40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 273 of 354
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17691 Entries
Goto page
Previous
1
,
2
,
3
...
272
, 273,
274
...
352
,
353
,
354
Next
Fri Feb 6 16:20:52 2009, Yoichi, Update, PSL, MOPA current slider fixed
Fri Feb 6 23:23:48 2009, Kakeru, Yoichi, Update, PSL, ISS is fixed
Mon Feb 9 16:02:42 2009, Yoichi, Update, PSL, PSL relative intensity noise
Mon Feb 9 19:50:48 2009, Yoichi, Configuration, PSL, ISS disconnected
Tue Feb 10 23:36:25 2009, Kakeru, Update, PSL, PA current and laser output
Wed Feb 11 07:28:25 2009, Yoichi, Update, PSL, PA current and laser output
Wed Feb 11 23:51:53 2009, Kakeru, Update, PSL, PA current and laser output
Thu Feb 12 18:35:10 2009, Kakeru, Configuration, PSL, PA current limitter
Wed Mar 4 23:42:45 2009, rana, Configuration, PSL, psl db change
Thu Mar 12 18:44:02 2009, Yoichi, Update, PSL, MZ aligned
Tue Mar 24 13:10:07 2009, Alberto, Configuration, PSL, new mirror installed on the AP table
Thu Mar 26 04:01:24 2009, Yoichi, Update, PSL, FSS Open Loop Gain
Fri Apr 10 18:11:18 2009, Jenne, Update, PSL, ISS has a bad cable?
Fri Apr 10 19:09:48 2009, Jenne, Update, PSL, PMC LO Calibration
Sat Apr 11 00:45:41 2009, Yoichi, Update, PSL, PMC LO Calibration
Sun Apr 12 19:27:20 2009, rana, Update, PSL, PMC LO Calibration
Mon Apr 13 08:59:57 2009, steve, Update, PSL, mixers on order
Mon Apr 13 17:55:37 2009, Jenne, Update, PSL, PMC LO Mon Calibration
Wed Apr 15 17:11:37 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon
Thu Apr 16 11:17:56 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon
Mon Apr 20 19:51:51 2009, Jenne, Configuration, PSL, PMC has new Level 13 Mixer installed
Sat May 9 00:15:21 2009, Yoichi, Update, PSL, Laser head temperature oscillation
Sat May 9 02:20:11 2009, Jenne, Update, PSL, Laser head temperature oscillation
Sat May 9 15:19:10 2009, rana, Update, PSL, Laser head temperature oscillation
Mon May 11 11:49:20 2009, steve, Update, PSL, MOPA cooling water lines are backwards
Thu May 21 18:07:32 2009, rana, Update, PSL, Screw on Needle valve loosened
Fri May 22 17:03:14 2009, rob, steve, Update, PSL, MOPA takes a holiday
Tue May 26 17:05:44 2009, rob, Update, PSL, MOPA re-activated
Tue May 26 17:34:14 2009, rob, Update, PSL, MOPA re-deactivated
Wed May 27 10:54:09 2009, rob, Update, PSL, we don't understand the chiller (broken)
Wed May 27 15:59:44 2009, rob, Update, PSL, we don't understand the chiller (broken)
Thu May 28 14:34:25 2009, rob, Update, PSL, chiller diagnosis
Thu May 28 18:41:26 2009, steve, Update, PSL, the saga of the chiller is ending
Fri May 29 18:57:09 2009, steve, Update, PSL, the laser is back
Sat May 30 11:24:56 2009, rob, Configuration, PSL, NPRO slow scan
Sat May 30 12:03:34 2009, rob, Update, PSL, MC locked
Mon Jun 1 13:56:52 2009, Alberto, Update, PSL, Laser Power after fixing the laser chiller
Mon Jun 1 14:49:07 2009, rob, Summary, PSL, psl thoughts
Mon Jun 1 15:01:31 2009, rana, Update, PSL, Laser Power after fixing the laser chiller: more traces
Mon Jun 1 19:19:26 2009, rana, Update, PSL, 1000 days of hour-trend
Thu Jun 4 15:53:15 2009, steve, Update, PSL, NPRO cooling flowrate adjusted
Wed Jun 10 09:28:14 2009, steve, Update, PSL, PMC
Wed Jul 8 19:13:19 2009, Alberto, Update, PSL, PSL beam aligned to the Mode Cleaner
Wed Jul 22 10:49:40 2009, Alberto, Update, PSL, MC Alignment Trend
Thu Jul 23 10:05:38 2009, Alberto, Update, PSL, Summary of the latest adventures with the alignment of the mode cleaner
Thu Jul 23 20:30:23 2009, Alberto, Update, PSL, Beam aligned to the Farady
Fri Jul 24 21:02:46 2009, Alberto, Update, PSL, Aligning the beam to the Faraday
Sat Jul 25 16:04:32 2009, rob, Update, PSL, Aligning the beam to the Faraday
Sat Jul 25 19:04:01 2009, Koji, Update, PSL, Aligning the beam to the Faraday
Sun Jul 26 13:19:54 2009, rana, Update, PSL, Aligning the mode cleaner
Goto page
Previous
1
,
2
,
3
...
272
, 273,
274
...
352
,
353
,
354
Next
ELOG V3.1.3-