40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 294 of 339  Not logged in ELOG logo
    Reply  Fri Aug 24 10:51:23 2018, Steve, Update, VAC, pumpdown 81 at day 38 d38.png
    Reply  Fri Aug 24 14:58:30 2018, Steve, Update, SUS, ETMX trips again glitches.png
    Reply  Mon Aug 27 09:14:45 2018, Steve, Update, PEM, small earth quakes  small_EQs_vs_SUSs.png
Entry  Tue Aug 28 18:39:41 2018, Jon, Update, CDS, C1LSC, C1AUX reboots CDS_FE_STATUS.png
    Reply  Wed Aug 29 09:20:27 2018, Steve, Update, SUS, local 4.4M earth quake 4.4_La_Verne.png3.4_&_4.4M_EQ.png
    Reply  Wed Aug 29 09:56:00 2018, Steve, Update, VAC, Maglev controller needs service 
    Reply  Wed Aug 29 11:46:27 2018, Jon, Update, SUS, local 4.4M earth quake 
Entry  Wed Aug 29 14:51:05 2018, Steve, Update, General, tomorrow morning 
    Reply  Tue Sep 4 10:14:11 2018, gautam, Update, CDS, CDS status update 
    Reply  Wed Sep 5 10:59:23 2018, wgautam, Update, CDS, CDS status update 
    Reply  Thu Sep 6 14:21:26 2018, gautam, Update, CDS, ADC replacement in c1lsc expansion chassis CDSoverview.png
    Reply  Fri Sep 7 12:35:14 2018, gautam, Update, CDS, ADC replacement in c1lsc expansion chassis Screenshot_from_2018-09-07_12-34-52.png
    Reply  Mon Sep 10 12:44:48 2018, Jon, Update, CDS, ADC replacement in c1lsc expansion chassis 
Entry  Wed Sep 12 22:22:30 2018, Koji, Update, Computers, SSL2.0, SSL3.0 disabled 
Entry  Mon Sep 17 12:28:19 2018, gautam, Update, IOO, PMC and IMC relocked, WFS inputs turned off 
    Reply  Tue Sep 18 14:02:37 2018, Steve, Update, safety, safety training 
    Reply  Tue Sep 18 17:56:01 2018, not gautam, Update, IOO, PMC and IMC relocked, WFS inputs turned off 
    Reply  Thu Sep 20 08:17:14 2018, Steve, Update, SUS, local 3.4M earth quake local_3.4M.png
    Reply  Thu Sep 20 11:29:04 2018, gautam, Update, CDS, New PCIe fiber housed PCIeFiberSwap.pngPCIeFiberSwap_FBrebooted.png
    Reply  Thu Sep 20 16:19:04 2018, gautam, Update, CDS, New PCIe fiber install postponed to tomorrow 
    Reply  Fri Sep 21 16:46:38 2018, gautam, Update, CDS, New PCIe fiber installed and routed PCIeFiber.pngIMG_5878.JPG
Entry  Fri Sep 21 16:51:43 2018, gautam, Update, VAC, c1vac1 is unresponsive 
Entry  Fri Sep 21 19:50:17 2018, Koji, Update, CDS, Frequent time out 33.png49.pngScreenshot_from_2018-09-21_21-52-54.png
    Reply  Sat Sep 22 00:21:07 2018, Koji, Update, CDS, Frequent time out 23.png
Entry  Sun Sep 23 17:38:48 2018, yuki, Update, ASC, Alignment of AUX Y end green beam was recovered 
    Reply  Mon Sep 24 15:06:10 2018, gautam, Update, VAC, c1vac1 reboot + TP1 controller replacement beforeReboot.pngafterReboot.pngCC1.png
    Reply  Wed Sep 26 10:07:16 2018, Steve, Update, VAC, why reboot c1vac1 NOcomm.pngReboot_&_sawp.pngc1vac1&2_.jpg
    Reply  Mon Oct 1 22:20:42 2018, gautam, Update, SUS, Prototyping HV Bias Circuit CoilDriverBias.pdfcurrentNoise.pdfPSRR.pdf
    Reply  Tue Oct 2 23:57:16 2018, gautam, Update, PonderSqueeze, Squeezing scenarios PonderSqueeze_NB_LORIN.pdf
    Reply  Thu Oct 4 08:25:50 2018, Steve, Update, VAC, rga scan pd81 at day 78 pd81d78.png
    Reply  Thu Oct 11 13:40:51 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Fri Oct 12 08:27:05 2018, Steve, Update, VAC, drypump forepump.png
    Reply  Fri Oct 12 12:29:34 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Fri Oct 12 17:37:03 2018, Steve, Update, VAC, pressure gauge choices  
    Reply  Fri Oct 12 20:20:29 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Sat Oct 13 20:11:10 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Sun Oct 14 16:55:15 2018, not gautam, Update, CDS, pianosa upgrade 
    Reply  Mon Oct 15 10:32:13 2018, yuki, Update, Computer Scripts / Programs, loss measurements XARM_20181015_1500.pdfYARM_20181015_1500.pdf
    Reply  Mon Oct 15 12:52:54 2018, yuki, Update, Computer Scripts / Programs, additional comments 
    Reply  Mon Oct 15 13:59:42 2018, Steve, Update, VAC, drypump replaced drypump_swap.png
    Reply  Tue Oct 16 00:44:29 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
Entry  Wed Oct 17 09:31:24 2018, Steve, Update, PSL, main laser off Inno2wFlipped_off.png
Entry  Thu Oct 18 00:27:37 2018, Koji, Update, SUS, SUS PD Whitening board inspection 43.png
    Reply  Mon Oct 22 15:19:05 2018, Steve, Update, VAC, Maglev controller serviced our_controller_is_back.png
    Reply  Thu Oct 25 16:17:14 2018, Steve, Update, safety, safety training 
Entry  Wed Oct 31 17:54:25 2018, gautam, Update, VAC, CC1 hornet power connection restored cc1_Hornet.png
Entry  Fri Nov 2 10:24:20 2018, Steve, Update, PEM, roof cleaning 
Entry  Fri Nov 2 12:07:16 2018, rana, Update, CDS, NDScope 
    Reply  Fri Nov 2 16:42:31 2018, aaron, Update, Computer Scripts / Programs, arm loss measuremenents 
    Reply  Fri Nov 2 19:25:16 2018, gautam, Update, Computer Scripts / Programs, loss measurements 
ELOG V3.1.3-