  1793   Sun Jul 26 13:19:54 2009 ranaUpdatePSLAligning the mode cleanerI set the MC back to its good alignment
(June 21st) using this
procedure. The trend of the OSEM values
 Untitled.png 
  1796   Mon Jul 27 14:12:14 2009 ranaSummarySUSTM Coil Noise SpectraRob noticed that the ITMY DAC channels were
saturating occassionally. Looking at the
spectrum we can see why.
 Coils.pdf 
  1809   Wed Jul 29 19:31:17 2009 ranaConfigurationComputerselog restartedJust now found it dead. Restarted it. Is
our elog backed up in the daily backups?
  
  1814   Thu Jul 30 21:26:16 2009 ranaUpdateIOOMC Drumhead modeI used COMSOL 3.5a to do a FEA of one of the
MC flat mirrors. Should be close to the same
for all the mirrors.
 mc2drum.png 
  1851   Fri Aug 7 00:10:14 2009 ranaUpdatePSLRef cav reflection PD is funkywe have a tester cable, but you don't want
it. Instead the problem is probably at the
cross-connect. The D-cable goes to a cross-connect
  
  1867   Sat Aug 8 15:08:14 2009 ranaConfigurationPSLSMOO settings updated in psl.db and SVN updatedI have added/modified SMOO settings to
all of the records in psl.db appropriately.
Changes checked in to SVN.
  
  1868   Sat Aug 8 17:19:07 2009 ranaUpdatePEMTwo Guralps plugged in, prepped for huddle test I found that several of the cables
are unlabeled so I'm not sure what's plugged
in. In the end, I found that the TEMP_2,
 Untitled.png 
  1869   Sat Aug 8 17:23:29 2009 ranaUpdatePEMoffensive 2 Hz sine wave removedFriday, we were seeing a 2 Hz harmonic
series in all of the PEM channels. Today
I found that some bad person had put in
  
  1870   Sun Aug 9 16:32:18 2009 ranaUpdateComputersRCG work. MDC MDP open loop transfer functionThis is very nice. We have, for the first
time, a real time plant with which we can
test our changes of the control system. From
 a.png 
  1887   Tue Aug 11 23:17:21 2009 ranaSummaryComputersNodus rebooted / SVN downLooks like someone rebooted nodus at ~3
PM today but did not elog it. Also the SVN
is not running. Why?
  
  1897   Thu Aug 13 09:22:06 2009 ranaUpdatePEMrangerRana, Jan, Jenne
We noticed that the Ranger data was
all bogus at low frequencies. So we checked
  
  1912   Sat Aug 15 18:57:48 2009 ranaUpdateVACUPS failedAs Rob noted last Friday, the UPS which
powers the Vacuum rack failed. When we were
trying to move the plugs around to debug
  
  1920   Mon Aug 17 17:43:11 2009 ranaSummaryGeneralconlogger restartedAdded the conlog directory to the SVN,
minus the enormous data directory. We are
now free to make changes to the conlog code.
  
  1927   Wed Aug 19 02:17:52 2009 ranaOmnistructureEnvironmentControl Room Workstation desks lowered to human heightThere were no injuries...Now we need to
get some new chairs.
  
  1938   Tue Aug 25 00:35:04 2009 ranaUpdateGeneralTransfer function of Mode Cleaner StacksLooks like all of the accelerometers and
seismometers have been disconnected since
early AM last Monday when Clara disconnected
 Untitled.png 
  1939   Tue Aug 25 01:27:09 2009 ranaConfigurationComputersRaid update to Framebuilder (not quite)


   
        
            
  
  1940   Tue Aug 25 02:37:53 2009 ranaConfigurationComputer Scripts / ProgramsFirefox 3.5 installed for 64 bit linux in apps/   DSC_0620.JPG 
  1942   Tue Aug 25 11:02:39 2009 ranaSummaryPSLTemperature BoxThe PSL Temperature Box (D980400-B-C, what
kind of numbering scheme is that?) modified
at LHO/LLO ~8 years ago to have better resolution
 D980400-B.pdf 
  1946   Tue Aug 25 21:55:11 2009 ranaUpdatePSLreference cavity temp box temporarly out of orderThere's no elog entry about what work has
gone on today, but it looks like Peter took
apart the reference cavity temperature control
 Untitled.pngrc-heater.jpg 
  1956   Thu Aug 27 13:42:08 2009 ranaSummaryPSLReference Cavity Temperature Control: psl.db changesI made the changes
to the psl.db to handle the new Temperature
  
  1957   Thu Aug 27 14:00:33 2009 ranaUpdatePSLRC thermal servo impulse responseI stepped the TIDALSET and looked at
what happened. Loop was closed with the very
 Untitled.png 
  1968   Mon Sep 7 20:05:18 2009 ranaUpdatePSLRCTEMP v. RMTEMPSince ~Aug. 27, the reference cavity has
been running with no thermal control. This
is not really a problem at the 40m; a 1 deg
 rct2.pngrct.png 
  1970   Mon Sep 7 23:35:03 2009 ranaUpdatePSLRC thermal servo: PID script modified, database + screen addedI have added the records for the RC thermal
PID servo into the psl/slowpid.db file which
also holds the records for the SLOW servo
 Untitled.png 
  1971   Mon Sep 7 23:51:48 2009 ranaConfigurationComputersmatlab installed: 64-bit linuxI have wiped out the 2008a install of 64-bit
linux matlab and installed 2009a in its place.
Enjoy.
  
  1976   Tue Sep 8 19:30:33 2009 ranaUpdatePSLc1psl rebooted for new RCPID database settingsThe RC thermal PID is now controllable
from its own MEDM screen which is reachable
from the FSS screen. The slowpid.db and
 c1psl-term-dump.txt.gzC1PSL_FSS_RCPID.pngPicture_1.png 
  1983   Thu Sep 10 18:25:15 2009 ranaUpdatePSLc1psl rebooted for new RCPID database settingsI added a new database record (C1:PSL-FSS_RCPID_SETPOINT)
to allow for changing of the RC setpoint
while the loop is on. This will enable us
  
  1986   Sat Sep 12 15:40:15 2009 ranaUpdatePSLRC response v. can temperatureI stepped the RC can temperature  Picture_2.pngUntitled.pdf 
  1995   Wed Sep 23 19:36:41 2009 ranaUpdatePSLRC temperature performanceThis first plot shows the RC temperature
channels' performance from 40 days ago, before
we disabled the MINCO PID controller. Although
 Untitled.pngUntitled.pnge.png 
  1998   Thu Sep 24 19:35:20 2009 ranaHowToPhotos40m Google accountI've created a 40m Google account. Please
post all the 40m related photos to this site.
If you don't already have it, download Picasa
  
  1999   Thu Sep 24 20:17:05 2009 ranaSummaryLSCComparison of Material Properties for the new RFPD Mounts
    

       
             
  
  2005   Fri Sep 25 19:56:08 2009 ranaConfigurationComputersNTPD restarted on c1dcuepics (to fix the MEDM screen times)[SIZE=3][FONT=Tahoma]restarted ntp on op440m
using this syntax[/FONT][/SIZE]
  
  2007   Sun Sep 27 12:52:56 2009 ranaUpdateMOPAIncreasing the power from the MOPAThis is a trend of the last 20 days. After
our work with the NPRO, we have recovered
only 5% in PMC trans power, although there's
 Picture_3.png 
  2010   Sun Sep 27 23:21:14 2009 ranaUpdatePSLSLOWscan result

    
        
  
  2011   Mon Sep 28 02:24:05 2009 ranaUpdateLockingMC1/3 Dewhitening found OFF: Turned back ONWhile trying to make the OAF work, I found
that the XYCOM switches for MC1/3 have been
set in the bad way for awhile. This means
 C1SUS_SRM_XYCOM1.pngUntitled.png 
  2021   Tue Sep 29 21:37:09 2009 ranaUpdateMZMZ work done : some noise checkingSince we used to run with a gain slider
setting of +15 dB on the MZ, I wanted to
check that the new setting of +30dB was OK.
 fsm.pdf 
  2025   Tue Sep 29 23:43:49 2009 ranaAoGall down cond.Cosmic   Actel1.jpg 
  2041   Fri Oct 2 14:52:55 2009 ranaUpdateComputersc1susvme2 timing problems updateThe attached shows the 200 day '10-minute'
trend of the CPU meters and also the room
temperature.
 Untitled.png 
  2061   Wed Oct 7 03:49:49 2009 ranaUpdateAdaptive FilteringAttempts to take a TF of the OAF system Here's a plot of the spectra of the
seismometers and MCL. The coherence shows
which axes are aligned right now: MC1_X is
 Untitled.png 
  2062   Wed Oct 7 06:26:09 2009 ranaHowToIOOMC_L calibration + some DTT loreI drove MC2 in POS and used the
resulting response in MC_F to calibrate the
IOO-MC_L channel.
 mcl-cal.pnga.png 
  2063   Wed Oct 7 07:42:55 2009 ranaUpdateAdaptive FilteringAttempts to take a TF of the OAF systemI remeasured
the OAF time delay using the OAF-TF template
  
  2066   Wed Oct 7 20:32:21 2009 ranaUpdateAdaptive Filteringextra delay and noise in PEM -> ASS/OAF system[Rana, Jenne]
There is some craziness going on
with the delay in the PEM path for the OAF. 
 a.gif 
  2072   Thu Oct 8 22:17:15 2009 ranaConfigurationDMFinput channels changedI changed the input channels of the DMF
recently so that it now uses 3 Guralp channels
in addition to the 3 ACC and 1 Ranger.
  
  2073   Fri Oct 9 01:31:56 2009 ranaConfigurationDAQtpchn mysteryDoes anyone know if this master
file is the real thing that's in use now?
  
  2079   Sun Oct 11 04:12:44 2009 ranaUpdatePEMAccelerometers relocatedSome of these channels are not like the
others.
 Untitled.png 
  2088   Mon Oct 12 22:15:15 2009 ranaConfigurationPSLStray beam blockingYou can remove the RFAM measuring setup.
Once we upgrade, we will no longer have a
MZ or the related problems. 
  
  2093   Wed Oct 14 23:02:41 2009 ranaUpdateLockingdaytime lockingThis is huge.  a.png 
  2094   Thu Oct 15 01:21:31 2009 ranaSummaryCOCThermal Lensing in the ITMThermal lensing formula:
 Untitled.pngaa.png 
  2096   Thu Oct 15 02:41:04 2009 ranaUpdateCOCChoice of folding mirrors in the RC cavitiesIn addition to the main mirrors (PRM, SRM)
we will also have fold mirrors (called PR1,
PR2, SR1, SR2). I am curious to see if we
 Picture_9.png 
  2100   Thu Oct 15 17:12:00 2009 ranaSummaryLockingnever had it so good 
  
  2107   Fri Oct 16 18:46:36 2009 ranaConfigurationASCloop opened on PZT2 YAW at 3:40 pm

    
        