40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 272 of 349
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17443 Entries
Goto page
Previous
1
,
2
,
3
...
271
, 272,
273
...
347
,
348
,
349
Next
Thu Jan 31 12:39:14 2008, John, Configuration, General, Y arm test mass cameras
Wed Jul 10 11:44:02 2013, Annalisa, Update, Green Locking, Y beat note found!
Fri Feb 14 21:03:13 2014, Koji, Update, General, Y end "BS"
Thu Mar 31 09:38:41 2016, Steve, Update, endtable upgrade, Y end 4x3 existing layout
Mon Nov 14 22:56:31 2011, kiwamu, Update, Green Locking, Y end PDH lock : UGF at 17 kHz
Tue Nov 15 09:51:04 2011, Zach, Update, Green Locking, Y end PDH lock : UGF at 17 kHz
Fri Apr 1 18:54:41 2011, Bryan, Configuration, Green Locking, Y end doubling oven
Thu Nov 17 17:21:22 2011, kiwamu, Update, Green Locking, Y end green PDH servo : it's okay
Fri Nov 18 11:28:39 2011, rana, Update, Green Locking, Y end green PDH servo : it's okay
Fri Nov 18 12:11:24 2011, Zach, Update, Green Locking, Y end green PDH servo : it's okay
Tue Dec 8 23:24:08 2015, gautam, Update, Green Locking, Y end laser (Lightwave) PZT calibration
Sun Dec 13 21:55:28 2015, gautam, Update, Green Locking, Y end laser (Lightwave) PZT calibration
Mon Jan 4 16:09:54 2016, gautam, Update, Green Locking, Y end laser (Lightwave) PZT calibration
Wed Nov 9 16:49:17 2011, kiwamu, Update, Green Locking, Y end laser temperature with slow input connected
Mon Apr 12 17:37:52 2010, josephb, Update, Computers, Y end simulated plant progress
Tue Apr 13 12:49:35 2010, josephb, Update, Computers, Y end simulated plant progress
Fri Sep 21 09:59:09 2018, yuki, Configuration, ASC, Y end table upgrade plan
Sun Sep 23 19:32:23 2018, yuki, Configuration, ASC, Y end table upgrade plan
Mon Sep 24 11:09:05 2018, yuki, Configuration, ASC, Y end table upgrade plan
Tue Sep 25 18:08:50 2018, yuki, Configuration, ASC, Y end table upgrade plan
Wed Oct 3 14:24:40 2018, yuki, Configuration, ASC, Y end table upgrade plan
Mon Oct 15 20:11:56 2018, yuki, Configuration, ASC, Y end table upgrade plan
Wed Oct 17 20:46:24 2018, yuki, Configuration, ASC, Y end table upgrade plan
Wed Apr 23 23:48:30 2014, manasa, Update, LSC, Y end whitening board
Thu Apr 24 14:23:09 2014, not manasa, Update, LSC, Y end whitening board
Thu Apr 24 23:55:31 2014, Koji, Update, LSC, Y end whitening board
Wed Sep 3 04:17:21 2014, Jenne, Update, LSC, Y green ALS (not PDH) needs investigation
Thu Jun 7 01:46:05 2012, yuta, Summary, Green Locking, Y green beat - found it!!
Thu Jun 7 02:59:31 2012, yuta, Update, Green Locking, Y green beat - found it!!
Sat Jun 2 03:19:37 2012, yuta, Update, Green Locking, Y green beat note found? - too small
Thu Jul 30 10:38:18 2015, Steve, Update, PEM, Y sesimostation is back on
Thu Jul 30 13:34:52 2015, Koji, Update, PEM, Y sesimostation is back on
Thu Jul 30 15:24:54 2015, Steve, Update, PEM, Y sesimostation is back on
Sat Jul 30 05:11:45 2011, Suresh, Update, Green Locking, Y- end table clean-up
Wed Apr 13 16:56:08 2011, Bryan, Configuration, Green Locking, Y-ARM Green-Locked!
Wed Aug 15 04:03:55 2012, rana, Summary, LSC, Y-Arm Locking
Fri Nov 18 00:36:23 2011, Zach, Update, Green Locking, Y-Arm PDH box modified
Sat Nov 19 00:47:24 2011, Zach, Update, Green Locking, Y-Arm locked with PDH Box #17
Thu Jun 16 11:25:00 2016, Johannes, Update, LSC, Y-Arm round-trip loss measurement with ALS
Wed Mar 23 19:16:17 2011, Aidan, Summary, Green Locking, Y-END green equipment is all available
Thu Mar 24 01:16:19 2011, Suresh, Summary, Green Locking, Y-END green equipment is all available
Fri Oct 11 00:37:21 2013, Masayuki, Update, Green Locking, Y-arm ALS
Tue Oct 15 01:39:07 2013, Masayuki, Update, Green Locking, Y-arm ALS
Tue Jul 9 18:06:05 2019, gautam, Update, LSC, Y-arm ASS in a workable state
Thu Aug 22 20:25:28 2013, Masayuki, Summary, Green Locking, Y-arm PDH OLTF measurement
Mon Mar 13 16:47:41 2017, Steve, Update, PEM, Y-arm air conditon belts replaced
Wed Jun 7 14:11:49 2017, gautam, Update, ASS, Y-arm coil driver electronics investigation
Wed Jun 7 17:45:11 2017, gautam, Update, ASS, Y-arm coil driver electronics investigation
Thu Jun 8 02:11:28 2017, gautam, Update, ASS, Y-arm coil driver electronics investigation
Thu Sep 26 10:55:29 2013, Steve, Update, General, Y-arm floor space for test
Goto page
Previous
1
,
2
,
3
...
271
, 272,
273
...
347
,
348
,
349
Next
ELOG V3.1.3-