40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 294 of 355  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  14207   Fri Sep 21 16:51:43 2018 gautamUpdateVACc1vac1 is unresponsiveSteve pointed out that some of the vacuum
MEDM screen fields were reporting "NO
COMM". Koji confirmed that this is a
  
  14215   Mon Sep 24 15:06:10 2018 gautamUpdateVACc1vac1 reboot + TP1 controller replacement[steve, gautam]

Following the procedure in this
 beforeReboot.pngafterReboot.pngCC1.png 
  14278   Tue Nov 6 19:41:46 2018 JonOmnistructure c1vac1/2 replacementThis afternoon I started setting up the
Supermicro 5017A-EP that will replace c1vac1/2.
Following Johannes's procedure in 
  
  1505   Mon Apr 20 23:27:59 2009 ranaSummaryVACc1vac2 rebooted: non-functional for several monthsWe found several problems with the framebuilder
tonight. The first symptom was that it was
totally out of
  
  5989   Wed Nov 23 16:48:39 2011 SureshUpdateGeneralcable cleanup[Koji Suresh]
As part of the general lab clean
up we removed many unused BNC cables (long
  
  875   Mon Aug 25 10:23:53 2008 steveHowToGeneralcable killerRack 1Y7 double violation:

BNC cables left to be jammed by door
 cablkill.pngcablkll2.png 
  7873   Thu Jan 3 19:19:59 2013 ranaHowToElectronicscable racksToday I found 3 power cables in the
orange Pomona cable tray, put in
so that the cables were 
  
  4390   Wed Mar 9 16:07:42 2011 kiwamuUpdateVIDEOcable session[Koji, Steve, Suresh, Kiwamu]
The following video cables have been
newly laid down :
  
  11659   Fri Oct 2 15:11:08 2015 SteveUpdatePEMcable squashedCable numbered #53 from Accelerometer 4
to 1X7 / DAQ input c26 was squased while
removing network card from Sun Fire x4600
  
  7807   Tue Dec 11 08:53:52 2012 SteveHowToPEMcables needs careHow NOT
to:
The
 IMG_1839.JPG 
  7809   Tue Dec 11 10:09:04 2012 AyakaHowToPEMcables needs care

    

       
            
  
  3996   Tue Nov 30 12:33:27 2010 kiwamuSummaryIOOcabling of in-vac PZT mirrors     
  10066   Wed Jun 18 22:34:44 2014 ericqUpdateIOOcaget frusrtation

    

       
            
  
  10077   Thu Jun 19 22:04:23 2014 ericqUpdateComputer Scripts / Programscaget/caput now return in reasonable timeI think I've fixed the caget/caput issue.
Rana's observation that pinging the IP directly
was faster than pinging the hostname set
  
  6931   Fri Jul 6 14:10:31 2012 yutaSummaryLSCcalculation of FPMI using ALSFrom calculation, phase fluctuation of
reflected beam from length stabilized arm
is not disturbing MI lock.
  
  4402   Thu Mar 10 17:03:48 2011 Larisa ThorneConfigurationElectronicscalculations for passive low pass filter on X arm[Kiwamu, Larisa] 
 
We want to increase gain in the lower
  
  17160   Tue Sep 27 10:50:11 2022 PacoUpdateBHDcalibrated LO phase noiseLocked LO phase to ITMX single bounce beam
at the AS port, using the DCPD (A-B) error
point and actuating on LO1 POS. For this
 lo_phase_asd.pdf 
  17161   Wed Sep 28 16:37:26 2022 PacoUpdateBHDcalibrated LO phase noise; update[yuta, paco]

Update; the high frequency ( >
100 Hz) drop is of course not real and comes
 lo_phase_asd.pdf 
  17163   Wed Sep 28 21:54:08 2022 PacoUpdateBHDcalibrated LO phase noise; updateRepeated the LO phase noise measurement,
this time with the LO - ITMY single
bounce, and a couple of fixes Koji
 dcpd_phase_asd.pdflo_phase_asd.pdf 
  8248   Thu Mar 7 01:43:35 2013 yutaUpdateLSCcalibrated MI differential length spectraFree swing MI differential length is 86 nm
RMS and residual length when locked
 LSCMICHOLTF_MI.pngMImotion.png 
  6841   Wed Jun 20 18:43:57 2012 yutaUpdateLSCcalibrated POX error signal[Jenne, Yuta]

We did the same calibration for POX.
 LSCxarmTF_usingITMX.pngLSCxarm_HAover1plusG.pngPOXerrorcalibration.png 
  6834   Tue Jun 19 23:36:19 2012 yutaUpdateLSCcalibrated POY error signal[Jenne, Yuta]

We calibrated POY error signal(C1:LSC-POY11_I_ERR).
 LSCyarmTF_usingITMY.pngLSCyarm_HAover1plusG.pngPOYerrorcalibration.png 
  6835   Wed Jun 20 00:01:04 2012 JenneUpdateLSCcalibrated POY error signal[Yuta, Jenne]
We have measured the out of loop
residual motion of the Yarm while locked
 LSC_POY_11_I_ERR_calib_19June2012.pdfPOY_calib_19June2012_FiltBankSettings.png 
  8256   Fri Mar 8 03:07:19 2013 yutaUpdateLSCcalibrated PRM-ITMY length spectraMeasured free swing PRM-ITMY length was
230
nm RMS.
 LSCPRCLOLTF_PRITMY.pngPRITMYmotion.png 
  9606   Wed Feb 5 20:41:57 2014 DenUpdateLSCcalibrated spetra from OAF testWe did online adaptive filtering test with
IMC and arms 1 year ago (log
7771). In the 40m presentations I can
 oaf_cal.pdf 
  6938   Sun Jul 8 00:27:54 2012 yutaSummaryLockingcalibrating phase tracking mode scan dataFSR
for X/Y arm are 3.97 +/- 0.03 MHz and 3.96
+/- 0.02 MHz respectively. This
  
  6939   Sun Jul 8 00:58:08 2012 KojiSummaryLockingcalibrating phase tracking mode scan data

    

       
            
  
  6815   Wed Jun 13 17:39:13 2012 yutaUpdateGreen Lockingcalibrating the beatbox[Jenne, Yuta]

We put 0 dBm sine wave to the RF input
 ALS-BEATY_COARSE_I_IN1_DQ.pngALS-BEATY_COARSE_Q_IN1_DQ.pngALS-BEATY_FINE_I_IN1_DQ.pngALS-BEATY_FINE_Q_IN1_DQ.png 
  1185   Mon Dec 8 00:10:42 2008 carynSummaryGeneralcalibrating the jenne laserI apologize in advance for the long list of
numbers in the attachment. I can't seem to
make them hide for some reason. 
 IvsDCmax.pngdata.tar.gzjcal_dip_2_norm_log.pngjcal_flat_3_norm_log.png 
  1189   Tue Dec 9 10:48:17 2008 CarynSummaryGeneralcalibrating the jenne laser: impedance mismatch?
We sent RFout of network analyzer to a splitter,
with one side going back to the network analyzer
 reflection.png 
  8255   Fri Mar 8 02:17:04 2013 yutaUpdateLSCcalibration of PRM actuator[Manasa, Yuta]

We measured AC response of PRM actuator
 calibREFL55Q.pngactcalibPRM.pngOLTF_PRCL.png 
  5637   Sat Oct 8 00:44:42 2011 kiwamuUpdateLSCcalibration of SRM actuatorThe AC response
of the SRM actuator has been calibrated.
 actuators.png 
  7738   Wed Nov 21 21:06:13 2012 AyakaUpdateLSCcalibration of armsMotivation
In order to estimate whether we can
see acoustic coupling in arms or not, we
 7x 
  7739   Sat Nov 24 13:58:07 2012 ranaUpdateLSCcalibration of armsFor the loop diagnosis, its best
to use the method of "IN1/IN2",
rather than manipulate the close loop gain.
  
  7743   Mon Nov 26 10:42:06 2012 AyakaUpdateLSCcalibration of armsI uploaded a zip file that contains data
files used for the calibration.
OLTF_x/y.txt: the open loop transfer
 armcalib.zip 
  8009   Wed Feb 6 15:05:18 2013 SteveUpdateSAFETYcameras must be anchordCameras
must be immediately anchord to avoid a possible
 IMG_0070_1.JPGIMG_0069_1.JPG 
  7178   Tue Aug 14 14:26:40 2012 SteveUpdateCamerascameras touched up I optimized the TM views with illuminator
light on quad1  It actually looks better
there. 
 cameras.png 
  2453   Sun Dec 27 20:05:28 2009 kiwamuUpdateComputerscan not communicate with front-endsIn this evening I found that fb40m has
been down, then I restarted fm40m successfully.
 C0DAQ_DETAIL.png 
  8714   Mon Jun 17 23:12:19 2013 ManasaUpdateGreen Lockingcan't get IR to resonateWhat I did: 
1. Followed the same procedure to
enable ALS (http://nodus.ligo.caltech.edu:8080/40m/8703)
  
  1836   Wed Aug 5 15:33:05 2009 rob, albertoDAQGeneralcan't get trendsWe can't read minute trends from either
Dataviewer or loadLIGOData from before 11am
this morning. 
  
  1841   Thu Aug 6 09:22:17 2009 AlbertoDAQGeneralcan't get trends


   
        
            
  
  8143   Sat Feb 23 07:14:58 2013 yutaUpdateLSCcan't lock Y armI tried to align and lock Y arm for the
first time after pumping.
But I couldn't lock Y arm for more
 TRYPOY.png 
  8149   Sat Feb 23 16:54:24 2013 JenneUpdateLSCcan't lock Y armI'm not sure that Yuta had found the real
Yarm flashes last night.  When I came
in today, the Yarm would flash.  However
  
  8150   Sat Feb 23 17:14:59 2013 yutaUpdateLSCcan't lock Y armJenne found that;
  0. If all mirrors are "aligned,"
Yarm flashes.
  
  6816   Thu Jun 14 01:36:34 2012 yutaUpdateGreen Lockingcan't scan Y arm for 1FSR[Jenne, Koji, Yuta]

We tried to scan of the Y arm but
 BEATY_COARSE_LoopOnOff.png 
  14336   Fri Dec 7 19:42:47 2018 ranaFrogselogcan't upgrade DokuWiki because of PHP / SL7All of our wikis (except the 40m one which
unfortunately got turned into ligo.org mess)
use DokuWiki. This now has an auto-upgrade
  
  4667   Mon May 9 16:12:49 2011 JamieConfigurationCDScanonicalize paths to core and userappsI have updated the /opt/rtcds paths to
reflect the new specification of the CDS
aLIGO code release procedures document.
  
  10938   Fri Jan 23 19:38:02 2015 JenneUpdateLSCcarm_cm_up supports both signs of CARM offsetA small change, but now the carm_up script
supports both sides of the CARM offset. 
After the arms are locked with ALS it asks
  
  12965   Wed May 3 16:12:36 2017 johannesConfigurationComputerscatastrophic multiple monitor failuresIt seems we lost  monfight.jpg 
  12966   Wed May 3 16:46:18 2017 KojiConfigurationComputerscatastrophic multiple monitor failures- Is there any machine that can handle
4K? I have one 4K LCD for no use.
- I also can donate one 24" Dell
  
ELOG V3.1.3-