40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 289 of 348  Not logged in ELOG logo
Entry  Fri Jul 9 20:16:19 2010, rana, Summary, PSL, Things I did to the PSL today: Refcav, PMC, cameras, etc. 
    Reply  Sun Jul 11 20:11:48 2010, rana, Summary, PSL, RC trend after the insulation removal rc.png
Entry  Tue Jul 13 19:26:47 2010, rana, Update, IOO, MC still broken a.txt.gz
Entry  Thu Jul 15 19:13:03 2010, rana, Update, IOO, MC_F check a.png
    Reply  Thu Jul 15 19:27:04 2010, rana, Summary, PSL, RC trend after the insulation removal Untitled.pnga.pngb.png
Entry  Sun Jul 18 20:50:03 2010, rana, Configuration, IOO, MC TRANS optics changed 
Entry  Mon Jul 19 21:47:36 2010, rana, Summary, DAQ, DAQ timing test 
Entry  Thu Jul 22 01:02:08 2010, rana, Update, Treasure, Monsters, LNVR, and Phase noise 
    Reply  Fri Jul 23 00:13:11 2010, rana, Update, PSL, Problem NOT REALLY Solved 
    Reply  Fri Jul 23 21:35:48 2010, rana, Update, CDS, Rerouted RFM around c1lsc, took RFM card out of c1lsc 
    Reply  Sat Jul 24 14:27:36 2010, rana, Update, Electronics, FSS Oscilaltor Phase Noise Measurement 
    Reply  Tue Jul 27 16:03:36 2010, rana, Summary, DAQ, DAQ timing test Untitled.png
    Reply  Wed Jul 28 01:05:44 2010, rana, Update, SEI, Bode Magnitude Plot and Concerns 
Entry  Sun Aug 1 21:04:45 2010, rana, Summary, Computer Scripts / Programs, MC Autolocker fixed 
Entry  Sun Aug 1 21:40:27 2010, rana, Summary, PSL, FSS: SLOWDC response Untitled.png
Entry  Wed Aug 4 19:50:58 2010, rana, Configuration, Electronics, Rubidium clocks too hot: hut removed beat.png
    Reply  Fri Aug 6 16:20:08 2010, rana, Update, General, clocks still not locked fully - phase shifted Untitled.pdf
Entry  Sat Aug 7 21:57:56 2010, rana, Summary, DMF, seisBLRMS restarted Untitled.png
Entry  Fri Aug 20 17:46:30 2010, rana, Update, PSL, 40m PSL Upgrade Layout v0.3 
Entry  Tue Aug 24 12:03:57 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-24_at_6.07.43_PM.png
    Reply  Wed Aug 25 15:32:52 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-25_at_6.26.23_PM.png
    Reply  Fri Aug 27 19:30:31 2010, rana, Update, CDS, SLOW controls 
    Reply  Sat Aug 28 01:02:31 2010, rana, Update, PSL, The beginnings of the new PSL 
Entry  Sun Aug 29 21:18:00 2010, rana, Update, Computers, kallo -> rossa 
    Reply  Mon Aug 30 18:22:00 2010, rana, Summary, PSL, PSL Enclosure is UNSTABLE 
Entry  Mon Aug 30 23:21:36 2010, rana, HowTo, PSL, 2W NPRO Mount designed with emachineshop.com software LaserMount.png
    Reply  Tue Aug 31 15:26:46 2010, rana, Update, PEM, room temp lowered 
    Reply  Tue Aug 31 19:46:00 2010, rana, Update, PSL, PSL upgrade update 
    Reply  Wed Sep 1 12:34:14 2010, rana, Update, Electronics, FSS Box Phase Noise from DAQ 
    Reply  Wed Sep 1 17:17:42 2010, rana, Update, Electronics, FSS Box Phase Noise from DAQ - Measurement setup modified 
    Reply  Thu Sep 2 23:35:33 2010, rana, Configuration, Computers, rossa nvidia driver and dual monitor configuration 
    Reply  Fri Sep 3 06:55:42 2010, rana, Update, PSL, PSL beam hitting the PMC! 
    Reply  Sun Sep 5 21:35:41 2010, rana, Configuration, Computers, rossa notes 
    Reply  Mon Sep 6 01:46:58 2010, rana, Update, PSL, PSL update of the day 
    Reply  Mon Sep 6 21:08:44 2010, rana, Update, CDS, Susension model reviewed 
    Reply  Wed Sep 8 09:50:13 2010, rana, Update, PSL, PSL update 
    Reply  Thu Sep 9 16:54:56 2010, rana, Update, SAFETY, main laser is back ON 
    Reply  Sat Sep 11 03:16:51 2010, rana, Configuration, Computers, rossa notes 
    Reply  Sun Sep 12 22:36:03 2010, rana, Configuration, Computers, rossa notes 
    Reply  Mon Sep 13 00:19:32 2010, rana, Update, , VCO Driver Output power v. slider control voltage vco.png
Entry  Mon Sep 13 02:45:59 2010, rana, Configuration, DMF, seisBLRMS restarts 
Entry  Mon Sep 13 19:41:38 2010, rana, Update, PSL, FSS AOM alignment 
Entry  Tue Sep 14 00:21:51 2010, rana, Omnistructure, Environment, Office area temperature change 
Entry  Sun Sep 19 18:09:09 2010, rana, Configuration, Cameras, Blue IP Camera installed on the PSL table Untitled.png
Entry  Sun Sep 19 18:52:52 2010, rana, Configuration, PSL, NPRO SLOW servo settings updated for Innolight NPRO Untitled.png
    Reply  Thu Sep 23 10:34:20 2010, rana, Frogs, Computers, nodus gracefully rebooted 
Entry  Mon Sep 27 00:33:50 2010, rana, Update, PSL, High Voltage Driver added to TTFSS -> NPRO 
Entry  Wed Sep 29 01:53:44 2010, rana, Update, PSL, paths broken and VCO turned off 
    Reply  Thu Sep 30 21:55:31 2010, rana, Update, CDS, DAQ sys update Untitled.png
    Reply  Tue Oct 5 13:52:15 2010, rana, Update, CDS, proof of trend Untitled.png
ELOG V3.1.3-