40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 274 of 357  Not logged in ELOG logo
    Reply  Mon Jul 4 14:27:35 2011, kiwamu, Summary, General, Weekly report 
    Reply  Tue Jul 5 16:09:54 2011, kiwamu, Update, ABSL, some photos for ABSL setup APtable.pngPSLtable.png
Entry  Tue Jul 5 17:38:46 2011, kiwamu, Update, ABSL, ABSL laser frequency-locked RFsetup.png
    Reply  Wed Jul 6 02:12:36 2011, kiwamu, Update, SUS, Re : More normalization of all sus controllers 
    Reply  Wed Jul 6 18:15:26 2011, kiwamu, Update, SUS, Re: BS oplev spectra 
    Reply  Wed Jul 6 23:03:57 2011, kiwamu, Update, LSC, modified locking scripts 
Entry  Wed Jul 6 23:53:38 2011, kiwamu, Summary, General, minutes of 40m meeting meeting.pdf
    Reply  Mon Jul 25 11:02:19 2011, kiwamu, Summary, General, Weekly report 
    Reply  Mon Jul 25 11:04:22 2011, kiwamu, Summary, General, Weekly report 
    Reply  Mon Jul 25 11:06:38 2011, kiwamu, Summary, General, Weekly report 
Entry  Mon Jul 25 13:01:24 2011, kiwamu, Update, CDS, c1ioo Make problem 
Entry  Wed Jul 27 01:58:23 2011, kiwamu, Update, LSC, locking status 
Entry  Wed Jul 27 15:18:50 2011, kiwamu, Summary, General, schedule 
    Reply  Wed Jul 27 15:42:41 2011, kiwamu, Summary, General, mitues of 40m meeting : Task list 
Entry  Thu Jul 28 16:00:28 2011, kiwamu, Update, Computer Scripts / Programs, another offset script : offset2 
    Reply  Thu Jul 28 16:10:34 2011, kiwamu, Update, LSC, Both arm locked 
Entry  Fri Jul 29 16:25:06 2011, kiwamu, Update, ASC, beam axis and Y arm aligned 
    Reply  Sat Jul 30 06:24:06 2011, kiwamu, Update, ASC, Y arm ASS fixed 
Entry  Sat Jul 30 07:07:28 2011, kiwamu, Update, ASC, MCASS status 
    Reply  Sat Jul 30 21:04:23 2011, kiwamu, Update, ASC, Y arm ASS fixed 
    Reply  Sun Jul 31 00:05:52 2011, kiwamu, Update, LSC, script for loss measurement : modified 
    Reply  Sun Jul 31 00:37:57 2011, kiwamu, Update, PSL, Re : PSL table work  
Entry  Sun Jul 31 17:28:34 2011, kiwamu, Summary, LSC, Tolerance of Arm length = 2 cm random2cm.pngarmsensMAT.pngPOP55phase2cm.png
    Reply  Sun Jul 31 22:35:35 2011, kiwamu, Update, LSC, arm loss measurement : done 
    Reply  Sun Jul 31 22:48:35 2011, kiwamu, Summary, General, preparation of the vent : status update 
Entry  Mon Aug 1 04:08:24 2011, kiwamu, Update, ABSL, Arm length measurement : cavity kick technique ETMY_kick.png
    Reply  Mon Aug 1 20:21:05 2011, kiwamu, Update, Green Locking, Y arm green beam axis : aligned 
    Reply  Mon Aug 1 22:30:59 2011, kiwamu, Summary, General, Weekly report 
    Reply  Tue Aug 2 02:20:09 2011, kiwamu, Update, Green Locking, Y arm green beam axis : done 
Entry  Tue Aug 2 02:35:23 2011, kiwamu, Update, General, preparation of the vent : status and plan 
Entry  Tue Aug 2 11:52:44 2011, kiwamu, Summary, General, Schedule 
Entry  Tue Aug 2 15:41:06 2011, kiwamu, Update, IOO, Measurement of MC spot positions : done MCdecenter.png
Entry  Tue Aug 2 19:05:13 2011, kiwamu, Update, IOO, peparation for low power MC : HWP+PBS installed attenuator.png
    Reply  Wed Aug 3 04:29:48 2011, kiwamu, Update, IOO, peparation for low power MC : HWP+PBS installed 
    Reply  Wed Aug 3 11:34:59 2011, kiwamu, Update, VAC, Re: vent 
Entry  Wed Aug 3 14:40:32 2011, kiwamu, Summary, General, minutes of 40m meeting : plan tomorrow 
Entry  Fri Aug 5 02:00:09 2011, kiwamu, Summary, General, summary of today's invac work 
Entry  Fri Aug 5 08:08:42 2011, kiwamu, Summary, General, plan today 
    Reply  Fri Aug 5 15:11:24 2011, kiwamu, Update, SUS, Re: cross coupling 
    Reply  Fri Aug 5 22:54:29 2011, kiwamu, Metaphysics, Treasure, Crane crew here Monday morning 
    Reply  Sun Aug 7 14:01:58 2011, kiwamu, Update, Green Locking, X green beam re-aligned 
Entry  Mon Aug 8 15:20:49 2011, kiwamu, Update, SUS, inspection on ETMY (round 1) Screen_shot_2011-08-08_at_15.08.23.png
Entry  Tue Aug 9 02:03:16 2011, kiwamu, Summary, SUS, summary of today's work on ETMY 
Entry  Tue Aug 9 03:05:05 2011, kiwamu, Summary, General, weekly report 
Entry  Tue Aug 9 10:15:25 2011, kiwamu, Update, General, in-vac work plan today 
    Reply  Tue Aug 9 11:33:33 2011, kiwamu, Update, SUS, Re: ETMX free swinging data 
    Reply  Wed Aug 10 14:30:55 2011, kiwamu, Update, IOO, Re: MC A2L alignment 
    Reply  Thu Aug 11 12:54:06 2011, kiwamu, Update, IOO, MC spot positions MCoffcenter.png
Entry  Fri Aug 12 03:52:51 2011, kiwamu, Update, SUS, PRM OSEM adjustment 
Entry  Fri Aug 12 04:11:13 2011, kiwamu, Update, SUS, free swinging 
ELOG V3.1.3-