40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 292 of 344  Not logged in ELOG logo
    Reply  Mon Sep 17 23:58:01 2012, rana, Update, General, Last of In-vac mirror photos taken 
    Reply  Wed Sep 19 23:17:25 2012, rana, Configuration, PSL, AOM installation 
Entry  Mon Sep 24 20:28:13 2012, rana, Summary, elog, restarted elog: was unresponsive 
    Reply  Mon Sep 24 23:45:39 2012, rana, Update, General, POP in-vac optics aligned, POY beam coming out of vac 
Entry  Mon Oct 1 19:21:03 2012, rana, Configuration, PEM, changed PEM DQ channels 
    Reply  Fri Oct 5 04:34:31 2012, rana, Update, SUS, How about the slow machines? 
    Reply  Mon Oct 8 09:51:30 2012, rana, Update, Modern Control, state estimation 
    Reply  Mon Oct 8 22:07:46 2012, rana, Update, SUS, Doors on, ready to pump 20120921_200637.jpg
    Reply  Wed Oct 10 02:15:14 2012, rana, Update, LSC, 11 MHz reconnected to EOM 
Entry  Wed Oct 10 02:20:34 2012, rana, Update, SUS, Optical Lever QPD mods C1-CORE_OPTICS_SUM_DATA_ALL_TIME_0-1033801216-86400.png
    Reply  Fri Oct 19 16:24:39 2012, rana, Update, Locking, Alignment is really bad?? 
    Reply  Mon Oct 22 11:26:12 2012, rana, Update, SUS, PITCH damping needed 
    Reply  Wed Oct 24 15:29:52 2012, rana, Update, Adaptive Filtering, microphone noise 
    Reply  Thu Oct 25 10:03:38 2012, rana, Update, Adaptive Filtering, microphone noise 
    Reply  Sat Oct 27 23:13:12 2012, rana, Update, Alignment, alignment strategy 
    Reply  Thu Nov 1 01:51:37 2012, rana, Update, Alignment, progress, then setback - trend of BS table shift 
    Reply  Fri Nov 2 03:28:54 2012, rana, Update, General, bronze bushing for 40m vac 
    Reply  Sat Nov 3 10:31:59 2012, rana, Update, Alignment, POP, POX, POY, IPPOS, IPANG, REFL all coming out of vac 
    Reply  Wed Nov 7 07:11:10 2012, rana, Update, Alignment, Alignment- POY and oplevs. photos. 
    Reply  Wed Nov 7 23:22:45 2012, rana, Update, Alignment, Jamie's tip tilt proposal 
    Reply  Tue Nov 20 11:40:19 2012, rana, Configuration, Green Locking, End table upgrade for auxiliary green laser : ETMX layout on new table 
    Reply  Sat Nov 24 13:58:07 2012, rana, Update, LSC, calibration of arms 
Entry  Mon Nov 26 10:06:51 2012, rana, Summary, IOO, MC slides from 2002 MCtalk.pdf
Entry  Wed Nov 28 21:42:21 2012, rana, Frogs, Computer Scripts / Programs, dataviewer font error 
    Reply  Fri Nov 30 14:21:18 2012, rana, HowTo, Computer Scripts / Programs, The mystery of PDFs and you. As deep as the mystery of Rasputin. darm.pdf
    Reply  Sat Dec 1 13:56:38 2012, rana, Update, Alignment, BS chamber 
    Reply  Tue Dec 4 01:43:37 2012, rana, Update, PSL, PMC calibration for MC_F calibration 
    Reply  Wed Dec 5 09:42:46 2012, rana, Omnistructure, Computers, new (beta) version of NDS2 installed on control room machines 
    Reply  Wed Dec 5 09:53:01 2012, rana, Update, WienerFiltering, The microphones and the speaker on the AP table 
    Reply  Fri Dec 7 00:08:39 2012, rana, Update, Alignment, c1ass 
    Reply  Sun Dec 9 17:51:53 2012, rana, Update, LSC, beam inside DRMI is clipping on PR3 Tip-Tilt 
    Reply  Thu Dec 13 01:49:53 2012, rana, Update, PEM, seismometers a.pdf
    Reply  Fri Dec 14 09:31:59 2012, rana, Update, LSC, High frequency noise in AS signal 
Entry  Mon Dec 17 19:47:15 2012, rana, Update, PEM, Seismic StripTool config updated SeismicRainbow.png
Entry  Mon Dec 17 21:41:30 2012, rana, Summary, SUS, BeCu wire 
Entry  Wed Dec 19 20:18:51 2012, rana, Update, Computers, We are Changing the Passwerdz next week---- 
Entry  Thu Dec 20 19:46:20 2012, rana, Configuration, Environment, Control Room Projector StevePurple.JPG
Entry  Thu Jan 3 19:19:59 2013, rana, HowTo, Electronics, cable racks 
    Reply  Fri Jan 4 13:23:10 2013, rana, Update, Electronics, Photodiode transimpedance 
Entry  Mon Jan 7 19:23:19 2013, rana, Update, Electronics, Jamie's 1811 PS from 1998 SOLA-1021-1026.pdfjamie98.jpg
    Reply  Tue Jan 15 01:41:40 2013, rana, Update, SUS, TT 
    Reply  Wed Jan 16 20:27:16 2013, rana, Update, Locking, Expected PRC gains 
Entry  Sat Jan 19 16:02:28 2013, rana, Omnistructure, Electronics, PS cleanup 
    Reply  Sat Jan 19 18:23:31 2013, rana, Update, Computers, All front ends but c1lsc are down FE.png
    Reply  Thu Jan 24 16:34:56 2013, rana, Update, General, Laseroptik mirror - SN6 
Entry  Thu Jan 31 22:14:11 2013, rana, Summary, ASC, Optics lit 
    Reply  Fri Feb 1 23:52:59 2013, rana, Update, Locking, PRM/PR2 cavity 
    Reply  Wed Feb 6 19:59:35 2013, rana, Update, Locking, PRC cavity gains 
    Reply  Fri Feb 8 00:23:33 2013, rana, Summary, General, PRC/arm mode matching calculations 
    Reply  Sat Feb 9 19:34:34 2013, rana, Update, Optics, G&H - AR Reflectivity  
ELOG V3.1.3-