40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 275 of 355
Not logged in
List
|
Find
|
Login
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17705 Entries
Goto page
Previous
1
,
2
,
3
...
274
, 275,
276
...
353
,
354
,
355
Next
ID
Date
Author
Type
Category
Subject
Text
5690
Wed Oct 19 04:23:58 2011
kiwamu
Update
SUS
SRM free swinging test
The following optics were kicked:
SRM
Wed Oct 19 04:22:53 PDT 2011
5691
Wed Oct 19 05:15:44 2011
kiwamu
Update
SUS
taking care of SRM
I
made some efforts to fix the situation of
SRM but it is still bad.
5694
Wed Oct 19 10:49:35 2011
kiwamu
Update
SUS
SRM oscillation removed
5698
Wed Oct 19 14:03:41 2011
kiwamu
Update
General
vent prep : dichroic mirrors
Status update on dichroic mirror:
I got the specification sheet
of an aLIGO 2" dichroic mirror from
5699
Wed Oct 19 15:46:49 2011
kiwamu
Update
SUS
taking care of SRM
5702
Wed Oct 19 16:53:38 2011
kiwamu
Update
CDS
some screens need labels
5704
Wed Oct 19 17:33:07 2011
kiwamu
Update
Green Locking
ETMY mechanical shutter : fully functional
The mechanical
shutter on the Y end is now fully functional.
5709
Thu Oct 20 04:47:37 2011
kiwamu
Update
LSC
clipping search round 1
[Koji / Kiwamu]
We tried finding a possible clipping in the
5744
Wed Oct 26 23:03:03 2011
kiwamu
Update
LSC
RF distribution box : two more 55MHz available
The RF distribution
box has been modified so that it generates
5746
Thu Oct 27 16:09:37 2011
kiwamu
Update
LSC
RF distribution box : two more 55MHz available
The diagram of the RF distribution box
has been updated according to the modification
( #5744).
5747
Thu Oct 27 18:00:38 2011
kiwamu
Summary
LSC
Offsets in LSC signals due to the RFAMs : Optickle simulation
The amount
of offsets in the LSC signals due to the
5749
Fri Oct 28 01:13:17 2011
kiwamu
Update
SUS
ITMX oplev : iris fully opened
I found that the sum of the ITMX oplev
signals had gone down to zero yesterday.
I checked the ITMX table and found
5752
Fri Oct 28 03:42:50 2011
kiwamu
Update
LSC
ITMX table needs to be refined
(POX)
The POX beam had been 80% clipped
at a black glass beam dump of the POX11 RFPD.
5753
Fri Oct 28 04:57:00 2011
kiwamu
Update
LSC
POX11 demod board broken
The POX11 demodulation
board is broken. It needs to be fixed in
5754
Fri Oct 28 05:17:13 2011
kiwamu
Update
LSC
locking activity : PZT1 is still railing
Status update on the LSC activity:
To see how good/bad the beam
5762
Sat Oct 29 05:50:44 2011
kiwamu
Update
LSC
MC suspensions misaligned to avid railing for PZTs
I have shifted the alignment of the MC
suspensions such that the PZT won't rail.
Since I didn't care of the spot positions
5773
Mon Oct 31 21:46:32 2011
kiwamu
Update
LSC
Dependence of Recycling gain on incident beam pointing
I
horizontally swept the translation of the
incident beam in order to investigate a possible
5776
Tue Nov 1 16:02:15 2011
kiwamu
Update
SUS
Re: SUS input matrix diagonalizer REMOVED from crontab
5788
Wed Nov 2 19:32:20 2011
kiwamu
Update
LSC
POP22/110 installed
[Steve / Kiwamu]
The
POP22/110 RFPD has been installed. It is
5794
Thu Nov 3 14:25:52 2011
kiwamu
Update
LSC
PDA10A as POP22/110 : too small signal
It
turned out that the signal was too small
with PDA10A to detect the 22 and 110 MHz
5796
Thu Nov 3 16:31:47 2011
kiwamu
Update
LSC
PDA10CF as POP22/110 : better
The
POP22/110 RFPD has been replaced by PDA10CF.
As a result the 22 and 110 MHz signals became
5801
Thu Nov 3 18:41:36 2011
kiwamu
Update
LSC
POX11 demod board : haven't been modified yet
I
pulled out the POX11 demod board and found
the power splitter on the board hadn't been
5802
Thu Nov 3 19:58:18 2011
kiwamu
Update
LSC
POX11 demod board : modification done
The modification
on the POX11 demod board has been successfully
5806
Fri Nov 4 05:24:56 2011
kiwamu
Update
LSC
offset introcuded in MC and IFO-configure script modified
[Offsets in MC]
I have introduce an offset
in MC2 PIT because the PZT1 again started
5817
Sat Nov 5 00:04:23 2011
kiwamu
Update
ASC
ASS scripts gone
Did
somebody delete all the scripts in /opt/rtcds/caltech/c1/scripts/ASS
5820
Sat Nov 5 04:30:21 2011
kiwamu
Update
Green Locking
Re:Passive summing box modifications
I think you also should check the PZT's
capacitance of the 700mW LightWave because
2.36 nF is the one for the 1W Innolight laser.
5838
Mon Nov 7 22:20:18 2011
kiwamu
Update
Green Locking
Re:YARM length fluctuation
A nice plot !
Can you put another y-axis on the
right hand side of the same plot in
5849
Wed Nov 9 14:49:07 2011
kiwamu
Summary
LSC
Characterization of the Power Recycled Michelson
EDIT
by KI:
5850
Wed Nov 9 16:03:21 2011
kiwamu
Summary
General
Goal this week
Goal of this week :
ALS on the Y arm
5852
Wed Nov 9 16:49:17 2011
kiwamu
Update
Green Locking
Y end laser temperature with slow input connected
Indeed it is strange. I took a quick look
at it.
In
5860
Thu Nov 10 05:54:23 2011
kiwamu
Update
Green Locking
Beat-note detected : PSL vs Y arm
[Katrin / Kiwamu]
The beat-note
5875
Fri Nov 11 14:55:47 2011
kiwamu
Summary
LSC
Characterization of the Power Recycled Michelson : take 2
5885
Mon Nov 14 11:32:02 2011
kiwamu
Summary
General
Goal this week
Goal of this week : Noise
budgeting on the Y arm ALS
5888
Mon Nov 14 17:01:14 2011
kiwamu
Update
Green Locking
ALS feedback on MC2
Leaving a note on the ALS feedback before
I forget:
The
5890
Mon Nov 14 22:56:31 2011
kiwamu
Update
Green Locking
Y end PDH lock : UGF at 17 kHz
[Tomotada / Kiwamu]
The open loop transfer function of the Y
5894
Tue Nov 15 12:25:38 2011
kiwamu
Update
Green Locking
Y arm ALS : beat-note free run fluctuation
Locking activity last night :
The free run beat-note in 532 nm has been
5895
Tue Nov 15 15:16:04 2011
kiwamu
Update
CDS
dataviewer doesn't run
Dataviewer is not able to access to fb
somehow.
I restarted daqd on fb but it didn't
5914
Wed Nov 16 17:29:46 2011
kiwamu
Update
Green Locking
Some updates on the Y end green PDH
5920
Thu Nov 17 03:46:52 2011
kiwamu
Update
Green Locking
PSL doubling had been diabled
I
found that the temperature controller of
the PSL doubling oven had been disabled.
5929
Thu Nov 17 17:21:22 2011
kiwamu
Update
Green Locking
Y end green PDH servo : it's okay
5930
Thu Nov 17 18:20:26 2011
kiwamu
Update
Green Locking
Y arm ALS : 1st trial of noise budget
The
noise budget on the Y arm ALS has begun.
5942
Fri Nov 18 02:50:10 2011
kiwamu
Update
IOO
RF generation box : power switch malfunction
[Suresh / Kiwamu]
The
power switch button of the RF generation
5947
Fri Nov 18 15:35:18 2011
kiwamu
Update
IOO
RF generation box : power switch malfunction
Jenne
gave me a spare LED power switch
5963
Sun Nov 20 14:48:55 2011
kiwamu
Update
General
recovery from the power shutdown
Recovery
from the power shutdown
- Turned on the raid disk of
5964
Sun Nov 20 15:11:09 2011
kiwamu
Update
IOO
RFAM monitoring test
DO NOT CHANGE
THE IFO ALIGNMENT UNTIL TOMORROW MORNING
5968
Mon Nov 21 14:35:28 2011
kiwamu
Update
IOO
RFAM monitoring test
5970
Mon Nov 21 16:08:04 2011
kiwamu
Update
Green Locking
2nd trial of Y arm ALS noise budget : broad band noise gone
5974
Tue Nov 22 00:19:10 2011
kiwamu
Update
SUS
c1auxey hadware rebooted
I found that the slow machine c1auxey,
which controls and monitoring the ETMY suspension
5975
Tue Nov 22 04:02:47 2011
kiwamu
Update
IOO
changed MC alignment
I
have changed the MC2_YAW DC bias because
the PZT1_YAW was railing.
5978
Tue Nov 22 15:18:18 2011
kiwamu
Update
Green Locking
broad band noise depends on the gain of Y green PDH. and comaprator broken
Goto page
Previous
1
,
2
,
3
...
274
, 275,
276
...
353
,
354
,
355
Next
ELOG V3.1.3-