  16445   Tue Nov 2 18:54:41 2021 Anchal, PacoUpdateBHDOptical fibres laid for BHD upgradeWe successfully laid down all required
optical fibre fiber cables from 1X4-1X7
region to 1Y1-1Y3 region today. This includes
  
  16446   Tue Nov 2 22:50:30 2021 KojiUpdateBHDSOS assembly2.5Hz is surprising. Can you move it down
to sub 1Hz by adding a socket cap screw at
the top instead of the set screw for the
  
  16448   Thu Nov 4 15:03:43 2021 KojiSummaryBHD1Y1 rack workI have visited the binder file for the
40m wiring file in the control room.
The 12V power supply on 1Y1 is for
  
  16450   Fri Nov 5 12:21:16 2021 AnchalSummaryBHDPart VI of BHR upgrade - Removal of ITMYC opticsToday I opened the ITMY chamber and removed
the following optics and placed them in Xend
flow bench (See attachment 1-3 for updated
 XendFlowBenchLeftEnd.jpgXendFlowBenchMiddle.jpgXendFlowBenchRightEnd.jpg 
  16452   Fri Nov 5 20:35:10 2021 KojiUpdateBHDFeedthru / Optical Mounts- New feedthrus [4xDB25 Qty 4 / 8xDB25
Qty 1] are placed on the wire shelf at the
entrance -> Jordan, please clean them.
 P_20211105_200817.jpg 
  16453   Mon Nov 8 10:13:52 2021 PacoSummaryBHD1Y1 rack work; Sorensens removed[Paco, Chub]

Removed all sorensen power supplies
from this rack except for 12 VDC one; that
  
  16454   Mon Nov 8 13:13:00 2021 KojiSummaryBHD1Y1 rack work; Sorensens removedUpdated the rack layout. Now there is an
issue.
We were supposed to have 1U space
 40m_BHD.png 
  16455   Mon Nov 8 15:29:05 2021 PacoSummaryBHD1Y1 rack work; New power for cameras[Paco, Anchal]

In reference to Koji's concern
(see previous elog), we have completely removed
  
  16456   Mon Nov 8 17:22:27 2021 YehonathanUpdateBHDSOS assemblyBig Gluing
Day
 Magnets_Positions.pngAdapters_Order.png 
  16458   Mon Nov 8 18:42:38 2021 KojiSummaryBHDRack Layout / Power Strips


Rack
 rack_plan.pdf 
  16459   Tue Nov 9 11:11:37 2021 YehonathanUpdateBHDSOS assemblyThe gluing was mostly successful. Only
two magnets didn't stick (see attachment).
 20211109_110408.jpg 
  16463   Tue Nov 9 19:02:47 2021 AnchalSummaryBHD1Y0 Populated and 1Y1,1Y0 powered[Anchal, Paco]

Today we populated 4 Sat Amp boxes
for LO1, Lo2, AS1, and AS4, 2 BO boxes for
  
  16465   Fri Nov 12 23:47:29 2021 YehonathanUpdateBHDSOS assembly{Tega, Yehonathan}

First
attempt at the suspension of a Lambda Optic
  
  16470   Tue Nov 16 17:42:46 2021 YehonathanUpdateBHDSOS assembly{Tega, Yehonathan}

Another
attempt at the suspension of a Lambda Optic
 20211115_170320_HDR.jpg20211116_163846.jpgmagnet_height_check(1).pngside_blcok_touching_1.pngside_blcok_touching_2.png 
  16471   Tue Nov 16 18:28:53 2021 KojiUpdateBHDSOS assemblyYehonathan told me that the wires
are touching between the clamps!
I went back to the CAD and confirmed
 D2100546_Wire_Block.pdfD2100546_Wire_Block.png 
  16475   Thu Nov 18 14:29:01 2021 KojiSummaryBHDBHD invac optics / opto-mechanicsI   
  16483   Wed Nov 24 14:15:15 2021 YehonathanUpdateBHDSOS assemblyLate update. We got 2 modified side blocks
from Jordan a few days ago. Yesterday, I
glued a side magnet to one of the modified
  
  16484   Wed Nov 24 14:34:15 2021 YehonathanUpdateBHDSaving on SUSAUX slow channelsKoji found out that the stock for BIO Acromag
modules is very low and that the lead time
for ordering new ones is ~ 1-year X-o.
  
  16489   Wed Dec 1 12:57:08 2021 YehonathanUpdateBHDSOS assembly{Yehonathan, Tega}

We glued some magnets onto modified
side blocks. We followed pretty much the
 7x 
  16491   Mon Dec 6 18:23:04 2021 YehonathanUpdateBHDSOS assemblyI installed OSEMs on the LO1 SOS. To my
surprise, the side magnet is not in the center
of the side OSEM. It completely misses the
 signal-2021-12-06-165751_001.jpeg 
  16497   Thu Dec 9 21:57:35 2021 YehonathanUpdateBHDSOS assembly{Yehonathan, Tega}

We took the optic out of the SOS
tower and removed the side blocks. We mounted
 balancingsos2.pngFreeSwingingSpectra.pdf 
  16499   Fri Dec 10 15:59:23 2021 PacoUpdateBHDFinished Coil driver (even serial number) units tests[Paco, Anchal]

We have completed modifications
and testing of the HAM Coil driver D1100687
 dc_fail.jpg 
  16505   Tue Dec 14 14:02:33 2021 YehonathanUpdateBHDSOS assembly{Yehonathan, Paco}

I fixed the overall height of the
adapter (attachment 1). I put an OSEM next
 magnetcentring.pngFreeSwingingSpectra.pdf 
  16506   Tue Dec 14 19:29:42 2021 PacoUpdateBHD1Y0 rack work for LO1[Paco]

Two coil drivers have been installed
on 1Y0 (slots 6, 7, for LO1 SOS). All connections
  
  16509   Wed Dec 15 16:11:38 2021 AnchalSummaryBHDPart VIII of BHR upgrade - Placed LO1[Anchal, Yehonathan, Paco]


Today we opened ITMX chamber
and removed the following optics and placed
 signal-2021-12-15-161437.jpeg 
  16510   Wed Dec 15 17:44:18 2021 KojiSummaryBHDPart VIII of BHR upgrade - Placed LO1If ITMX already has another side magnet,
we can migrate the side OSEM of ITMX to the
other side. This way, the interference of
  
  16511   Wed Dec 15 22:09:53 2021 YehonathanUpdateBHDSOS assembly{Paco, Yehonathan, Anchal}

I cut the wires from the winches
and removed the winch adapter plate. I engrave 
  
  16512   Thu Dec 16 12:21:16 2021 AnchalUpdateBHDCoil driver test failed for S2100619-v1Today I found one of the coil driver boards,
S2100619
failed the test on CH2. There appears to
 D1100687_S2100619-v1_TF_CH2_Not_Matching.pdf 
  16514   Thu Dec 16 15:32:59 2021 AnchalUpdateBHDFinished Coil driver (odd serial number) units testsWe have completed modifications and testing
of the HAM Coil driver D1100687 units with
serial numbers listed below. The DCC
  
  16516   Thu Dec 16 17:41:12 2021 KojiUpdateBHDCoil driver test failed for S2100619-v1Good catch. It turned out that the both
+ and - side of the output stages for CH2
were oscillating at ~600kHz. If I use a capacitance
 6x 
  16517   Thu Dec 16 17:57:17 2021 AnchalUpdateBHDFinished Coil driver (odd serial number) units testsS2100619 was fixed
by Koji and it passed the test after
that.
  
  16518   Thu Dec 16 18:16:36 2021 YehonathanUpdateBHDSOS assemblyToday I glued magnets onto the new 3/4"
mirror adapters. I also took the opportunity
to make some more side magnets assemblies.
 chippedmirror.pngIMG_6311.JPGIMG_6310.JPGIMG_6309.JPG 
  16520   Fri Dec 17 17:50:17 2021 YehonathanUpdateBHDSOS assemblyI threaded a new wire through a different
side block with a magnet and clamped it under
a microscope. It was hard, but eventually,
 AS1rollbalance.pngAS1Magnet_height.pngghostbeam.pnglambdaopticarrow.jpg 
  16521   Fri Dec 17 19:16:45 2021 KojiUpdateBHDSOS assemblyWe @40m do the convention of the arrow
at the thinnest side & pointing the HR
side, but nobody says Lambda does the same.
  
  16523   Fri Dec 17 22:16:07 2021 YehonathanUpdateBHDSOS assemblyI specifically checked the specification
before mounting the mirror. It says clearly
"Arrow at the thinnest location pointing
  
  16524   Sat Dec 18 00:56:14 2021 KojiUpdateBHDSOS assemblySad... We just need to check the wedge
direction everytime, unfortunately.

Pencil: can you try to gently wipe
  
  16526   Mon Dec 20 13:52:01 2021 KojiUpdateBHDSOS assemblyLO1: No need to remove
the pencil mark for the damping test. Until
we see serious contamination on the LO1 optic,
  
  16527   Mon Dec 20 14:10:56 2021 AnchalUpdateBHDAll coil drivers ready to be used, modified and testedKoji found some 68nF caps from Downs and
I finished modifying the last remaining coil
driver box and tested it.
  
  16528   Mon Dec 20 17:26:13 2021 YehonathanUpdateBHDSOS assembly{Yehonathan, Anchal}

I released the AS1 wires from the
winches, removed the adapter from the SOS
 7x 
  16531   Tue Dec 21 18:04:46 2021 YehonathanUpdateBHDSOS assemblyI locked the EQ stops while retaining the
XY alignment on the QPD and installed 5 green
OSEMs. AS1 is ready for transfer into the
  
  16539   Mon Jan 3 12:05:08 2022 PacoUpdateBHD1Y0 rack work for LO2 AS1 AS4[Paco, Anchal]

Continue working on 1Y0. Added
coil drivers for LO2, AS1, AS4. Anchal made
  
  16540   Mon Jan 3 16:46:41 2022 PacoUpdateBHD1Y1 rack work for SR2, PR2, PR3[Paco, Anchal]

Continued working on 1Y1 rack.
Populated the 6 coil drivers, made all connections
  
  16541   Tue Jan 4 18:26:59 2022 AnchalUpdateBHDTested 2" PR2 candidates transmissionI used the rejected light from the PBS
after the motorized half-wave plate between
PMC and IMC injection path (used for input
  
  16542   Tue Jan 4 18:27:23 2022 PacoUpdateBHDSOS assembly -- PR3[yehonathan, paco, anchal]

We continue suspending PR3 today.
Yehonathan and Paco suspended the thick optic
 PR3_roll_balance.pngPR3_magnet_height.pngFreeSwingingSpectra.pdfPXL_20220104_231742123.jpgPXL_20220104_232809203.jpg 
  16543   Wed Jan 5 17:46:04 2022 AnchalUpdateBHDTested 2" PR2 candidates transmissionI tested 2 more optics today, the old PR2
that we took out and another optic I found
in QIL. Both these optics are also not good
  
  16544   Wed Jan 5 19:18:06 2022 YehonathanUpdateBHDSOS assembly -- AS4{Paco, Yehonathan, Anchal}

Today we suspended AS4
(E2000226-B
 AS4_roll_balance.pngAS_4_magnet_height.pngFreeSwingingSpectra.pdf 
  16545   Thu Jan 6 11:54:20 2022 AnchalSummaryBHDPart IX of BHR upgrade - Placed AS1 and AS4[Paco (Vacuum Work), Anchal]

Today we opened the ITMY Chamber
and installed suspended AS1 and AS4 in their
  
  16550   Thu Jan 6 17:00:20 2022 YehonathanUpdateBHDSOS assembly -- LO2{Paco, Yehonathan}

Today we suspended LO2 (E1800089)
 LO2_roll_balance.pngLO2_magnet_height.pngFreeSwingingSpectra.pdf 
  16551   Thu Jan 6 17:16:51 2022 YehonathanUpdateBHDUsing Peek screws/nutsThere were several cases where the long
EQ stops didn't perform as expected.

In one type of case, we used a
  
  16552   Thu Jan 6 21:04:41 2022 AnchalSummaryBHDPart VIII of BHR upgrade - LO1 OSEMs inserted[Anchal, Koji] Part of elog: