40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 274 of 341  Not logged in ELOG logo
Entry  Wed Jan 15 14:10:28 2020, Jon, Configuration, PSL, New EPICS database for C1PSL + C1IOO 
    Reply  Wed Jan 15 15:04:31 2020, gautam, Update, PSL, PMC Linewidth measurement 
    Reply  Wed Jan 15 16:08:40 2020, not gautam, Update, PSL, Assembly underway for c1psl upgrade 
    Reply  Fri Jan 17 21:56:22 2020, Yehonathan, Update, PSL, AOM first order beam alignment 20200117_174841.jpg
    Reply  Fri Jan 17 22:11:19 2020, Yehonathan, Update, PSL, Ringdown measurements 20200117_192455.jpg20200117_192448.jpg
Entry  Mon Jan 20 12:16:50 2020, gautam, Update, PSL, PMC input reverted to AOM zeroth order beam IMG_8362.JPG
Entry  Mon Jan 20 15:11:20 2020, gautam, Update, PSL, PMCT photodiode grounding issue PMCT_anomaly.pdf
Entry  Mon Jan 20 20:20:36 2020, gautam, Update, PSL, PMC servo checkout PMCsweep.pdfOLTFmeas.pdf
    Reply  Wed Jan 22 11:00:21 2020, gautam, Update, PSL, PMC REFL ghost beam 
    Reply  Wed Jan 22 11:22:39 2020, gautam, Update, PSL, PMC modulation depth measurement modDepth.pdf
    Reply  Wed Jan 22 20:12:36 2020, gautam, Update, PSL, PMC demodulator electrical characterization demodChar.pdfmixerChar.pdf
    Reply  Thu Jan 23 14:37:05 2020, gautam, Update, PSL, PMC VGA chip damaged? VGAchar.pdf
    Reply  Thu Jan 23 16:37:14 2020, rana, Update, PSL, PMC VGA chip damaged? 
    Reply  Thu Jan 23 18:52:31 2020, gautam, Update, PSL, PMC RFPD characterization PDresp.pdf
    Reply  Thu Jan 23 22:10:01 2020, gautam, Update, PSL, PMC servo pulled out 
Entry  Thu Jan 23 23:07:04 2020, Jon, Configuration, PSL, c1psl breakout board wiring c1psl_feedthrough_wiring.pdf
    Reply  Fri Jan 24 15:42:08 2020, gautam, Update, PSL, PMC servo restored 
    Reply  Sat Jan 25 11:54:42 2020, Yehonathan, Update, PSL, Ringdown measurements Input_beam_path.jpgReflected_Beam_Path.jpgTransmitted_Beam_Path.jpgPMCRingdownNormalizedRawdata.pdfTransPDFits.pdf
    Reply  Sun Jan 26 13:47:00 2020, gautam, Update, PSL, PMC servo characterization elecTFs.pdfVGAchar_postFix.pdfVGAlinearity_postFix.pdfnewOLTFs.pdf
    Reply  Mon Jan 27 21:35:06 2020, Yehonathan, Update, PSL, Ringdown measurements IMC_REFL_Beam_Path.jpg
    Reply  Mon Jan 27 21:48:49 2020, gautam, Update, PSL, Ringdown measurements elevatedSeis.pdf
    Reply  Tue Jan 28 14:33:24 2020, gautam, Update, PSL, Inferred free-running frequency noise inLoopNoise_IMClocked.pdffreqNoiseComparison.pdf
Entry  Tue Jan 28 19:12:30 2020, Jon, Configuration, PSL, Spare channels added to c1psl chassis c1psl_feedthrough_wiring_v2.pdf
Entry  Thu Jan 30 17:31:28 2020, Jon, Update, PSL, Errant FSS_INOFFSET change 
    Reply  Thu Jan 30 17:41:10 2020, gautam, Update, PSL, Errant FSS_INOFFSET change 
Entry  Mon Feb 3 15:22:39 2020, Jon, Update, PSL, c1psl progress/Acromag ADC grounding 
Entry  Tue Feb 4 18:13:01 2020, Yehonathan, Update, PSL, Bench testing of PSL ai channels c1psl_wire_testing_-_By_Connector.pdf
    Reply  Wed Feb 5 08:57:11 2020, Yehonathan, Update, PSL, Bench testing of PSL ai channels 
    Reply  Wed Feb 5 21:04:10 2020, Yehonathan, Update, PSL, Bench testing of PSL ai channels 
Entry  Thu Feb 6 21:54:13 2020, Jon, Update, PSL, c1psl bench testing complete 
Entry  Mon Feb 10 10:07:20 2020, gautam, Update, PSL, PMC re-locked PMCunlock.png
Entry  Mon Feb 10 15:54:47 2020, Jordan, Update, PSL, Completed Acromag Wiring 
Entry  Mon Feb 10 15:55:46 2020, Jordan, Update, PSL, PMCTRANSPD ADC1.jpg
Entry  Thu Feb 27 17:50:36 2020, gautam, Update, PSL, c1psl setup setup 20200227_173535.jpg20200227_173454_HDR.jpg20200227_172659.jpg
    Reply  Fri Feb 28 08:05:22 2020, gautam, Update, PSL, c1psl setup setup 
    Reply  Fri Feb 28 10:04:41 2020, gautam, Update, PSL, c1psl setup setup 
    Reply  Fri Feb 28 19:37:18 2020, gautam, Update, PSL, New c1psl installed 
Entry  Wed Mar 4 11:16:37 2020, gautam, Update, PSL, PMC realignment PMCrealignment.png
Entry  Wed Mar 4 22:38:31 2020, Jon, Update, PSL, c1psl communications problem resolved 
    Reply  Thu Mar 5 19:45:23 2020, Jon, Summary, PSL, C1PSL in-situ test results c1psl_feedthrough_wiring_-_By_Connector_(3).pdf
    Reply  Wed Mar 11 18:12:53 2020, gautam, Summary, PSL, WFS Demod board modifications D980233-B_Mar2020Mods.pdf
Entry  Thu Mar 12 16:13:16 2020, gautam, Update, PSL, Temperature sensors connected to Acromag P_20200317_153736_vHDR_On_2.jpg
Entry  Fri Mar 13 14:28:39 2020, gautam, Update, PSL, Added tees to PMC Trans and REFL 
Entry  Wed Apr 22 17:29:14 2020, gautam, Update, PSL, FSS debugging attempts FSSspec.pdf
    Reply  Thu Apr 23 10:42:02 2020, rana, Update, PSL, FSS debugging attempts 
Entry  Tue Sep 15 10:57:30 2020, gautam, Update, PSL, PMC re-locked, RGA re-enabled RGAscan.pdf
Entry  Mon Sep 21 16:40:52 2020, gautam, Update, PSL, HEPAs are no longer running 
Entry  Fri Nov 6 14:08:44 2020, gautam, Update, PSL, PMC re-locked 
Entry  Mon Apr 12 08:32:54 2021, Anchal, Paco, Summary, PSL, PMC unlocked at 2pm on Sunday; ~ Restored 
    Reply  Mon Apr 12 18:34:26 2021, Yehonathan, Summary, PSL, PMC unlocked at 2pm on Sunday; ~ Restored 
ELOG V3.1.3-