  2677   Tue Mar 16 09:37:30 2010 steveUpdateSUSeq 4.4 seen by oplevs and osemsThe oplev plots clearly show the alignment
effect of this eq.
 opleveq4.4.jpgeq4.4.jpgopleveq4.4d3.jpg 
  2676   Tue Mar 16 05:10:39 2010 kojiUpdateEnvironmentEarthquake, Mag 4.4 Some of the suspensions got watchdog tripped
-> enabled -> damped.
The MC mirrors got slightly misaligned.
 100316_MC_SUS.png 
  2675   Tue Mar 16 04:22:02 2010 JenneUpdateEnvironmentEarthquake, Mag 4.4 Earthquake Details

    

       
            Magnitude
 EQ_16Mar2010.png 
  2674   Mon Mar 15 16:39:36 2010 steveUpdatePEMGuralp2 centered

    
        
 grlp2ffst.jpg 
  2673   Mon Mar 15 09:43:47 2010 steveUpdatePEMmore sandblasting todayDo not open IFO vacuum envelope today!
They are sandblasting again at CES
  
  2672   Sat Mar 13 22:16:03 2010 ranaUpdateWienerFilteringGuralp Huddle Test softwareI used some recent better data to try for
better Z subtraction.
Dmass helped me understand that sqrt(1-Coherence)
 guralpznoise.png 
  2671   Sat Mar 13 21:30:22 2010 ranaUpdatePEMStyrofoam Cooler on the Seismos   Untitled.png 
  2670   Fri Mar 12 17:08:22 2010 steveConfigurationVACbg-RGAscan at d18RGA scan of rga-region only at day 18  
This is the back ground of the rga with some
calibration gas.
 bg-d18_20100312scan.png 
  2669   Fri Mar 12 13:52:18 2010 ZachUpdateelogelog restarted The elog was down and I ran the restart
script.
  
  2668   Thu Mar 11 17:51:04 2010 KojiUpdateSUSRecent status of SOSsJenne, Koji
Recent status of SOSs:
  
  2667   Thu Mar 11 15:24:51 2010 steveMetaphysicsEnvironmentIFO was well protected

    
        
  
  2666   Wed Mar 10 15:02:58 2010 ranaUpdatePEMStyrofoam Cooler on the SeismosThis is the spectra and coherence from
a quiet time last night. I've lowered the
Guralp cal by a factor of 2 to account for
 Seismic-Ref_100310.pngUntitled.gif 
  2665   Tue Mar 9 12:06:53 2010 rana, JenneUpdatePEMStyrofoam Cooler on the SeismosLooks like the GUR2_X signal is bad. Jenne
says that we need to center it mechanically
before the signals will become useful again.
  
  2664   Tue Mar 9 09:32:31 2010 KojiSummaryGeneralWideband measurement of Fast PZT responseI have measured a wideband response
of the fast PZT in the LWE NPRO 700mW in
the Alberto's setup.
 PZT_response.png 
  2663   Tue Mar 9 09:04:20 2010 steveUpdatePEMkeep vacuum chamber closedThey are sandblasting at CES: our particle
counts are very high. DO NOT OPEN CHAMBER!
 sandblasting.jpg 
  2662   Mon Mar 8 18:15:27 2010 ranaUpdatePEMStyrofoam Cooler on the SeismosI put Jenne's
cooler over the seismometers
 SeismometersHuddled.jpg 
  2661   Sun Mar 7 23:05:39 2010 ranaUpdatePEMSeismic witnesses near MC1 tank moved

    
        
 seis.png 
  2660   Sun Mar 7 07:01:21 2010 ranaUpdateWienerFilteringGuralp Huddle Test softwareWe need to do a new huddle test of the
Guralps for the Wiener filtering paper. The
last test had miserable results.
 huddlez.png 
  2659   Fri Mar 5 18:04:56 2010 ranaUpdateSUSused OSEMs are magneticThe OSEM LEDs and PDs from Honeywell have
always had some ferromagnetic material in
them. These are the same OSEMs we had since
  
  2658   Fri Mar 5 11:21:18 2010 steveUpdateSUSused OSEMs are magnetic


   
        
            
  
  2657   Thu Mar 4 22:07:21 2010 ranaUpdate40m Upgrading11MHz PD not yet designedUse 10 Ohms for the resistance - I have
never seen a diode with 25 Ohms.
p.s. PDFs can be joined together
  
  2656   Thu Mar 4 19:53:56 2010 AlbertoUpdate40m Upgrading11MHz PD designed adjusted for diode's resistance; 55 MHz RFPD designedAfter
reading this study done
 6x 
  2655   Thu Mar 4 08:43:35 2010 AlbertoUpdate40m Upgrading11 MHz RFPD elctronics


   
        
            
 rfpd11_v2.fil 
  2654   Thu Mar 4 02:25:14 2010 JenneUpdateCOCFurther details on the magnet story, and SRM guiderod glued[Koji, Jenne]
First, the easy story:  
  
  2653   Wed Mar 3 18:32:25 2010 AlbertoUpdate40m Upgrading11 MHz RFPD elctronics** Please
add LISO file w/ component values.
 
 rfpd11_v2_TF.pdfrfpd11_v2_Noise.pdf 
  2652   Wed Mar 3 02:57:29 2010 JenneUpdateSUSITMX hung


   
        
            
  
  2651   Tue Mar 2 23:11:43 2010 KojiUpdateSUSITMX hungJenne and Koji
We successfully hung ITMX on the
SOS. Side magnet is ~2mm off from the center
  
  2650   Tue Mar 2 12:20:54 2010 kiwamuUpdatePSLstray beamIn order to block stray beams, I have
put some beam dumps and razor blades on the
PSL  table.
  
  2649   Mon Mar 1 22:38:12 2010 ranaUpdateComputersRC sensitivity to RINThe overnight triangle wave I ran on the
AOM drive turns out to have produced no signal
in the FAST feedback to the PZT.
 Untitled.png 
  2648   Mon Mar 1 11:21:50 2010 steveConfigurationVACvacuum contoller is back to normal


   
        
            
  
  2647   Mon Mar 1 08:49:37 2010 steveBureaucracySAFETYsafety auditThe 40m safety audit will be at Wednesday
afternoon, March 3
Please participate getting our lab
  
  2646   Sun Feb 28 23:47:52 2010 ranaUpdateComputersrosalbaSince Rosalba wanted to update ~500
packages, I let it do it. This, of course,
stopped the X server from running. I downloaded
  
  2645   Sun Feb 28 16:45:05 2010 ranaSummaryGeneralPower ON Recovery
    Turned ON the RAID above linux1.

   Hooked up a monitor and keyboard and
then turned ON linux1.
    After
  
  2644   Fri Feb 26 15:32:13 2010 steveConfigurationVACpreparation for power outage: vacuum all offThere is a planned power outage tomorrow,
Saturday from 7am till midnight.
I vented all annulies and switched
 ventd3.jpg 
  2643   Fri Feb 26 11:48:36 2010 KojiUpdateGeneralMC incident beam shiftLast night I worked on the MC incident
beam such that we can hit the center of the
MC mirrors.
  
  2642   Fri Feb 26 01:00:07 2010 JenneUpdateCOCSuspension ProgressThis is going to be a laundry list of the
mile markers achieved so far:
* Guiderod and wire standoff glued
  
  2641   Thu Feb 25 19:59:50 2010 KojiConfigurationSUSITMX OSEMsKoji, Steve
ITMX OSEM CONFIGURATION
 
 osem_config_ITMX.png 
  2640   Thu Feb 25 15:49:05 2010 AlbertoAoGCDSNew IO Chassis for the new CDSYesterday Kiwamu and I went to Downs
to take all the available parts of the IO
chassis that Gary and I had put together
  
  2639   Thu Feb 25 11:21:06 2010 KojiUpdateGeneralTanks opened[Steve, Bob, Joe, Zach, Alberto, Kiwamu,
Koji]
We opened the OMC-IMC access connector,
  
  2638   Wed Feb 24 16:11:15 2010 JenneUpdatePEMSeismic witnesses near MC1 tank movedSince we're going to open the MC1 tank
tomorrow, I've moved the MC1 accelerometers
and the Guralp over to underneath MC2 for
  
  2637   Wed Feb 24 12:08:31 2010 KojiUpdateComputersRFM goes red -> recovered by the nuclear optionMost of the RFM went red this morning.
I took the nuclear option and it seemed to
be recovered.
  
  2636   Tue Feb 23 19:07:43 2010 kiwamu and steveConfigurationVACvent is completed

    
        
 vent2010feb23.jpg 
  2635   Tue Feb 23 19:00:45 2010 kiwamuConfigurationVACvent finishedThe vent has been
finished.
  
  2634   Tue Feb 23 16:42:02 2010 ranaConfigurationComputer Scripts / ProgramsSVN restarted on NODUSI ran the start Apache script as described
by Yoichi in the WIki. SVN back up.
  
  2633   Tue Feb 23 16:20:44 2010 steveConfigurationVACoutgassing + leak

    
        
 outgleak.jpg 
  2632   Tue Feb 23 14:56:24 2010 steveUpdateGeneralETMX optical table massOur janitor dropped one 48" long 
fluorescent tube on the top cover of ETMX-isct.
This accident made glasses fly all over the
 etmxmass.jpg 
  2631   Tue Feb 23 13:37:04 2010 kiwamu and steveConfigurationVACventing the 40m vac envelopeKiwamu and Steve have started venting
the 40m vacuum envelope.
Preparation:
  
  2630   Tue Feb 23 06:47:57 2010 KojiUpdateGeneralIFO situations / low power MC lockWork on 22nd Monday:
[MC
recovery]
- Tried to lock MC
after the computer recovery by Joe.
 MC_incident.pngMC_REFL.png 
  2629   Mon Feb 22 21:07:26 2010 JenneUpdateCOCMagnets glued to ITMX[Kiwamu, Jenne]
The magnets + dumbbell standoffs
have been glued to ITMX.  We're waiting
  
  2628   Mon Feb 22 13:08:27 2010 josephbUpdateComputersMinor tweaks to c1omcWhile working on c1omc, I created a .cshrc
file in the controls home directory, and
had it source the cshrc.40m file so that
  