40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 282 of 341  Not logged in ELOG logo
Entry  Tue Oct 12 22:06:08 2010, yuta, Update, Computers, celan-installed CentOS 5.5 on mafalda 
    Reply  Tue Oct 12 23:35:12 2010, mafalda, Update, Computers, celan-installed CentOS 5.5 on mafalda 
    Reply  Fri Sep 5 16:25:36 2014, Steve, Update, SUS, center ITMY oplev 
Entry  Tue May 29 10:08:21 2012, steve, Update, IOO, centered IOO monitoring qpds 40dtrendIOO.pngIOOcentered.png
    Reply  Tue Nov 5 17:12:34 2013, Steve, Update, LSC, centered qpds recentered.png
Entry  Sun Aug 14 20:04:40 2011, Keiko, Anamaria, Jenne, and Kiwamu, Summary, Locking, central part ifo locking plan 
Entry  Mon Aug 15 21:43:29 2011, Anamaria and Keiko, Summary, Locking, central part ifo locking project 
    Reply  Fri Aug 31 10:24:36 2012, Steve, Update, VAC, chamber dog clamps checked 
    Reply  Wed Sep 12 08:16:49 2012, Steve, Configuration, PEM, chamber must be sealed overnight! 
Entry  Tue Nov 22 04:02:47 2011, kiwamu, Update, IOO, changed MC alignment 
Entry  Mon Oct 1 19:21:03 2012, rana, Configuration, PEM, changed PEM DQ channels 
    Reply  Fri Oct 5 01:36:49 2012, Den, Configuration, PEM, changed PEM DQ channels 
Entry  Tue Sep 13 19:12:53 2011, Suresh, Update, Computer Scripts / Programs, changes to the c1ioo, c1mcs and c1rfm 
Entry  Thu Sep 10 17:47:25 2009, Jenne, Update, Computers, changes to the startass scripts 
Entry  Thu May 5 13:14:15 2011, kiwamu, Update, LSC, chans file for LSC 
    Reply  Thu May 5 14:50:30 2011, Jenne, Update, LSC, chans file for LSC 
    Reply  Thu May 5 16:11:22 2011, Jamie, Update, LSC, chans file for LSC 
Entry  Sun Jul 8 19:31:53 2012, yuta, Update, Locking, characterizing LSC arm lock by ALS error signal XarmLengthspectra20120708.pngLSCPOYarmIRlockOLTF.pngYarmLengthspectra20120708.pngLSCPOXarmIRlockOLTF.png
Entry  Wed May 5 13:05:07 2021, Chub, Update, General, chassis delivery from De Leone de_leone_del_5-5-21.jpg
Entry  Tue May 25 17:08:17 2021, Chub, Update, Electronics, chassis rework complete! 40M_chassis_reworked_5-25-21.jpg
Entry  Fri Apr 18 19:46:08 2008, rana, Update, ASS, check adaptive 0052_xray_thm45.jpg
    Reply  Mon Apr 21 12:58:42 2008, rob, Update, ASS, check adaptive 
    Reply  Fri Feb 18 20:06:59 2011, kiwamu, Summary, SUS, check f2p function on ETMX  f2p_ETMX.png
Entry  Wed Aug 10 00:11:39 2011, jamie, Update, SUS, check of input diagnolization of ETMX after OSEM tweaking ETMX.png
Entry  Thu Oct 28 04:28:50 2010, yuta, Update, Green Locking, checked frequency counter SR620 
    Reply  Thu Oct 28 11:54:31 2010, Koji, Update, Green Locking, checked frequency counter SR620 
    Reply  Mon Nov 1 23:31:05 2010, yuta, Update, CDS, checked input hardware filter in single frequency 
Entry  Thu Oct 7 23:24:44 2010, yuta, Update, CDS, checking MC1 suspension damping 
    Reply  Fri Oct 8 12:21:11 2010, josephb, Update, CDS, checking MC1 suspension damping  
    Reply  Mon Dec 20 16:57:58 2010, steve, Update, IOO, checking out & closing the vacuum chambers 
Entry  Wed Nov 3 02:23:11 2010, yuta, Summary, CDS, checking whitening filter board MC3SEN.png
Entry  Wed Oct 20 21:43:25 2010, yuta, Update, CDS, checking whitening filters for MCs and messed up MC2ULSEN.pngMC2LRSEN.png
Entry  Thu Apr 13 19:54:07 2017, rana, Update, DAQ, checkup on minute trends BRLMS-trend.png
    Reply  Fri Dec 14 14:25:36 2018, Koji, Update, CDS, chiara backup fsck_log.log
Entry  Thu Sep 2 17:53:15 2021, Paco, Summary, Computers, chiara down, vac interlock tripped 
    Reply  Thu Sep 2 21:49:03 2021, Paco, Summary, Computers, chiara down, vac interlock tripped 2021-09-02_21-51-15.png
Entry  Wed Dec 22 14:57:05 2021, Koji, Update, General, chiara local backup 
Entry  Thu Feb 10 21:16:27 2022, Koji, Summary, CDS, chiara resolv.conf wierdo 
    Reply  Thu May 28 14:34:25 2009, rob, Update, PSL, chiller diagnosis 
Entry  Tue Jul 19 21:05:55 2011, haixing, Update, DAQ, choose the right relay 
Entry  Tue Jun 30 23:09:40 2009, Alberto, Update, Locking, chronicles of some locking attempts 
Entry  Mon Feb 6 10:05:28 2017, Steve, Update, SUS, clamped cables clamped.jpg
Entry  Fri Aug 10 17:17:41 2012, Alex Masha Den, Update, PEM, classify seismic c code 
    Reply  Fri Aug 10 17:38:29 2012, Den, Update, PEM, classify seismic c code 
    Reply  Thu Oct 22 08:52:04 2015, Steve, Update, VAC, clean RGA scan after sweaty Maglev clean_scan.png
Entry  Tue Feb 5 15:31:03 2013, Steve, Update, General, clean assembly room benches cleaned up IMG_0057.JPGIMG_0061.JPG
Entry  Tue Aug 9 16:40:12 2011, steve, Update, General, clean room coat counts  P1080155.JPG
Entry  Thu Aug 25 17:14:49 2011, steve, Update, VAC, clean room fashion changes P1080185.JPGP1080183.JPG
Entry  Tue Mar 8 15:23:16 2011, steve, Update, PEM, clean room gloves 
    Reply  Wed Oct 13 11:09:28 2010, yuta, Update, Computers, clean-installed CentOS 5.5 on mafalda 
ELOG V3.1.3-