40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 286 of 341  Not logged in ELOG logo
ID Dateup Author Type Category Subject Text Attachments
  14364   Tue Dec 18 11:42:40 2018 ChubUpdateGeneralAcromag box wiredThe Auxiliary DAQ Chassis, or Acromag box,
is now wired and ready for testing. 
I will be sorting the cables at the vacuum
  
  14365   Tue Dec 18 18:13:32 2018 aaronUpdateOMCOMC L HV Piezo driver tests (again)I tested the OMC-L HV driver box again,
and made the following observations:


Drove the HV diff pins
 IMG_4576_copy.jpg 
  14366   Wed Dec 19 00:12:46 2018 gautamUpdateOMC40m OMC DCC nodeI made a node
to collect drawings/schematics for the 40m
OMC, added the length drive for now. We should
  
  14367   Wed Dec 19 14:19:15 2018 KojiSummaryVACPlan for pumpoing down testWe
still need elaborated test procedure posted

12/29 Wed
 Screenshot_from_2018-12-19_14-49-34.png 
  14368   Wed Dec 19 15:15:56 2018 gautamUpdateIOOTT1/TT2 steppingI removed the ND filter from the ETMYT
camera to facilitate searching for a TRY
beam. This should be replaced before we go
  
  14369   Wed Dec 19 19:51:19 2018 gautamUpdateGeneralPumpdown prep[Koji,
gautam]

Summary:
 OMCscan.pdf 
  14370   Wed Dec 19 21:14:50 2018 gautamUpdateVACPumpdown tomorrow I just spoke to Jon who asked me to make
this elog - we will be ready to test one
or more parts of the pumpdown procedure tomorrow
  
  14371   Wed Dec 19 22:11:28 2018 KojiUpdateGeneralHow to align the copper OMCThe OMC input optics layout is attached

Checked the spot position on OMMT-FM1.
It was off from the center. This was causing
 110804_40m_OMC_layout.pdfOMC_alignment.pdf 
  14372   Thu Dec 20 08:38:27 2018 JonUpdateVACPumpdown tomorrow Linked is the pumpdown
procedure, contained in the old 40m documentation.
The relevant procedure is "All Off -->
  
  14373   Thu Dec 20 10:28:43 2018 gautamUpdateVACHeavy doors back on for pumpdown 82[Chub, Koji, Gautam]

We replaced the EY and IOO chamber
heavy doors by 10:10 am PST. Torquing was
  
  14374   Thu Dec 20 17:17:41 2018 gautamUpdateCDSLogging of new Vacuum channelsAdded the following channels to C0EDCU.ini:

  
  14375   Thu Dec 20 21:29:41 2018 JonOmnistructureUpgradeVacuum Controls Switchover Completed[Jon, Chub, Koji, Gautam]

Summary

Today we carried
out the first pumpdown with the new vacuum
 40m_vacuum_acromag_channels.pdf 
  14376   Fri Dec 21 11:11:51 2018 gautamUpdateCDSLogging of new Vacuum channelsThe N2 pressure channel name was also wrong
in C0EDCU.ini, so I updated it this morning
to the correct name and units:
  
  14377   Fri Dec 21 11:13:13 2018 gautamOmnistructureVACN2 line valved offPer the discussion yesterday, I
valved off the N2 line in the drill press
 VacGauges.pngScreenshot_from_2018-12-21_13-02-06.png 
  14379   Fri Dec 21 12:57:10 2018 KojiOmnistructureVACN2 line valved offIndependent question: Are all the turbo
forelines vented automatically? We manually
did it for the main roughing line.
  
  14380   Thu Jan 3 15:08:37 2019 gautamOmnistructureVACVac status unknownLarry W came by the 40m, and reported that
there was a campus-wide power glitch (he
was here to check if our networking infrastructure
 Screenshot_from_2019-01-03_15-19-51.pngScreenshot_from_2019-01-03_15-14-14.png997B13A9-CAAF-409C-A6C2-00414D30A141.jpeg 
  14382   Thu Jan 3 21:17:49 2019 ranaConfigurationComputersWorkstation Upgrade: Donatella -> Scientific Linux 7.2donatella was one of our last workstations
running ubuntu12. we installed SL7 on there
today
 IMG_20190103_205158.jpg 
  14383   Fri Jan 4 10:25:19 2019 JonOmnistructureVACN2 line valved offYes, for TP2 and TP3. They both have
a small vent valve that opens automatically
on shutdown.
  
  14384   Fri Jan 4 11:06:16 2019 JonOmnistructureUpgradeVac System PunchlistThe base Acromag vacuum system is running
and performing nicely. Here is a list of
remaining questions and to-do items we still
  
  14385   Fri Jan 4 15:18:15 2019 KojiUpdateGeneralChiara disk clean up and internally mounted[Koji Gautam]

Took the opprtunity of the power
glitch to take care of the disk situation
 P_20190104_143336.jpgP_20190104_143357.jpg 
  14386   Fri Jan 4 17:43:24 2019 gautamUpdateCDSTiming issues[J Hanks (remote),
koji, gautam]
  
  14387   Mon Jan 7 11:54:12 2019 JonConfigurationComputer Scripts / ProgramsVac system shutdownI'm making a controlled shutdown of
the vac controls to add new ADC channels.
Will advise when it's back up.
  
  14388   Mon Jan 7 19:21:45 2019 JonConfigurationComputer Scripts / ProgramsVac system shutdownADC work finished for the day. The vac
controls are back up, with all valves
CLOSED and all pumps OFF.
  
  14389   Tue Jan 8 10:27:27 2019 gautamUpdateGeneralNear-term in-chamber work Here is a list of tasks I think we should
prioritize for the next two weeks. The idea
is to get back to the previous state of being
  
  14390   Tue Jan 8 19:13:39 2019 JonUpdateUpgradeReady for pumpdown tomorrowEverything is set for a second pumpdown
tomorrow. We'll plan to start pumping
after the 1pm meeting. Since the main volume
  
  14391   Wed Jan 9 11:07:09 2019 gautamUpdateVACNew Vac channel loggingLooks like I didn't restart all the
daqd processes last night, so the data was
not in fact being recorded to frames. I just
 Screenshot_from_2019-01-09_11-08-28.png 
  14392   Wed Jan 9 11:33:35 2019 gautamUpdateCDSTiming issues still persistSummary:

The gps time mismatch between /proc/gps
and gpstime seems to be resolved. However,
 gpstimeSync.pngScreenshot_from_2019-01-09_17-56-58.png 
  14393   Wed Jan 9 20:01:25 2019 JonUpdateVACSecond pumpdown completed[Jon, Koji, Chub, Gautam]

Summary

The
second pumpdown with the new vacuum system
 Screenshot_from_2019-01-09_20-00-39.pngIMG_3088.jpg 
  14394   Thu Jan 10 10:23:46 2019 gautamUpdateVACovernight leak rateOvernight, the pressure increased from
247 uTorr to 264 uTorr over a period of 30000
seconds. Assuming an IFO volume of 33,000
 OvernightLeak.png 
  14395   Thu Jan 10 11:32:40 2019 ChubUpdateVACManual valve interfaced with CDSConnected the manual gate valve status
indicator to the Acromag box this morning. 
Labeled the temporary cable (a 50' 9p
  
  14396   Thu Jan 10 19:59:08 2019 JonUpdateVACVac System Running Normally on Turbo Pumps[Jon, Gautam, Chub]

Summary

We continued
the pumpdown of the IFO today. The main volume
 Screen_Shot_2019-01-10_at_7.58.24_PM.pngCCs.pngTPs.png 
  14397   Fri Jan 11 16:38:57 2019 gautamUpdateGeneralSome alignment checksThe pumpdown seems to be progressing smoothly,
so I think we are going to stick with the
plan decided on Wednesday, and vent the IFO
 pd82.pngLSC_X.png 
  14398   Mon Jan 14 10:06:53 2019 gautamUpdateVACVent 82 complete[chub, gautam]


IFO pressure was ~2e-4
 Vent82Summary.png 
  14399   Tue Jan 15 10:52:38 2019 gautamUpdateSUSEY door opened[chub, bob, gautam]

We took the heavy door off the
EY chamber at ~930am.
  
  14400   Tue Jan 15 15:27:36 2019 gautamUpdateGeneralLasers and other stuff turned back onVEA is now a laser hazard area
as usual, several 1064nm lasers
in the lab have been turned back on. Apart
  
  14401   Tue Jan 15 15:49:47 2019 gautamUpdateSUSEY door openedWhile restoring OSEMs on ETMY, I noticed
that the open voltages for the UR and LL
OSEMs had significantly (>30%) changed
 EY_OSEMs.png 
  14402   Tue Jan 15 18:16:00 2019 gautamUpdateOptical LeversETMY Oplev HeNe needs replacementPerhaps the ETMY Oplev HeNe is also giving
up - the power has fallen by ~30% over 1
year (Attachment #2), nearly twice as much
 OLRIN.pdfOLsums.png 
  14403   Wed Jan 16 16:25:25 2019 gautamUpdateSUSYarm locked[chub, gautam]

Summary:

Y arm was locked at low power in
 Yarm_locked.png 
  14404   Fri Jan 18 12:52:07 2019 gautamUpdateOptical LeversBS/PRM Oplev HeNe replacedI replaced the BS/PRM Oplev HeNe with one
of the heads from the SP table where Steve
was setting up the OL RIN/pointing noise
 OLRIN_20190118.pdf 
  14405   Fri Jan 18 15:34:37 2019 gautamUpdateThermal CompensationElliptical reflector part numberNobody documented this, but here is the
part number with mechanical drawings of the
elliptical reflector installed at EY: 
  
  14406   Fri Jan 18 17:44:14 2019 gautamUpdateVACPumping on RGA volumeSteve came by the lab today, and looked
at the status of the upgraded vacuum system.
He recommended pumping on the RGA volume,
 CC4.png 
  14407   Fri Jan 18 21:34:18 2019 gautamUpdateSUSUnused optic on EY tableDoes anyone know what the purpose of the
indicated optic in Attachment #1 is? 
 IMG_5408.JPG 
  14408   Sat Jan 19 05:07:45 2019 KojiUpdateSUSUnused optic on EY tableI don't think it was used. It is not
on the diagram too. You can remove it.
  
  14409   Sat Jan 19 15:33:18 2019 gautamUpdateSUSETMY OSEMs faultyAfter diagnosis with the tester box, as
I suspected, the fully open DC voltages on
the two problematic channels, LL and UR,
 Screen_Shot_2019-01-19_at_3.32.35_PM.pngETMY_sensors_1231832635.pdf 
  14410   Sun Jan 20 23:41:00 2019 JonOmnistructureVACNotes on vac serial comm, adapter wiringI've attached my handwritten notes
covering all the serial communications in
the vac system, and the relevant wiring for
 Jon_wiring_notes.tar.gz 
  14411   Tue Jan 22 20:36:53 2019 gautamUpdateSUSETMY OSEMs faultyShort update on latest Satellite box woes.


I checked the resistance
of all 5 OSEM coils on ETMY using a DB25
  
  14412   Tue Jan 22 20:45:21 2019 gautamUpdateVACNew N2 setupThe N2 ran out this weekend (again no reminder
email, but I haven't found the time to
setup the Python mailer yet). So all the
  
  14413   Wed Jan 23 12:39:18 2019 gautamUpdateSUSEY chamber workWhile Chub is making new cables for the
EY satellite box...


I removed the unused
 6x 
  14414   Wed Jan 23 18:11:56 2019 gautamUpdateElectronicsEthernet Power Strip IP conflictFor the last week, I noticed that I was
unable to turn the EY chamber illuminator
on using the remote python scripts. This
  
  14415   Wed Jan 23 23:12:44 2019 gautamUpdateSUSPrep for FC cleaningIn preparation for the FC cleaning, I did
the following:


Set up mini-cleanroom at
 IY_level_before.pdf 
ELOG V3.1.3-