  6024   Mon Nov 28 15:00:20 2011 kiwamuUpdateGreen LockingY arm ALS engaged
    

       
            
  
  6026   Mon Nov 28 16:46:55 2011 kiwamuUpdateCDSc1sus is now upI have restarted the c1sus machine and
burt-restored c1sus and c1mcs to the day
before Thank giving, namely 23rd of November.
  
  6027   Mon Nov 28 16:51:57 2011 kiwamuUpdateLSCmodulation frequency resetI reset the modulation frequency to 11065910
Hz (#5530).
It had been at 11065399 Hz probably since
  
  6028   Mon Nov 28 18:19:53 2011 kiwamuUpdateIOOStochmon seems workingHere is a 48 hours trend of the RFAM
monitor (a.k.a StochMon):
 RFAM_48hours.png 
  6033   Tue Nov 29 04:47:49 2011 kiwamuUpdateCDSc1sus shut down againI have shut down the c1sus machine at 3:30
AM.
  
  6042   Tue Nov 29 18:54:29 2011 kiwamuUpdateCDSc1sus machine up[Zach / Kiwamu]
 Woke up the c1sus machine in
order to lock PSL to MC so that we can observe
  
  6044   Tue Nov 29 22:10:18 2011 kiwamuUpdateRF SystemRFAM fluctuation reduced

    

       
            
 RFAM_withEOMheater_edit.png 
  6050   Wed Nov 30 03:01:55 2011 kiwamuUpdateRF SystemRFAM fluctuation reducedOkay I have turned ON the temperature control
at 2:40 AM and will leave it ON for a while.

  
  6060   Thu Dec 1 17:33:18 2011 kiwamuUpdateSUSwatchdogs fixedThe watchdogs'
issue has been solved and they are now working
  
  6071   Mon Dec 5 17:44:41 2011 kiwamuUpdateGeneralmy plan tonightI am going
to try handing off the ALS servo to the IR
  
  6072   Mon Dec 5 19:21:55 2011 kiwamuUpdateLSCcoarse beat note signal : ADC limited above 30 HzThe
signal observed by the coarse frequency discriminator
was actually dominated by the ADC noise above
 Yarm_ALS_coarse.png 
  6074   Tue Dec 6 00:26:00 2011 kiwamuUpdateLSCALS became robust : UGF = 100 HzEventually
the instability in the Y end PDH servo turned
out to be some kind of an alignment issue.
  
  6076   Tue Dec 6 02:57:44 2011 kiwamuUpdateGreen Locking1st trial of handing offI
succeeded in handing off the servo from that
of the ALS to IR-PDH.
 YarmALS.png 
  6079   Wed Dec 7 00:48:58 2011 kiwamuUpdateRF SystemRealigned incindent pointing to MCActually it was already in a good place.
I
just realigned the zig-zag mirrors on the
PLS table to bring the entire beam axis a
  
  6080   Wed Dec 7 02:55:38 2011 kiwamuUpdateGreen Lockinglocking activity tonightNo
real progress.
  
  6091   Thu Dec 8 19:48:23 2011 kiwamuUpdateCDSrestarted c1lsc machine and daqdSince the c1lsc machine became frozen I
restarted the c1lsc machined and daqd.
Then I burtrestored c1lsc, c1ass
  
  6102   Sat Dec 10 05:27:43 2011 kiwamuUpdateGreen Lockingstatus update of the Y arm green lockStatus
update of the Y arm green lock:
  
  6103   Sun Dec 11 17:28:36 2011 kiwamuUpdateGreen Lockingstatus update of the Y arm green lock


   
        
            
 ALSscreens.png 
  6106   Mon Dec 12 13:02:08 2011 kiwamuUpdateCDSdaqd restartedI have restarted the daqd process at 1:01
PM since I have added some new ALS's daq
channels.
  
  6126   Fri Dec 16 13:29:15 2011 kiwamuUpdateGreen LockingY arm noise budget : 60Hz line noise is killing usAlong with development of the automation
script, my goals last night were :

 (1) Take
 Yarm_ALS_2011DEC16.png 
  6127   Sat Dec 17 00:00:03 2011 kiwamuUpdateGreen Locking60 Hz line nose gone

    

       
            
  
  6129   Sat Dec 17 03:59:32 2011 kiwamuUpdateSUSAborted Hysteresis test

    

       
            
  
  6132   Sun Dec 18 16:16:55 2011 kiwamuUpdateSUSAnother trial of Hysteresis testKoji has modified the script for the hysteresis
measurement.
A
  
  6133   Sun Dec 18 18:45:22 2011 kiwamuUpdateGreen LockingY arm ALS : time series and noise budgetAs I said in the previous entry (#6126)
my current goals were :
 time_series.pngYarm_ALS_2011DEC17.png 
  6134   Sun Dec 18 19:56:00 2011 kiwamuUpdateSUSAnother trial of Hysteresis testThe measurement finished at ~ 21:50
PT.

  
  6135   Sun Dec 18 23:00:22 2011 kiwamuUpdateSUSoplve recenterdI have recentered the oplev beams, including
BS, ITMs and ETMs.
  
  6136   Mon Dec 19 01:54:35 2011 kiwamuUpdateSUSanother trial of hystersis testAnother hysteresis test has begun at 1:50
PT, Dec/19.
It will finish after 3 or 4 hours.
  
  6140   Wed Dec 21 03:38:14 2011 kiwamuUpdateGreen LockingY arm ALS : automation script 80 % doneScripting
of the single arm automated lock script is
80% done.
  
  6141   Wed Dec 21 04:29:01 2011 kiwamuUpdateGreen LockingPower Recycled Single ArmI made the
first trial of locking a Power-recycled single
 time_series.png 
  6143   Wed Dec 21 14:41:22 2011 kiwamuSummaryGeneralminutes of 40m meeting : short-term planHere is the Gantt chart we discussed in
the 40m meeting today.
Based on the discussions we had,
 40mproject.png 
  6144   Wed Dec 21 16:55:30 2011 kiwamuUpdateGreen LockingPower Recycled Single Arm I did some brief parameter checks
for the power-recycled single arm which I
have done yesterday.
The
  
  6145   Thu Dec 22 19:15:22 2011 kiwamuUpdateGreen Lockingrearrangement of PSL green optics As
planed (#6143
  
  6147   Fri Dec 23 01:07:41 2011 kiwamuUpdateGreen Lockingrearrangement of PSL green optics part IIAfter
I did a fine alignment of the X green beam
path on the PSL table, the X arm beat-note
 newLayout.png 
  6149   Mon Dec 26 12:04:41 2011 kiwamuUpdateCDSc1gcy.ini hand editedI have edited c1scx.ini by hand in order
to acquire some green locking related channels.
Somehow
  
  6150   Mon Dec 26 14:01:45 2011 kiwamuUpdateLSCmultiple-LOCKIN newly addedThe multiple
LOCKIN module has been newly added on the
 multiple-lockin.png 
  6151   Tue Dec 27 16:56:15 2011 kiwamuUpdateLSCScmitt trigger installedThe old
trigger system has been replaced by Schmitt
 trigger_time_series.pngtrig_mat.pngmodel_trigger_edit.png 
  6152   Tue Dec 27 22:17:56 2011 kiwamuUpdateLSCmultiple-LOCKIN new screensSome
new screens have been made for the new multiple-LOCKIN
system running on the LSC realtime controller.
 Untitled.png 
  6153   Tue Dec 27 23:03:56 2011 kiwamuUpdatePSLPMC realignedI have realigned the steering mirrors for
PMC because the transmitted light had been
at ~ 0.741
  
  6154   Wed Dec 28 14:13:16 2011 kiwamuUpdateGreen LockingALS feedback on MC2I
added an ALS feedback path on the MC2 suspension
and this path will enable us to stabilise
 MC2_ALS.png 
  6155   Fri Dec 30 02:16:48 2011 kiwamuUpdateGreen LockingYarm ALS : high frequency noise reducedThe
high frequency noise, which has been a dominant
noise above 30 Hz in the Y arm ALS (
 Yarm_ALS_2011Dec29.png 
  6156   Fri Dec 30 22:05:16 2011 kiwamuUpdateLSCpower normalization in LSCNow a power
normalization is doable for the LSC error
 POW_NORM_MTRX.png 
  6158   Tue Jan 3 15:48:39 2012 kiwamuUpdateLSCpower normalization in LSCIt
turned out that the power normalization need
a modification.
  
  6164   Wed Jan 4 00:43:06 2012 kiwamuUpdateIOOMC became flakyI
don't know what exactly is going on, but
MC became flaky and it's been frequently
  
  6166   Wed Jan 4 03:03:24 2012 kiwamuUpdateLSClocking activity tonight and beyondLast night and tonight, I was doing
a kind of rehabilitation -- locking PRMI
and DRMI with the new trigger system.
  
  6167   Wed Jan 4 05:02:58 2012 kiwamuUpdateLSCSidebands measurement at POPJust
a quick report: 
I did
 SB_DRMI.png 
  6170   Wed Jan 4 16:22:30 2012 kiwamuUpdateLSCpower normalization in LSC : modification doneThe
dynamic power normalization system has been
modified such that the normalization happen
 pow_norm.png 
  6175   Fri Jan 6 01:00:56 2012 kiwamuUpdateCDSc1scx out of syncBoth
the c1scx and its IOP realtime processes
became out of sync.
  
  6181   Mon Jan 9 13:19:09 2012 kiwamuUpdateSUSETMX damping restoredNo
we can't do that because the c1scx model
is not working properly.
  
  6182   Mon Jan 9 23:52:15 2012 kiwamuUpdateCDSSUS channels not accessible from dataviewer[John / Kiwamu]
 We
found that some of the suspensions channels
  
  6183   Tue Jan 10 00:09:33 2012 kiwamuUpdateLSCspike hunting in REFL33[John / Kiwamu]
 We
tried to figure out what is causing spikes
  
ELOG V3.1.3-