  1525   Tue Apr 28 01:48:45 2009 peteConfigurationVACVC1 openAt about 1am or so Yoichi and I opened
VC1.  CC1 had fallen to about 5e-5 torr.
  
  1557   Thu May 7 18:12:12 2009 peteUpdateLockingarm power curveI've plotted TRX, TRY, PD12I and PD11Q. 
Arm powers after locking increase for a few
tens of minutes, peak out, and then decrease
 2009_may_7_powers.jpg 
  1558   Thu May 7 23:21:04 2009 peteUpdateLockingarm power curve


   
        
            
  
  1560   Fri May 8 02:08:59 2009 peteUpdateLockinglock stretcheslocks last for about an hour.  this
was true last night as well (see "arm
power curve" entries).   the second
 powers_oplev.pdf 
  1565   Fri May 8 15:40:44 2009 peteUpdateLockingprogressively weaker locksthe align script was run after the third
lock here.  it would have been interesting
to see the arm powers in a 4th lock 
 powers_3lock.pdf 
  1578   Tue May 12 17:26:56 2009 peteUpdateoplevsetmy oplev quad was badPete, Rob
After looking at some oplev noise
spectra in DTT, we discovered that the ETMY
 bad_oplev_quad.pdf 
  1580   Wed May 13 03:05:13 2009 peteUpdateoplevsetmy oplev quad was bad


   
        
            
  
  1585   Thu May 14 02:36:05 2009 peteUpdateLockingunstable IFOIt seems that the MC3 problem is intermittent
(one-day trend attached).  I tried to
take advantage of a "clean MC3"
 mc3.jpg 
  1587   Thu May 14 16:07:20 2009 peteSummarySUSChannel Hopping: That ancient enemy (MC problems)[quote][quote]The MC side problem could also
be the side tramp unit problem. Set the tramp
to 0 and see if that helps.[/quote]
 mc3_5days.jpg 
  1588   Fri May 15 00:02:34 2009 peteUpdateSUSETMX coils look OKI checked the four rear coils on ETMX by
exciting XXCOIL_EXC channel in DTT with amplitude
1000@ 500 Hz and observing the oplev PERROR
  
  1610   Wed May 20 01:41:19 2009 peteUpdateVACcryopump probably not itI found some neat signal analysis software
for my mac (http://www.faberacoustical.com/products/),
and took a spectrum of the ambient noise
  
  1616   Thu May 21 18:05:03 2009 peteUpdateSUSETMX coils look OK


   
        
            
 etmx_etmy_coils.pdf 
  1620   Fri May 22 01:27:14 2009 peteUpdateSUS200 days of MC3 side Looks like something went nuts in late
April.  We have yet to try a hard reboot.
 mc3_side_200days.png 
  1641   Tue Jun 2 02:28:58 2009 peteUpdateLockingDD handoff workalberto, pete
 
We worked on tuning the DD handoff
 mich_dd.pdf 
  1643   Tue Jun 2 23:53:12 2009 peteDAQComputersreset c1susvme1rob, alberto, rana, pete
we reset this computer, which was
out of sync (16384 in the FE_SYNC field instead
  
  1645   Wed Jun 3 03:22:16 2009 peteUpdateLockingDD handoffRana, Alberto, Pete
We have the DD handoff nominally
working.  Sometimes, increasing the
  
  1652   Thu Jun 4 16:54:19 2009 peteUpdateLockingdaytime DD handoffI played with the DD handoff during the
day.  The DRM dark port was flickering
like a candle flame in Dracula's castle. 
  
  1653   Thu Jun 4 23:39:23 2009 peteUpdatePEM5 days, 20 days of accelerometersLooks like yesterday was particularly noisy. 
It's unclear to me why diurnal variation
much more visible in MC1_Y, and why the floor
 acc_5day.pngacc_20days.png 
  1658   Fri Jun 5 17:22:55 2009 peteUpdateLockingdaytime lockingAfter fixing the tp problem, I tried locking
again.  Grabbing and DD handoff, no
problem.  Died earlier than last night,
  
  1679   Tue Jun 16 16:10:01 2009 peteUpdateLockinginput matrix experimentsLast night Rob ran senseDRM and loadDRMImatrixData
and came up with the following for the input
matrix:
  
  1769   Tue Jul 21 17:01:18 2009 peteDAQDAQtemp channel PEM-PETER_FEI added a temporary channel, to input 9
on the PEM ADCU.    Beware
the 30, 31, and 32 inputs.  I tried
  
  1781   Wed Jul 22 20:11:26 2009 peteUpdateComputersRCG front endI compiled and ran a simple (i.e. empty)
front end controller on scipe12 at wilson
house.  I hooked a signal into the ADC
  
  1805   Wed Jul 29 12:14:40 2009 peteUpdateComputersRCG workKoji, Pete 
Yesterday, Jay brought over the IO
box for megatron, and got it working. 
 TF090729_1.pngTF090729_1.png 
  1819   Mon Aug 3 13:47:42 2009 peteUpdateComputersRCG workAlex has firewalled megatron.  We
have started a framebuilder there and added
testpoints.  Now it is possible to take
  
  1826   Tue Aug 4 13:40:17 2009 peteUpdateComputersRCG work - rateKoji, Pete
 
Yesterday we found that the channel
  
  1829   Tue Aug 4 17:51:25 2009 peteUpdateComputersRCG workKoji, Peter
 
We put a simple pendulum into the
  
  1839   Wed Aug 5 17:41:54 2009 peteUpdateComputersRCG work - daq fixedThe daq on megatron was nuts.  Alex
and I discovered that there was no gds installation
for site_letter=C (i.e. Caltech) so the default
  
  1856   Fri Aug 7 16:00:17 2009 peteUpdateComputersRCG work. MDC MDP open loop transfer functionToday I was able to make low frequency
transfer function with DTT on megatron. 
There seems to have been a timing problem,
 tf_au_natural.pdf 
  1879   Mon Aug 10 17:36:32 2009 peteUpdateComputersRCG work. PIT, YAW, POS in MDP/MDC systemI've added the PIT and YAW dofs to the
MDC and MDP systems.  The pendula frequencies
in MDP are 0.8, 0.5, 0.6 Hz for POS, PIT,
 mdcmdpyaw.jpg 
  1881   Mon Aug 10 17:49:10 2009 peteUpdateComputersRCG work - plansPete, Koji
 
We discussed a preliminary game plan
  
  2182   Thu Nov 5 16:30:56 2009 peteUpdateComputersmoving megatron Joe and I moved megatron and its
associated IO chassis from 1Y3 to 1Y9, in
preparations for RCG tests at ETMY.
  
  2198   Fri Nov 6 18:52:09 2009 peteUpdateComputersRCG ETMY plan  Koji, Joe, and I are planning
to try controlling the ETMY, on Monday or
Tuesday.  Our plan is to try to do this
  
  2233   Wed Nov 11 01:33:52 2009 peteUpdateCDSRCG ETMY code update I've added the side coil to the model
controller and plant, and the oplev quad
to the model controller and plant.  After
  
  2243   Wed Nov 11 20:46:07 2009 peteUpdateCDSRCG ETMY phase I updateThe .mdl code for the mdc and
mdp
  
  2293   Wed Nov 18 16:24:25 2009 peteConfigurationSUSETMY suspension conencted to megatron ADC/DAC/cvs/cds/caltech/target/fb/daqd -c daqdrc
This starts the FB.
Now the dataviewer and DTT work!
  
  2296   Thu Nov 19 08:53:12 2009 peteFrogsEnvironmentdiesel fumes Instead of doing RCG stuff, I went
to Millikan to work on data analysis as I
couldn't stand the fumes from the construction.
  
  1655   Fri Jun 5 02:59:03 2009 pete, albertoUpdateLockingtdsavg failure in cm_step scriptthe command
tdsavg 5 C1:LSC-PD4_DC_IN1
was causing grievous woe in the cm_step
  
  1561   Fri May 8 02:39:02 2009 pete, ranaUpdateLockingcrossoverattached plot shows MC_IN1/MC_IN2. 
needs work.
This is supposed to be a measurement
 crossover.pdfphoto.jpg 
  5   Fri Oct 19 16:11:38 2007 pkpOtherOMCOMC PZT responseSam and I locked the laser to the OMC cavity
and looked at the error signal as a function
of the voltage applied to the OMC PZT.
 fullspec.jpg4.5to10.jpg4.5to10.pdffullres.pdf 
  8   Mon Oct 22 19:27:14 2007 pkpOtherOMCPZT calibration/ transfer function.We measured the PZT transfer function by comparing
the PZT response of the circuit with the
cavity in the loop, with that of the circuit
 calib.pdfcalibpzt2.pdfall2.pdfnoPZT2.pdf 
  82   Thu Nov 8 00:55:44 2007 pkpUpdateOMCSuspension tests[Sam , Pinkesh]

We tried to measure the transfer functions
 9x 
  87   Fri Nov 9 00:23:12 2007 pkpUpdateOMCX and Z resonancesI got a couple of resonance plots going for
now. I am still having trouble getting the
Y measurement going for some reason. I will
 Xtransferfunc.pdfZtransferfunc.pdf 
  93   Mon Nov 12 10:53:58 2007 pkpUpdateOMCVertical Transfer functions[Norna Sam Pinkesh]

These plots were created by injected white
 VerticalTrans.pdf 
  102   Wed Nov 14 16:54:54 2007 pkpUpdateOMCMuch better looking vertical transfer functions[Norna Pinkesh]

So after Chub did his wonderful mini-surgery
 VerticalTransPreampwireremovedNov142007.pdfVerticalTranswiresclampedNov142007.pdf 
  105   Thu Nov 15 17:09:37 2007 pkpUpdateOMCVertical Transfer functions with no cables attached.[Norna Pinkesh]

The cables connecting all the electronics
 VerticaltransferfuncnocablesattachedNov152007.pdf 
  215   Thu Dec 27 12:12:02 2007 pkpUpdate Update on GigE CameraSo I finally got the linux software to compile
on mafalda. I got the software to dump all
the information regarding the camera onto
  
  218   Sun Dec 30 02:36:35 2007 pkpUpdateGeneralAnother updateSo I followed suggestions 1 and 3 so far and
have started writing up what all needs to
be done in order to compile and use the camera.
  
  236   Fri Jan 11 17:01:51 2008 pkpUpdateCamerasGigE again So, here I detail all the efforts on the GigE
so far 
  
  13874   Mon May 21 17:36:00 2018 poojaUpdateCamerasGigE camera image of ETMXToday Steve and I tried to to capture the
image of scattering of light by dust particles
on the surface of ETMX using GigE camera.
 Image__2018-05-21__17-34-15_125k100g.tiff 
  13909   Fri Jun 1 19:25:11 2018 poojaUpdateCamerasSynchronizing video data with the applied motion to the mirrorAim: To synchronize data
from the captured video and the signal applied
to ETMX
 camera_mirror_motion_plots.pdf 