40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 293 of 341  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  2603   Sat Feb 13 18:58:31 2010 josephb, alexUpdateComputersfb40m testpoints fixedI received an e-mail from Alex indicating
he found the testpoint problem and fixed
it today:
  
  1743   Tue Jul 14 14:54:19 2009 steveConfigurationComputersfb40m2 in 1Y6Alex and Steve,
SunFire x4600 ( not  MEGATRON
2 , it is fb40m2 ) and JetStor ( 16 x 1 TB
  
  7267   Fri Aug 24 00:23:20 2012 DenUpdateModern Controlfeedback using LQG methodI did a simulation of linear quadratic
gaussian (LQG) controller applied to local
damping. The cost function was frequency
 model.pngfeedback_lqg.png 
  7732   Tue Nov 20 15:11:22 2012 SteveUpdateGeneralfew more sensing cardsNew  Lumitek IR
Sensor Cards are here. We got 2 pieces
of Q-11-T (2" x 2"), 2 pieces of
  
  8985   Thu Aug 8 10:31:28 2013 SteveUpdateVACfew reminders of this vent 1, Vacuum envelope grounds must be
connected all times!  After door removal
reconnect both cables immediately.
 GROUND!.jpgbad_Folding.jpgtoomuchred.jpgBETTERholder.jpg 
  238   Mon Jan 14 23:11:26 2008 tobinConfigurationGeneralfiberJohn and I removed the fiber that ran from
the SP table to the cleanroom.  We plan to
build a MZ interferometer with this fiber
  
  14530   Wed Apr 10 16:58:54 2019 ranaUpdateIOOfiber MZ for NPRO freq noise measurementsCan we get some panel
mount FC/APC connectors and put them on a
  
  247   Thu Jan 17 20:50:55 2008 tobinUpdateGeneralfiber couplingSam, John, and I matched the beam from an
NPRO into a fiber on the SP table today.
 In doing so we used our GigE camera for
  
  10677   Thu Nov 6 10:18:12 2014 SteveUpdateGeneralfiber insulation in cable tray

    

       
            
 APT07810.jpgfromYend.jpg 
  8813   Tue Jul 9 17:03:06 2013 SteveUpdateGreen Lockingfiber layed for Y armAlex, Gautam and Steve,
Single
mode fiber 50m long is layed out into
 fromETMYtowardPSL.jpgfibreETMYtoPSL50m.jpgPSLfiberfromETMY.jpg 
  8578   Wed May 15 08:29:28 2013 SteveConfigurationRF Systemfiber protection at splitter box area I positioned the fiber loaded protecting
tubing and anchored them so they can do their
job.
 fiberprotect.jpg 
  564   Wed Jun 25 11:01:45 2008 MashaUpdateAuxiliary lockingfiber stabilizationFor the first week, I have been learning about
fiber noise cancellation, auxiliary locking
techniques, and other relevant helpful topics
  
  4852   Wed Jun 22 01:59:43 2011 SonaliUpdateGreen Lockingfibre-coupling of the IR beam  What
I did today.
1. Collimation of a beam.
 ETMY_june_21.jpgcollimation_700nm_21_june.JPG 
  7185   Wed Aug 15 00:52:17 2012 DenUpdateWienerFilteringfilter calculationA Matlab script to calculate Wiener filter
coefficients and convert fir to iir is ready.
Input is a file with zero mean witness and
 wiener.png 
  7052   Mon Jul 30 16:05:36 2012 DenUpdatedigital noisefilter checker We decided to write a script that
will check online filters for digital noise.
One method can be implemented using the following
 iir_psd_notch.pngiir_psd_lp.pngiir_time_lp.png 
  7085   Sat Aug 4 17:32:31 2012 DenUpdatedigital noisefilter checkerThe script estimates digital noise produces
by online filters. First version of Matlab
files and complied c files are in scripts/digital_noise
 gur1x.pngC1SUS_BS_SUSPOS.png 
  6137   Mon Dec 19 17:17:02 2011 DenUpdateAdaptive Filteringfilter tap dependenceOnline filter diverges. I did offline simulations
with current c-code. Offline filter also
diverges, even in the simplest case 
 OfflineAF.png 
  480   Thu May 15 14:39:33 2008 CarynSummaryPEMfiltering mode cleaner with micTried filtering for mode cleaner data(C1:IOO-MC_L)
using a siso-firwiener filter and microphone
data(C1:PEM-AS_MIC) for noise input. The
 MC_L_with_PEM-AS_MIC_filter.pdfMC_L_with_PEM-ACC_MC1_X_filter.pdf 
  494   Fri May 23 21:21:52 2008 CarynSummaryGeneralfiltering mode cleaner with wiener filterI tried filtering some saved MC_L data (from
Mon May19 4:30pm) with multiple MISO filters
of different orders, with various sampling
 10x 
  12562   Fri Oct 14 15:47:00 2016 ranaUpdateTreasurefilters + clipI say just fix the clipping. Don't
worry about the PRM OSEM filters. We can
do that next time when we put in the ITM
  
  1418   Mon Mar 23 15:50:44 2009 ranaConfigurationLSCfilters deleted, lsc rebootedThe LSC time had gone too high. I deleted
~20 filters and rebooted. CPU time came down
to 50 usec.
  
  5355   Wed Sep 7 08:14:01 2011 steveUpdateSUSfinal OSEM checkAll fine, except ITMX_sensor_UL's 
60  counts deep hoop for an hour.
 finalcheck.jpgITMX10min.jpgfinalsum.png 
  13704   Mon Mar 26 16:10:33 2018 KiraUpdatePEMfinal setup sketchI made sketches of the final setup. There
will be a box in the rack that contains both
the heater circuit and the temperature sensor
 heater_1_new.pngheater_2_new.pngHeaterCircuit.pdftemp_sensor.png 
  13759   Wed Apr 18 12:18:39 2018 KiraUpdatePEMfinal setup sketchI've updated the sketches and added
in front panels for the seismometer block
and the 1U panel (attachments 3 and 4). There
 7x 
  13782   Tue Apr 24 09:10:20 2018 KiraUpdatePEMfinal setup sketchI've attached the final sketch for
the panel on the granite block.
 EX-can-panel_1.pdf 
  13800   Mon Apr 30 15:36:18 2018 KiraUpdatePEMfinal setup sketchI've attached a sketch of how the panel
will be mounted. We should make a small rectangular
box that would raise the panel from the block
 mount.png 
  13769   Thu Apr 19 12:23:30 2018 KiraUpdatePEMfinal setup sketch updateI've added in the dimensions to my
sketch.

It seems like placing the two connectors
 heater_1_new.pngheater_2_new.png 
  13771   Thu Apr 19 18:23:51 2018 KiraUpdatePEMfinal setup sketch updatesince we're just going from the short
rack (not the tall rack) to the seismometer,
can't we use a cable shorter than 45'
  
  13774   Fri Apr 20 15:07:45 2018 KiraUpdatePEMfinal setup sketch updateIf we lay the cable along the floor then
it should be around 6' to the current
setup and about 20' to the actual
  
  13760   Wed Apr 18 16:59:35 2018 ranaUpdatePEMfinal setup sketch: EX SeisCan you please add dimensions to the drawing,
so we can see if things fit and what the
cable lenghts need to be?
 Screen_Shot_2018-04-18_at_5.20.53_PM.png 
  4925   Thu Jun 30 21:00:20 2011 kiwamuUpdateABSLfine alignment done(Just a quick report)
The
fine alignment of the ABSL laser injection
  
  6230   Fri Jan 27 05:21:43 2012 kiwamuUpdateGreen Lockingfine alignment of the Y end green setupI did a fine alignment on the Y end green
setup. The green light became able to be
locked again.
  
  13979   Mon Jun 18 11:12:23 2018 KiraSummaryPEMfinishing up work at the labSince I am finishing my job at the lab,
I have stored all my electronics in a box
(attachment 1) and placed it under the table
 IMG_20180618_101640.jpgIMG_20180618_093920.jpgIMG_20180618_093932.jpg 
  11976   Thu Feb 4 10:19:05 2016 SteveUpdatesafetyfire marshal inspectionPasadena fire marshal inspected the lab
today. No violation was found.
  
  11901   Wed Dec 23 16:15:47 2015 ranaOmnistructureALARMfire alarmFire alarm went off several minutes ago.
Talked to security and they said there was
no fire. It beeped twice again just now.
  
  12216   Mon Jun 27 15:26:03 2016 SteveOmnistructureALARMfire alarm testThe fire alarm came on around 15:05 
for about 2-3 minutes. We all  left
the lab and counted heads.  I called
 fireAlarmTest.png 
  11452   Tue Jul 28 15:05:09 2015 SteveUpdatesafetyfire alarm test ? noWe just had fire alarm trigged avacuation
of the 40m lab.

It turned out that the CES building
 6minGaps.png 
  708   Mon Jul 21 15:52:22 2008 steveBureaucracySAFETYfire alarms testThe fire alarm test and evacuation drill was
successfully completed at 13:45 Wednesday,
July 16, 2008
  
  8026   Thu Feb 7 17:24:13 2013 SteveUpdateSAFETYfire extinguishers checkedThe fire department weighted and pressure
checked our units today. Surprisingly they
found one powder filled can. We can only
  
  9090   Fri Aug 30 08:08:29 2013 steveUpdatesafetyfire horns-flashers tested OK 
 We had fire alarm tests
 and evacuation drills at 1:30pm yesterday.
  
  14812   Thu Jul 25 14:28:03 2019 gautamConfigurationComputersfirewalld disabled for EPICS CAI think rana did some more changes to this
workstation to make it useful for commissioning
activities - but the MEDM screens were still
 donatellaCommissioning.png 
  8661   Fri May 31 10:25:17 2013 steveUpdatesafetyfirst aid kits refilled

    

       
            
 refilledFAidK.jpg 
  6063   Fri Dec 2 20:16:41 2011 DenUpdatedigital noisefirst order transitionIn order to verify our theory about coherence
corruption in linear systems due to the line
 freqz.pdftrans.pdf 
  8238   Wed Mar 6 08:40:03 2013 SteveUpdateVACfirst scan of this pumpdown Pumpdown 75 - Maglev - day 12
Precondition: 66 days at atm, installed
TIP-TILTs with coils that  replaced
 pd75m12d.pngpd75mRGA12d.png 
  14329   Sun Dec 2 19:32:35 2018 ranaUpdateIOOfit timesneed to vary start/stop times in fit to
test for systematics
  
  11439   Thu Jul 23 15:41:41 2015 SteveUpdatePEMfitting ants with TERROPasadena got 0.2" of  rain on
Saturday. Temperatures were high with high
humidity since than.The ants were back in
  
  3478   Fri Aug 27 13:41:02 2010 kiwamuUpdateSUSfix watchdogs  [Joe, Kiwamu]
We found that the vertex watchdogs were
  
  4691   Wed May 11 17:10:04 2011 kiwamuConfigurationElectronicsfixed : MC3 LL PD has no signal[Valera / Kiwamu]
It was because of a loose connection.
Pushing the connector solved the issue.
 looseconnectionMC3.png 
  3788   Tue Oct 26 17:31:17 2010 yutaUpdateCDSfixed OPLEV stuff and MCL filters(Joe, Yuta)

Background:
 optlevMC2.png 
  3789   Tue Oct 26 21:27:02 2010 JenneUpdateCDSfixed OPLEV stuff and MCL filtersSince MC2_TRANS is, in fact, MC2 Transmission,
and not an oplev at all (it's not red, and
it's not a lever, although it does use a
  
ELOG V3.1.3-