40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 288 of 344  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  2510   Tue Jan 12 13:24:50 2010 HaixingUpdateSUSQuadrant Magnetic LevitationI have tried to make the quadrant magnetic
levitation work but unfortunately I did
not succeed. During the experiment, I
 schmematic.png 
  2574   Fri Feb 5 14:31:46 2010 JenneUpdateSUS2 SOS towers assembled[Jenne, Kiwamu]
The 2 SOS towers for the ITMs have
been assembled, and are on the flow bench
 DSC_1156.JPG 
  2641   Thu Feb 25 19:59:50 2010 KojiConfigurationSUSITMX OSEMsKoji, Steve
ITMX OSEM CONFIGURATION
 
 osem_config_ITMX.png 
  2651   Tue Mar 2 23:11:43 2010 KojiUpdateSUSITMX hungJenne and Koji
We successfully hung ITMX on the
SOS. Side magnet is ~2mm off from the center
  
  2652   Wed Mar 3 02:57:29 2010 JenneUpdateSUSITMX hung


   
        
            
  
  2658   Fri Mar 5 11:21:18 2010 steveUpdateSUSused OSEMs are magnetic


   
        
            
  
  2659   Fri Mar 5 18:04:56 2010 ranaUpdateSUSused OSEMs are magneticThe OSEM LEDs and PDs from Honeywell have
always had some ferromagnetic material in
them. These are the same OSEMs we had since
  
  2668   Thu Mar 11 17:51:04 2010 KojiUpdateSUSRecent status of SOSsJenne, Koji
Recent status of SOSs:
  
  2677   Tue Mar 16 09:37:30 2010 steveUpdateSUSeq 4.4 seen by oplevs and osemsThe oplev plots clearly show the alignment
effect of this eq.
 opleveq4.4.jpgeq4.4.jpgopleveq4.4d3.jpg 
  2717   Sat Mar 27 16:23:10 2010 KojiUpdateSUSanother SRM sidemagnet gluedKiwamu and Koji
Last night we have released PRM from
the gluing fixture. All of the six magnets
  
  2730   Mon Mar 29 18:41:34 2010 KojiConfigurationSUSStarted to build TTsSteve and Koji
WE started to build 5 TTs. 4 of them
are used in the recycling cavities. One is
 IMG_2348.jpg 
  2731   Mon Mar 29 18:50:14 2010 KojiUpdateSUSPRM sidemagnet gluedPRM was released from the fixuture without
any trouble. This was the last magnet gluing
until ETMs are delivered.
 StatusTable.png 
  2753   Thu Apr 1 17:35:24 2010 KojiUpdateSUSWorking on ITMX/YSteve and Koji
- We removed old ITMX/Y from the
chambers. Now they are temporarily placed
 IMG_2353.jpg 
  2766   Mon Apr 5 09:48:57 2010 KojiUpdateSUSITMs placed on the tables in the chambersSteve and Koji (Friday, Apr 02)
Summary
Intsallation of ITMs are going on.
  
  2769   Mon Apr 5 11:39:41 2010 steveUpdateSUSITM-south installation


   
        
            
  
  2773   Mon Apr 5 14:10:06 2010 steveUpdateSUSsus damping restored

    
        
  
  2777   Tue Apr 6 22:54:34 2010 KojiUpdateSUSITMY (south) alignedKiwamu and Koji
ITMY
(south) was aligned
 IMG_2362.jpg 
  2796   Mon Apr 12 22:51:31 2010 KojiUpdateSUSITMX installed and alignedKoji
ITMX
was aligned
 IMG_2381.jpg 
  2800   Tue Apr 13 20:02:02 2010 KojiUpdateSUSBS chamber opened, PRM/SRM SOS removed from the tableBob, Steve, and Koji
We
opened North heavy door of the BS chamber
 IMG_2384.jpg 
  2813   Tue Apr 20 08:00:52 2010 steveUpdateSUSETMY damping restoredETMY sus damping was restored   
  2848   Mon Apr 26 21:12:53 2010 KojiUpdateSUSPRM/SRM standoffs gluedKiwamu and Koji
The PRM/SRM were balanced with the
standoffs. We glued them to the mirror.
  
  2862   Fri Apr 30 23:16:51 2010 KojiUpdateSUSSRM/PRM ready for bakingKiwamu and Koji
- Checked the SRM/PRM balancing after
the gluing.
  
  2863   Sun May 2 13:04:51 2010 KojiSummarySUSCoil Actuator Balancing and Spot PositionI liked to know quantitatively where the
spot is on a mirror.

With an interferometer and A2L
 coil_balance.png 
  2865   Sun May 2 15:38:12 2010 ranaSummarySUSCoil Actuator Balancing and Spot Position 
Oh, but it gets even better: in order
to trust the A2L script in this regard you
  
  2866   Sun May 2 16:52:44 2010 KojiSummarySUSCoil Actuator Balancing and Spot PositionYes, of course. But so far I am trusting
that the coils are inheretly balanced.
Probably you are talking about the
  
  2867   Sun May 2 17:16:43 2010 KojiUpdateSUSHow to steer the incident beam to the MC?Deviations of the MC spot from the center
of the mirrors were measured.
MC1H = +0.29 mm
 steering.png 
  2868   Mon May 3 00:36:49 2010 KojiUpdateSUSHow to steer the incident beam to the MC?Actually, I tried some tweaks of the input
steering to get the  beam being more centered
on the MC mirrors on Saturday evening.
  
  2870   Mon May 3 01:35:41 2010 KojiUpdateSUSLessons learned from MC spot centeringLessons
learned on the beam spot centering (so far)
  
  2901   Sun May 9 20:02:23 2010 ranaConfigurationSUSSUS filters deleted again to reduce CPU load on c1susvme2 againOn Friday, I deleted a bunch of filters
from the c1susvme2 optics' screens (MC1,2,3
+ SRM) so as to reduce the CPU load and keep
 40.png400.png 
  2939   Mon May 17 10:57:16 2010 steveConfigurationSUSdamping restored to ETMYsETMY-south sus damping was restored   
  3104   Wed Jun 23 12:47:43 2010 JenneUpdateSUSPRM, SRM ready for vacuumI fitzed
with the PRM and SRM briefly, and I now believe
 SRM_pitch_offset_small.jpg 
  3162   Tue Jul 6 17:38:27 2010 JenneUpdateSUSTip Tilt Progress![Jenne, Kyung Ha]
We successfully suspended the 4 eddy
current dampers for the first Tip Tilt. 
  
  3171   Wed Jul 7 19:41:27 2010 JenneUpdateSUS1.5 more ECD sets suspended for tip tilts[Jenne, Kyung Ha]
We made some good progress on suspending
the Tip Tilt ECDs today.  We finished
 ECDbackplane_blackdump_small.jpgECDbackplane_foil_small.jpg 
  3197   Mon Jul 12 15:49:56 2010 nancyUpdateSUSCharacterisation of the QPDI and koji setup the measurement of the
QPD response to the pitch and yaw displacements
of the beam spot.
 fullyaw.jpgyaw_linear.jpgfullpitch.jpgpitch_linear.jpg 
  3198   Mon Jul 12 17:05:30 2010 nancyUpdateSUSCharacterisation of the QPD

    
        
 plot.pngplot.png 
  3201   Mon Jul 12 22:01:13 2010 KojiUpdateSUSOne TT suspended. Still need fine alignmentJenne and Koji
We tweaked the alignment of the TT
mirror.
 IMG_2634.jpg 
  3233   Thu Jul 15 23:51:47 2010 Mr. MaricHowToSUSLevitate me if you canYou guys must work harder.
 mag_lev.jpg 
  3235   Fri Jul 16 13:05:48 2010 Kyung-haUpdateSUSLate update for 7/13 Tue (Tip Tilts)[Jenne & Kyung-ha]
We suspended the mirror to one of
the main frame with the ECD backplane we
  
  3249   Tue Jul 20 11:49:31 2010 JenneUpdateSUSSome Suspensions not damping[Jenne, Koji]
I moseyed into the control room this
morning, to find ITMX and ITMY both with
  
  3278   Fri Jul 23 15:54:38 2010 kiwamuUpdateSUSPRM and TT installed[ Jenne, Koji and Kiwamu]
 
 DSC_2275.JPG 
  3281   Fri Jul 23 18:55:25 2010 kiwamuUpdateSUSPRM and TT installedI updated    
  3294   Mon Jul 26 20:12:18 2010 kiwamuUpdateSUSOSEMs on PRM [Alberto and Kiwamu]
We installed the OSEMs to the new PRM.
 DSC_2279.JPG 
  3295   Mon Jul 26 20:30:35 2010 JenneUpdateSUS2 Tip Tilts suspended and balanced[Koji, Jenne]
We were on Team Cleanroom, while
Kiwamu and Alberto were on Team Chamber. 
  
  3302   Tue Jul 27 21:38:21 2010 kiwamuUpdateSUSinstallation of in-vac optics[Alberto and Kiwamu] 
We put the PRM back approximately on
 DSC_2284.JPGDSC_2291.JPG 
  3303   Tue Jul 27 23:46:45 2010 JenneUpdateSUSQ measurements of 2 TTs[Koji, Jenne]
We took measurements of the Q of
all the modes that we could think of for
  
  3313   Wed Jul 28 17:32:37 2010 kiwamuUpdateSUSinstallation of in-vac optics[Jenne, Koji and Kiwamu]
We have installed two steering mirrors
  
  3315   Thu Jul 29 10:39:43 2010 kiwamuUpdateSUSRe: installation of in-vac opticsI updated the last entry   
  3326   Thu Jul 29 22:08:32 2010 AlbertoUpdateSUSMore optics installed on the BS table[Koji, Steve, Kiwamu, Alberto]
- This afternoon we installed
a few new optics on the BS table: GR_PBS,
  
  3425   Mon Aug 16 19:12:18 2010 JenneUpdateSUSMore TT characterization[Jenne, Yoichi]
We
characterized Tip Tilts numbers 2 & 3
  
  3427   Mon Aug 16 23:39:29 2010 YoichiUpdateSUSMore TT characterization


   
        
            
 EQStopScrewHoles.jpg 
ELOG V3.1.3-