40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 282 of 341  Not logged in ELOG logo
    Reply  Fri Dec 11 14:12:32 2009, rana, Configuration, LSC, 166 LO Disconnected 
    Reply  Sat Dec 12 07:36:56 2009, rana, HowTo, Electronics, How to Measure the Length of a Cable: Interferometry 
Entry  Sun Dec 13 20:50:45 2009, rana, Summary, IOO, Mach Zender Calibration Untitled.png
    Reply  Sun Dec 13 23:18:09 2009, rana, Summary, IOO, Displacement noise on the PSL table mz.pdf
Entry  Tue Dec 15 00:02:10 2009, rana, Update, PEM, Noise of the Ranger SS-1 Seismometer rangerx.pdfranger827.pdf
    Reply  Wed Dec 16 11:55:47 2009, rana, Update, ABSL, Universal PDH Box Servo Filters 
Entry  Wed Dec 16 20:29:08 2009, rana, Update, COC, ETM Coating study layerfrac.png
Entry  Thu Dec 17 23:27:23 2009, rana, Update, PEM, Ranger Noise: sim w. Rai FET box as readout ranger.pdf
Entry  Mon Dec 21 01:14:08 2009, rana, Summary, Electronics, Noise measurement of the Rai Weiss FET preamp box IMG_0242.JPGPicture_2.pngRWnoise.png
    Reply  Mon Dec 21 19:24:29 2009, rana, Update, ASS, OAF Model update and build instructions mc12mcl.png
    Reply  Wed Dec 23 17:33:14 2009, rana, Update, ASS, OAF Feedaround ON and doing something good 
    Reply  Sun Dec 27 23:44:59 2009, rana, Update, Electronics, MCT QPD investigation 
Entry  Sun Jan 3 08:23:39 2010, rana, Configuration, CDS, autoburt.pl 'fixed' for post 2009 years 
Entry  Mon Jan 4 09:52:40 2010, rana, Configuration, Cameras, ITMX camera and PSL channels 
    Reply  Tue Jan 5 11:00:04 2010, rana, Omnistructure, Environment, Added new wall cable-racks 
Entry  Sun Jan 17 05:22:42 2010, rana, Configuration, Computers, ELOG script change 
    Reply  Tue Jan 19 00:10:44 2010, rana, Update, Electronics, triple resonant circuit for EOM 
    Reply  Tue Jan 26 03:28:56 2010, rana, Update, ABSL, 166 MHz sideband turned off 
Entry  Tue Jan 26 20:18:32 2010, rana, Configuration, ALARM, op540m: alarms and BLRMS and StripTool restored 
    Reply  Thu Feb 4 00:59:52 2010, rana, Update, elog, elog restarted 
    Reply  Thu Feb 11 19:20:44 2010, rana, Update, Computers, Status of the IP change over 
    Reply  Sun Feb 21 17:44:35 2010, rana, Update, General, Prep for Power Supply Stop  
    Reply  Mon Feb 22 07:25:58 2010, rana, Update, General, Prep for Power Supply Stop  
Entry  Tue Feb 23 16:42:02 2010, rana, Configuration, Computer Scripts / Programs, SVN restarted on NODUS 
Entry  Sun Feb 28 16:45:05 2010, rana, Summary, General, Power ON Recovery 
Entry  Sun Feb 28 23:47:52 2010, rana, Update, Computers, rosalba 
    Reply  Mon Mar 1 22:38:12 2010, rana, Update, Computers, RC sensitivity to RIN Untitled.png
    Reply  Thu Mar 4 22:07:21 2010, rana, Update, 40m Upgrading, 11MHz PD not yet designed 
    Reply  Fri Mar 5 18:04:56 2010, rana, Update, SUS, used OSEMs are magnetic 
Entry  Sun Mar 7 07:01:21 2010, rana, Update, WienerFiltering, Guralp Huddle Test software huddlez.png
    Reply  Sun Mar 7 23:05:39 2010, rana, Update, PEM, Seismic witnesses near MC1 tank moved seis.png
    Reply  Mon Mar 8 18:15:27 2010, rana, Update, PEM, Styrofoam Cooler on the Seismos SeismometersHuddled.jpg
    Reply  Wed Mar 10 15:02:58 2010, rana, Update, PEM, Styrofoam Cooler on the Seismos Seismic-Ref_100310.pngUntitled.gif
    Reply  Sat Mar 13 21:30:22 2010, rana, Update, PEM, Styrofoam Cooler on the Seismos Untitled.png
    Reply  Sat Mar 13 22:16:03 2010, rana, Update, WienerFiltering, Guralp Huddle Test software guralpznoise.png
    Reply  Fri Mar 19 21:15:33 2010, rana, Update, PEM, Guralp2 centered again Untitled.png
    Reply  Fri Mar 19 23:03:41 2010, rana, Update, PEM, Guralp2 centered again huddlez.png
    Reply  Sun Mar 21 19:25:29 2010, rana, Update, PEM, Guralp2 centered again huddlez.png
Entry  Mon Mar 22 02:03:57 2010, rana, Summary, Electronics, UPDH Box #17: Ready 
Entry  Sun Mar 28 20:00:17 2010, rana, Update, Cameras, GigE camera no work from screen Untitled.png
Entry  Sun Mar 28 20:05:33 2010, rana, Summary, PSL, FSS Work from Sunday: AOM/VCO level set wrong Untitled.png
    Reply  Sun Mar 28 20:51:31 2010, rana, Summary, PSL, FSS Work from Sunday: Cavity Suspension is Ridiculously Undamped! Untitled.png
    Reply  Sun Mar 28 23:17:46 2010, rana, Summary, PSL, FSS Work from Sunday: noise spec in2.png
    Reply  Sun Mar 28 23:47:47 2010, rana, Summary, PSL, FSS Work from Sunday: Open Loop Gain fssloop.pngsweep2.png
    Reply  Mon Mar 29 01:11:33 2010, rana, Summary, PSL, FSS Work from Sunday: RF Out Spectrum rfout.pngTEK00000.PNGTEK00001.PNGTEK00002.PNG
    Reply  Tue Mar 30 06:37:32 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum rc.png
    Reply  Wed Mar 31 12:30:31 2010, rana, Update, Green Locking, frequency counter for green PLL 
    Reply  Thu Apr 1 12:07:22 2010, rana, Update, General, PZT response for the innolight 
    Reply  Thu Apr 1 15:21:12 2010, rana, Update, Green Locking, frequency counter for green PLL 
    Reply  Sat Apr 3 11:35:47 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum 
ELOG V3.1.3-