40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 272 of 341  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  12940   Wed Apr 12 00:36:53 2017 gautamUpdatePSLPMC demod moved off servo boardHere is a more detailed comparison of the
spectra of the signals at the front panel
DAQ LEMO output, measured with the Agilent
 PMC_digitalSpec.pdfPMC_DAQ_spectra.pdf 
  12944   Tue Apr 18 01:01:03 2017 gautamUpdatePSLPMC OLTF measured, DAQ channels calibratedQuick entry, details to follow in the AM
tomorrow.


I calibrated the PMC DAQ
 PMCspectra_calibrated.pdfPMC_MEDMs.png 
  12945   Tue Apr 18 16:10:00 2017 gautamUpdatePSLPMC OLTF measured, DAQ channels calibratedHere are the details:


PMC OLTF:


the
procedure used was identical to what Koji
 PMC_OLTF_170418.pdf 
  12946   Tue Apr 18 23:37:15 2017 ranaUpdatePSLPMC OLTF measured, DAQ channels calibratedWhat's
the reasoning behind setting the the gain
  
  12947   Wed Apr 19 15:13:30 2017 gautamUpdatePSLPMC/MCL multicoherenceI used a one hour stretch of data from
last night to look at coherence between the
PMC control signal and MCL, to see if the
 PMC_MCL_multicoherence.pdf 
  13137   Mon Jul 24 12:00:21 2017 gautamUpdatePSLPSL NPRO mysteriously shut offSummary:

At around 10:30AM
 IMG_7454.JPG 
  13213   Wed Aug 16 14:57:01 2017 SteveUpdatePSLref Cavity heating blanket power supplyThe last entry I found relating to ref
cavity was
2011 Aug 19
 refCavPSheat.jpgrefCavTempSens.jpgrefTempSen_1X1.jpg 
  13223   Thu Aug 17 08:42:27 2017 SteveUpdatePSLPSL HEPAThe PSL HEPA was running noisy at 100V  
The bearing is wearing out. I turned it down
to 30V It is quiet there.
  
  13264   Mon Aug 28 23:22:56 2017 johannesUpdatePSLPSL table auxiliary NPROI moved the axuiliary NPRO to the PSL table
today and started setting up the optics.

The Faraday Isolator was showing
 aom_switching_zoomin.pngaom_switching_zoomout.pngaom_switching_mini_zoomin.pngaom_switching_mini_zoomout.png 
  13270   Tue Aug 29 20:04:09 2017 ranaUpdatePSLPSL table auxiliary NPROI don't understand why the 1st order
diffracted beam doesn't go to zero when
you shut off the drive. My guess is that
  
  13271   Tue Aug 29 21:36:59 2017 johannesUpdatePSLPSL table auxiliary NPRO


 isomet_mini_1st_zoomout.pngisomet_mini_0th_zoomout.png 
  13278   Thu Aug 31 00:19:35 2017 rana[^r]UpdatePSLIMC/FSS FAST gainnominal changed from 22 to 23 dB to minimize
PC drive RMS

  
  13298   Tue Sep 5 23:13:44 2017 johannesUpdatePSLPSL table auxiliary NPROI used Gautam's mode measurement of
the auxiliary NPRO (w=127.3um,
z=82mm) for the spacing of the optics
 PSL_IR.pdfpsl_aux_laser.pdf 
  13301   Thu Sep 7 23:09:00 2017 johannesUpdatePSLPSL table auxiliary NPROI brought the DEI Pulser
unit and a suitable Pockels cell
over from Bridge today (I also found an identical
 3200-1113_200_switching_PD10A_zoomin.png3200-1113_200_switching_PD10A_zoomout.png 
  13306   Mon Sep 11 12:40:32 2017 johannesUpdatePSLPSL table auxiliary NPROI changed the PSL table auxiliary laser
setup to the 200 MHz AOM and put the light
back in the fiber. Coupling efficiency is
 psl_aux_laser2.svg.pngPSL_IR2.png 
  13457   Wed Nov 29 15:33:16 2017 ranaUpdatePSLPMC lockingPMC wasn't locking. Had to power down
c1psl. Did burt restore. Still not great.

I think many of the readbacks on
  
  13488   Mon Dec 18 20:37:18 2017 gautamUpdatePSLPMC MEDM cleanupThere are fewer lies on this screen now.
For reference, the details of the electronics
modifications made are in this
 PMC_revamped.png 
  13532   Thu Jan 11 14:47:11 2018 SteveUpdatePSLshelf work for tomorrowI have just received the scheduling of
the PSL self work for tomorrow. Gautam and
I agreed that if it is needed I will shut
  
  13538   Fri Jan 12 10:26:24 2018 SteveUpdatePSL PSL shelf work scheduleMeasurements for good fit were made. The
new shelf will be installed on next Tuesday
at 2pm
  
  13549   Tue Jan 16 11:05:51 2018 gautamUpdatePSL PSL shelf - AOM power connection interruptedWhile moving the RefCav to facilitate the
PSL shelf install, I
bumped the power cable to the AOM driver.
  
  13550   Tue Jan 16 16:18:47 2018 SteveUpdatePSLnew PSL shelf in place[ Johannes, Rana, Mark and Steve ]

On the second trial the shelf was
installed. Plastic cover removed. South end
 DSC00020.JPG 
  13551   Tue Jan 16 21:46:02 2018 gautamUpdatePSL PSL shelf - AOM power connection interruptedJohannes informed me that he touched up
the PMC REFL camera alignment. I am holding
off on re-soldering the AOM driver power
  
  13714   Wed Mar 28 17:28:58 2018 SteveUpdatePSLnoise eater on or offTill RIN measurement noise eater is off
on 2W laser. The inno 1W  has no noise
eater.
 inno2W.pnginno1W.png 
  13743   Mon Apr 9 23:49:50 2018 ranaUpdatePSLPSL chansI think we can scrap the 126MOPA channels
since they're associated with the Lightwave
NPRO and MOPA. We should add the channels
  
  13818   Sat May 5 20:30:21 2018 KojiUpdatePSLModulation depth measurement for the 3IFO aLIGO EOM and aftermathCaution:
Because of this work and my negligence, the
RF output of the main Marconi for the IFO
  
  13819   Sat May 5 22:32:07 2018 KojiUpdatePSLModulation depth measurement for the 3IFO aLIGO EOM The 3IFO EOM was formerly tuned as the
H2 EOM, so the resonant frequencies are different
from the nominal aLIGO ones.
  
  13842   Tue May 15 10:42:14 2018 KojiUpdatePSLModulation depth measurement for the 3IFO aLIGO EOM and aftermathThe marconi RF output was turned on and
thus the RF generator condition was restored
to the nominal state on Friday 11th.
  
  13900   Thu May 31 02:04:55 2018 johannesUpdatePSLAUX laser state of mindThe AUX laser is down to 5.4 mW output
power 
 IMG_20180530_220058190.jpg 
  13911   Sun Jun 3 22:48:59 2018 johannesUpdatePSLaux laser replacementI brought the NPRO from the Crackle experiment
over to the 40m Lab and set it up on the
PSL table to replace the slowly dying AUX
  
  13912   Mon Jun 4 02:52:52 2018 johannesUpdatePSLaux laser replacement> While the laser output is going strong,
the controller displays a power output of
only 10 mW, which makes me think that the
  
  13913   Mon Jun 4 11:00:37 2018 gautamUpdatePSLaux laser replacement


Quote:


  
  13916   Tue Jun 5 02:06:59 2018 gautamUpdatePSLaux laser first (NULL) results[johannes,
gautam]
 Close-But-no.jpg 
  13924   Thu Jun 7 10:26:36 2018 keerthanaUpdatePSLobserving the resonance signal corresponding to the injected frequency.

(Johannes, Koji,
Keerthana)

The PLL loop ensures that the frequency
 photodetector_alignment.jpgdesign1.PNG 
  13930   Thu Jun 7 22:36:09 2018 not keerthanaUpdatePSLobserving the resonance signal corresponding to the injected frequency.I worked a bit on the PSL table today   
  13931   Fri Jun 8 00:36:54 2018 gautamUpdatePSLobserving the resonance signal corresponding to the injected frequency.It isn't clear to me in the drawing
where the Agilent is during this measurement.
Over 40m of cabling,
  
  13932   Fri Jun 8 01:08:22 2018 johannesUpdatePSLFirst light of AUX at YENDAmong the things that we hadn't taken
care of yesterday before beginning to look
for transmission signals were the polarization
 AG4395A_07-06-2018_205019.pdfPSL_AUX_SETUP.pdfAS_AUX_SETUP.pdf 
  13981   Mon Jun 18 14:32:42 2018 gautamUpdatePSLOptics on AS tableYesterday, I moved the following optics:


Lens in front of AS110
PD.
BS splitting light between
  
  13982   Mon Jun 18 15:59:17 2018 johannesUpdatePSLOptics on AS table


Quote:


  
  13983   Mon Jun 18 16:57:54 2018 KojiUpdatePSLOptics on AS tableOf course, many (but no all) of the optics
were custom-ordered back in ~2000.
  
  14006   Fri Jun 22 14:18:04 2018 SteveUpdatePSLOptics on AS table 




  
  14033   Fri Jun 29 18:16:32 2018 JonConfigurationPSLChanges to AUX Optical Layout on PSL TableIn order to use the 0th-order deflection
beam from the AOM for cavity mode scans,
I've coaligned this beam to the
 PSL_AUX_SETUP_CHANGE.pdf 
  14144   Tue Aug 7 23:06:30 2018 KojiUpdatePSLEOM measuement preparationI was preparing for the aLIGO EOM measuement
to be carried out tomorrow afternoon.

I did a few modifications to the
  
  14145   Wed Aug 8 20:56:11 2018 KojiUpdatePSLEOM measuement preparationRich and I worked on the EOM measurement.
After the measurement, the setup was reverted
to the nominal state
  
  14259   Wed Oct 17 09:31:24 2018 SteveUpdatePSLmain laser offThe main laser went off when PSL doors
were opened-closed. It was turned back on
and the PSL is locked.
 Inno2wFlipped_off.png 
  14276   Tue Nov 6 15:32:24 2018 SteveUpdatePSLMC_TransmittedI tried to plot a long trend MC Transmitted
today. I could not get farther than
2017
 MC_Trans.png 
  14532   Wed Apr 10 23:37:59 2019 gautamUpdatePSLPSL fan is noisyAttached is my phone recording of what
it sounds like right now in the PSL enclosure
- not good for frequency noise measurement!
 New_Recording.m4a 
  14535   Thu Apr 11 11:42:10 2019 KojiUpdatePSLPSL fan is noisyThis thread: ELOG
10295

My interpretation of these ELOGs
  
  14537   Thu Apr 11 12:21:01 2019 not KojiUpdatePSLPSL fan is noisyI could probably install the new fan if
we have one.  Can you do without the
laser for a while?
  
  14556   Fri Apr 19 14:06:36 2019 gautamUpdatePSLInnolight NPRO shutoffWhen I got back from lunch just now, I
noticed that the PMC TRANS and REFL cameras
were showing no spots. I
 Screenshot_from_2019-04-19_14-06-11.png 
  14560   Fri Apr 19 20:21:52 2019 gautamUpdatePSLInnolight NPRO shutoffHappened again at ~730pm.

The NPRO diag channels don't
really tell me what happened in a causal
 Screenshot_from_2019-04-19_20-27-04.png 
ELOG V3.1.3-