40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 273 of 357
Not logged in
List
|
Find
|
Login
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17819 Entries
Goto page
Previous
1
,
2
,
3
...
272
, 273,
274
...
355
,
356
,
357
Next
ID
Date
Author
Type
Category
Subject
Text
4760
Mon May 23 12:27:26 2011
kiwamu
Update
LSC
DRMI trial : details
(PRMI
locking with slightly misaligned SRM)
First I tried locking PRC and
4761
Mon May 23 14:28:23 2011
kiwamu
Configuration
LSC
POY55 installed
Last
Saturday the POY55 RFPD (see
this entry
4762
Mon May 23 18:10:41 2011
kiwamu
Update
LSC
f2p filters on PRM : not good
During
the DRMI trial I noticed that the f2p filters
on PRM is not quite effective
4797
Wed Jun 8 23:17:25 2011
kiwamu
Update
LSC
DRMI output matrix diagonalization
Approximately
two weeks ago I diagonalized the LSC output
matrix for the DRMI locking.
4799
Thu Jun 9 12:21:07 2011
kiwamu
Update
PSL
Re : PMC needs help
Nulling
the slow actuation offset fixed the issue.
4801
Thu Jun 9 18:25:22 2011
kiwamu
HowTo
CDS
look back a channel which doesn' exist any more
For
some purposes I looked back the data of some
channels which don't exist any more.
4802
Thu Jun 9 20:10:38 2011
kiwamu
Update
SUS
ETMY whitening filter : all off
I checked
the state of the whitening filters for the
4806
Fri Jun 10 18:49:40 2011
kiwamu
Update
IOO
Intensity Noise after the MC
Last
night the relative intensity noise (RIN)
of the beam after MC was measured.
4824
Wed Jun 15 15:18:01 2011
kiwamu
Update
General
Wednesday cleaning
[Jenne / Kiwamu]
We spent approximately an hour for
the weekly Wednesday cleaning.
4832
Fri Jun 17 16:05:07 2011
kiwamu
Update
ABSL
LightWave out of MOPA box
[Suresh / Kiwamu]
We did the following things
:
4835
Mon Jun 20 00:59:02 2011
kiwamu
Summary
General
Weekly report
This
is a summary for the week ending June 19th.
Feel
4840
Mon Jun 20 11:38:49 2011
kiwamu
Update
ABSL
I-P curve of LightWave M126-1064-700
The
I-P curve of the LightWave NPRO (M126-1064-700),
which was taken out from the MOPA box, was
4850
Tue Jun 21 20:35:50 2011
kiwamu
Update
LSC
a script to measure sensing matrix
Last
night I was making a script which will measure
the sensing matrix using the realtime LOCKIN
4851
Tue Jun 21 23:29:41 2011
kiwamu
Update
LSC
sensing matrix measurement
I
am now measuring the sensing matrix in the
DRMI configuration.
4855
Wed Jun 22 15:24:10 2011
kiwamu
Update
ABSL
got a laser controller for LightWave
Peter
King came over to the 40m with a laser controller
and gave it to us.
4857
Wed Jun 22 17:42:03 2011
kiwamu
Update
LSC
sensing matrix measurement
The sensing
matrix was measured in the DRMI configuration
4863
Thu Jun 23 05:22:51 2011
kiwamu
Update
LSC
PRMI locking : not stable enough
I was trying
4867
Thu Jun 23 21:34:21 2011
kiwamu
Update
CDS
no foton on the CentOS machines
For
some reasons foton's deafault sample rate
is NOT correct when it runs on the CentOS
4871
Thu Jun 23 22:53:02 2011
kiwamu
Update
CDS
ran activateDQ.py
I found some DQ channels (e.g. SENSOE_UL
and etc.) for C1SUS haven't been activated,
so I ran activateDQ.py.
4872
Thu Jun 23 22:59:45 2011
kiwamu
Update
ABSL
I-P curve of LWE
The
4874
Fri Jun 24 00:13:24 2011
kiwamu
Update
ABSL
beam profile measurement of LWE
The
beam profile of the LWE (LightWave Electronics)
NPRO was measured.
4884
Sat Jun 25 06:09:38 2011
kiwamu
Update
LSC
Friday locking
I
was able to measure the sensing matrix in
the PRMI configuration.
4885
Sun Jun 26 16:02:12 2011
kiwamu
Update
IOO
Friday MC activity
[Rana / Kiwamu]
Last Friday we did several
things for MC :
4890
Mon Jun 27 10:04:29 2011
kiwamu
Summary
General
Weekly report
Summary
for the week ending June 26th.
(Number
4898
Tue Jun 28 14:21:41 2011
kiwamu
Update
IOO
something wrong ? : Power incident on REFL11 and REFL55
The measured
change in the REFL DC power with and without
4899
Tue Jun 28 15:20:08 2011
kiwamu
Update
LSC
sensing matrix measurement in PRMI configuration
Here is
the result of the measurement of the sensing
4910
Wed Jun 29 12:20:53 2011
kiwamu
Update
LSC
sensing matrix measurement in PRMI configuration
Of course
I made a mistake in my calculation of the
4911
Wed Jun 29 13:56:42 2011
kiwamu
Update
General
minutes of 40m meeting
4917
Thu Jun 30 03:26:40 2011
kiwamu
Update
ABSL
status update
Status
update of the absolute length (ABSL) measurement:
4923
Thu Jun 30 14:11:55 2011
kiwamu
Update
ABSL
a photo of ABSL setup on the AP table
Here
is a picture of the latest ABSL setup at
the east part of the AP table.
4925
Thu Jun 30 21:00:20 2011
kiwamu
Update
ABSL
fine alignment done
(Just a quick report)
The
fine alignment of the ABSL laser injection
4936
Mon Jul 4 14:27:35 2011
kiwamu
Summary
General
Weekly report
Summary
of the week ending July 3rd.
4939
Tue Jul 5 16:09:54 2011
kiwamu
Update
ABSL
some photos for ABSL setup
Here
I show two photos of the latest ABSL (ABSolute
Length measurement) setup.
4940
Tue Jul 5 17:38:46 2011
kiwamu
Update
ABSL
ABSL laser frequency-locked
In this
past weekend the ABSL laser was successfully
4943
Wed Jul 6 02:12:36 2011
kiwamu
Update
SUS
Re : More normalization of all sus controllers
[Jenne / Rana/ Kiwamu]
4948
Wed Jul 6 18:15:26 2011
kiwamu
Update
SUS
Re: BS oplev spectra
[Steve / Kiwamu]
Motivation:
4949
Wed Jul 6 23:03:57 2011
kiwamu
Update
LSC
modified locking scripts
[Jenne / Kiwamu]
Last night we modified the
locking scripts, that were called from C1IFO_CONFIGURE.adl,
4950
Wed Jul 6 23:53:38 2011
kiwamu
Summary
General
minutes of 40m meeting
5026
Mon Jul 25 11:02:19 2011
kiwamu
Summary
General
Weekly report
Summary of the week
5027
Mon Jul 25 11:04:22 2011
kiwamu
Summary
General
Weekly report
Summary
of the week ending July 17th.
5028
Mon Jul 25 11:06:38 2011
kiwamu
Summary
General
Weekly report
Summary
of the week ending July 24th.
5030
Mon Jul 25 13:01:24 2011
kiwamu
Update
CDS
c1ioo Make problem
[Suresh / Kiwamu]
HELP US Jamieeeeeeee !!
5040
Wed Jul 27 01:58:23 2011
kiwamu
Update
LSC
locking status
Through some locking exercise
5046
Wed Jul 27 15:18:50 2011
kiwamu
Summary
General
schedule
The vent
will start from 1 st of August ! !
5048
Wed Jul 27 15:42:41 2011
kiwamu
Summary
General
mitues of 40m meeting : Task list
5053
Thu Jul 28 16:00:28 2011
kiwamu
Update
Computer Scripts / Programs
another offset script : offset2
A new offset-zeroing
script has been developed and it is ready
5054
Thu Jul 28 16:10:34 2011
kiwamu
Update
LSC
Both arm locked
[Nicole / Jamie / Rana / Kiwamu]
The X arm and Y arm have been
locked.
5062
Fri Jul 29 16:25:06 2011
kiwamu
Update
ASC
beam axis and Y arm aligned
Last night
I aligned the incident beam axis and the
5067
Sat Jul 30 06:24:06 2011
kiwamu
Update
ASC
Y arm ASS fixed
The servos
of C1ASS for the Y arm and the beam axis
5068
Sat Jul 30 07:07:28 2011
kiwamu
Update
ASC
MCASS status
Since
we will measure (and hopefully adjust) the
spot positions on the MC suspensions prior
Goto page
Previous
1
,
2
,
3
...
272
, 273,
274
...
355
,
356
,
357
Next
ELOG V3.1.3-