40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 283 of 341  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  13447   Wed Nov 22 14:47:03 2017 KiraUpdatePEMseismometer can testingFor the insulation, I have decided to use
this
one (Buna-N/PVC Foam Insulation
  
  13448   Wed Nov 22 15:29:23 2017 gautamUpdateOptical LeversOplev "noise budget"[steve,
gautam]

What is the best way to set this
 OplevTest.jpg 
  13449   Wed Nov 22 16:40:00 2017 KojiUpdateOptical LeversOplev "noise budget"You may want to consult with the cryo Q
people (Brittany, Aaron) for a Si QPD. If
you want the same QPD architecture, I can
  
  13450   Wed Nov 22 17:52:25 2017 gautamUpdateOptimal ControlVisualizing cost functionsI've attempted to visualize the various
components of the cost function in the way
I've defined it for the current iteration
 globalCosts.pdf 
  13451   Wed Nov 22 19:20:01 2017 ranaUpdateOptical LeversOplev "noise budget"too complex; just shoot straight from the
HeNe to the QPD. We lower the gain of the
QPD by changing the resistors; there's
  
  13452   Wed Nov 22 23:56:14 2017 gautamUpdateOptical LeversOplev "noise budget"Do not turn
on BS/ITMY/SRM/PRM Oplev servos without reading
  
  13453   Thu Nov 23 18:03:52 2017 gautamUpdateOptical LeversOplev "noise budget"Here are a couple of preliminary plots
of the noise from a 20minute stretch of data
- the new curve is the orange
 ITMY_P_noise.pdfITMY_Y_noise.pdf 
  13454   Sun Nov 26 19:38:40 2017 SteveUpdateVACTP3 drypump replaced againThe TP3 foreline pressure was 4.8 Torr,
50K rpm 0.54A and 31C........Maglev rotation
normal 560 Hz.......    IFO pressure
 after_replacement.png 
  13455   Tue Nov 28 16:02:32 2017 ranaUpdatePEMseismometer can testingI've ordered 4 of these from McMaster.
Should be delivered to the 40m by noon tomorrow.

  
  13457   Wed Nov 29 15:33:16 2017 ranaUpdatePSLPMC lockingPMC wasn't locking. Had to power down
c1psl. Did burt restore. Still not great.

I think many of the readbacks on
  
  13459   Thu Nov 30 10:38:39 2017 SteveUpdateVACannuloses are not pumpedAnnuloses are not pumped for 30 days, since
TP2 failed.  IFO pressure 7e-6 Torr
it,  Rga 2.6e-6 Torr
 AnnulosesNotPumped.png 
  13467   Thu Dec 7 16:28:06 2017 KojiUpdateIOOLots of red on the FE status screenOnce the RT machines were back, we launched
only the five IOPs. They had bunch of red
lights, but we continued to run essential
  
  13471   Wed Dec 13 09:49:23 2017 johannesUpdateASSwiring diagramI attached a wiring schematic from the
slow DAQ to the eurocrate modules. Of these,
pins 1-32 (or 1A-16C) and pins 33-64 (17A-32C)
 1Y9.pdf 
  13473   Thu Dec 14 00:32:56 2017 johannesUpdateASSAcromag new crate; c1auxex2 configured as gateway server for acromagThis splicing in of fast binary channels
we discussed at yesterday's and today's
meetings is getting messy with the current
 fp_mod_4U.pdfIMG_20171213_171541850_HDR.jpg 
  13474   Thu Dec 14 07:07:09 2017 ranaUpdateIOOLots of red on the FE status screenI had to key the c1psl crate to get the
PMC locking again. Without this, it would
still sort of lock, but it was very hard
  
  13475   Thu Dec 14 08:59:17 2017 SteveUpdateGeneralwe are here   8_days.png 
  13477   Thu Dec 14 19:41:00 2017 gautamUpdateCDSCDS recovery, NFS woes[Koji, Jamie(remote), gautam]

Summary:
The CDS system seems to be back up and functioning.
 CDS_14Dec2017.pngCDS_errors.png 
  13478   Thu Dec 14 23:27:46 2017 johannesUpdateDAQaux chassis designMade a front and back panel and slot panels
for DSub and IDC breakouts. I want to send
this out soon, are there any comments? Preferences
 auxdaq_40m_4U_front.pdfauxdaq_40m_4U_rear.pdfauxdaq_40m_4U_DSub37x2.pdfauxdaq_40m_4U_IDC50.pdf 
  13479   Fri Dec 15 00:26:40 2017 johannesUpdateCDSRe: CDS recovery, NFS woes


Quote:


  
  13480   Fri Dec 15 01:53:37 2017 jamieUpdateCDSCDS recovery, NFS woes


Quote:


  
  13481   Fri Dec 15 11:19:11 2017 gautamUpdateCDSCDS recovery, NFS woesLooking at the dmesg on c1iscex for example,
at least part of the problem seems to be
associated with FB1 (192.168.113.201, see
 NFS.pngMCautolocker.png 
  13482   Fri Dec 15 17:05:55 2017 gautamUpdatePEMTrillium seismometer DC offsetYesterday, while we were bringing the CDS
system back online, we noticed that the control
room wall StripTool traces for the seismic
 Trillium.png 
  13483   Fri Dec 15 18:23:03 2017 ranaUpdatePEMTrillium seismometer DC offsetUVW refers to the 3 internal, orthogonal
velocity sensors which are not aligned with
the vertical or horizontal directions. XYZ
  
  13485   Fri Dec 15 19:09:49 2017 gautamUpdateIOOIMC lockloss correlated with PRM alignment?Motivation:

To
test the hypothesis that the IMC lock duty
 PSL_layout.JPG 
  13486   Mon Dec 18 16:45:44 2017 gautamUpdateIOOIMC lockloss correlated with PRM alignment?I stopped the test earlier today morning
around 11:30am. The log file is located at
  
  13487   Mon Dec 18 17:48:09 2017 ranaUpdateComputersrossa: SL7.3 upgrade continuesFollowing instructions
from LLO-CDS fo the rossa upgrade. Last time
there were some issues with not being to
  
  13488   Mon Dec 18 20:37:18 2017 gautamUpdatePSLPMC MEDM cleanupThere are fewer lies on this screen now.
For reference, the details of the electronics
modifications made are in this
 PMC_revamped.png 
  13492   Tue Dec 26 17:24:24 2017 SteveUpdateGeneralpower outageThere was a power outage.

The IFO pressure is 12.8 mTorr-it
and it is not pumped. V1 is still closed.
 powerOutage.png 
  13493   Thu Dec 28 17:22:02 2017 gautamUpdateGeneralpower outage - CDS recovery
I had to manually reboot c1lsc,
c1sus and c1ioo.
I edited the
line in /etc/rt.sh (specifically, on FB /diskless/root.jessie/etc/rt.sh)
 28.png 
  13495   Tue Jan 2 15:43:35 2018 SteveUpdateVACpumpdown after power outage 




 pumpdown_from_44_mTorr.png 
  13496   Tue Jan 2 16:24:29 2018 gautamUpdatesafetyProjector periodically shuts itself offI noticed this behaviour since ~Dec 20th,
before the power failure. The bulb itself
seems to work fine, but the projector turns
  
  13497   Tue Jan 2 16:37:26 2018 gautamUpdateOptimal ControlOplev loop tuningI've made various changes to the optimal
loop design approach, but am still not having
much success. A summary of changes made:
 loopOpt_180102_1706.pdfglobalCosts.pdf 
  13498   Wed Jan 3 12:33:16 2018 ranaUpdateOptimal ControlOplev loop tuningWhen putting code into git.ligo.org, one
way to have automated testing is to use the
Gitlab CI. This is an automated 'checker',
  
  13499   Wed Jan 3 15:13:55 2018 SteveUpdateGeneralprojector light bulb replacedBulb 
is replaced.

  
  13500   Wed Jan 3 16:25:32 2018 awadeUpdateOptimal ControlOplev loop tuningAnother cool feature
is client side pre-commit hooks. 
  
  13501   Wed Jan 3 18:00:46 2018 gautamUpdatePonderSqueezeplan of actionNotes
of stuff we discussed @ today's meeting,
and afterwards, towards measuring ponderomotive
  
  13502   Thu Jan 4 12:46:27 2018 gautamUpdateALSFiber ALS assayAttachment
#1 is the updated
 FiberALS.pdfFiberALS.svg.zip 
  13503   Thu Jan 4 14:39:50 2018 gautamUpdateGeneralpower outage - timing errorAs mentioned in my previous elog, the CDS
overview screen "DC" indicators
are all RED (everything else is green). Opening
  
  13506   Fri Jan 5 21:54:28 2018 ranaUpdateGeneralpower outage - timing errorRolf came here in the morning, but not
sure what he did or if Jamie remotely did
something. But the screen is green.
 huh.png 
  13507   Fri Jan 5 22:19:53 2018 gautamUpdateGeneralpower outage - timing errorJust putting the relevant line from email
from Rolf which at least identifies the problem
here:
  
  13508   Sat Jan 6 05:18:12 2018 KevinUpdatePonderSqueezeDisplacement requirements for short-term squeezingI have been looking into whether we can
observe squeezing on a short timescale. The
simulations I show here say that we can get
 displacement_noise.pdfnoise_budget.pdf 
  13509   Sat Jan 6 13:47:32 2018 ranaUpdatePonderSqueezeDisplacement requirements for short-term squeezing
ought to tune for 210 Hz (in-between
powerlines) since 100 Hz is tough to work
due to scattering, etc.
rename
  
  13510   Sat Jan 6 18:27:37 2018 gautamUpdateGeneralpower outage - IFO recoveryMostly back to nominal operating conditions
now.


EX TransMon QPD is not
 EX_QPD_Quad1_Faulty.pdfTrillium_faulty.pdf 
  13511   Sat Jan 6 23:25:18 2018 KevinUpdatePonderSqueezeDisplacement requirements for short-term squeezing 




 displacement_noise.pdfnoise_budget.pdfangles.pdf 
  13512   Sun Jan 7 03:22:24 2018 KojiUpdatePonderSqueezeDisplacement requirements for short-term squeezingInteresting. My understanding is that this
is close to signal recycling, rather than
resonant sideband extraction. Is that correct?
  
  13513   Sun Jan 7 11:40:58 2018 KevinUpdatePonderSqueezeDisplacement requirements for short-term squeezingYes, this SRC detuning is very close to
extreme signal recycling (0° in this
convention), and the homodyne angle is close
  
  13514   Sun Jan 7 17:27:13 2018 gautamUpdatePonderSqueezeDisplacement requirements for short-term squeezingMaybe you've accounted for this already
in the Optickle simulations - but in Finesse
(software), the "tuning" corresponds
  
  13515   Sun Jan 7 20:11:54 2018 KojiUpdatePonderSqueezeDisplacement requirements for short-term squeezingIn fact, that is my point. If we use signal
recycling instead of resonant sideband extraction,
the "tuning" of the SRC is opposite
  
  13517   Tue Jan 9 00:07:03 2018 johannesUpdateDAQetmx slow daq chassisAll parts received and assembly near complete,
small problem detected because the two DSub
connectors are too close together for two
  
  13518   Tue Jan 9 11:52:29 2018 gautamUpdateCDSslow machine bootfestEurocrate key turning reboots today morning
for and
  
ELOG V3.1.3-