ID Date Author Type Category Subject Text Attachments
  3273   Fri Jul 23 08:18:03 2010 josephbUpdateCDSNot enough room in IO chassis for RFM card - need to swap PMC to PCIe adaptersThe End IO chassis have small trenton boards,
which apparently only have 5 usuable PCI
slots, even though there are 6 on the board.
  
  3272   Fri Jul 23 08:15:59 2010 steveUpdatePSLref cavity ion pumpThe ref cavity ion pump was running at
7.7kV instead of 5kV
This Digitel SPC-1 20 l/s ion pump
  
  3271   Fri Jul 23 00:13:11 2010 ranaUpdatePSLProblem NOT REALLY SolvedSo...who was working around the PSL rack
this morning and afternoon? Looks like there was
  
  3270   Thu Jul 22 18:18:54 2010 AlbertoUpdatePSLProblem Solved


   
        
            
  
  3269   Thu Jul 22 15:59:29 2010 AlbertoUpdatePSLPSL front end machine


   
        
            
  
  3268   Thu Jul 22 14:07:20 2010 kiwamuUpdatePSLPSL front end machineIt
looks like something wrong happened around
the PSL front end.  One
 PSL-PMC2010-07-22.png 
  3267   Thu Jul 22 13:44:47 2010 JennaUpdatePEMGuralp seismometerOne of the Guralps [Gur2] has been taken
to the atf gyro lab, along with the breakout
box.
  
  3266   Thu Jul 22 08:07:27 2010 steveUpdateVACvent finished

    
        
 30hvent.jpg 
  3265   Thu Jul 22 07:19:56 2010 AlbertoUpdateTreasureMonsters, LNVR, and Phase noise


   
        
            
  
  3264   Thu Jul 22 03:08:27 2010 KojiUpdateIOOVent and MC lockSummary

- The vacuum chambers have been vented.
  
  3263   Thu Jul 22 01:02:08 2010 ranaUpdateTreasureMonsters, LNVR, and Phase noiseOn
Picasa
  
  3262   Wed Jul 21 19:11:18 2010 DmassUpdateGreen LockinglockedWhat did you use to filter the 2f components
from your error signal? A homemade low pass
or what?
  
  3261   Wed Jul 21 17:41:17 2010 GopalConfigurationOptic StacksPictures of StacksNow that venting is complete, this is a
request for anyone who opens any chamber:
1) Please notify me immediately
  
  3260   Wed Jul 21 15:43:38 2010 MeganSummaryPSLCopper Layer Thickness on the Reference CavityUsing the equation for thermal resistance
Rthermal = L/(k*A)
where k is the thermal conductivity
  
  3259   Wed Jul 21 12:41:31 2010 kiwamuUpdateVACvent finishedThe vent
has been finished successfully in this morning.
  
  3258   Wed Jul 21 12:20:58 2010 RazibUpdatePhase CameraWeekly updateThis past week I have worked on the following:
1. Setting up the infrastructure
to do noise analysis: We added a temporary
 phase_cam_setup_21_07_2010.jpg 
  3257   Wed Jul 21 12:20:29 2010 josephb, kiwamuUpdateComputersMegatron temporarily disconnected, c1iscex firewalled, green FE testWe are moving towards a first test of getting
Kiwamu's green locking signals into the new
front end at the new X end, as well as sending
  
  3256   Wed Jul 21 12:03:14 2010 Katharine, SharmilaUpdateWIKI-40M Updateweekly updateThis past week, we levitated our small
cylindrical magnet (with the flag made from
heat shrink).  Though the levitated
  
  3255   Wed Jul 21 11:57:59 2010 GopalUpdateWIKI-40M Update7.14.10-7.21.10 Weekly UpdateSummary of this week's activities:
7/14: Analytical calculation of Viton
spring constant; updated Viton values in
  
  3254   Tue Jul 20 23:52:36 2010 kiwamuUpdateVACupdate: slow vent has startedThe
vent is still going on. At this moment the
pressure inside of the chambers is about
 untitled.png 
  3253   Tue Jul 20 18:29:43 2010 nancyUpdateIOOQPD installed behind the MC2 
Yesterday I installed teh QPD on
the table behind MC2, and observed teh signal
  
  3252   Tue Jul 20 17:38:16 2010 GopalConfigurationOptic StacksStack Type ClarificationsSome clarification is warranted regarding
the different shapes of stacks. Corrections
  
  3251   Tue Jul 20 15:06:48 2010 josephb, bobOmnistructureGeneralNew speakers in ceiling in control roomAfter the crane training, Bob attached
speakers to the ceiling right next to the
projector, for use with presentations.
  
  3250   Tue Jul 20 11:55:15 2010 Sharmila,KatharineUpdateelogMaglevWe plotted the transfer functions for the
maglev control circuit and compared them
with the plots from the spectrum 
 tf.pngP7140292.JPG 
  3249   Tue Jul 20 11:49:31 2010 JenneUpdateSUSSome Suspensions not damping[Jenne, Koji]
I moseyed into the control room this
morning, to find ITMX and ITMY both with
  
  3248   Tue Jul 20 08:04:31 2010 steveConfigurationVACslow vent has startedThe PSL shutter was closed. The beam path 
blocked two places. High voltage power supplies
to IOO and OMC PZT were checked to be off.
  
  3247   Mon Jul 19 21:47:36 2010 ranaSummaryDAQDAQ timing testSince we now have a good measurement of
the phase noise of the Rb clock
Marconi locked to the Rb clock, I wanted
  
  3246   Mon Jul 19 16:11:17 2010 GopalUpdateOptic StacksEigenfrequency Analysis of Full StackExpanding on the single-layer model, I
added the second, third, and fourth layers
to the stack in COMSOL. Eigenfrequency
 Eigenfrequency_1_4Stacks.pngEigenfrequency_2_4Stacks.pngEigenfrequency_3_4Stacks.pngEigenfrequency_6_4Stacks.png 
  3245   Mon Jul 19 14:16:01 2010 nancy, kojiUpdateIOOQPD Response Transfer Function

    
        
 QPDTF2.png 
  3244   Mon Jul 19 14:14:03 2010 nancy, kojiUpdateIOOQPD Response Transfer FunctionFriday night myself and Koji measured the
Transfer function of the QPD circuit at MC2
side using a chopper . Following was our
  
  3243   Mon Jul 19 13:51:09 2010 kiwamuUpdateCDSTIming card at X end[Joe, Kiwamu]
 
 The timing slave in the IO
  
  3242   Sun Jul 18 20:50:03 2010 ranaConfigurationIOOMC TRANS optics changedTo make the beam on the MC trans camera
bigger, I removed the lens + ND filter that
was in that path.
  
  3241   Fri Jul 16 23:53:27 2010 RanaUpdatePSLReference Cavity InsulationFrom the trend, it seems that the Reference
Cavity's temperature servo is working fine
with the new copper foil. I was unable to
  
  3240   Fri Jul 16 20:25:52 2010 MeganUpdatePSLReference Cavity InsulationRana and I
1) took the temperature sensors off
the reference cavity;
 DSC_2271.JPGDSC_2266.JPG 
  3239   Fri Jul 16 16:12:31 2010 AlbertoConfigurationComputersc1susvme1/2 rebootedToday I noticed that the FE SYNC counters
of c1susvme1/2 on the RFM network screen
were stuck at 16384. I tried to reboot the
  
  3238   Fri Jul 16 16:07:14 2010 josephbUpdateComputersPossible solution for the last ADC After talking with Jenne, I realized the
ADC card in the c1ass machine was currently
going unused.  As we are short an ADC
  
  3237   Fri Jul 16 15:57:19 2010 josephb,kiwamuUpdateComputersNew X end FE and IO chassis workWe finished setting up the new X end front
end machine (still temporarily called c1scx),
and attached it to its IO chassis. 
  
  3236   Fri Jul 16 15:39:27 2010 nancyUpdateIOOWavefront Sensors- switched offI tuned the gain of WFS to 0 last night
at about 3am.
I turned it back on now.
  
  3235   Fri Jul 16 13:05:48 2010 Kyung-haUpdateSUSLate update for 7/13 Tue (Tip Tilts)[Jenne & Kyung-ha]
We suspended the mirror to one of
the main frame with the ECD backplane we
  
  3234   Fri Jul 16 12:36:00 2010 Katharine, SharmilaUpdateeloglevitationAfter last night's challenge (or inspiration),
we levitated our magnet this morning. 
Since the nice Olympus camera is not currently
 CIMG0649.AVI 
  3233   Thu Jul 15 23:51:47 2010 Mr. MaricHowToSUSLevitate me if you canYou guys must work harder.
 mag_lev.jpg 
  3232   Thu Jul 15 19:27:04 2010 ranaSummaryPSLRC trend after the insulation removal   Untitled.pnga.pngb.png 
  3231   Thu Jul 15 19:13:03 2010 ranaUpdateIOOMC_F checkSometimes I like to plot the spectrum of
MC_F. Its a good diagnosis of whether something
is wrong.
 a.png 
  3230   Thu Jul 15 16:57:31 2010 josephb, kiwamuUpdateCDSThe temporarily named c1scx machine getting ready to connect to IO chassisThis is the machine which will be the new
x end front end machine.  Its IP is
192.168.113.86. 
  
  3229   Thu Jul 15 16:16:51 2010 AlbertoConfigurationLSCPRC and SRC length adjustements


   
        
            
  
  3228   Thu Jul 15 15:57:10 2010 KojiConfigurationLSCPRC and SRC length adjustementsTell me whether it is correct or not. Otherwise
I won't be able to sleep tonight.

  
  3227   Thu Jul 15 12:21:08 2010 AlbertoConfigurationLSCPRC and SRC length adjustementsLately I've been trying to calculate the
corrections to the recycling cavity lengths
that would compensate for the phase that
 8x 
  3226   Thu Jul 15 11:58:50 2010 josephbUpdateComputersAdded channel to ADCU_PEM (C0DCU1)I modified the C1ADCU_PEM.ini file in /cvs/cds/caltech/chans/daq/
(after making a backup), and added a temporary
channel called C1:PEM-TEMP_9, the 9 corresponding
  
  3225   Wed Jul 14 20:15:04 2010 DmassBureaucracyCamerasIR OlympusI borrowed the Olympus and forgot to leave
a note - I should have it for at most a day.
dmassey@ligo if you need it urgently
  
  3224   Wed Jul 14 19:36:17 2010 GopalUpdateOptic StacksExperimental Confirmation of COMSOL AnalysisI experimentally determined the spring
constant of a single Vitol spring in
order to obtain a rough estimate for the
 Untitled.png 