40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 292 of 327  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  14284   Wed Nov 7 19:42:01 2018 gautamUpdateGeneralIFO checkup and DRMI locking prepEarlier today, I rebooted a few unresponsive
VME crates (susaux, auxey).

The IMC has been unhappy for a
  
  14285   Wed Nov 7 23:07:11 2018 gautamUpdateLSCDRMI locking recoveredI had some
success today. I hope that the tweaks I made
will allow working with the DRMI during the
 Screenshot_from_2018-11-07_23-05-58.pngSRCL2MICH_crosscpl.pdfPRCangularCoh_rot.pdf 
  14286   Fri Nov 9 15:00:56 2018 gautamUpdateIOONo IFO beam as TT1 UL hijacked for REFL55 checkThis
problem resurfaced. I'm doing the
debugging.
 REFL55_wht_chk.png 
  14288   Sat Nov 10 17:32:33 2018 gautamUpdateLSCNulling MICH->PRCL and MICH->SRCLWith the DRMI locked, I drove a line in
MICH using the sensing matrix infrastructure.
Then I looked at the error points of MICH,
 sensMat_2018-11-10.pdf 
  14289   Sat Nov 10 17:40:00 2018 aaronUpdateIOOIMC problematicGautam was doing some DRMI locking, so
I replaced the photodiode at the AS port
to begin loss measurements again.
  
  14290   Mon Nov 12 13:53:20 2018 ranaUpdateIOOloss measurement: oscope vs CDS DAQsstop using the ssscope, and just put the
ssssignal into the DAQ with sssssome whitening.
You'll get 16 bitsśšß.
  
  14291   Tue Nov 13 16:15:01 2018 SteveUpdateVACrga scan pd81 at day 119 

 
 pd81-d119.pngpd81-560Hz-d119.png 
  14292   Tue Nov 13 18:09:24 2018 gautamUpdateLSCInvestigation of SRCL-->MICH couplingSummary:

I've been looking into the
cross-coupling from the SRCL loop control
 TF_sweptSineMeas.pdfdigitalDemod.pdfdigitalDemod_hist.pdfDRMI_LSCspectrogram.pdf 
  14293   Tue Nov 13 21:53:19 2018 gautamUpdateCDSRFM errorsThis
problem resurfaced, which I noticed when
I couldn't get the single arm locks going.
 RFMerrors.png 
  14294   Wed Nov 14 14:35:38 2018 SteveUpdateALARM emergency calling list for 40m Lab It is posted at the 40m
wiki with Gautam' help. Printed copies
posted around doors also.
  
  14295   Wed Nov 14 18:58:35 2018 aaronUpdateDAQNew DAC for the OMCI began moving the AA and AI chassis over
to 1X1/1X2 as outlined in
the elog.
 6D079592-1350-4099-864B-1F61539A623F.jpeg5868D030-0B97-43A1-BF70-B6A7F4569DFA.jpeg 
  14297   Thu Nov 15 10:21:07 2018 aaronUpdateIOOIMC problematicI ran a BNC from the PD on the AS table
along the cable rack to a free ADC channel
on the LSC whitening board. I lay the BNC
 181115_chansDown.pngPD_noise.png 
  14298   Fri Nov 16 00:47:43 2018 gautamUpdateLSCMore DRMI characterizationSummary:


More DRMI characterization
was done.
I was working on trying
 PRCff.pdfDRMI_withPRCff.png 
  14299   Fri Nov 16 10:26:12 2018 SteveUpdateVAC single viton O-ringsThe 40m vacuum envelope has one large single
O-ring on the OOC west side. All other doors
have double O-ring with annuloses.
 Single-O-ring.png 
  14300   Fri Nov 16 10:53:07 2018 aaronUpdateIOOIMC problematicBack to loss measurements.

I replaced the PD I've been
using for the AS beam.
 Screenshot_from_2018-11-16_19-22-34.png 
  14302   Sat Nov 17 18:59:01 2018 aaronUpdateIOOIMC problematicI made additional measurements on the x
and y arms, at 5 offset positions for each
arm (along with 6 measurements at the "zeroed"
  
  14303   Sun Nov 18 00:59:33 2018 gautamUpdateGeneralVent prepI've begun prepping the IFO for the
vent, and completed most of the IFO related
items on the checklist.
  
  14304   Sun Nov 18 17:09:02 2018 gautamUpdateGeneralVent prepVent prep

Following the checklist,
I did these:
 VentPrepNov2018.pngMCautolocker_lowPower.pngIMG_7163.JPG 
  14305   Mon Nov 19 14:59:48 2018 ChubUpdateVACVent 81Vent 80 is nearly complete; the instrument
is almost to atmosphere.  All four ion
pump gate valves have been disconnected,
  
  14306   Mon Nov 19 17:09:00 2018 SteveUpdateVACVent 81Gautam, Aaron, Chub and Steve,




 beforeVent82.pngvent81completed.png 
  14307   Mon Nov 19 22:01:50 2018 gautamUpdateVACLoose nut on valveAs I was turning off the lights in the
VEA, I heard a rattling sound from near the
PSL enclosure. I followed it to a valve -
 IMG_7171.JPG 
  14310   Tue Nov 20 13:13:01 2018 gautamUpdateVACIMC alignment is okayI checked the IMC alignment following the
vent, for which the manual beam block placed
on the PSL table was removed. The alignment
  
  14311   Tue Nov 20 17:38:13 2018 ranaUpdateUpgradeNew Coffee MachineRana, Aaron, Gautam

The
  
  14312   Tue Nov 20 20:33:11 2018 aaronUpdateOMCOMC scanning/aligning scriptI finished running the cabling for the
OMC, which involved running 7x 50ft DB9 cables
from the OMC_NORTH rack to the 1X2 rack,
 pathwaysketch.pdfIMG_0094.JPGIMG_0097.JPG 
  14313   Wed Nov 21 09:59:26 2018 gautamUpdateLSCLSC feedforward block diagramAttachment
#1 is a block diagram depicting
the pathway by which the vertex DOF control
 IMG_7173.JPG 
  14314   Wed Nov 21 16:48:11 2018 gautamUpdateCOCEY mini cleanroom setupWith Chub's help, I've setup a
mini cleanroom at EY - Attachment
#1. The HEPA unit is running on
 IMG_7174.JPG 
  14316   Mon Nov 26 10:22:16 2018 aaronUpdateGeneralprojector light bulb replacedI replaced the projector bulb. Previous
bulb was shattered.
  
  14317   Mon Nov 26 15:43:16 2018 aaronUpdateOMCOMC scanning/aligning scriptI've started testing the OMC channels
I'll use.

I needed to update the model, because
 c1omc.png 
  14318   Mon Nov 26 15:58:48 2018 SteveUpdateVACVent 81Gautam, Aaron, Chub & Steve,

ETMY heavy door replaced by light
one.
  
  14319   Mon Nov 26 17:16:27 2018 gautamUpdateSUSEY chamber work[steve,
rana, gautam]


PSL and EY 1064nm laser
 IMG_5251.JPG 
  14321   Tue Nov 27 10:50:20 2018 SteveUpdatePEMearth quake MexicoNothing tripped.

 
 5.5M.Mexico.png 
  14323   Thu Nov 29 08:13:33 2018 SteveUpdatePEMEQ 3.9m So CAEQ did not trip anything. atm1

Just
a REMINDER:
our vacuum system is at atm to help the vacuum
 3.9mSoCA.pngVac_as_today.pngas_is.png 
  14324   Thu Nov 29 17:46:43 2018 gautamUpdateGeneralSome to-dos[koji,
gautam, jon, steve]


We suspect analog voltage
  
  14326   Fri Nov 30 19:37:47 2018 gautamUpdateLSCLSC feedforward block diagramI wanted to set up an RTCDS model to understand
this problem better. Attachment #1 is the
simulink diagram of the signal flow. The
 LSC_FF_tester.pngScreenshot_from_2018-11-30_19-41-07.pngScreenshot_from_2018-12-10_15-31-23.pngSimLSC.png 
  14328   Sun Dec 2 17:26:58 2018 gautamUpdateIMCIMC ringdown fittingRecently we wondered at the meeting what
the IMC round trip loss was. I had done several
ringdowns in the winter of 2017, but because
 tauTheoretical.pdfringdownFit.pdfringdownScatter.pdfcavPole.pdf 
  14329   Sun Dec 2 19:32:35 2018 ranaUpdateIOOfit timesneed to vary start/stop times in fit to
test for systematics
  
  14332   Thu Dec 6 11:16:28 2018 aaronUpdateOMCOMC channelsI need to hookup +/- 24 V supplies to the
OMC whitening/dewhitening boxes that have
been added to 1X2.
  
  14334   Fri Dec 7 12:51:06 2018 gautamUpdateIMCIMC ringdown fittingI started putting together some code to
implement some ideas we discussed at the
Tuesday meeting here. Pipeline isn't
 time_reflAndTrans.pdfcorner_transOnly.pdfcorner_reflAndTrans.pdf 
  14335   Fri Dec 7 17:04:18 2018 gautamUpdateIOOIMC transmission
Power just before PSL shutter on
PSL table = 97
  
  14337   Mon Dec 10 12:11:28 2018 aaronUpdateOMCAligning the OMCI did some ray tracing and determined that
the aux beam will enter the OMC after losing
some power in reflection on OMPO (couldn't
 B9DCF55F-1355-410C-8A29-EE45D43A56A4.jpeg 
  14338   Mon Dec 10 12:29:05 2018 aaronUpdateOMCOMC channelsI kept having trouble keeping the power
LEDs on the dewhitening board 'on'.
I did the following:
 52DE723A-02A4-4C62-879B-7B0070AE8A00.jpeg545E5512-D003-408B-9F00-55F985966A16.jpegDFF34976-CC49-4E4F-BFD1-A197E2072A32.jpeg 
  14339   Mon Dec 10 15:53:16 2018 gautamUpdateLSCSwept-sine measurement with DTTDisclaimer:
This is almost certainly some user error
 SimTF.pdf 
  14340   Mon Dec 10 19:47:06 2018 aaronUpdateOMCOMC channelsTaking another look at the datasheet, I
don't think LM7812 is an appropriate
replacement and I think the LM2940CT-12
  
  14341   Tue Dec 11 13:42:44 2018 KojiUpdateOMCOMC channelsFYI:

D050368 Anti-Imaging Chassis
https://dcc.ligo.org/LIGO-D050368
  
  14342   Tue Dec 11 13:48:04 2018 aaronUpdateOMCOMC channelsKoji gave me some tips on testing this
board that I wanted to write down, notes
probably a bit intermingled with my thoughts.
  
  14343   Tue Dec 11 14:24:18 2018 aaronUpdateOMCAligning the OMCI set up a function generator to drive
OMC-L, and have the two DCPD mons and the
OMC REFL PD sent to an oscilloscope. I need
  
  14344   Tue Dec 11 14:33:29 2018 gautamUpdateCDSNDScopeNDscope is now running on pianosa. To be
really useful, we need the templates, so
I've made 
 ndscope.png 
  14345   Tue Dec 11 18:20:59 2018 gautamUpdateOptical LeversBS/PRM HeNe is deadI found that the BS/PRM OL SUM channels
were reading close to 0. So I went to the
optical table, and found that there was no
 BSOL_dead.png 
  14346   Tue Dec 11 22:50:07 2018 aaronUpdateOMCAligning the OMCI did the following:


Noticed that the OMC rack's
power has +-18V, but I had tested
 6x 
  14347   Wed Dec 12 11:53:29 2018 aaronUpdateGeneralPower OutageAt 11:13 am there was a ~2-3 second interruption
of all power at the 40m.

I checked that nobody was in any
 IMG_0033.HEICIMG_1027.HEICIMG_2605.HEIC 
ELOG V3.1.3-