    Reply  Tue Apr 10 23:56:44 2012, rana, Update, Computers, Sensoray 
Now that Mike has got the Sensoray working, Jenne/Suresh should grab some new images of the ETM cage as Keiko did so that we can analyze them for another
mode matching diagnostic.
Entry  Wed Apr 11 22:48:39 2012, rana, Update, Environment, BLRMS seis_blrms.png
 
    Reply  Wed Apr 25 18:59:47 2012, rana, Update, PEM, Blue Bird Pre-Amplifier 
Usually R is for resistors and D is for diodes. Do you think from the schematic that we should put diodes into the R slots? 
Entry  Mon Apr 30 18:46:34 2012, rana, Update, Computers, megatron 
Last week I found that megatron was still off after the power outage. Apparently, the power recovery checklist had not been followed during the recovery.
Please remember to use the checklist and post the checklist results after each power outage. Megatron is now on and functioning.
Entry  Sun May 27 17:19:27 2012, rana, Summary, lore, Strawberries 20120527_145826.jpg
 We have placed some sweet giant strawberries in the fridge; free for eating for anyone working in the lab today or tomorrow:
    Reply  Wed May 30 20:12:15 2012, rana, Update, IOO, MC beam spot oscillation 
This is a common occurrence when diagnostic scripts are written without the ability to handle exceptions (e.g. ctrl-c, terminal gets closed, etc.).
The first thing to do is make sure that the "new" script you are writing doesn't already exist (hint: look in the old scripts directory).
If you are writing a script that touches things in the interferometer, it must always return the settings
    Reply  Fri Jun 1 19:48:54 2012, rana, Update, SUS, Oplevs all different, messed up 
 
 Its a good question, but the answer is yes. At some level all of the OL servos should be different to handle the different mechanical resonances
of the suspension as well as the optical table's acoustic noise and the different noise requirements for the difference optical cavities.
    Reply  Thu Jun 7 13:18:42 2012, rana, Update, SUS, PRM is still oscillating 
  Set the PRM OL servo gains to zero until someone can take care of this. Turning off the buttons doesn't help anything if people run the alignment
scripts.
    Reply  Wed Jun 13 02:24:02 2012, rana, Update, Green Locking, my first modescan (sort of) 
 That sounds goofy.
With the delay line technique, you can get a linear signal over 50 MHz with no phase shifting. What is with all this I/Q stuff?
    Reply  Wed Jun 13 11:10:56 2012, rana, Update, Green Locking, my first modescan (sort of) 
You can easily calculate whether or not the coarse readout will work by thinking about the scan resolution you need given the ADC dynamic range and the
whitening filter that you use.
Entry  Wed Jun 20 18:00:10 2012, rana, Summary, PSL, summaries 
 Nice PSL summaries from LHO:
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=3187
    Reply  Wed Jun 27 10:27:09 2012, rana, Summary, IOO, how to improve mode matching to arms 
The MC waist is correct as is the arm RoCs. Most likely the error is in the telescope length or its distance from the MC. Jenne probably has all the
numbers and can give us a surface plot showing how the MM degrades as a function of those two parameters.
    Reply  Thu Jun 28 15:21:02 2012, rana, Update, Locking, PRMI work started, commissioning plan 
 
 Cycling the vacuum is easy. Why not vent starting Thursday evening and pop the doors on Friday morning? Inspect on Friday and pump on Monday
morning.
    Reply  Mon Jul 2 00:41:13 2012, rana, Summary, General, clipping at BS, my plan 
 
 Start pumping on Monday before Steve goes home.
    Reply  Sun Jul 15 16:25:15 2012, rana, Update, LSC, PRMI LSC is making PRM motion worse 
As stephanie did a few years ago, the idea should be to match the damping between the DRMI optics so as to minimize the differential motion. No notching
is necessary. Read her SURF report about the IMC.
    Reply  Thu Jul 19 15:55:21 2012, rana, Update, Computers, used 'aptitude' to install software (TexLive) on rosalba 
I used APTITUDE to install texlive-full on rosalba so that I could work
on a paper. pdflatex was not found on pianosa, rosalba, megatron, etc. I used this command:

sudo aptitude install texlive-full

While this was installing, I read a bunch of forums which claim that its better to bypass the apt-get
Entry  Fri Jul 20 11:59:27 2012, rana, Update, Computer Scripts / Programs, CONLOG not running 
WE tried to use the new conlog today and discovered that:
1) No one at the 40m uses conlog because they don't know that it ever ran and don't know how to use regexp.
2) It has not been running since the last time Megatron was rebooted (probably a power outage).
Entry  Fri Jul 20 12:12:25 2012, rana, Update, PSL, PMC problems examined Untitled.png
Jenne, Den, Rana
The PMC transmission has been varying a lot and the MC seems unstable. Superstitious people might blame this on the El-nino or the alignment with
Sagitarius, but we are ostensibly scientists.
    Reply  Mon Jul 23 21:54:48 2012, rana, Update, PEM, Weather Station Works! Untitled.png
To get the code to run on c1pem1, we had to move the old target back into the /cvs/cds/caltech/target/ directory.  It is in /cvs/cds/caltech/target/c1pem1/.
JoeB had apparently moved it into some other area called 'oldfe' and this was why the weather station has not been running for years.    Joe is at LLO now, but he's not beyond our reach...
    Reply  Wed Jul 25 23:03:22 2012, rana, Update, digital noise, notch, lowpass filters 
If the problem is the precision in DTT, then why would the noise change when the corner frequency of the filter is changed? 
And how about checking for filter noise in the situation we saw online? 4th order low pass at 1 Hz or 8 Hz.
    Reply  Thu Jul 26 15:43:03 2012, rana, Update, LSC, modelled ringdown 
You cannot use the digital system for this. You hook up a scope to the transmitted light as well as the incoming light (after the MC, perhaps at IP_POS).
Then you acquire the data from both places simultaneously using an ethernet equipped scope. The step response of the PDs used for this has to be calibrated
separately.
    Reply  Tue Aug 7 16:21:16 2012, rana, Update, SUS, optical table box wall proposal 


    
        
            Quote:
        
        
            

            Sanwiched wall as shown: 1" clear acrylic, 2 layers of 0.004" thick "window tint", 1 layer of  0.007"
Entry  Tue Aug 7 23:30:58 2012, rana, Update, Environment, Nearby EQ 
 Just felt an EQ. Impulse moved some vertical blinds by several mm.
Tue Aug 07 23:26:06 2012 
    Reply  Tue Aug 7 23:33:44 2012, rana, Update, STACIS, More noise data 
Looks like you're just measuring the ADC noise. You should add ADC noise to your plot. To compare the geophones with the accelerometers, you have to
correct for the preamp gain and plot them both in the same units.
To get above the ADC noise you can use an SR560 preamp. (AC Coupled, G = 100)
    Reply  Wed Aug 8 22:12:30 2012, rana, Configuration, IOO, MC trans optics configured 
  The PDA255 is a
good ringdown detector - Steve can find one in the 40m if you ask him nicely.
Entry  Tue Aug 14 21:01:51 2012, rana, Update, PEM, BLRMS Screenshot-Untitled_Window.png

I fixed up the seismic.stp file
    Reply  Wed Aug 15 04:03:55 2012, rana, Summary, LSC, Y-Arm Locking yArmNoise_120815.pngyarm.pdf
0) Did a bunch of alignment to get beams roughly centered on ETMY and ITMY and maximize power. Adjusted the aperture and focus on ETMY camera to get
nice image. Camera needs to be screwed in tightly and cables given some real strain relief, Steve.
    Reply  Fri Aug 17 14:45:51 2012, rana, Update, Cameras, video cameras in the dark 
 The problem with the glow on the ETMY face is due to the red light being scattered off of the optical table from the HeNe laser for the OL. Why
is the red light hitting the table?
One way to fix the problem for the camera image is to insert a long pass filter (if Steve can find one).
Entry  Tue Aug 21 00:02:05 2012, rana, Summary, Computer Scripts / Programs, GDS/DTT bug: 10 digit GPS times not accepted 
 I've noticed that we're experiencing this bug which was
previously seen at LHO. We cannot enter 10 digit GPS times into the time fields for DTT due to a limit in TLGEntry.cc, which Jim Batch fixed in September
of last year. Seems like we're running an old version of the GDS tools.
Entry  Tue Aug 21 00:35:25 2012, rana, Summary, IOO, Visibilities and Chrome Untitled.pdf
MC and PMC vis:
MC REFL Unlocked    = 4.4
MC REFL Locked      = 0.67
    Reply  Thu Aug 23 15:35:33 2012, rana, Update, , IMC Ringdown 
 
 It is HIGHLY unlikely that the IMC mirrors are having any effect on the ringdown. The ringdowns take ~20 usec to happen. The mirrors
are 0.25 kg and you can calculate that its very hard to get enough force to move them any appreciable distance in that time.
    Reply  Thu Aug 23 15:42:48 2012, rana, Update, STACIS, STACIS signal box made vsanni-1107222997.pdf
 
 I found this
entry in the old 40m ilog which describes the STACIS performance. It shows that even though the STACIS is bad for the differential arm motion
Entry  Thu Aug 23 22:21:13 2012, rana, Configuration, IOO, MCL turned back on mcl-screen.pngmcf-noise.pdf
I turned on some filters and gain in the SUS-MC2_MCL filter bank tonight so as suppress the seismic noise influence on MC_F. This may help the MC stay
in lock in the daytime.
Koji updated the mcdown and mcup scripts to turn the MCL path on and off and to engage the Boost filters at the right time.
    Reply  Mon Sep 10 19:04:32 2012, rana, Update, General, plan 
 On Friday, Koji and I adjusted the beam pointing into the DRMI using the PZT yaw and found that the beam inside the DRMI (as seen on the AS camera)
looked OK (not distorted too much).
So it seems that the issue seen before, namely that the DRMI resonant mode is very strange, is no longer true.
Entry  Fri Sep 14 00:33:31 2012, rana, Update, PSL, PMC alignment - mystery in reflected power pmcr.jpge.pnga.png
The PMC reflection made it seem that the beam going into it was misaligned. I went to the table and aligned the input beam to maximize the PMC transmission.
I got ~10% improvement.
Just to check if something was loose, I started tapping things upstream of the Faraday. When I tapped the actual PMC body it seemed to get unseated
Entry  Fri Sep 14 01:18:51 2012, rana, Update, COC, 2 Layout Changes 
After looking at the in-vacuum layout I think we should make two changes during
the next vent:
1) Reduce the number of mirrors between the FI and its camera. We install a large silvered mirror in the vacuum flange which holds the Faraday
    Reply  Fri Sep 14 18:15:43 2012, rana, Update, ASC, First In Vac Picture 
 
 Looks good. Any way that you can tell in an unambiguous way, where the beam is, is very good. Ideally we want to have1-2 mm accuracy.
    Reply  Mon Sep 17 07:57:58 2012, rana, Update, PEM, BS and AS tables for REFL change 
 
 This was in response to my suggestion to move the REFL beam path to the table containing the BS/PRM Oplevs. From this seismic data it is
clear that the BS table is no worse than the AS table, so we should plan to make the layout change during the next vent.
    Reply  Mon Sep 17 23:58:01 2012, rana, Update, General, Last of In-vac mirror photos taken 
 My hope is that the DRMI flashes will be bright enough to see on the PO beams. IF we get 10 mW through the Faraday, you should get some buildup
when the carrier resonates in the DRMI.
If the recycling gain is 10 and the pickoff fraction is 100 ppm you ought to get ~10 uW on PO. How much of the recycling cavity power gets out
    Reply  Wed Sep 19 23:17:25 2012, rana, Configuration, PSL, AOM installation 
Mannasa and Unni and I looked at the RF driver for the AOM. It was fine.
With the ALC input left unconnected, with the power supply set to +28V, it was drawing 0.56 A.
By adjusting the modulation input we were able to get 1.1 Vrms into the scope (terminated at 50 Ohms) after going through 2 10dB attenuators. 11
Entry  Mon Sep 24 20:28:13 2012, rana, Summary, elog, restarted elog: was unresponsive 
 
    Reply  Mon Sep 24 23:45:39 2012, rana, Update, General, POP in-vac optics aligned, POY beam coming out of vac 
  What was the reasoning / resolution of the POP forward/backward beam? Are we going to have the right beam for DRMI locking?
Entry  Mon Oct 1 19:21:03 2012, rana, Configuration, PEM, changed PEM DQ channels 
Changed the list of channels to be written to frames from having the IN1 suffix to OUT. Now we can load the calibration of the channel into the filter
module and the DQ channel will be calibrated.
We should do this wherever possible so that our channels will have real calibrations associated with them.
    Reply  Fri Oct 5 04:34:31 2012, rana, Update, SUS, How about the slow machines? 


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Mon Oct 8 09:51:30 2012, rana, Update, Modern Control, state estimation 
 
 I guess that the estimated state has the same low pass filter, effectively, that we use to low pass the feedback signal in SUSPOS. I wonder
if there is an advantage to the state estimation or not. Doesn't the algorithm also need to know about the expected seismic noise transmission from the
    Reply  Mon Oct 8 22:07:46 2012, rana, Update, SUS, Doors on, ready to pump 20120921_200637.jpg


    
        
            Quote:
        
        
            

           All oplevs need a little realignment, especially ETMY, which had it's lens removed (Rana has a Wall of Shame photo of this, which is why
    Reply  Wed Oct 10 02:15:14 2012, rana, Update, LSC, 11 MHz reconnected to EOM 
 Absolutely hokey. What are our requirements for this RFPD? What are the power levels and SNR that we want (I seem to remember that
its for 22 as well as 110 MHz)? Perhaps we can test an aLIGO one if Rich has one sitting around, or if the aLIGO idea is to use a broadband PD I guess
we can just keep using what we have.
Entry  Wed Oct 10 02:20:34 2012, rana, Update, SUS, Optical Lever QPD mods C1-CORE_OPTICS_SUM_DATA_ALL_TIME_0-1033801216-86400.png
 Since we upgraded the CDS system, I guess our ADC ranges have gone up but we never did anything to the OLs to match the ADC ranges. From Liz's
daily summary page of the OL, I see this:
    Reply  Fri Oct 19 16:24:39 2012, rana, Update, Locking, Alignment is really bad?? 
 
 VENT NOW and FIX ALIGNMENT!
    Reply  Mon Oct 22 11:26:12 2012, rana, Update, SUS, PITCH damping needed 
 
Too bad - I thought it would at least give a little damping. Since we want the viscous-like energy loss to be ~49x larger, we need to have the
field modulation in the damper (not dumper) increase by ~7.