40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 293 of 330  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  14307   Mon Nov 19 22:01:50 2018 gautamUpdateVACLoose nut on valveAs I was turning off the lights in the
VEA, I heard a rattling sound from near the
PSL enclosure. I followed it to a valve -
 IMG_7171.JPG 
  14310   Tue Nov 20 13:13:01 2018 gautamUpdateVACIMC alignment is okayI checked the IMC alignment following the
vent, for which the manual beam block placed
on the PSL table was removed. The alignment
  
  14311   Tue Nov 20 17:38:13 2018 ranaUpdateUpgradeNew Coffee MachineRana, Aaron, Gautam

The
  
  14312   Tue Nov 20 20:33:11 2018 aaronUpdateOMCOMC scanning/aligning scriptI finished running the cabling for the
OMC, which involved running 7x 50ft DB9 cables
from the OMC_NORTH rack to the 1X2 rack,
 pathwaysketch.pdfIMG_0094.JPGIMG_0097.JPG 
  14313   Wed Nov 21 09:59:26 2018 gautamUpdateLSCLSC feedforward block diagramAttachment
#1 is a block diagram depicting
the pathway by which the vertex DOF control
 IMG_7173.JPG 
  14314   Wed Nov 21 16:48:11 2018 gautamUpdateCOCEY mini cleanroom setupWith Chub's help, I've setup a
mini cleanroom at EY - Attachment
#1. The HEPA unit is running on
 IMG_7174.JPG 
  14316   Mon Nov 26 10:22:16 2018 aaronUpdateGeneralprojector light bulb replacedI replaced the projector bulb. Previous
bulb was shattered.
  
  14317   Mon Nov 26 15:43:16 2018 aaronUpdateOMCOMC scanning/aligning scriptI've started testing the OMC channels
I'll use.

I needed to update the model, because
 c1omc.png 
  14318   Mon Nov 26 15:58:48 2018 SteveUpdateVACVent 81Gautam, Aaron, Chub & Steve,

ETMY heavy door replaced by light
one.
  
  14319   Mon Nov 26 17:16:27 2018 gautamUpdateSUSEY chamber work[steve,
rana, gautam]


PSL and EY 1064nm laser
 IMG_5251.JPG 
  14321   Tue Nov 27 10:50:20 2018 SteveUpdatePEMearth quake MexicoNothing tripped.

 
 5.5M.Mexico.png 
  14323   Thu Nov 29 08:13:33 2018 SteveUpdatePEMEQ 3.9m So CAEQ did not trip anything. atm1

Just
a REMINDER:
our vacuum system is at atm to help the vacuum
 3.9mSoCA.pngVac_as_today.pngas_is.png 
  14324   Thu Nov 29 17:46:43 2018 gautamUpdateGeneralSome to-dos[koji,
gautam, jon, steve]


We suspect analog voltage
  
  14326   Fri Nov 30 19:37:47 2018 gautamUpdateLSCLSC feedforward block diagramI wanted to set up an RTCDS model to understand
this problem better. Attachment #1 is the
simulink diagram of the signal flow. The
 LSC_FF_tester.pngScreenshot_from_2018-11-30_19-41-07.pngScreenshot_from_2018-12-10_15-31-23.pngSimLSC.png 
  14328   Sun Dec 2 17:26:58 2018 gautamUpdateIMCIMC ringdown fittingRecently we wondered at the meeting what
the IMC round trip loss was. I had done several
ringdowns in the winter of 2017, but because
 tauTheoretical.pdfringdownFit.pdfringdownScatter.pdfcavPole.pdf 
  14329   Sun Dec 2 19:32:35 2018 ranaUpdateIOOfit timesneed to vary start/stop times in fit to
test for systematics
  
  14332   Thu Dec 6 11:16:28 2018 aaronUpdateOMCOMC channelsI need to hookup +/- 24 V supplies to the
OMC whitening/dewhitening boxes that have
been added to 1X2.
  
  14334   Fri Dec 7 12:51:06 2018 gautamUpdateIMCIMC ringdown fittingI started putting together some code to
implement some ideas we discussed at the
Tuesday meeting here. Pipeline isn't
 time_reflAndTrans.pdfcorner_transOnly.pdfcorner_reflAndTrans.pdf 
  14335   Fri Dec 7 17:04:18 2018 gautamUpdateIOOIMC transmission
Power just before PSL shutter on
PSL table = 97
  
  14337   Mon Dec 10 12:11:28 2018 aaronUpdateOMCAligning the OMCI did some ray tracing and determined that
the aux beam will enter the OMC after losing
some power in reflection on OMPO (couldn't
 B9DCF55F-1355-410C-8A29-EE45D43A56A4.jpeg 
  14338   Mon Dec 10 12:29:05 2018 aaronUpdateOMCOMC channelsI kept having trouble keeping the power
LEDs on the dewhitening board 'on'.
I did the following:
 52DE723A-02A4-4C62-879B-7B0070AE8A00.jpeg545E5512-D003-408B-9F00-55F985966A16.jpegDFF34976-CC49-4E4F-BFD1-A197E2072A32.jpeg 
  14339   Mon Dec 10 15:53:16 2018 gautamUpdateLSCSwept-sine measurement with DTTDisclaimer:
This is almost certainly some user error
 SimTF.pdf 
  14340   Mon Dec 10 19:47:06 2018 aaronUpdateOMCOMC channelsTaking another look at the datasheet, I
don't think LM7812 is an appropriate
replacement and I think the LM2940CT-12
  
  14341   Tue Dec 11 13:42:44 2018 KojiUpdateOMCOMC channelsFYI:

D050368 Anti-Imaging Chassis
https://dcc.ligo.org/LIGO-D050368
  
  14342   Tue Dec 11 13:48:04 2018 aaronUpdateOMCOMC channelsKoji gave me some tips on testing this
board that I wanted to write down, notes
probably a bit intermingled with my thoughts.
  
  14343   Tue Dec 11 14:24:18 2018 aaronUpdateOMCAligning the OMCI set up a function generator to drive
OMC-L, and have the two DCPD mons and the
OMC REFL PD sent to an oscilloscope. I need
  
  14344   Tue Dec 11 14:33:29 2018 gautamUpdateCDSNDScopeNDscope is now running on pianosa. To be
really useful, we need the templates, so
I've made 
 ndscope.png 
  14345   Tue Dec 11 18:20:59 2018 gautamUpdateOptical LeversBS/PRM HeNe is deadI found that the BS/PRM OL SUM channels
were reading close to 0. So I went to the
optical table, and found that there was no
 BSOL_dead.png 
  14346   Tue Dec 11 22:50:07 2018 aaronUpdateOMCAligning the OMCI did the following:


Noticed that the OMC rack's
power has +-18V, but I had tested
 6x 
  14347   Wed Dec 12 11:53:29 2018 aaronUpdateGeneralPower OutageAt 11:13 am there was a ~2-3 second interruption
of all power at the 40m.

I checked that nobody was in any
 IMG_0033.HEICIMG_1027.HEICIMG_2605.HEIC 
  14349   Thu Dec 13 01:26:34 2018 gautamUpdateGeneralPower Outage recovery[koji,
gautam]

After several combinations of soft/hard
  
  14350   Thu Dec 13 10:03:07 2018 ChubUpdateGeneralOMC chamberBob, Aaron, and I removed the door from
the OMC chamber this morning.  Everything
went well.
  
  14351   Thu Dec 13 12:06:35 2018 gautamUpdateGeneralPower Outage recoveryI did a walkaround and checked the status
of all the interlock switches I could find
based on the SOP
  
  14352   Thu Dec 13 18:12:47 2018 gautamUpdateIOOND filter on AS camera changedIn order to see the AS beam a bit more
clearly in our low-power config, I swapped
out the ND=1.0 filter on the AS camera for
  
  14353   Thu Dec 13 20:10:08 2018 KojiUpdateGeneralPower Outage recovery[Gautam, Aaron, Koji]

The PSL interlock system
was fixed and now the 40m lab is laser hazard
 OMRON_S82K-00712.JPGreset_button_repaired1.JPGreset_button_repaired2.JPGgray_box.JPGgray_box2.JPG 
  14354   Thu Dec 13 22:24:21 2018 aaronUpdateOMCOMC channelsI completed testing of the AI board mentioned
above. In addition to the blown fuse, there
were two problems:
  
  14355   Thu Dec 13 22:36:42 2018 aaronUpdateOMCAligning the OMCI turned on AUX, and aligned the aux beam
to be centered on the first optic the AS
beam sees on the AP table. I then turned
  
  14356   Thu Dec 13 22:56:28 2018 gautamUpdateCDSFrames[koji, gautam]

We looked into the /frames situation
a bit tonight. Here is a summary:
  
  14357   Fri Dec 14 13:02:24 2018 aaronUpdateOMCAligning the OMCI replaced the 2'' AUX-AS combining
BS with a 2'' HR mirror for 1064.
I aligned the AUX beam from the new HR mirror
  
  14358   Fri Dec 14 13:06:12 2018 aaronUpdateOMCAligning the OMCI replaced the 2'' AUX-AS combining
BS with a freshly mounted 2'' HR
mirror for 1064. The mirror is labelled 'Y1-2037-45-P',
  
  14359   Fri Dec 14 14:25:36 2018 KojiUpdateCDSchiara backupfsck of chiara backup disk (UUID="90a5c98a-22fb-4685-9c17-77ed07a5e000")
was done. But this required many files to
be fixed. So the backed-up files are not
 fsck_log.log 
  14360   Fri Dec 14 22:19:22 2018 KojiUpdateGeneralChiara new USB 4TB DIskEdit:
It was not 4TB
  
  14361   Sat Dec 15 18:29:53 2018 KojiUpdateGeneralChiara new USB 4TB DIskThe local backup was done at 18:18
after 11h18m of running.

  
  14362   Sat Dec 15 20:04:03 2018 gautamUpdateIOOTT1/TT2 steppingI'm running a script that moves TT1
and TT2 randomly in some restricted P/Y space
to try and find an alignment that gets some
  
  14363   Mon Dec 17 20:45:40 2018 aaronUpdateOMCAligning the OMC[gautam, aaron]

We did work in the OMC chamber
today to get the OMC aligned. Aaron was in
 IMG_5922.JPGIMG_5921.JPG 
  14364   Tue Dec 18 11:42:40 2018 ChubUpdateGeneralAcromag box wiredThe Auxiliary DAQ Chassis, or Acromag box,
is now wired and ready for testing. 
I will be sorting the cables at the vacuum
  
  14365   Tue Dec 18 18:13:32 2018 aaronUpdateOMCOMC L HV Piezo driver tests (again)I tested the OMC-L HV driver box again,
and made the following observations:


Drove the HV diff pins
 IMG_4576_copy.jpg 
  14366   Wed Dec 19 00:12:46 2018 gautamUpdateOMC40m OMC DCC nodeI made a node
to collect drawings/schematics for the 40m
OMC, added the length drive for now. We should
  
  14368   Wed Dec 19 15:15:56 2018 gautamUpdateIOOTT1/TT2 steppingI removed the ND filter from the ETMYT
camera to facilitate searching for a TRY
beam. This should be replaced before we go
  
  14369   Wed Dec 19 19:51:19 2018 gautamUpdateGeneralPumpdown prep[Koji,
gautam]

Summary:
 OMCscan.pdf 
ELOG V3.1.3-