ID Date Authorup Type Category Subject Text Attachments
  3190   Sun Jul 11 20:11:48 2010 ranaSummaryPSLRC trend after the insulation removal   rc.png 
  3209   Tue Jul 13 19:26:47 2010 ranaUpdateIOOMC still brokenAfter whatever Joe/Alberto did this afternoon,
the MC was not locking. Koji and I removed
several of the cables in the side of the
 a.txt.gz 
  3231   Thu Jul 15 19:13:03 2010 ranaUpdateIOOMC_F checkSometimes I like to plot the spectrum of
MC_F. Its a good diagnosis of whether something
is wrong.
 a.png 
  3232   Thu Jul 15 19:27:04 2010 ranaSummaryPSLRC trend after the insulation removal   Untitled.pnga.pngb.png 
  3242   Sun Jul 18 20:50:03 2010 ranaConfigurationIOOMC TRANS optics changedTo make the beam on the MC trans camera
bigger, I removed the lens + ND filter that
was in that path.
  
  3247   Mon Jul 19 21:47:36 2010 ranaSummaryDAQDAQ timing testSince we now have a good measurement of
the phase noise of the Rb clock
Marconi locked to the Rb clock, I wanted
  
  3263   Thu Jul 22 01:02:08 2010 ranaUpdateTreasureMonsters, LNVR, and Phase noiseOn
Picasa
  
  3271   Fri Jul 23 00:13:11 2010 ranaUpdatePSLProblem NOT REALLY SolvedSo...who was working around the PSL rack
this morning and afternoon? Looks like there was
  
  3283   Fri Jul 23 21:35:48 2010 ranaUpdateCDSRerouted RFM around c1lsc, took RFM card out of c1lsc I just realized that an unfortunate
casualty of this LSC work was the deletion
of the slow controls for the LSC which we
  
  3286   Sat Jul 24 14:27:36 2010 ranaUpdateElectronicsFSS Oscilaltor Phase Noise MeasurementI reconnected the RF signal to the FSS
and to the FSS' EOM so that we could lock
the refcav again.
  
  3299   Tue Jul 27 16:03:36 2010 ranaSummaryDAQDAQ timing test

    
        
 Untitled.png 
  3304   Wed Jul 28 01:05:44 2010 ranaUpdateSEIBode Magnitude Plot and Concerns1) Gravity has to be included because the
inverted pendulum effect changes the resonant
frequencies. The deflection from gravity
  
  3345   Sun Aug 1 21:04:45 2010 ranaSummaryComputer Scripts / ProgramsMC Autolocker fixedSomeone had left a typo in the MC autolocker
script recently while trying to set the lock
threshold to 0.09. As a result, the autlocker
  
  3346   Sun Aug 1 21:40:27 2010 ranaSummaryPSLFSS: SLOWDC responseI bet you thought that the NPRO slow actuator
response could be well represented by a pole
at ~0.1 Hz? Well, that's just what they want
 Untitled.png 
  3361   Wed Aug 4 19:50:58 2010 ranaConfigurationElectronicsRubidium clocks too hot: hut removedAlastair found that the foam hut that he
and Jan put on top of the Rb clocks to temperature
stabilize them was too good of an insulator.
 beat.png 
  3377   Fri Aug 6 16:20:08 2010 ranaUpdateGeneralclocks still not locked fully - phase shifted I tried to get the clocks to be closer
to 90 deg for the relative phase by adding
some cable length to one of the lines, but
 Untitled.pdf 
  3385   Sat Aug 7 21:57:56 2010 ranaSummaryDMFseisBLRMS restartedThe green xterm on op540m which is running
the seisBLRMS DMF got stuck somehow ~3 days
ago and lost its NDS connection. I closed
 Untitled.png 
  3451   Fri Aug 20 17:46:30 2010 ranaUpdatePSL40m PSL Upgrade Layout v0.3http://lhocds.ligo-wa.caltech.edu:8000/40m/PSL/LayoutUpgrade
P-pol = purple
S-pol = red
  
  3463   Tue Aug 24 12:03:57 2010 ranaUpdatePSLPSL Upgrade: Mode Matching from PMC to IMCI used the free software called 'ABCD'
for Mac to construct this mode matching solution
for going from the PMC to the IMC.
 40mPSL.pngScreen_shot_2010-08-24_at_6.07.43_PM.png 
  3469   Wed Aug 25 15:32:52 2010 ranaUpdatePSLPSL Upgrade: Mode Matching from PMC to IMCIn a manner similar to the now classic
'Mode Matching from PMC to  IMC' entry, I
have calculated the lenses and positions
 40mPSL.pngScreen_shot_2010-08-25_at_6.26.23_PM.png 
  3481   Fri Aug 27 19:30:31 2010 ranaUpdateCDSSLOW controlsFor the future SLOW controls our current
plan is to keep using the VME based stuff
and associated processors (Baja, Motorola,
  
  3483   Sat Aug 28 01:02:31 2010 ranaUpdatePSLThe beginnings of the new PSLIn fact, many of the mounts need
to be adapted to 4": the beefy
steering mirrors going into the PMC, the
  
  3485   Sun Aug 29 21:18:00 2010 ranaUpdateComputerskallo -> rossaWe changed the name of the new control
room computer from kallo to rossa (since
its red).
  
  3488   Mon Aug 30 18:22:00 2010 ranaSummaryPSLPSL Enclosure is UNSTABLEThe lifting and resetting of the
BLUE PSL enclosure has made it unstable somehow.
When I push on it a little it rocks
  
  3491   Mon Aug 30 23:21:36 2010 ranaHowToPSL2W NPRO Mount designed with emachineshop.com softwareTo test out this website - emachineshop.com,
Jenne and I are designing some of the mounts
for the new beam height.
 LaserMount.png 
  3497   Tue Aug 31 15:26:46 2010 ranaUpdatePEMroom temp loweredAnd I raised it back to 73F. The thermometers
on the wall show 74-75F as the actual room
temp. The dial on the temperature controller
  
  3500   Tue Aug 31 19:46:00 2010 ranaUpdatePSLPSL upgrade update
    Steve is handling the mount
height increase for the PMC and RC steering
mirrors, as well as a mount (non-steerable)
  
  3508   Wed Sep 1 12:34:14 2010 ranaUpdateElectronicsFSS Box Phase Noise from DAQThe differences between this setup and
the one used previously is the lack of the
50 Ohm terminator in the mixer output and
  
  3510   Wed Sep 1 17:17:42 2010 ranaUpdateElectronicsFSS Box Phase Noise from DAQ - Measurement setup modifiedWith the setup now working, we should now
test the power filtering for the crystal
and amplifier.
  
  3518   Thu Sep 2 23:35:33 2010 ranaConfigurationComputersrossa nvidia driver and dual monitor configurationWhy are we running CentOS 4.8 instead of
5.5 ?    What runs at LLO?    
What runs in Downs?
  
  3519   Fri Sep 3 06:55:42 2010 ranaUpdatePSLPSL beam hitting the PMC!NPRO
Koji and I inspected and photographed
the laser after opening up its case. I then
  
  3524   Sun Sep 5 21:35:41 2010 ranaConfigurationComputersrossa notes**** Deleted
apps/emacs
apps/linux64/firefoxold
  
  3525   Mon Sep 6 01:46:58 2010 ranaUpdatePSLPSL update of the dayTo bypass the polarizer issue, I just used
cubes. One I took from the FSS-Refcav path
and the other from the power control part
  
  3528   Mon Sep 6 21:08:44 2010 ranaUpdateCDSSusension model reviewedWe must remember
that we are using the Rev.B
SOS Coil Drivers and not the Rev. A. 
  
  3543   Wed Sep 8 09:50:13 2010 ranaUpdatePSLPSL updateAlso, Kiwamu has modified the layout drawing
to add the green PLL stuff. This has collapsed
the reference cavity's wave function placing
  
  3554   Thu Sep 9 16:54:56 2010 ranaUpdateSAFETYmain laser is back ONI turned off the laser last night to protect
against the electricians. but failed to elog
it. I accept the burnt toast completely.
  
  3557   Sat Sep 11 03:16:51 2010 ranaConfigurationComputersrossa notesI wiped out the old CentOS install on rossa
and installed CentOS 5.5 on there. The DVDs
are on a spindle in the control room; there
  
  3559   Sun Sep 12 22:36:03 2010 ranaConfigurationComputersrossa notesI found Sanjit's instructions for doing
the Nvidia settings too complicated and so
I followed these instructions from Facebook:
  
  3562   Mon Sep 13 00:19:32 2010 ranaUpdate VCO Driver Output power v. slider control voltageI measured the RF power output of the VCO
Driver box as a function of slider value.
I measured using the Gigatronics Handheld
 vco.png 
  3563   Mon Sep 13 02:45:59 2010 ranaConfigurationDMFseisBLRMS restartsI restarted the seisBLRMS DMF monitor by
ssh'ing into mafalda and starting up a matlab
session. I also have started a StripTool
  
  3568   Mon Sep 13 19:41:38 2010 ranaUpdatePSLFSS AOM alignmentThe IR sensitive Olympus 570 camera gives
us a really nice view of these IR beams.
Its actually a lot better than what you can
  
  3571   Tue Sep 14 00:21:51 2010 ranaOmnistructureEnvironmentOffice area temperature changeI changed the setpoint for the HVAC control
(next to Steve) from 73F to 72F. This is
to handle the temperature increase in the
  
  3586   Sun Sep 19 18:09:09 2010 ranaConfigurationCamerasBlue IP Camera installed on the PSL table   Untitled.png 
  3587   Sun Sep 19 18:52:52 2010 ranaConfigurationPSLNPRO SLOW servo settings updated for Innolight NPROOur new 2W Mephisto has a pretty zippy
"SLOW" temperature input. Tuning
the perl PID servo, I found that the best
 Untitled.png 
  3598   Thu Sep 23 10:34:20 2010 ranaFrogsComputersnodus gracefully rebootedSVN down
mafalda down 
I am guessing that the NFS file system
  
  3610   Mon Sep 27 00:33:50 2010 ranaUpdatePSLHigh Voltage Driver added to TTFSS -> NPROWe added the Thorlabs HV Driver in
between the FSS and the NPRO today.
The FSS is locking with it, but we
  
  3618   Wed Sep 29 01:53:44 2010 ranaUpdatePSLpaths broken and VCO turned offI found that several linux libraries have
been moved around and disabled today. In
particular, I see a bunch of new stuff in
  
  3631   Thu Sep 30 21:55:31 2010 ranaUpdateCDSDAQ sys updateIts pretty exciting to see that Joe got
Alex to actually use the ELOG. Its a proof
that even rare events occur if you are patient
 Untitled.png 
  3649   Tue Oct 5 13:52:15 2010 ranaUpdateCDSproof of trend   Untitled.png 
  3657   Wed Oct 6 00:32:01 2010 ranaSummaryDAQNDS2This is the link to the NDS2 webpage:
https://www.lsc-group.phys.uwm.edu/daswg/wiki/NetworkDataServer2
We should install this so that we
  