, Koji, Summary, IOO, MC incident power
|
Sat May 8 03:09:15 2010, Koji, Update, IOO, Steering around MC
|
Sun May 9 20:02:23 2010, rana, Configuration, SUS, SUS filters deleted again to reduce CPU load on c1susvme2 again 
|
Mon May 10 16:59:35 2010, Alberto, Update, 40m Upgrading, Unexpected oscilaltionin the POY11 PD 
|
Mon May 10 18:56:53 2010, rana, Update, Electronics, Unexpected oscilaltionin the POY11 PD
|
Mon May 10 19:09:45 2010, rana, Update, Electronics, Unexpected oscilaltionin the POY11 PD
|
Mon May 10 19:29:33 2010, Alberto, HowTo, Electronics, New Focus 1811 PD calibrated against New Focus 1611 PD
|
Mon May 10 17:47:16 2010, josephb, Summary, CDS, Finished
|
Mon May 10 20:33:29 2010, Koji, Summary, CDS, Finished
|
Tue May 11 16:38:16 2010, josephb,rana,rolf, Update, CDS, CDS questions and thoughts
|
Mon May 3 01:16:50 2010, rana, HowTo, Electronics, Marconi phase noise measurement setup
|
Tue May 4 18:40:27 2010, rana, HowTo, Electronics, Marconi phase noise measurement setup 
|
Tue May 11 18:58:49 2010, rana, HowTo, Electronics, Marconi phase noise measurement setup
|
Wed May 12 02:21:56 2010, rana, HowTo, Electronics, Marconi phase noise measurement setup
|
Wed May 12 03:56:54 2010, Koji, Update, IOO, Faraday aligned
|
Wed May 12 12:32:04 2010, josephb, Configuration, CDS, Modified /etc/rc.d/rc.local on megatron
|
Wed May 12 12:58:26 2010, josephb, Configuration, CDS, Setup fb to handle lsc, lsp models on megatron
|
Wed May 12 17:10:16 2010, Alberto, Update, 40m Upgrading, RF frequency generation box - step 0
|
Wed May 12 23:31:17 2010, Alberto, Update, 40m Upgrading, 216 MHz resonance in the POY11 PD killed 
|
Thu May 13 05:06:43 2010, rana, Update, 40m Upgrading, 216 MHz resonance in the POY11 PD killed
|
Thu May 13 15:19:44 2010, josephb, Update, CDS, Trying to get lsc.mdl and lsp.mdl working
|
Wed May 12 02:35:13 2010, Koji, Rana, Kiwamu, Update, Green Locking, Reflection from ETM and ITM !
|
Wed May 12 03:52:54 2010, Koji, Update, Green Locking, Reflection from ETM and ITM !
|
Wed May 12 10:33:32 2010, kiwamu, Update, Green Locking, Re: Reflection from ETM and ITM !
|
Wed May 12 12:25:11 2010, Koji, Update, Green Locking, Re: Reflection from ETM and ITM !
|
Wed May 12 09:16:29 2010, steve, Update, Green Locking, Reflection from ETM and ITM !
|
Fri May 14 08:18:46 2010, steve, Update, Green Locking, Reflection from ETM and ITM !
|
Fri May 14 12:14:26 2010, josephb, Update, CDS, Need to track down old code for lsc system and remove them
|
Mon May 10 20:03:22 2010, Kevin, Update, Green Locking, Green Laser Beam Profile   
|
Mon May 10 22:25:03 2010, Koji, Update, Green Locking, Green Laser Beam Profile
|
Tue May 11 14:39:17 2010, Aidan, Update, Green Locking, Green Laser Beam Profile
|
Tue May 11 17:02:43 2010, Kevin, Update, Green Locking, Green Laser Beam Profile   
|
Wed May 12 03:42:38 2010, Koji, Update, Green Locking, Green Laser Beam Profile
|
Fri May 14 16:14:37 2010, Kevin, Update, Green Locking, Green Laser Beam Profile 
|
Fri May 14 16:19:22 2010, Jenne, Update, PEM, Guts of a Guralp
|
Thu May 13 23:59:46 2010, Zach, Summary, IOO, MC table leveled
|
Fri May 14 03:30:45 2010, Koji, Summary, IOO, MC table leveled
|
Fri May 14 10:33:01 2010, Zach, Summary, IOO, MC table leveled
|
Sat May 15 04:13:33 2010, Koji, Summary, IOO, MC table leveled
|
Mon May 17 02:10:10 2010, Koji, Configuration, IOO, How to lock / align the MC
|
Mon May 17 10:57:16 2010, steve, Configuration, SUS, damping restored to ETMYs
|
Mon May 17 17:17:49 2010, josephb, steve, alberto, kiwamu, Update, CDS, New CDS computers now in racks.
|
Tue May 18 14:30:31 2010, josephb, Update, CDS, LSC.mdl problem found and fixed
|
Tue May 18 11:54:29 2010, steve, Configuration, SAFETY, psl mechanical shutter is not working
|
Tue May 18 15:09:02 2010, steve, Configuration, SAFETY, PSL output shutter in order again
|
Tue May 18 16:19:19 2010, josephb, Update, CDS, We have two new IO chassis
|
Mon May 17 19:42:11 2010, Jenne, Update, IOO, First steps toward MC mode measuring
|
Tue May 18 01:40:56 2010, Koji, Update, IOO, First steps toward MC mode measuring
|
Tue May 18 16:44:35 2010, Koji, Update, IOO, First steps toward MC mode measuring
|
Tue May 18 12:04:13 2010, rob, Update, IOO, First steps toward MC mode measuring
|
Tue May 18 23:03:08 2010, Jenne, Update, IOO, No real progress....
|
Wed May 19 16:09:11 2010, josephb, Update, CDS, Racks to small for IO Chassis rails
|
Wed May 19 16:00:18 2010, Jenne, Update, IOO, Hooray! We locked the MC! (and some other stuff)
|
Wed May 19 22:28:05 2010, Koji, Update, IOO, Hooray! We locked the MC! (and some other stuff)
|
Wed May 19 14:36:46 2010, Aidan, HowTo, Phase Camera, Phase Camera algorithm and stuff   
|
Thu May 20 10:06:56 2010, Aidan, HowTo, Phase Camera, Phase Camera- raw data video
|
Thu May 20 12:10:44 2010, kiwamu, Update, Photos, ETMY end table
|
Thu May 20 12:34:46 2010, kiwamu, Configuration, 40m Upgrading, optical breadboards with legs 
|
Thu May 20 13:12:28 2010, josephb, Update, CDS, Preparations for testing lsc,lsp, scy,spy together
|
Thu May 20 20:03:37 2010, Jenne, Update, SAFETY, Don't walk down the Y(new convention) arm tonight!
|
Fri May 21 00:21:24 2010, Jenne, Update, SAFETY, Don't walk down the Y(new convention) arm tonight!
|
Fri May 21 00:51:06 2010, Jenne, Update, IOO, First MC mode measuring (hopefully) done
|
Fri May 21 00:30:44 2010, Jenne, Update, VAC, TP3 fore pump is very loud
|
Fri May 21 08:28:29 2010, steve, Configuration, VAC, TP3 turned off
|
Fri May 21 14:31:46 2010, josephb,alex, Update, CDS, New computer and IO chassis working in 1X4
|
Fri May 21 16:27:45 2010, Alberto, Omnistructure, Environment, The control room is molding...
|
Fri May 21 16:37:35 2010, steve, Configuration, VAC, tp3's drypump replaced
|
Fri May 21 16:41:38 2010, Alberto, Jo, Update, Computers, It's a boy!
|
Fri May 21 11:56:34 2010, Alberto, Update, 40m Upgrading, 40mUpgrade Field Power and RF Power Spectrum at the ports. 38m/38.55m arm length issue. 7x
|
Fri May 21 16:24:11 2010, Koji, Update, LSC, 40mUpgrade Field Power and RF Power Spectrum at the ports. 38m/38.55m arm length issue.
|
Mon May 24 10:03:14 2010, rana, Update, LSC, 40mUpgrade Field Power and RF Power Spectrum at the ports. 38m/38.55m arm length issue.
|
Mon May 24 11:32:05 2010, rana, Update, LSC, 40mUpgrade Field Power and RF Power Spectrum at the ports. 38m/38.55m arm length issue.
|
Mon May 24 16:34:22 2010, Kevin, Update, PSL, ND Filters for 2W Beam Profile
|
Tue May 25 00:10:24 2010, Zach, Update, IOO, IMC table leveled again
|
Tue May 25 07:58:23 2010, kiwamu, Update, elog, elog down
|
Mon May 24 07:53:57 2010, steve, Configuration, PEM, air cond. just turned ON
|
Tue May 25 09:12:46 2010, kiwamu, Configuration, Green Locking, effect from air conditioner
|
Mon May 24 14:28:35 2010, kiwamu, Update, Electronics, bad power supply of a vme rack
|
Tue May 25 07:22:59 2010, kiwamu, Update, Electronics, bad power supply of a vme rack
|
Tue May 25 10:06:09 2010, kiwamu, Update, Electronics, bad power supply of a vme rack
|
Tue May 25 16:32:26 2010, kiwamu, HowTo, Electronics, front ends are back
|
Tue May 25 16:40:27 2010, josephb, alex, Update, CDS, Finally tracked down why new models wouldn't talk to each other
|
Tue May 25 17:04:37 2010, Kevin, Update, , Beam Profile After Mode Cleaner 
|
Tue May 25 17:09:22 2010, Koji, Update, IOO, Beam Profile After Mode Cleaner
|
Tue May 25 17:22:56 2010, Kevin, Update, IOO, Beam Profile After Mode Cleaner
|
Wed May 26 10:58:29 2010, josephb, Update, CDS, New RCG checkout for use with all machines plus some issues
|
Wed May 26 12:59:26 2010, josephb, Update, CDS, Created sus, sup, scx, spx models
|
Wed May 26 00:50:16 2010, Jenne, Update, IOO, Mirrors moved in prep for round 2 of MC mode measuring
|
Wed May 26 14:28:01 2010, Koji, Update, IOO, Mirrors moved in prep for round 2 of MC mode measuring
|
Wed May 26 15:34:00 2010, Jenne, Update, IOO, Mirrors moved in prep for round 2 of MC mode measuring
|
Wed May 26 17:10:09 2010, Alberto, Update, 40m Upgrading, RF Generation box
|
Wed May 26 18:54:55 2010, Aidan, Summary, Green Locking, Mounted Crystal 724 in the Doubling Oven
|
Wed May 26 22:22:03 2010, Alberto, Configuration, 40m Upgrading, Arm cavity length 
|
Thu May 27 08:22:57 2010, Aidan, Update, Computers, Restarted the elog this morning
|
Thu May 27 10:30:32 2010, kiwamu, HowTo, Green Locking, PSL setup for green locking
|
Thu May 27 12:52:02 2010, Alberto, Update, 40m Upgrading, Arm lengths
|
Fri May 28 07:13:05 2010, Alberto, Frogs, Green Locking, SR785 found abandoned next to the workbenches
|
Fri May 28 11:35:33 2010, josephb, Update, CDS, Taking a step backwards to get stuff running
|
Fri May 28 13:17:05 2010, josephb, Update, CDS, Fixed problem with channel access on c1iscex
|
Fri May 28 13:32:01 2010, alberto, kiwamu, Update, VAC, vacuum work
|
Fri May 28 13:51:51 2010, Jenne, Update, VAC, vacuum work
|
Fri May 28 14:24:30 2010, Jenne, Update, VAC, vacuum work
|
Sun May 30 15:33:21 2010, Alberto, Configuration, IOO, mode cleaner and air conditioning
|
Sun May 30 15:36:22 2010, Alberto, Configuration, PSL, IMC periscope shutter
|
Mon Jan 11 14:16:59 2010, Jenne, Update, PEM, Gur2 cables reconnected to the PEM ADCU
|
Tue Jan 12 11:34:26 2010, josephb, Update, PEM, Allegra dataviewer
|
Sun May 30 17:51:04 2010, kiwamu, HowTo, PEM, Allegra dataviewer
|
Fri May 28 21:32:32 2010, Alberto, Update, 40m Upgrading, MC alignment
|
Fri May 28 23:21:52 2010, Koji, Update, IOO, MC alignment
|
Mon May 31 00:10:18 2010, kiwamu, Update, IOO, MC alignment
|
Mon May 31 03:38:48 2010, Koji, Update, IOO, MC alignment
|
Mon May 31 17:47:34 2010, kiwamu, Update, IOO, today's plan : MC alignment
|
Sun May 30 22:18:49 2010, rana, Update, PEM, Granite slab w/ lead balls is so far a flop
|
Mon May 31 22:52:57 2010, rana, Update, PEM, Granite slab w/ lead balls is so far a flop  
|
Tue Jun 1 06:30:38 2010, Koji, Configuration, 40m Upgrading, effect of the arm length  
|
Tue Jun 1 15:51:42 2010, steve, Update, PEM, foam box for good thermal stability
|
Tue Jun 1 16:29:51 2010, Alberto, Update, IOO, MC transmitted beam aligned to the Faraday; next things to do
|
Tue Jun 1 18:39:59 2010, Nancy, Update, , Lead spheres for the seismographs  
|
Sun May 30 13:26:07 2010, rana, kiwamu, Update, PSL, new HIGH-LOW value for PMC_TRANS
|
Tue Jun 1 20:40:03 2010, Koji, Update, PSL, new HIGH-LOW value for PMC_TRANS
|
Wed Jun 2 03:24:22 2010, Kevin, Update, PSL, 2W Beam Profile  
|
Wed Jun 2 04:27:02 2010, Koji, Update, PSL, 2W Beam Profile
|
Wed Jun 2 11:25:16 2010, josephb,alex, Update, CDS, CDS saga (aka the bad code saga)
|
Wed Jun 2 07:54:55 2010, steve, Update, MOPA, laser headtemp is up 
|
Wed Jun 2 11:28:31 2010, Koji, Update, MOPA, laser headtemp is up
|
Wed Jun 2 17:34:33 2010, josephb, alex, valera, Update, CDS, CDS updates
|
Wed Jun 2 18:36:20 2010, valera, DAQ, CDS, Noise generators in LSP
|
Wed Jun 2 22:25:39 2010, Kevin, Update, PSL, Low Power 2W Beam Profile
|
Wed Jun 2 22:58:04 2010, Kevin, Update, PSL, 2W Second Reflected Beam Profile
|
Thu Jun 3 00:47:17 2010, Kevin, Update, PSL, 2W Beam Profile of Second Reflected Beam
|
Thu Jun 3 22:33:31 2010, valera, Summary, CDS, simulated plant work
|
Fri Jun 4 11:32:51 2010, Alberto, kiwamu, Update, IOO, MC MMT1 Mirror Tests
|
Wed Jun 2 18:09:32 2010, steve, Update, PEM, seismometers off of linoleum floor
|
Wed Jun 2 21:21:43 2010, steve, Update, PEM, seismometers off of linoleum floor
|
Thu Jun 3 22:17:05 2010, rana, Update, PEM, seismometers off of linoleum floor  
|
Fri Jun 4 23:52:57 2010, rana, Update, PEM, seismometers off of linoleum floor 
|
Sun Jun 6 04:48:41 2010, rana, Update, COC, ITM01 HR Phase Map
|
Sun Jun 6 08:08:05 2010, rana, sanjit, Summary, Electronics, Capacitor Bridge Test
|
Mon Jun 7 07:39:38 2010, Alberto, Omnistructure, Electronics, Capacitor Bridge Test
|
Tue Jun 8 15:58:25 2010, josephb, alex, Update, CDS, New multi-filter matrix part added to RCG (at the 40m at least)
|
Wed Jun 9 10:31:13 2010, steve, Update, SAFETY, safety training
|
Wed Jun 9 21:05:44 2010, rana, Summary, Computers, op540m is not to be used
|
Wed Nov 11 12:50:10 2009, Jenne, Update, PEM, Seismometer Noise Characteristics
|
Thu Apr 22 20:28:40 2010, Jenne, Update, PEM, Seismometer Noise Characteristics
|
Thu May 27 23:59:54 2010, rana, Update, PEM, New Foam Box installed
|
Fri May 28 00:40:53 2010, rana, Update, PEM, DAQ down
|
Fri May 28 10:44:47 2010, josephb, Update, PEM, DAQ down
|
Tue Jun 8 18:39:36 2010, rana, Update, PEM, DAQ down
|
Tue Jun 8 20:52:25 2010, josephb, Update, PEM, DAQ up (for the moment)
|
Fri May 28 11:26:35 2010, Jenne, Update, PEM, New Foam Box installed
|
Tue Jun 1 11:47:14 2010, steve, Update, PEM, lead balls on concrete
|
Wed Jun 9 19:47:08 2010, nancy, Update, PEM, lead balls on concrete
|
Thu Jun 10 07:53:14 2010, Alberto, Update, PEM, LaTeXlabs
|
Thu Jun 10 10:58:02 2010, Koji, Update, General, LaTeXlabs
|
Thu Jun 10 11:10:21 2010, Alberto, Update, General, LaTeXlabs
|
Wed Jun 2 01:47:28 2010, Alberto, Kiwamu, Update, IOO, mode measurement of new input optics   
|
Wed Jun 2 03:50:03 2010, Koji, Update, IOO, mode measurement of new input optics
|
Thu Jun 3 13:14:27 2010, kiwamu, Update, IOO, mode measurement of new input optics
|
Thu Jun 3 14:01:51 2010, kiwamu, Update, IOO, mode measurement of new input optics
|
Thu Jun 3 14:13:20 2010, Jenne, Update, IOO, mode measurement of new input optics
|
Thu Jun 3 14:40:28 2010, Alberto, Kiwamu, Update, IOO, mode measurement of new input optics
|
Tue Jun 8 00:38:22 2010, Koji, Kiwamu, Update, IOO, improved Gaussian beam in new IOO
|
Fri Jun 11 14:31:04 2010, kiwamu, Update, IOO, mode matching of new IOO 
|
Fri Jun 11 15:04:25 2010, josephb, Update, CDS, Multi-filter matrix medm screens finished and script for copying filters from SOS file
|
Fri Jun 11 22:09:58 2010, valera, HowTo, CDS, foton
|
Sat Jun 12 18:03:00 2010, sharmila, Update, elog, Temperature Controller
|
Sat Jun 12 19:43:19 2010, Alberto, Update, WIKI-40M Update, IFO modeling Wiki Page updated
|
Sat Jun 12 19:41:04 2010, Alberto, Update, Locking, 40m Upgrade Optickle Model
|
Sun Jun 13 08:28:44 2010, valera, Update, Locking, 40m Upgrade Optickle Model
|
Mon Jun 14 07:57:07 2010, alberto, Update, Locking, 40m Upgrade Optickle Model
|
Tue Jun 15 21:28:44 2010, alberto, Update, Locking, 40m Upgrade Optickle Model  
|
Wed Jun 16 11:31:19 2010, josephb, Summary, Computers, Removed scaling fonts from medm on Allegra
|
Wed Jun 16 18:14:13 2010, Aidan, Update, General, Glass cover from overhead light smashed on PSL table 
|
Wed Jun 16 18:12:16 2010, nancy, Configuration, Computers, 40MARS
|
Wed Jun 16 18:44:07 2010, Alberto, Configuration, Computers, 40MARS
|
Fri Jun 18 13:42:52 2010, Koji, HowTo, General, Update your work
|
Thu Jun 17 17:09:44 2010, Alberto, Update, LSC, Short Cavity Length Adjustments
|
Fri Jun 18 13:47:20 2010, Koji, Update, LSC, Short Cavity Length Adjustments
|
Fri Jun 18 15:07:26 2010, Alberto, Update, LSC, Short Cavity Length Adjustments
|
Mon Jun 14 22:16:08 2010, Jenne, Update, IOO, Mode scan after Mode Matching Telescope
|
Tue Jun 15 16:28:32 2010, kiwamu, Update, IOO, Mode Profile after Mode Matching Telescope
|
Tue Jun 15 19:24:25 2010, rana, Update, IOO, Mode Profile after Mode Matching Telescope
|
Fri Jun 18 21:45:39 2010, kiwamu, Update, IOO, Mode Profile after Mode Matching Telescope (Round 2) 
|
Fri Jun 18 22:12:29 2010, Alberto, Update, IOO, Mode Profile after Mode Matching Telescope (Round 2)
|
Sat Jun 19 17:31:48 2010, rana, DAQ, CDS, Excess Noise in C1:IOO-MC_DRUM1 fixed by reboot
|
Sun Jun 20 16:07:23 2010, Koji, Summary, COC, Calibration of the metrology lab interferometer  
|
Mon Jun 21 18:01:34 2010, Jenne, Update, 40m Upgrading, SRM, PRM hung, magnets inspected
|
Mon Jun 21 14:21:34 2010, Jenne, Kiwamu, Update, Photos, Inspection of Magnets for the TTs
|
Mon Jun 21 20:11:21 2010, Koji, Update, Photos, Inspection of Magnets for the TTs
|
Tue Jun 22 09:45:21 2010, Aidan, Joe, Razib, Update, Phase Camera, Current phase camera setup. Seeing Acoustic beat
|
Tue Jun 22 13:38:13 2010, Koji, Update, Phase Camera, Current phase camera setup. Seeing Acoustic beat
|
Tue Jun 22 18:56:32 2010, Jenne, Update, Environment, Bad placement of recycling bin
|
Tue Jun 22 20:07:08 2010, Jenne, Update, 40m Upgrading, First attempt at Tip Tilt hanging 
|
Wed Jun 23 11:25:14 2010, Katharine and Sharmila, Update, WIKI-40M Update, Maglev
|
Wed Jun 23 11:31:12 2010, nancy, Update, WIKI-40M Update, Weekly Update
|
Wed Jun 23 12:28:34 2010, Razib, Summary, Phase Camera, Weeekly Summary 
|
Wed Jun 23 12:31:36 2010, Gopal, Update, General, 6.16.10-6.23.10 Weekly Update
|
Wed Jun 23 12:47:43 2010, Jenne, Update, SUS, PRM, SRM ready for vacuum
|
Wed Jun 23 12:52:35 2010, kiwamu, Update, Photos, BS chamber before cleaning up
|
Wed Jun 23 15:15:53 2010, josephb, Summary, Computers, 40m computer security issue from last night and this morning
|
Wed Jun 23 15:33:42 2010, josephb, Update, CDS, Daily Downs Update
|
Wed Jun 23 17:48:16 2010, steve, Update, MOPA, laser head temp
|
Wed Jun 23 18:05:00 2010, Koji, Configuration, PSL, FSS SLOWDC should be ~-4.0
|
Wed Jun 23 23:08:30 2010, rana, Configuration, PSL, FSS SLOWDC should be ~-4.0
|
Thu Jun 24 01:02:34 2010, Sharmilla, Rana and Kiwamu, Update, Green Locking, a channel for PPKTP temperature
|
Thu Jun 24 06:49:29 2010, Aidan, Update, Green Locking, a channel for PPKTP temperature
|
Wed Jun 23 23:55:03 2010, Katharine, Sharmila, Rana, Steve and Kiwamu, Update, VAC, wiped the BS
|
Thu Jun 24 11:16:32 2010, Sharmila, Rana and Kiwamu, HowTo, VAC, Inspection of the BS (sorry, no sounds)
|
Thu Jun 24 13:02:59 2010, Jenne, Update, Computers, Some lunchtime reboots
|
Thu Jun 24 16:59:24 2010, josephb, Update, VAC, Finished restoring the access connector and door
|
Thu Jun 24 18:47:26 2010, Frank, DAQ, IOO, VME crate rebooted
|
Fri Jun 25 08:10:23 2010, josephb, Update, CDS, Daily Downs Update
|
Fri Jun 25 12:09:27 2010, kiwamu, Update, Computers, GPIB controller of HP8591E
|
Fri Jun 25 15:22:45 2010, Jenne, Omnistructure, SAFETY, No entry to the 40m LVEA until further notice!
|
Fri Jun 25 20:32:30 2010, kiwamu, Update, Green Locking, green power on the PSL table
|
Fri Jun 25 01:28:33 2010, Dmass, HowTo, SVN, SVN woes
|
Sat Jun 26 05:02:04 2010, rana, HowTo, SVN, SVN woes
|
Sat Jun 26 20:16:44 2010, josephb, Update, CDS, New checkout of RCG from SVN and changes made
|
Sat Jun 26 21:13:19 2010, rana, Summary, Computer Scripts / Programs, COMSOL 4.0 Installation
|
Mon Jun 28 11:27:08 2010, Megan, Update, Electronics, Marconi Phase Noise   
|
Mon Jun 28 13:40:53 2010, josephb, Alex, Update, CDS, Changes added to CDS SVN, new checkout, new features, some changes made
|
Mon Jun 28 12:48:04 2010, josephb, Summary, CDS, CDS adapter board notes
|
Mon Jun 28 21:26:05 2010, rana, Summary, CDS, CDS adapter board notes
|
Tue Jun 29 08:55:18 2010, Jenne, Frogs, Environment, We're being attacked! 
|
Tue Jun 29 12:08:43 2010, josephb, Update, CDS, Daily Downs Update
|
Tue Jun 29 11:48:17 2010, Jenne, Configuration, SAFETY, Back in LASER HAZARD mode.
|
Tue Jun 29 14:16:35 2010, Koji, Configuration, SAFETY, Back in LASER HAZARD mode.
|
Tue Jun 29 14:19:44 2010, josephb, Update, CDS, Daily Downs Update (Part 2)
|
Tue Jun 29 08:41:06 2010, steve, Update, MOPA, MOPA is dead
|
Tue Jun 29 10:20:58 2010, rana, Update, MOPA, MOPA is NOT dead
|
Tue Jun 29 16:44:12 2010, Jenne, rana, Update, MOPA, MOPA is NOT dead, was just asleep
|
Tue Jun 29 20:47:19 2010, Jenne, Update, PEM, Terminator put on Guralp Box
|
Wed Jun 30 11:35:06 2010, Gopal , Update, General, 6.23.10 - 6.30.10 Weekly Update
|
Wed Jun 30 11:39:20 2010, nancy, Update, WIKI-40M Update, Weekly Update
|
Wed Jun 30 12:01:20 2010, josephb, Update, CDS, SUS IO Chassis
|
Wed Jun 30 12:13:39 2010, Sharmila, Katharine, Update, WIKI-40M Update, weekly update
|
Wed Jun 30 12:20:49 2010, Razib, Update, Phase Camera, Weekly update
|
Wed Jun 30 14:38:04 2010, Jenne, Update, PEM, Guralp terminator is switched
|
Tue Jun 29 17:10:49 2010, steve, rana, Update, VAC, slow pumpdown started
|
Tue Jun 29 23:49:18 2010, steve, rana, Update, VAC, slow pumpdown started
|
Wed Jun 30 00:45:26 2010, rana, Update, VAC, slow pumpdown stopped for the night
|
Wed Jun 30 15:24:04 2010, steve,kiwamu, Update, VAC, slow pumpdown copmlete 
|
Wed Jun 30 17:30:54 2010, Jenne, Update, PEM, Seismometers moved for MC Wiener work
|
Wed Jun 30 18:16:55 2010, steve, Update, SAFETY, SURF safety training 2010
|
Wed Jun 30 23:03:46 2010, rana, Configuration, IOO, Power into MC restored to max
|
Thu Jul 1 10:26:34 2010, steve, Configuration, VAC, pd68 at vacuum normal state 
|
Thu Jul 1 14:03:40 2010, josephb, Update, PEM, Temporary disconnect of some PEM channels for ~20 minutes
|
Thu Jul 1 14:28:39 2010, Jenne, Update, PEM, MC1 Accelerometers in place
|
Thu Jul 1 17:05:36 2010, josephb, kiwamu, steve, Update, CDS, New SUS Chassis in rack
|
Fri Jul 2 11:06:38 2010, josephb, kiwamu, Update, CDS, CDS and Green locking thoughts
|
Fri Jul 2 11:33:15 2010, josephb, Update, CDS, c1sus needs real time linux to be setup on it
|
Tue Jul 6 11:57:06 2010, josephb, Update, CDS, Daily Downs Update
|
Tue Jul 6 17:05:30 2010, Megan and Joe, Update, Computers, c1iovme reboot
|
Tue Jul 6 17:07:56 2010, josephb, Update, CDS, c1sus status
|
Tue Jul 6 17:29:04 2010, Chip, Update, PEM, The Ranger is mine!
|
Tue Jul 6 17:38:27 2010, Jenne, Update, SUS, Tip Tilt Progress!
|
Wed Jul 7 00:15:29 2010, tara,Rana, Summary, PSL, power spectral density from RefCav transmitted beam 
|
Wed Jul 7 10:42:29 2010, Koji, Summary, PSL, power spectral density from RefCav transmitted beam
|
Wed Jul 7 11:23:08 2010, Sharmila, Katharine, Update, WIKI-40M Update,
|
Wed Jul 7 11:35:59 2010, Gopal, Update, WIKI-40M Update, 6.30.10 - 7.7.10 Weekly Update
|
Wed Jul 7 12:45:00 2010, nancy, Update, , Weekly Update
|
Wed Jul 7 17:05:30 2010, steve, rana, Update, SAFETY, Summary of Crane Damage/Malfunction 10x
|
Wed Jul 7 17:18:57 2010, Alberto, Configuration, Electronics, Stochmon and LSC AM Stabilizer Decomissioned
|
Wed Jul 7 19:41:27 2010, Jenne, Update, SUS, 1.5 more ECD sets suspended for tip tilts 
|
Wed Jul 7 22:52:38 2010, rana, nancy, Configuration, IOO, bad length control offset for the MC 
|
Thu Jul 8 14:32:42 2010, josephb, Update, CDS, Daily Downs Update
|
Thu Jul 8 15:19:27 2010, josephb, koji, Configuration, Computers, Added Zonet camera to IP table on linux1
|
Wed Jul 7 22:22:49 2010, Jenne, Update, Computers, Some channels not being recorded!!!
|
Thu Jul 8 14:11:16 2010, josephb, Update, Computers, Some channels not being recorded!!!
|
Thu Jul 8 15:43:58 2010, rana, Update, Computers, Some channels not being recorded!!!
|
Thu Jul 8 16:24:30 2010, Gopal, Update, Optic Stacks, Completion of single stack layer
|
Thu Jul 8 17:29:20 2010, Katharine, Sharmila, Update, elog, 6x
|
Wed Jul 7 22:58:08 2010, nancy, Update, IOO, MC alignment values.
|
Wed Jul 7 23:11:08 2010, Koji, Update, IOO, MC alignment values.
|
Thu Jul 8 20:32:22 2010, nancy, Update, IOO, MC alignment values.
|
Thu Jul 8 19:43:16 2010, nancy, Update, IOO, WFS calculations
|
Thu Jul 8 21:44:43 2010, nancy, Update, IOO, WFS calculations
|
Fri Jul 9 11:09:14 2010, josephb, Update, Computers, Fb40m and a few other machines turned off briefly just before 11am
|
Fri Jul 9 11:41:58 2010, Gopal, Summary, Optic Stacks, Top Optic Layer Complete; Mechanical Tests Giving Problems 7x
|
Wed Jul 7 12:17:36 2010, Razib, Update, Phase Camera, Weekly update  
|
Fri Jul 9 12:07:26 2010, Razib, Update, Phase Camera, Weekly update 
|
Mon Jul 12 02:21:01 2010, Koji, Configuration, ASC, Resurrection of MC WFS
|
Mon Jul 12 10:23:51 2010, steve, Update, PEM, air condition maintenance is today
|
Mon Jul 12 11:20:56 2010, Gopal , HowTo, COMSOL Tips, Intrusions (Negative Extrusions) 6x
|
Mon Jul 12 12:16:50 2010, Dmass, HowTo, COMSOL Tips, Intrusions (Negative Extrusions)
|
Mon Jul 12 15:49:56 2010, nancy, Update, SUS, Characterisation of the QPD   
|
Mon Jul 12 17:05:30 2010, nancy, Update, SUS, Characterisation of the QPD 
|
Mon Jul 12 18:37:10 2010, Gopal, Update, Optic Stacks, Eigenfrequency Analysis of Simple Objects
|
Mon Jul 12 21:26:02 2010, Katharine, Sharmila, Update, elog, maglev coils
|
Mon Jul 12 22:01:13 2010, Koji, Update, SUS, One TT suspended. Still need fine alignment
|
Tue Jul 13 10:02:30 2010, steve, Update, MOPA, laser power is dropping slowly
|
Fri Jul 9 12:25:25 2010, kiwamu, Update, Green Locking, SHG on PSL table
|
Tue Jul 13 11:00:29 2010, kiwamu, Update, Green Locking, SHG on PSL table : optimum temeprature
|
Tue Jul 13 11:20:07 2010, Dmass, Update, Green Locking, SHG on PSL table : optimum temeprature
|
Tue Jul 13 14:59:04 2010, Gopal, Update, Optic Stacks, Eigenfrequency Analysis of Single Stack Complete   
|
Tue Jul 13 17:36:42 2010, nancy, Update, IOO, Wavefront Sensing Matrix Control
|
Tue Jul 13 19:26:47 2010, rana, Update, IOO, MC still broken
|
Tue Jul 13 21:04:49 2010, tara,rana, Summary, PSL, Transfer function of FSS servo
|
Tue Jul 13 11:51:19 2010, Jenne, Update, PEM, Gur1 has no signal?!?!?!?!
|
Tue Jul 13 23:20:37 2010, Jenne, Update, PEM, Gur1 has no signal?!?!?!?!
|
Wed Jul 14 01:05:27 2010, Sharmila,Katharine, Summary, elog, Maglev   
|
Wed Jul 14 11:32:36 2010, Sharmila, Katharine, Update, WIKI-40M Update,
|
Wed Jul 14 10:00:14 2010, josephb, Update, Phase Camera, Work near 1Y2 yesterday
|
Wed Jul 14 11:51:48 2010, Razib, Update, Phase Camera, Work near 1Y2 yesterday
|
Wed Jul 14 12:12:03 2010, Razib, Summary, Phase Camera, Weekly update
|
Wed Jul 14 12:31:11 2010, nancy, Update, General, Weekly Update
|
Wed Jul 14 13:03:04 2010, Gopal , Update, WIKI-40M Update, 7.8.10 - 7.14.10 Weekly Update
|
Wed Jul 14 11:54:33 2010, josephb, Update, DAQ, Debugging Guralp and reboots
|
Wed Jul 14 16:39:06 2010, Jenne, Update, DAQ, Debugging Guralp and reboots
|
Wed Jul 14 18:09:50 2010, josephb, razib, Update, Phase Camera, Some cleanup behind 1Y2 rack of phasecamera electronics
|
Tue Jul 13 13:56:29 2010, Gopal, Configuration, Optic Stacks, Vitol Material Properties
|
Wed Jul 14 19:00:56 2010, Gopal, Configuration, Optic Stacks, Vitol Material Properties, REVISED
|
Wed Jul 14 19:15:26 2010, Gopal, Summary, Optic Stacks, REVISION: Eigenfrequency Analysis of Single Stack Complete    
|
Wed Jul 14 19:36:17 2010, Gopal, Update, Optic Stacks, Experimental Confirmation of COMSOL Analysis
|
Wed Jul 14 20:15:04 2010, Dmass, Bureaucracy, Cameras, IR Olympus
|
Thu Jul 15 11:58:50 2010, josephb, Update, Computers, Added channel to ADCU_PEM (C0DCU1)
|
Thu Jul 15 12:21:08 2010, Alberto, Configuration, LSC, PRC and SRC length adjustements 8x
|
Thu Jul 15 15:57:10 2010, Koji, Configuration, LSC, PRC and SRC length adjustements
|
Thu Jul 15 16:16:51 2010, Alberto, Configuration, LSC, PRC and SRC length adjustements
|
Thu Jul 15 16:57:31 2010, josephb, kiwamu, Update, CDS, The temporarily named c1scx machine getting ready to connect to IO chassis
|
Thu Jul 15 19:13:03 2010, rana, Update, IOO, MC_F check
|
Fri Jul 9 20:16:19 2010, rana, Summary, PSL, Things I did to the PSL today: Refcav, PMC, cameras, etc.
|
Sun Jul 11 20:11:48 2010, rana, Summary, PSL, RC trend after the insulation removal
|
Thu Jul 15 19:27:04 2010, rana, Summary, PSL, RC trend after the insulation removal  
|
Mon Jul 12 14:22:36 2010, Jenne, Summary, PSL, Things I did to the PSL today: Refcav, PMC, cameras, etc.
|
Thu Jul 15 23:51:47 2010, Mr. Maric, HowTo, SUS, Levitate me if you can
|
Fri Jul 16 12:36:00 2010, Katharine, Sharmila, Update, elog, levitation
|
Fri Jul 16 13:05:48 2010, Kyung-ha, Update, SUS, Late update for 7/13 Tue (Tip Tilts)
|
Fri Jul 16 15:39:27 2010, nancy, Update, IOO, Wavefront Sensors- switched off
|
Fri Jul 16 15:57:19 2010, josephb,kiwamu, Update, Computers, New X end FE and IO chassis work
|
Fri Jul 16 16:07:14 2010, josephb, Update, Computers, Possible solution for the last ADC
|
Fri Jul 16 16:12:31 2010, Alberto, Configuration, Computers, c1susvme1/2 rebooted
|
Sun Jul 18 20:50:03 2010, rana, Configuration, IOO, MC TRANS optics changed
|
Mon Jul 19 13:51:09 2010, kiwamu, Update, CDS, TIming card at X end
|
Mon Jul 19 14:14:03 2010, nancy, koji, Update, IOO, QPD Response Transfer Function
|
Mon Jul 19 14:16:01 2010, nancy, koji, Update, IOO, QPD Response Transfer Function
|
Mon Jul 19 16:11:17 2010, Gopal, Update, Optic Stacks, Eigenfrequency Analysis of Full Stack   
|
Tue Jul 20 11:49:31 2010, Jenne, Update, SUS, Some Suspensions not damping
|
Tue Jul 20 11:55:15 2010, Sharmila,Katharine, Update, elog, Maglev 
|
Tue Jul 20 15:06:48 2010, josephb, bob, Omnistructure, General, New speakers in ceiling in control room
|
Tue Jul 20 17:38:16 2010, Gopal, Configuration, Optic Stacks, Stack Type Clarifications
|
Tue Jul 20 18:29:43 2010, nancy, Update, IOO, QPD installed behind the MC2
|
Wed Jul 21 11:57:59 2010, Gopal, Update, WIKI-40M Update, 7.14.10-7.21.10 Weekly Update
|
Wed Jul 21 12:03:14 2010, Katharine, Sharmila, Update, WIKI-40M Update, weekly update
|
Wed Jul 21 12:20:29 2010, josephb, kiwamu, Update, Computers, Megatron temporarily disconnected, c1iscex firewalled, green FE test
|
Wed Jul 21 12:20:58 2010, Razib, Update, Phase Camera, Weekly update
|
Wed Jul 21 15:43:38 2010, Megan, Summary, PSL, Copper Layer Thickness on the Reference Cavity
|
Wed Jul 21 17:41:17 2010, Gopal, Configuration, Optic Stacks, Pictures of Stacks
|
Sun May 16 12:51:08 2010, kiwamu, Update, Green Locking, reflected beam at PD
|
Sun May 16 19:25:45 2010, Koji, Update, Green Locking, reflected beam at PD
|
Thu May 20 13:29:40 2010, kiwamu, Update, Green Locking, mode profile at PPKTP crystal
|
Thu May 20 14:18:59 2010, kiwamu, Update, Green Locking, mode profile of 40m cavity
|
Wed May 26 04:14:21 2010, kiwamu, Update, Green Locking, locked
|
Wed May 26 14:38:02 2010, Koji, Update, Green Locking, locked
|
Thu May 27 02:22:24 2010, kiwamu, Update, Green Locking, more details  
|
Thu May 27 09:43:50 2010, rana, Update, Green Locking, more details
|
Mon Jul 12 13:16:53 2010, kiwamu, Update, Green Locking, PZT feedback at X end
|
Wed Jun 9 11:13:11 2010, kiwamu, Update, Green Locking, lock with PDH box
|
Fri Jun 11 11:54:42 2010, kiwamu, Update, Green Locking, end PDH with thermal feedback 
|
Fri Jun 11 13:32:28 2010, Koji, Update, Green Locking, end PDH with thermal feedback
|
Sun Jun 20 18:28:25 2010, kiwamu, Update, Green Locking, Re: lock with PDH box
|
Wed Jul 21 19:11:18 2010, Dmass, Update, Green Locking, locked
|
Thu Jul 22 03:08:27 2010, Koji, Update, IOO, Vent and MC lock
|
Thu Jul 22 01:02:08 2010, rana, Update, Treasure, Monsters, LNVR, and Phase noise
|
Thu Jul 22 07:19:56 2010, Alberto, Update, Treasure, Monsters, LNVR, and Phase noise
|
Tue Jul 20 08:04:31 2010, steve, Configuration, VAC, slow vent has started
|
Tue Jul 20 23:52:36 2010, kiwamu, Update, VAC, update: slow vent has started
|
Wed Jul 21 12:41:31 2010, kiwamu, Update, VAC, vent finished
|
Thu Jul 22 08:07:27 2010, steve, Update, VAC, vent finished
|
Thu Jul 22 13:44:47 2010, Jenna, Update, PEM, Guralp seismometer
|
Thu Jul 22 14:07:20 2010, kiwamu, Update, PSL, PSL front end machine
|
Thu Jul 22 15:59:29 2010, Alberto, Update, PSL, PSL front end machine
|
Thu Jul 22 18:18:54 2010, Alberto, Update, PSL, Problem Solved
|
Fri Jul 23 00:13:11 2010, rana, Update, PSL, Problem NOT REALLY Solved
|
Fri Jul 23 08:18:03 2010, josephb, Update, CDS, Not enough room in IO chassis for RFM card - need to swap PMC to PCIe adapters
|
Fri Jul 23 12:33:51 2010, josephb, Update, CDS, megatron, c1iscex, c1sus firewalled
|
Fri Jul 23 14:26:01 2010, Gopal, Update, Optic Stacks, Simple Frequency Response Measurements in COMSOL
|
Fri Jul 23 16:00:35 2010, steve, Update, SAFETY, crane load test tomorrow
|
Fri Jul 23 15:54:38 2010, kiwamu, Update, SUS, PRM and TT installed
|
Fri Jul 23 18:55:25 2010, kiwamu, Update, SUS, PRM and TT installed
|
Fri Jul 16 20:25:52 2010, Megan, Update, PSL, Reference Cavity Insulation 
|
Fri Jul 16 23:53:27 2010, Rana, Update, PSL, Reference Cavity Insulation
|
Fri Jul 23 16:02:16 2010, Rana, Update, PSL, Reference Cavity Insulation
|
Fri Jul 23 21:14:29 2010, Rana, Update, PSL, Reference Cavity Insulation
|
Sat Jul 24 14:03:19 2010, Alberto, Update, Electronics, FSS Oscilaltor Phase Noise Measurement
|
Sat Jul 24 14:27:36 2010, rana, Update, Electronics, FSS Oscilaltor Phase Noise Measurement
|
Sun Jul 25 18:47:23 2010, Alberto, Update, SVN, Optickle 40mUpgrade model updated to include short cavity length corrections
|
Fri Jul 23 15:32:02 2010, steve, Update, PEM, control room AC set point changed
|
Mon Jul 26 08:51:31 2010, steve, Update, PEM, lowering AC setpoint by 2F makes PSL happy
|
Fri Jul 23 10:16:44 2010, josephb, Update, CDS, Rerouted RFM around c1lsc, took RFM card out of c1lsc
|
Fri Jul 23 21:35:48 2010, rana, Update, CDS, Rerouted RFM around c1lsc, took RFM card out of c1lsc
|
Mon Jul 26 10:02:42 2010, josephb, Update, CDS, Rerouted RFM around c1lsc, took RFM card out of c1lsc
|
Mon Jul 26 11:15:23 2010, Gopal, HowTo, COMSOL Tips, Pictures from Transfer Function Tutorial on the Wiki 7x
|
Mon Jul 26 12:31:36 2010, kiwamu, Update, CDS, front end machine for the X end
|
Mon Jul 26 14:24:46 2010, josephb, kiwamu, Update, CDS, RFM test take 1
|
Mon Jul 26 20:30:35 2010, Jenne, Update, SUS, 2 Tip Tilts suspended and balanced
|
Tue Jul 27 11:24:53 2010, josephb, HowTo, Computer Scripts / Programs, killdataviewer script
|
Tue Jul 27 11:43:24 2010, steve, Update, PEM, air quality is bad today
|
Tue Jul 27 12:02:31 2010, Gopal, Update, Optic Stacks, Preliminary Transfer Function Measurements on MC1/MC3    
|
Mon Jul 19 21:47:36 2010, rana, Summary, DAQ, DAQ timing test
|
Tue Jul 27 16:03:36 2010, rana, Summary, DAQ, DAQ timing test
|
Tue Jul 27 16:33:50 2010, Koji, Summary, General, High school students tour
|
Tue Jul 27 23:46:45 2010, Jenne, Update, SUS, Q measurements of 2 TTs
|
Wed Jul 28 12:09:06 2010, Sharmila,Katharine, Update, WIKI-40M Update, Maglev
|
Tue Jul 27 18:42:57 2010, Gopal, Update, Optic Stacks, Bode Magnitude Plot and Concerns
|
Wed Jul 28 01:05:44 2010, rana, Update, SEI, Bode Magnitude Plot and Concerns
|
Wed Jul 28 12:16:03 2010, Gopal, Update, SEI, Bode Magnitude Plot and Concerns
|
Wed Jul 28 12:31:00 2010, Gopal, Update, WIKI-40M Update, 7.21.10-7.28.10 Weekly Update
|
Wed Jul 28 12:53:32 2010, channa, Update, Computers, nds data listener
|
Wed Jul 28 13:06:47 2010, Razib, Update, Phase Camera,  
|
Wed Jul 28 14:34:29 2010, channa, Update, Computers, installation on allegra
|
Wed Jul 28 14:54:56 2010, steve, Update, SAFETY, evacuation drill at the 40m
|
Wed Jul 28 18:24:57 2010, Jenne, Update, Green Locking, 2 Green Periscopes have mirrors, aligned
|
Mon Jul 26 20:12:18 2010, kiwamu, Update, SUS, OSEMs on PRM
|
Tue Jul 27 21:38:21 2010, kiwamu, Update, SUS, installation of in-vac optics 
|
Wed Jul 28 17:32:37 2010, kiwamu, Update, SUS, installation of in-vac optics
|
Thu Jul 29 10:39:43 2010, kiwamu, Update, SUS, Re: installation of in-vac optics
|
Thu Jul 29 11:33:38 2010, kiwamu, Update, CDS, PCI5565 driver for RFM
|
Thu Jul 29 12:13:28 2010, kiwamu, Summary, CDS, near term plan
|
Thu Jul 29 12:31:24 2010, josephb, Update, CDS, Working DAC, working IOP - next up SUS
|
Thu Jul 29 17:11:16 2010, Gopal, Update, COMSOL Tips, Including Gravity in COMSOL
|
Thu Jul 29 15:35:21 2010, josephb, kiwamu, Update, CDS, Working out ADC/DAC/BO wiring
|
Thu Jul 29 17:12:48 2010, josephb, kiwamu, Update, CDS, Re:Working out ADC/DAC/BO wiring
|
Thu Jul 29 20:43:32 2010, Gopal, Summary, Optic Stacks, Modeling Tips and Tilts   
|
Thu Jul 29 22:08:32 2010, Alberto, Update, SUS, More optics installed on the BS table
|
Fri Jul 30 02:54:04 2010, Koji, Update, 40m Upgrading, More optics installed on the BS table
|
Wed Apr 21 10:09:23 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals
|
Tue Apr 27 14:18:53 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals
|
Thu Jul 29 21:13:39 2010, Dmass, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals
|
Thu Jul 29 22:58:25 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals
|
Fri Jul 30 00:02:15 2010, Dmass, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals
|
Fri Jul 30 09:51:58 2010, kiwamu, Update, Green Locking, Re: waist positon of Gaussian beam in PPKTP crystals   
|
Fri Jul 30 12:46:38 2010, Koji, Configuration, 40m Upgrading, BS chamber status
|
Thu Jul 29 12:31:09 2010, Koji, Summary, General, Lab Schedule
|
Fri Jul 30 14:53:09 2010, steve, Update, General, PSL table leg upgrade
|
Fri Jul 30 17:24:22 2010, Jenne, Update, PEM, Guralps back in the 40m
|
Fri Jul 30 17:52:12 2010, Koji, Configuration, General, Jacket
|
Fri Jul 30 19:20:15 2010, Alastair, Configuration, General, Jacket
|
Sat Jul 31 04:03:11 2010, Gopal, Summary, Optic Stacks, Complete Displacement Translational Transfer Function Matrix
|
Sat Jul 31 22:35:01 2010, Koji, Update, VAC, Vac-P1 still 1.2mtorr
|
Sun Aug 1 18:50:35 2010, Koji, Update, VAC, P1 = 0.48 torr
|
Sun Aug 1 21:04:45 2010, rana, Summary, Computer Scripts / Programs, MC Autolocker fixed
|
Sun Aug 1 21:40:27 2010, rana, Summary, PSL, FSS: SLOWDC response
|
Fri Jul 30 09:55:34 2010, steve, Configuration, VAC, slow pumpdown has started
| |
|