  13403   Fri Oct 27 10:14:11 2017 SteveUpdateVACRGA scan at day 372Valve configuration: Vacuum normal

Note: Tp2 running at 75Krpm 0.25A
26C has a  load high pitch sound today.
 RGA_scan_d372.png 
  13404   Sat Oct 28 00:36:26 2017 gautamUpdateCDS40m files backup situation - ddrescueNone of the 3 dd backups I made were bootable
- at boot, selecting the drive put me into
grub rescue mode, which seemed to suggest
 415E2F09-3962-432C-B901-DBCB5CE1F6B6.jpegBFF8F8B5-1836-4188-BDF1-DDC0F5B45B41.jpeg 
  13406   Mon Oct 30 08:08:06 2017 SteveUpdatesafetysafety trainingUdit Kahndelwal received 40m specific basic
safety traning on Friday, Oct. 27
  
  13407   Mon Oct 30 10:09:41 2017 SteveUpdateVACTP2 failed IFO pressure 1.2e-5 Torr at 9:30am




 tp2failed.pngifo_1.0E-5_Torrit.pngtp2failed2dago.png4days.png 
  13408   Mon Oct 30 11:15:02 2017 gautamUpdateCDSslow machine bootfest + vacuum snafuEurocrate key turning reboots today morning
for c1psl
  
  13409   Mon Nov 6 09:09:43 2017 SteveUpdateVACsetting up new TP2 turboOur new Agilent Technology TwisTorr
84FS AG rack controller ( English Manual
pages 195-297 )  RS232/485, product
  
  13410   Mon Nov 6 11:15:43 2017 gautamUpdateCDSslow machine bootfest + IFO re-alignmentEurocrate key turning reboots today morning
for
  
  13412   Tue Nov 7 17:45:05 2017 gautamUpdateLSCDRMI Nosie Budget v3.1Some days ago, I had tried to measure the
SRCL->MICH and PRCL->MICH cross couplings
using broadband noise injected between 120-180
 SRCL_MICH_whitenoise_tf.pdfPRCL_MICH_whitenoise_tf.pdfMICH_aux.pdfC1NB_disp_40m_MICH_NB_2017-10-08.pdf 
  13413   Tue Nov 7 22:56:21 2017 gautamUpdateLSCDRMI locking recoveredI hadn't re-locked the DRMI after the
work on the AS55 demod board. Tonight, I
was able to recover the DRMI locking with
 DRMI_7Nov20178.png 
  13414   Wed Nov 8 00:28:16 2017 gautamUpdateLSCLaser intensity coupling measurement attemptI tried measuring the coupling of PSL intensity
noise by driving some broadband noise bandpassed
between 80-300Hz using the spare DAC channel
 PSL_RIN.pdf 
  13415   Wed Nov 8 09:37:45 2017 ranaUpdateLSCDRMI Nosie Budget v3.1why no oplev trace in the NB ?




  
  13416   Wed Nov 8 09:59:12 2017 gautamUpdateLSCDRMI Nosie Budget v3.1The Oplev trace is missing for now, as
I have not re-measured the A2L coupling since
modifying the Oplev loop shape (specifically
  
  13417   Wed Nov 8 12:19:55 2017 gautamUpdateSUScoil driver series resistanceWe've been talking about increasing
the series resistance for the coil driver
path for the test masses. One consequence
 vthresh.pdf 
  13418   Wed Nov 8 14:28:35 2017 gautamUpdateGeneralMC1 glitches returnThere hasn't been a big glitch that
misaligns MC1 by so much that the autolocker
can't lock for at least 3 months, seems
 MC1_glitchy.png6AFDA67D-79B1-469C-A58A-9EC5F8F01D32.jpeg 
  13419   Wed Nov 8 16:39:24 2017 KiraUpdatePEMADC noise measurementGautam and I measured the noise of the
ADC for channels 17, 18, and 19. We plan
to use those channels for measuring the noise
 ADC-fit.pngIMG_20171108_162532.jpgIMG_20171108_162556.jpg 
  13420   Wed Nov 8 17:04:21 2017 gautamUpdateCDSgds-2.17.15 [not] installedI wanted to use the foton.py utility for
my NB tool, and I remember Chris telling
me that it was shipping as standard with
  
  13422   Thu Nov 9 15:33:08 2017 johannesUpdateCDSrevisiting Acromag


  
  13423   Fri Nov 10 08:52:21 2017 SteveUpdateVACTP3 drypump replacedPSL shutter closed at 6e-6 Torr-it    

   The foreline pressure
of the drypump is 850 mTorr at 8,446 hrs
  
  13424   Fri Nov 10 13:46:26 2017 SteveUpdatePEMM3.1 local earthquakeBOOM
SHAKA-LAKA
 3.1M_local_EQ.png 
  13426   Tue Nov 14 08:54:37 2017 SteveUpdateIOOMC1 glitching   MC1_glitching.png 
  13428   Wed Nov 15 01:37:07 2017 gautamUpdateLSCDRMI low freq. nosie improvedPianosa
just crashed and ate my elog, along with
 C1NB_disp_40m_MICH_NB_2017-11-15.pdfOL_A2L_couplings.pdf 
  13429   Thu Nov 16 00:14:47 2017 Udit KhandelwalUpdateSUSSOS Sapphire Prism designSummary:


SOS solidworks model is
nearly complete

Having trouble
  
  13430   Thu Nov 16 00:45:39 2017 gautamUpdateSUSSOS Sapphire Prism design 




  
  13431   Thu Nov 16 00:53:26 2017 gautamUpdateLSCDRMI noise sub-budgetsI've incorporated the functionality
to generate sub-budgets for the various grouped
traces in the NBs (e.g. the "A2L"
 C1NB_a2l_40m_MICH_NB_2017-11-15.pdfC1NB_aux_40m_MICH_NB_2017-11-15.pdf 
  13432   Thu Nov 16 13:57:01 2017 gautamUpdateOptical LeversOptical lever noiseI disabled the OL loops for ITMX, ITMY
and BS at GPStime 1194897655 to come up with
an Oplev noise budget. OL spots were reasonably
 VertexOLnoise.pdfITMYvsSRM.pdf 
  13433   Thu Nov 16 15:43:01 2017 ranaUpdateOptical LeversOptical lever noiseI bet the calibration
is out of date; probably we replaced the
  
  13436   Tue Nov 21 11:21:26 2017 gautamUpdateCDSRFM network downI noticed yesterday evening that I wasn't
able to engage the single arm locking servos
- turned out that they weren't getting
 RFMerrors.png 
  13437   Tue Nov 21 11:37:29 2017 gautamUpdateOptical LeversBS OL calibration updatedI calibrated the BS oplev PIT and YAW error
signals as follows:


Locked X-arm, ran dither
 OL_calib_BS_PERROR.pdfOL_calib_BS_YERROR.pdfVertexOLnoise_updated.pdf 
  13438   Tue Nov 21 16:00:05 2017 KiraUpdatePEMseismometer can testingI performed a test with the can last week
with one layer of insulation to see how well
it worked. First, I soldered two heaters
 cooling_fit.pngIMG_20171121_164835.jpg 
  13439   Tue Nov 21 16:28:23 2017 gautamUpdateOptical LeversBS OL calibration updatedThe numbers I have from the fitting don't
agree very well with the OSEM readouts. Attachment
#1 shows the Oplev pitch and yaw channels,
 BS_oplev_sweep.png 
  13441   Tue Nov 21 23:04:12 2017 gautamUpdateOptical LeversOplev "noise budget"Per our discussions in the meetings over
the last week, I've tried to put together
a simple Oplev noise budget. The only two
 vertexOL_noises.pdf 
  13444   Wed Nov 22 05:41:32 2017 ranaUpdateOptical LeversOplev "noise budget"For the OL NB, probably don't have
to fudge any seismic noise, since that's
a thing we want to suppress. More important
  
  13446   Wed Nov 22 12:13:15 2017 KiraUpdatePEMseismometer can testingUpdated some values, most importantly,
the k-factor. I had assumed that it was in
the correct units already, but when converting
 cooling_fit_1.png 
  13447   Wed Nov 22 14:47:03 2017 KiraUpdatePEMseismometer can testingFor the insulation, I have decided to use
this
one (Buna-N/PVC Foam Insulation
  
  13448   Wed Nov 22 15:29:23 2017 gautamUpdateOptical LeversOplev "noise budget"[steve,
gautam]

What is the best way to set this
 OplevTest.jpg 
  13449   Wed Nov 22 16:40:00 2017 KojiUpdateOptical LeversOplev "noise budget"You may want to consult with the cryo Q
people (Brittany, Aaron) for a Si QPD. If
you want the same QPD architecture, I can
  
  13450   Wed Nov 22 17:52:25 2017 gautamUpdateOptimal ControlVisualizing cost functionsI've attempted to visualize the various
components of the cost function in the way
I've defined it for the current iteration
 globalCosts.pdf 
  13451   Wed Nov 22 19:20:01 2017 ranaUpdateOptical LeversOplev "noise budget"too complex; just shoot straight from the
HeNe to the QPD. We lower the gain of the
QPD by changing the resistors; there's
  
  13452   Wed Nov 22 23:56:14 2017 gautamUpdateOptical LeversOplev "noise budget"Do not turn
on BS/ITMY/SRM/PRM Oplev servos without reading
  
  13453   Thu Nov 23 18:03:52 2017 gautamUpdateOptical LeversOplev "noise budget"Here are a couple of preliminary plots
of the noise from a 20minute stretch of data
- the new curve is the orange
 ITMY_P_noise.pdfITMY_Y_noise.pdf 
  13454   Sun Nov 26 19:38:40 2017 SteveUpdateVACTP3 drypump replaced againThe TP3 foreline pressure was 4.8 Torr,
50K rpm 0.54A and 31C........Maglev rotation
normal 560 Hz.......    IFO pressure
 after_replacement.png 
  13455   Tue Nov 28 16:02:32 2017 ranaUpdatePEMseismometer can testingI've ordered 4 of these from McMaster.
Should be delivered to the 40m by noon tomorrow.

  
  13457   Wed Nov 29 15:33:16 2017 ranaUpdatePSLPMC lockingPMC wasn't locking. Had to power down
c1psl. Did burt restore. Still not great.

I think many of the readbacks on
  
  13459   Thu Nov 30 10:38:39 2017 SteveUpdateVACannuloses are not pumpedAnnuloses are not pumped for 30 days, since
TP2 failed.  IFO pressure 7e-6 Torr
it,  Rga 2.6e-6 Torr
 AnnulosesNotPumped.png 
  13467   Thu Dec 7 16:28:06 2017 KojiUpdateIOOLots of red on the FE status screenOnce the RT machines were back, we launched
only the five IOPs. They had bunch of red
lights, but we continued to run essential
  
  13471   Wed Dec 13 09:49:23 2017 johannesUpdateASSwiring diagramI attached a wiring schematic from the
slow DAQ to the eurocrate modules. Of these,
pins 1-32 (or 1A-16C) and pins 33-64 (17A-32C)
 1Y9.pdf 
  13473   Thu Dec 14 00:32:56 2017 johannesUpdateASSAcromag new crate; c1auxex2 configured as gateway server for acromagThis splicing in of fast binary channels
we discussed at yesterday's and today's
meetings is getting messy with the current
 fp_mod_4U.pdfIMG_20171213_171541850_HDR.jpg 
  13474   Thu Dec 14 07:07:09 2017 ranaUpdateIOOLots of red on the FE status screenI had to key the c1psl crate to get the
PMC locking again. Without this, it would
still sort of lock, but it was very hard
  
  13475   Thu Dec 14 08:59:17 2017 SteveUpdateGeneralwe are here   8_days.png 
  13477   Thu Dec 14 19:41:00 2017 gautamUpdateCDSCDS recovery, NFS woes[Koji, Jamie(remote), gautam]

Summary:
The CDS system seems to be back up and functioning.
 CDS_14Dec2017.pngCDS_errors.png 